Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Similar documents
Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

SEWER SYSTEM DESIGN GUIDELINES

Fencing, locks on access manholes, and other necessary precautions shall be provided to prevent trespassing, vandalism, and sabotage.

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

Short title. This chapter may be cited as the "Kern County Plumbing Code."

City of Logan Sanitary Sewer Design Standards

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Florida Administrative Codes and

SECTION WATER DISTRIBUTION SYSTEM

City of Columbia Engineering Regulations - 2-i

CITY OF COLUMBIA ENGINEERING REGULATIONS PART 2: WATER DISTRIBUTION DESIGN STANDARDS TABLE OF CONTENTS

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS

(Contaminant) Backsiphonage or Backpressure Backsiphonage or Backpressure

GRAY WATER RECYCLING SYSTEMS

A. TYPE OF AUTHORIZATION REQUESTED (Applies to all applicants) NEW RENEWAL MODIFICATION DISCHARGE IMPOUNDMENT

INSTRUCTIONS FOR APPLICATION FORM (PUMP STATIONS, FORCE MAINS, AND GRAVITY SEWERS)

B. All new water mains and temporary pipelines shall be disinfected prior to connection to the District s existing system.

BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN EXTENSIONS FOR PWSs

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2017 LAPC

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

Cross-Connection Control Program and Plan of Operation

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)


BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS

Section 9 Design Criteria Non-Potable Water Facilities

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

Current as of 11/10/08 1 of 5

The following is required for a complete permit submittal for each unit.

The following information is required when submitting a building permit application:

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/

RULES AND REGULATIONS FOR WATER AND WASTEWATER SERVICE APPENDIX G BACKFLOW PREVENTION AND CROSS CONNECTION CONTROL (BPCCC) PROGRAM

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE

City of Friendswood Community Development 910 South Friendswood Drive Friendswood, Texas 77546

BUILDING CONSTRUCTION

Milk Pre-Cooler Plumbing Considerations. ATCP 65, Wisconsin Administrative Code and the 2015 PMO

CHAPTER 8 WATER SUPPLY SYSTEM

I. Preconstruction Meeting and Site Preparation Date: Inspector: A. MDE Certified Installer Name

Protecting Drinking Water Pipelines with Inflow Prevention

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

MODEL Stormwater Local Design Manual. City of Centerville

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Building Permit Application

Napa County Building Officials Coalition

Revised Total Coliform Rule (RTCR) Level 1 Assessment Form

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

HOLLEY NAVARRE WATER SYSTEM, INC. BACKFLOW PREVENTION & CROSS CONNECTION CONTROL POLICIES & REGULATIONS

CONSTRUCTION PLAN CHECKLIST

Stormwater Local Design Manual For Houston County, Georgia

SOUTHERN NEVADA AMENDMENTS TO THE 2012 UNIFORM MECHANICAL CODE

County of Yolo Development Services Building Inspection Division

Procedures for Connecting to Central Sewer System

TITLE 17. (b) Auxiliary Water Supply is any water supply other than that received from a public water system.

Description of Work: Cost: $

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)

Check if Issues Found. Check if Reviewed. Assessment Elements

Application for Commercial Plan Review and Building Permit. Address:

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.

Sewage Compliance Form Instructions

DIVISION 2: BACKFLOW PREVENTION PROGRAM

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

Last Updated March 15, 2016

SECTION 400 SANITARY SEWER SYSTEM

Section 10 Design Criteria: Components

ICC-SRCC LISTING. DIVISION: PLUMBING Section: Residential Solar Domestic Water Heater System

SECTION WASTEWATER FORCE MAINS

Oklahoma Department of Environmental Quality Water Quality Division, Public Water Supply Group Revised Total Coliform Rule Level 1 Assessment Form

SECTION PROTECTION OF WATER SUPPLIES

The following is required for a complete permit submittal for each unit.

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

Application For Graywater Irrigation System Permit

STORM DRAINAGE CHAPTER 11

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation.

PERMIT APPLICATION REQUIREMENTS NEW RESIDENTIAL (SFD) POOL

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

SECTION 8 SEPARATION OF LINES

CITY OF MERIDIAN LAND DEVELOPMENT SERVICES SUBDIVISION PLAN REVIEW CHECK LIST

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

New Jersey Home Inspection - Standards of Practice

Index. Composition and Order of Plan Set. Utility Plan... 5

Warner Robins Stormwater Local Design Manual

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Ordinances of the Plainview Water District Town of Oyster Bay, Nassau County, New York ARTICLE VII CONTROL OF BACKFLOW AND CROSS-CONNECTIONS

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Transcription:

Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form The proposes the construction of a Reclaimed Water Treatment, Pumping, Storage, and Distribution in the manner indicated by the information contained herein and by the plans, profiles, specifications, and other data attached hereto. The plans and specifications have been approved and signed by the proper city officials or owner and an application for a permit properly executed by the Mayor, Chairman of the Board or owner accompanies this report. I. General Information 1. Name of Facility: 2. Facility Number: S- R 3. Legal Description: /4, /4, /4, of Section, T- -, R - -, I.M./C.M., County 4. Technical specifications for the reclaimed water distribution line(s), pump station(s), and/or storage tank(s) are provided? If, the most current City Ordinances or Standards are referred to? If, the Ordinances/Standards are included or on file with the Construction Permit Section, Water Quality Division, Oklahoma Department of Environmental Quality. 5. The area of the proposed development:. If area of development is 1 acre or more, has the developer/builder obtained a DEQ Storm Water Construction Permit? Developers/builders are required to obtain a DEQ Storm Water Construction Permit for a construction site that will disturb one (1) acre or more in accordance with OPDES, 27A O.S. 2-6-201 et seq. 6. End user contract with supplier attached? 7. How will the reclaimed water be used? (refer OAC 252:656-27-1) II. Distribution Line and System Technical Information 1. A minimum of 30 inches of earth cover is provided? If, explain: DEQ Form. 627 WRER

2. Leakage tests are specified in accordance with OAC 252:656-5-5(b)? 3. Allowable leakage does not exceed 10 gallons per inch diameter per mile per day? 4. Deflection tests are specified for all flexible pipe in accordance with OAC 252:656-5-5(a)? 5. Bedding and backfill in accordance with OAC 252:656-5-3 is specified? 6. Portion(s) of the proposed reclaimed water line system will be at or below normal ground water level? If yes, describe the portion(s): 14. Reclaimed water line materials: 7. Are there any possible cross connections between the reclaimed water line and any public water supply? 8. A minimum of two (2) feet of vertical separation and ten (10) feet of horizontal separation between reclaimed water line and potable water lines is maintained? If, the special provisions of OAC 252:656-5-4(c)(3) are met? 9. Are there any existing or proposed public water wells within 300 feet of the reclaimed water line? 10. Are there any existing or private water wells within 50 feet of the reclaimed water line? 11. Are there any petroleum storage tanks within 50 feet of the reclaimed water line? 12. Are there any stream crossings? If, do the plans and/or specifications contain all the requirements of OAC 252:656-5-4(e)? If no, explain: 13. Are there any aerial crossings? If, do the plans and/or specifications contain all the requirements of OAC 252:656-5-4(d)? If no, explain: Line Segment Diameter (inches) Length (feet) Material DEQ Form. 627-WRER

15. Detailed specifications list ASTM standards for all pipe, material, and construction methods in accordance with OAC 252:656-5-3(a)? 16. Piping: i. All reclaimed water piping, valves, outlets, and appurtenances in distribution systems are colored purple (Pantone 522)? ii. All reclaimed water piping, valves, outlets, and appurtenances in distribution systems are stamped with warning that includes the words CAUTION: CATEGORY#X RECLAIMED WATER- DO NOT DRINK? 17. Force main(s): Diameter (inches) Length (feet) Material Calculated Velocity (feet/second) 18. Air relief valves are positioned at the high points in the force main? 19. Force main reaction blocking is provided? III. Disinfection Facilities 1. Design flow of reclaimed water to be treated: gpd. 2. A flow meter is provided in order to measure water flow to determine chemical application rate? 3. Disinfection chemicals specified: 4. Type of chlorinator specified: 5. Maximum feed range: Minimum feed range: 6. Capacity of chlorinator can meet chlorine demands at maximum flow? 7. Provisions are provided for measuring the quantities of chemicals used? 8. Standby equipment is provided? 9. Residual chlorine of 0.2 mg/l at distant points is provided for? 10. Chlorine residual test equipment is provided? DEQ Form. 627 WRER

11. Use of chlorine gas is proposed?, If : a. A separate room is provided? b. A shatter resistant, clear glass inspection window is installed in an exterior door or interior wall to permit the chlorinator to be viewed without entering the room is provided? c. The chlorine room is constructed in such a manner that all openings between the chlorine room and the remainder of the plant are sealed? d. Scales are provided for weighing cylinders? e. The chlorine room is equipped with a ventilating fan with a capacity which provides one complete air change per minute in the room? f. Exhaust fans take suction near the floor? g. Switches for fans and lights are located outside of the room, at the entrance, with a signal light indicating when the fan is in operation? h. A heater is provided which has the capability of heating the chlorine room to 60 o F? i. Chlorine gas lines that extend beyond the chlorine gas room are fed under vacuum? I.V. Storage and Impoundments 1. One hundred year flood plain elevation: 2. Type of storage tank(s): Does it meet NSF or ASTM standard? 3. A vent is provided? 4. Tank is equipped with an overflow which is brought down to an elevation between 12 and 24 inches above the ground surface? te: Any overflow is a discharge without a permit, per Title 27A. 5. Convenient access to the interior of the tank for cleaning and maintenance is provided? 6. Does lagoons meet 252:656-27-5-(a)(3)? 7. Is there rechlorination for Category 2 reclaimed water after storage? 8. Fencing is provided for protection from trespass? DEQ Form. 627-WRER

V. Pump Stations 1. One hundred year flood elevation: 2. Site is accessible at all times, regardless of floods? 3. Site will be graded so as to lead surface drainage away from the station so water will not enter or pool against the building? 4. Building has outward-opening doors of adequate size? 5. All floors slope 0.3 inch per foot to a suitable drain? 6. All construction shall be in accordance with state and local safety, building, electrical, plumbing, and sanitary codes? 7. Provisions are provided for adequate heating? 8. Pump house is adequately lighted throughout and all electrical work conforms with requirements of National Electrical Code? 9. A means of bypassing the pumping station is provided? 10. Pumping station is equipped with a flow meter? 11. Type of pump(s): 12. A check valve of the non-slam type is located at each pump casing? 13. A positive closing valve is located on the discharge line after the check valve? 14. Piping is protected against freezing? 15. Shut-off valves are provided on the suction line to each pump? 16. Each pump has a standard pressure gauge on its discharge line? Professional Engineer s Certification: I certify that, to the best of my knowledge, all the information provided in this engineering report form is correct and no significant information necessary for a proper evaluation of the project has been omitted: Signature of Professional Engineer: Date:,20 Name of Professional Engineer: State of Oklahoma Professional Engineer : Phone : ( ) Seal DEQ Form. 627 WRER