SECTION VI POTABLE WATER, RECYCLED WATER, AND SANITARY SEWER SYSTEM FACILITY CONSTRUCTION

A.1 WATER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Chapter 3: Permit Procedures and Requirements

PROCEDURE FOR ACCEPTANCE OF SUBDIVISION IMPROVEMENTS INTO THE CITY OF HUNTSVILLE MAINTENANCE PROGRAM

APPROVAL PROCESS FOR NEW SEWER SYSTEMS & LINE EXTENSIONS

Town of Huntertown Lima Road * PO Box 95 * Huntertown, IN Phone (260) * * Fax (260)

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

SECTION MEASUREMENT AND PAYMENT

(ITEMS APPLICABLE TO THIS PROJECT MARKED WITH "X")

BONDING REQUIREMENTS AND PROCEDURES

Appendix 3. POLICY & PROCEDURE No

Agreement For Proposed Development

Municipal Engineering Standards Development Agreement Request Form

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

ARTICLE 700 LARGE SCALE DEVELOPMENTS

Agreement For Proposed Development

PUBLIC WORKS DEPARTMENT GENERAL NOTES

Index. Composition and Order of Plan Set. Utility Plan... 5

OPERATING POLICY MANUAL

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

MAIN EXTENSIONS: WATER & SEWER. 7.1 General Provisions

COUNTY OF ALBEMARLE. Community Development Department 401 McIntire Road, Room 227 Charlottesville, Virginia (434)

CITY OF LA MARQUE CHAPTER 7. Construction, Inspection, Approval and Acceptance Procedures for Public Infrastructure

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

8. APPROVAL AND DEDICATION OF PROJECTS WITH PUBLIC SEWERS [Amended. See Section 16]

Beaumont Lot Grading Guidelines

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017

IFB B Attachment 3 Page 112-1

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

Construction Specification for General Excavation

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

SITE-UTILITY SYSTEMS

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

INTRODUCTION 1. PURPOSE OF THE STANDARDS MANUAL

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

Construction Documents Checklist

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

ARRANGE FOR INSPECTION FORTY-EIGHT HOURS IN ADVANCE

Developer s Packet. For Developments Requiring Large Meters

DESIGN CRITERIA AND STANDARD DRAWINGS FOR WATER AND SEWER FACILITIES

ARTICLE 700 LARGE SCALE DEVELOPMENT

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

SECTION MEASUREMENT AND PAYMENT

SECTION 2 Design Manual

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

Developer s Packet. Water and Sewer Construction

DONALA WATER AND SANITATION DISTRICT

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

REGIONAL CONSTRUCTION STANDARDS

7.00 INTRODUCTION... 1

Developer s Packet. Water Construction

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

CITY OF BELGRADE DESIGN STANDARDS AND SPECIFICATIONS

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable

April 18, 2018 CONTRACT NO.: TENDER CLOSING DATE: Friday April 27, :00 pm EST

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

STANDARD IRRIGATION & LANDSCAPE PLAN NOTES FOR PRIVATELY CONSTRUCTED COMMUNITY FACILITIES DISTRICTS

RESIDENTIAL PROJECT GUIDELINES 1500 SOLANA BOULEVARD, BUILDING 7, SUITE 7200 WESTLAKE, TEXAS 76262

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

N.J.A.C. 19: This file includes all Regulations adopted and published through the New Jersey Register, Vol. 50 No. 1, January 2, 2018

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

B-PERMIT PLAN CHECK MANUAL

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUPPLEMENTAL SPECIFICATIONS AND DRAWINGS TO THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION TABLE OF CONTENTS

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

WASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone:

APPLICATION FOR RIGHT OF WAY PERMIT

General Rules and Regulations

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SECTION ASPHALT PAVING AND SURFACING

TOWN OF HOLLIS, NEW HAMPSHIRE

Storm. Section. B. General Design and Drawing Standards Design

T a b l e o f C o n t e n t s

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

CURRENT NORTH LAS VEGAS ADDENDA

Index to Technical Specifications

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CONSTRUCTION PROCEDURE

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

DESIGN CRITERIA & CONSTRUCTION REGULATIONS

Transcription:

Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example Water Inspections Require ts Items applicable to both W&S Street Inspection Require ts Warranty Sewer Inspections Water As Built Dwg Example 2.1 EASEMENTS REQUIRED A. Where possible, all water and sewer mains shall be placed within the right-of-way. When this is impractical, or where, due to depth or slope, additional easements are required, then easements shall be dedicated and recorded on plats prior to acceptance for maintenance. When utilities are located outside the public street rights of way, the developer and his/her Engineer shall verify that the final location of the public utilities is located within a platted easement. The Town will verify that the easements shown on the preliminary plat are also duplicated on the final plat. B. All public easements including (sewer, water, storm sewer, and electric) are to remain clear of obstructions. No building, fences, trees, shrubs or other obstructions shall be placed in any utility easement. Driveways, walkways, asphalt and parking lots may be permitted in easements; however, the Town reserves the right to remove such asphalt, concrete, base course and sod as necessary to access its facility in the case of emergency. Pavement or concrete will be replaced with a patch. Sod will be replaced with Fescue or Rye seeding. The Town of Clayton will not be responsible for replacing a property owners sod after repairing a utility line. 2.2 INSPECTIONS: 2.2.1. WATER A. The following items must be inspected during and after installation of water mains and appurtenances: 1) All bend fittings, tees, valves, tapping sleeves and valves, for proper installation, blocking, and rodding. 2) Fire hydrant installation for proper blocking and rodding, clearance and location, painting and flow. 3) Vertical bends (fittings, rodding if applicable, piles, etc.) 4) All services from corporation to meter box. 5) Vaults, air release valves, vacuum valves. 6) New main pressure test: 150 psi minimum or 1.5 times the system static pressure.

Inspection and Acceptance For Maintenance Page 2 2.2.2. SEWER 7) Valve and hydrant operation to ensure the lines are open and the hydrants flowing. 8) Hydrant painting. 9) Bacteriological test. 10) Flushing logs shall be provided to the inspector for all water flushed. Inspections will be discontinued if logs are not provided. 11) For the purpose of eliminating excessive chlorine used during the disinfection process, the contractor must document and provide the inspector with information on which hydrant was opened and how long the system was flushed. The Town s construction inspector must be informed in advance of flushing. It should be noted that unauthorized use of Town s water is subject to penalty. A. The following items must be inspected during and after the installation of sewer lines: 1) Sewer service from the main to the right-of-way cleanout. 2) Sewer line integrity test (mirror test). 3) At the contractor s expense, a TV inspection shall be performed on all gravity sanitary sewer lines. 4) Sewer line pressure test (completed after installation of all cleanouts). 5) Mandrel pull-through test (95% certified mandrel). 6) Manhole integrity, invert (construction, etc.). 7) Manhole vacuum test. 8) Check for removal of debris from manholes and sewer mains. 9) Pump Stations: Witnessed Testing, Drawdown test, and Manufacturers Startup Services. See 02530, Sanitary Sewer; paragraph 3.10 I, Pump Station Operation/Testing/Startup. 2.3 ITEMS APPLICABLE TO BOTH WATER AND SEWER: A. Check for buried items: It is the responsibility of the developer and/or Contractor to ensure that all water meter boxes, valves, manholes, and sewer cleanouts are not buried. B. Record Drawings: Record drawings are required to be submitted upon completion of the project prior to final acceptance.

Inspection and Acceptance For Maintenance Page 3 1) Verify Sewer Grades: The Design Engineer shall verify that the sewer main grades fall within the permitted tolerances by having the manholes surveyed upon completion of construction. Provide plans, prepared by a NC Professional Surveyor, showing as-built inverts, stations of manholes, and the actual main grade. Minimum grades flatter than permitted are not permitted. See paragraph 2.4, A, As-Built Drawings Required, below. 2) GPS Post-Construction Survey Requirements: a. To acquire accurate information for updating the Town s GIS base, using GPS equipment, the Engineer shall employ a Professional Land Surveyor to field locate and tie-in to the NC State Plane Coordinate system (NAVD 83; x,y,z coordinates) the following water and sewer appurtenances so constructed: i. Manholes ii. Valve boxes iii. Cleanouts iv. Meters v. Fire hydrants vi. Storm catch basins and junction boxes vii. Invert of flared end sections The Engineer shall then furnish to the Town one paper copy and one electronic.dxf file of the surveyed elements on a CD rom. The As-built drawings showing the appurtenances (required in paragraph 2.4A, below); however, does not need to be modified to accurately reflect the surveyed field location. b. Electronic Format: Electronic format of as-built survey to be compatible with ESRI s ArcGIS or ArcView. C. Engineer s Water & Sewer Certification: Prior to the issuance of a certificate of occupancy for any dwelling, an Engineer s certification must be received by the State and the Town for the water and/or sewer extensions stating that the construction conforms substantially to the approved plans. D. Inspection scheduling: All inspections must be scheduled the day prior to when needed. Inspections will be performed in the order received. Every effort will be made to accommodate the time of request, however, this cannot be guaranteed. E. Re-inspection fees: All inspections that fail or are not ready for inspection are subject to a re-inspection fee in accordance with the current Town of Clayton fee schedule. 2.4 ITEMS APPLICABLE TO ALL UTILITY PROJECTS A. As-Built Drawings Required: The following is a list of standards for the composition of as-built drawings. These standards are set forth as the minimal requirements to achieve a suitable level of recordation for utilities or utility systems that will become property of the Town of Clayton.

Inspection and Acceptance For Maintenance Page 4 1) Field data is to be delivered to the Engineer by the owner s sub-contractor(s) for as-built preparation. 2) Construction information such as grades, distances, and elevations shall be marked through and as-built information added. 3) All miscellaneous notes, not relative to as-built conditions, shall be omitted from drawings. 4) Drawings shall be dated and sealed by the engineer of record. 5) Two paper copies shall be submitted, for review, prior to the preparation of Mylars. 6) All easements shall be labeled as utility easements. 7) Distances to sewer services shall be stationed from the immediate downstream manhole. 8) Any utility that is to be privately maintained shall be specified and/or labeled as such. 9) A copy of the Engineer s certification letter, which is submitted to DENR, shall be sent with as-built. 10) All fittings contained in utility mainlines shall show on drawings. 11) All phase lines shall be clearly labeled on plan and profile. 12) All mainlines shall be labeled with size and material. 13) Detail sheets shall be omitted from as-built drawings. 14) As-built sheets shall be numbered sequentially. 15) All vertical and horizontal curve information shall be omitted from drawings. 16) Provide a digital formatted copy of the approved as-built drawing.

Inspection and Acceptance For Maintenance Page 5 ILLUSTRATIVE AS-BUILT DRAWING REQUIREMENTS WATER DISTRIBUTION

Inspection and Acceptance For Maintenance Page 6 GRAVITY SEWER Be advised that these standards are subject to amendment and/or expansion at the discretion of the Town of Clayton s Public Works Department. It will be the responsibility of the Owner s or developer s Engineer to accommodate changes made on any as-built submitted to the Town for review. B. Other items that must be submitted prior to Final Acceptance. 1) Bound Operation and Maintenance manuals.

Inspection and Acceptance For Maintenance Page 7 2) Equipment Warranties, spare parts requested as part of project, if applicable. 3) List of subcontractors, manufacturers and suppliers who participated in this project, 4) Pump station witness testing certification from pump manufacturer s representative. 5) Statement of payment of taxes (Town Projects) 6) Affidavit of Payment of Debts and Claims (Town Projects) 7) Affidavit of Release of Liens (Town Projects), and 8) The submission of the Design Engineer s water and/or sewer certifications, 2.5 STREET INSPECTION REQUIREMENTS See Section,5 Street Design for the applicable inspection requirements. 2.6 ACCEPTANCE A. Pre-Warranty Inspection: All inspections are to be coordinated with Town s Engineer. A pre-warranty inspection will be made at the request of the contractor upon satisfactory completion of construction and required tests for the entire project or approved phase. Landscaping shall be to rough grade. A representative of the contractor (foreman or supervisor) shall be present or no inspection will be given. A punch list will be prepared stating any deficiencies found. A copy of the punch list will be available from the Town s Engineer within 2 working days. When all deficiencies have been corrected, the contractor may request a warranty inspection. B. Warranty Inspection: At the request of the contractor, a warranty inspection shall be made. If in the course of the inspection any deficiency is found that was on the punch list given at the pre-warranty inspection, the inspection shall stop at that point. When the contractor has satisfactorily corrected all deficiencies on the punch list, he may request another warranty inspection. One weeks notice is to be given in scheduling all repeat warranty inspections. C. Warranty Acceptance: Warranty Acceptance will be given upon receipt of Recorded Easements, Performance Bonds, Certificates of Completion and approved Record Drawings. Warranty Acceptance will be made in writing upon completion of the above items and upon approval by the Town Council. The Town s Engineer will make the appropriate recommendation for Warranty Acceptance to the Town Council. D. Final Acceptance: One month before the one-year warranty period is over, the project will be inspected for any failures or defects (including TV inspections of sewer lines). Any problems found will have to be corrected within 30 days. Final Acceptance will be made in writing following approval by the Town Council. 2.7 WARRANTY: A. Warranty and Defects Guarantee: Upon the acceptance of facilities, utilities, or streets, a one-year warranty for all improvements shall become effective. This warranty must be satisfactory to the Town of Clayton. A performance bond (to guarantee the

Inspection and Acceptance For Maintenance Page 8 correction of all defects in such facilities, utilities or streets) shall be required on all public and subdividers/developers projects. B. Reference Point for commencement of warranty period: See paragraph 2.6C, Warranty Acceptance. C. For the purposes of this section, the term defects refers to any condition in publicly dedicated facilities, utilities or streets that requires the Town to make repairs to such improvements over and above the normal amount of maintenance that they would require. D. Latent Defects: During the one-year warranty period the developer or contractor shall repair any latent defects that occur. E. End of Warranty Period: At the end of the one-year warranty period the developer shall request a final inspection. Upon successful completion of all warranty items the developer shall be released from maintenance responsibilities for the warranted construction. F. Warranty repairs to the following common problems shall be as follows: 1) Trench failures in pavement shall be repaired in accordance with the requirements of 02275, Trenching, Backfilling & Compaction of Utilities. 2) If more than 3 trench failures occur within a longitudinal distance of 800 feet on any segment of a street, the Town may require a 1-inch overlay once repairs have been completed. 3) Cracks in sidewalk and/or curb and gutter shall be repaired by removing and repouring such sections as necessary; 4) Pavement, sidewalk or curb and gutter failures caused by latent subsurface problems shall be repaired in accordance with the recommendations of an approved Geotechnical engineer. 5) All sanitary sewers and manholes, streets and ditches impacted by the construction shall be free of debris, dirt or silt; 6) All water, sewer, storm sewer, drainage and street appurtenances impacted by the water and/or sewer construction shall be in acceptable condition and properly exposed (particularly water meters and sewer cleanouts); 7) All other defects shall be corrected in accordance with the recommendations of the Town Engineer or his/her representative; G. The Town will consider taking water and sewer lines under warranty separate from the completion of the rest of the development improvements (in a subdivision/development) provided there is at least the first lift of asphalt over the areas to be paved.

Inspection and Acceptance For Maintenance Page 9 H. If a developer fails to complete warranty items, future projects of the developer shall not be reviewed by the Town Engineer. In addition, the Town may take additional legal action against the developer. Back to Top bj.toc_inspectionacceptance_final.doc