SHORING SYSTEMS FROM SHORING PROFESSIONALS

Similar documents
ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type FP

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

manufacturer: 6%+7LHIEDXWHFKQLN*PE+ Ferdinand-Porsche-Str. 8 D HEINSBERG

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August


Instruction Manual Span Scaffolds

Edge Support Trench Lining System

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

ABACO LITTLE GIANTLIFTER

KS - Assembly and operating manual Trench box

OPERATION MANUAL BISON LIFTER (ABL150)

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

h Installation Manual

CIRCULAR COLUMN SK 100

July Climbing Scaffold with retractable formwork Instructions for erection and use

Conergy SolarFamulus II

Summary. Mini KKP - Assembly and operating manuel Pile guide box. Montage. Implementation. Accessories. Technical data

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Pallet Jack 4,400 Lbs Capacity Model #31001

ALUMINUM SCAFFOLDING

Mounting systems for solar technology

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

HST -B Interlocking device (Translation of Original Manual)

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Trench Box. Important Notes. Introduction. User Guide

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

Instruction Manual HK285. Note: The Owner/Operator must read carefully and understand all the information presented here before operation.

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

Design Guide. Original version of the design guide

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

Installation and maintenance instructions for GRAF rainwater storage tank, Carat-S series

Mounting systems for solar technology

MevaFlex Assembly and Operating Instructions

Trench lining systems: STEEL

11, 000- L b. E x t r e m e - D u t y P a l l e t Tr u c k OWNER S MANUAL

STRAIL level crossing systems & STRAILastic track damping systems

Instructions for 12 IGT system

MODEL 185R Kontrol-Karrier Operator s Manual for Morse Kontrol-Karrier

Operator s Manual for Morse Mobile-Karrier for 55-Gallon Plastic or Steel Drum

PERI PD 8 The cost-effective shoring for slab tables and high loads

MRT (-AL) USER MANUAL

Operator s Manual for Morse Kontrol-Karrier with Spark Resistant Parts and Air Power Tilt

Layher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

General Guidelines. Tools Required. Safety. Deluxe Steel Folding Scooter & Wheelchair Carrier Instructions for Part # SC500-V3

A Assembly instructions Maxi Cheops pyramid (registered design) Art B to set into concrete

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

Instructions for installation the GRAF EcoBloc Inspect flex

DT 23 DT 24 DT 32 DT 33 DT 34 DT 44

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

Up to 25'w Backdrop = 2 Backdrop LIFTs + 5 sections of 5' Truss

Z5384/Z5551 Mounting instructions 1.4 en

SP Prop Steel prop. // Versatile, strong, safe

Z5377 E6 Swivel bracket Mounting instructions (1.2 EN)

STRAIL - installation instructions. Subject to technical changes / December STRAIL level crossing systems & STRAILastic track damping systems

Z5394 Rigging manual 1.2 en

User Guide. Scaffold Trolley

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions.

MHGR-32: Manhole Guardrail System

FW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Mounting systems for solar technology

Assembly and usage instructions. Z600 brace-free mobile scaffold

Attachment Solutions MONUMENT LIFTER

Z5385 V Flying adapter Rigging manual (1.3 EN)

Bridge Drainage Systems

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

BoSS Climalite Camera and lighting tower

Assembly and Installation Instructions Grease Separator KLsepa.pop

Operator s Manual for Morse Heavy-Duty Kontrol-Karrier with 3-Piece Drum Holder

MODEL GEK E3 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E3 for Can Tumbler Model E3

MODEL GEK E1 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E1 for Can Tumbler Model E1

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN

RHA100 Sandite Applicator

GRIDFLEX The flexible slab formwork with safe accessible grid elements

Safety First Mobile Towers - 3T Method

User Manual For Clamp H- Beam

ECO BLOCK LIFTER NG6K24T30/BLK6K22T26

Standards Summary Sheet

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

Mounting systems for solar technology

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

Loading Arm Installation, Maintenance & Safety Manual

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

Assembly and usage instructions REACHMASTER

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Ring System Scaffolding φ60.2mm Instruction Manual

Assembly instructions Fortuna Play Course Art part

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

CR-3000 Car Rotator Capacity 3,000 lbs Installation Manual 2016 Mar

User Guide. Scaffold Trolley

General Guidelines. Tools Required. Steel Folding Scooter & Wheelchair Carrier Instructions for Part # SC400-V2. Safety

Span 300 Instruction Manual

Span 400 Instruction Manual

Installation Instructions, Pressure Regulator Series Manual Model: 20313, Air motor Operated: F20313, Hydraulic Motor Operated: G20313

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

Transcription:

MANUAL STANDARD-BOX VB 100 Klosterhofweg 62 Tel: +492166-2163850 Site: www.euroverbau.de GmbH D-41199 Mönchengladbach-Güdderath Fax: +492166-1320506 Mail: info@euroverbau.de TRENCH SHORING SYSTEMS FROM SHORING PROFESSIONALS

These instructions for use must be presented to the building site personnel. The diagram relating to the stress on the lower strut must be observed, as well as the load capacity diagram (characteristic stress curve) of the strut type. With the strut stress determined from the stress diagram, it must be checked on the load capacity diagram for the strut whether it is possible to use the required trench width. 1. General purpose of use Edge-supported shoring box with a plate thickness of 105 mm (up to 3,500 mm plate length) or 120 mm plate thickness at a length of 4,000 or 5,000 mm Optimal stability means it is best suited for installation in the lowering procedure. 2. Specifications Box length : 2000/2500/3000/3500/4000/5000 mm Box height of baseplate : 2.600/2.400 mm Max. pipe culvert height : 1.555/1.355 mm Box height, support plate : 1.300 mm Strut type : SP SB 98 x 700/500/392 or 817 3. Safety regulations WARNING We refer to the fact that the above shoring system is only for the intended use and may only be assembled, installed, dismantled and unmounted in the sequence listed under points 4-7, exclusively with the use of all relevant "original construction elements". Please ensure a steady installation of the box; otherwise, it should be changed if necessary! If this is not observed, the manufacturer's liability and warranty are invalid. Observe the load-bearing capacity of the shoring elements. Note: All of the requirements of BG-Bau (the professional association) as well as DIN 4124 Excavations and trenches, embankments, work - room widths, shoring are applicable. In the event of conditions deviating from the standard conditions, construction site statics must be prepared. 4. Assembly: a) Lay the plate (1) with the soldier profiles (2) facing upwards on level ground. b) Insert four pretensioned mushrooms (3) into the guide profiles of the soldier profiles. Insert the corresponding bolts (4) d = 43 mm, L = 212 mm into the mounting holes provided on the soldier profiles and secure them with safety clips. Detension the mushrooms by loosening the nuts (5). Note: Two mushrooms with a strut (6) and possibly a extension pipe (7) form one strut unit. c) Insert the strut (6) into the spring caps. Insert the bolt (8) d = 20 mm, L = 140 mm and secure with cotter pins. d) If necessary, i.e. according to the trench width, only one Extension pipe(7) may be used for each strut unit. The extension pipe must not be longer than 3.00 m. For static reasons, the struts are mounted alternately staggered (Fig. 1), attached with bolts (9) d = 20 mm, L = 140 mm and safety clips. e) Attach the second plate (10) equipped with mushrooms onto the mounted strut/widening tubes and bolt and secure with safety clips pins as described above. f) Using a strut wrench on the struts, increase the lower distance of the plates by 4-5 cm (Fig. 2). Image 1a Image 1b 2

5. Installation 5.1 Installation procedure for solid ground Pick up the first preassembled shoring box using an appropriate hoisting device and place it in the previously raised ditch section. The weights can be taken from the datasheets, as mentioned above. Then, by turning the shafts with the shaft wrench, press the plates against the ditch walls. 5.2 Lowering procedure for unsolid ground a) Protect the plates of the VB 100 against damage before insertion by the excavator by attaching the pressure rails (13) to them. The shoring unit is pressed in the area of the post. The max. distance "B" per insertion procedure is shown in Fig. 2. For example, a ditch width "A" of 300 cm results in a distance "B" of 37 cm. If the distance "B" is greater than that shown in Fig. 2, individual components of the shoring unit may become damaged. Pre-excavate the ditch to a max. depth of 1.25 m. b) Lift the preassembled shoring unit set to the ditch width with an appropriate hoisting device and place it in the pre-excavated ditch. Refer again to the datasheets to find the weights. c) Excavate approx. 0.50 m alternately and press down the plates by the distance "B" (see Fig. 2). d) If the ditch depth exceeds the box height, then the shoring depth can be increased if necessary with the support boxes (Fig. 3). These are connected to the guide posts with connecting rings (14) via locking pins (4) d = 43 mm and secured with cotter pins. Now excavate and press down again, as described in 5.2 c). B: Max. Plattemvorlauf in cm Image 2 Max. Plattenvorlauf bezogen auf die Grabenbreite 40 35 30 25 20 15 10 5 0 0 100 200 300 320 Grabenbreite in cm Image 3 3

6. Dismantling 6.1 Dismantling in setting procedures a) Loosen the plates pressed against the ditch wall (see 5.1) by turning the struts away from the ditch wall. b) Insert the backfilling material in layers (observing the compaction level). c) Pull the entire shoring unit up to the filled height. d) Compact the back filling material. e) Restart at point 6.1.b, until the VB 100 is completely pulled out of the earth. 6.2 Dismantling in the lowering procedure a) Insert the back filling material in layers (observing the compaction level). b) Pull out the VB 100 up to the filled area. The height of the respective individual pass "B" is according to Fig. 2. c) Compact the back filling material. d) Restart at point 6.2.a, until the VB 100 is completely pulled out of the earth. 7. Disassembly Before transporting away the VB 100, it is disassembled analogously to the assembly but in the reverse sequence. 8. Maintenance / Service On each disassembly, the VB 100 should be cleaned. The free strut ends must be cleaned and kept in a well-lubricated state. The entire shoring unit must be protected against corrosion caused by handling damage by the use of appropriate protective measures. 9. Transport When unloading, you should store the supplied wooden blocks and the rubber plates appropriately. These parts must always be re-used for the return transport. As the shipper, you are co-responsible for the appropriate shipping of the return transport. 10. Lifting and pulling Lifting, transporting, pulling or towing are only permitted with an appropriate and approved lifting accessory. Use a loading hook with a safety latch. Transport as close to the ground as possible. Only place on level, solid ground. Standing underneath hanging loads is prohibited. Standing in the machine area is prohibited. 11. Criteria for removing parts from service and repair instructions a) As a matter of principle, all shoring parts must be checked for functionality before use. b) The criteria for the removal from service of worn or damaged parts include: 1 missing parts, such as nuts, screws, rungs and bolts 2 broken parts, such as shafts, bolts, spreading systems 3 With regard to strongly deformed or twisted parts, or holes in the plate body, for example, the manufacturer should be consulted in case of doubt. c) Defective parts must be replaced or repaired. d) Smaller repairs may be performed by the user, after consultation with the manufacturer. e) Only original manufacturer spare parts may be used. f) There is no warranty for improperly performed repairs or the use of non-original parts. g) The requirements of the Operating Safety Ordinance are applicable. 4

12. Deflection according to DIN EN 13331-1 The calculated deflection applies to maximum load at the identified point. 13. Dimensioning of the pendant Diagram for selecting the lifting accessory (pendant). The vertical axis indicates the tractive force in to and the horizontal axis indicates the earth pressure in kn/m 2. (Depth of use according to standard BG example: Ditch depth < 3.0 4.0 5.0 6.0 7.0 m 17.5 23.0 28.6 34.1 39.7 kn/m²) Dimensioning of the pendant: Required payload of the pendant = Eah x l x h x μ x 0.05/ sin [to] Eah = Earth pressure l = plate length h = plate height μ = friction coefficient (0.2-0.5) = try-square of the pendant The values in the diagram are dimensioned with æ=0.5. In the case of loose (or dry) soil, the indicated values can be more than halved accordingly. D C Shoring plate Deflection f [mm] VB100 2000x2600 16.25 VB100 2500x2600 19.32 VB100 3000x2600 24.22 VB100 3500x2600 31.46 VB100 3750x2600 33.23 VB100 4000x2600 35.32 VB100 5000x2600 32.84 1/2 1 5

VB 100 2000x2600/1300 VB 100 2500x2600/1300 6

VB 100 3000x2600/1300 VB 100 3500x2600/1300 7

2012 EUROVERBAU Die hier veröffentlichten Inhalte sind urheberrechtlich geschützt. Der Inhalt darf ohne schriftliche Genehmigung der Herausgeber weder bearbeitet, übersetzt, vervielfältigt oder verbreitet werden. 2012A MANUALSTANDARD-BOX VB 100 VB 100 4000x2600/1300 VB 100 5000x2600/1300 pendant length l > 3,20m Manufacturer Certification in Compliance with DIN 18800-7:2008-11 B 8