Enterprise IT application evaluation based on BP neural network in Tianjin city

Similar documents
Forecast of Total Energy Consumption in Shandong Province Based on Grey BP Model

Application of an Improved Neural Network Algorithm in E- commerce Customer Satisfaction Evaluation

Research on Regional Logistics Industry Development Strategy Based on System Dynamics: Take Changzhou as a Case

Research on Comprehensive Evaluation Index System of Software Outsourcing Personnel Training Jingxian Wang

Power Grid Project Cost Intelligent Evaluation Technology Based on Probability Statistics

Empirical Analysis of Gray Relational Analysis of Employment Structure and Industrial Structure in Guangdong Province

Axiomatic Design of Hospital Operations Management Based on ERP System Shu-hai FAN, Ce ZHOU, Lei ZHANG * and Chao-qun LIN

Humanities and Social Sciences

The Grey Clustering Analysis for Photovoltaic Equipment Importance Classification

EDI in e-commerce application and safety measures. Liu Dan

The Combined Model of Gray Theory and Neural Network which is based Matlab Software for Forecasting of Oil Product Demand

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE *

International Conference on Management Science and Management Innovation (MSMI 2014)

Research Article. Wind power interval prediction utilizing SOM-BP artificial neural network

Evaluating User Satisfaction Based on BP Neural Network in Mobile Government

Journal of Chemical and Pharmaceutical Research, 2014, 6(7): Research Article

The game study of negotiation after bidding between purchasing agent and supplier for pharmaceutical equipments in China

Research on Operation Mode of Intelligent Logistics Base on Fourth Party Logistics Platform

Research on Logistics Capability of the Supply Chain in Food Production Enterprise Based on AHP and Fuzzy Entropy

Genetic Algorithms-Based Model for Multi-Project Human Resource Allocation

Research Article Fuzzy Comprehensive Evaluation on the Effect of Measures Operation for Oil-Water Well

The study of the cooperation evolution between school-enterprises on dynamic force model

2013, IJARCSSE All Rights Reserved Page 392

Applied Hybrid Grey Model to Forecast Seasonal Time Series

Research and Application of Coal Mine Enterprise Risk Information. Database. Prof. CHEN Quan, JIA Li-meng

Short-Term Electricity Price Forecasting Based on Grey Prediction GM(1,3) and Wavelet Neural Network

Research on Personal Credit Assessment Based. Neural Network-Logistic Regression Combination

A Trust Evaluation Model for Social Commerce Based on BP Neural Network

Chapter 2 Research on Logistics Center Layout Based on SLP

Research on the optimization of industrial structure in Shaanxi Province Based on DEA model

The Development of British Civil Servants Classification System for China's Enlightenment

International Journal of Science and Research (IJSR)

2 System dynamics model of coal mining area energy saving and emission reduction

Prediction of air pollution in Changchun based on OSR method

Analysis on Spatial Distribution of Commodity Delivery Warehouses in Yangtze River Delta Hong-le ZHANG 1,a*, Ping SUN 2,b and Li-li MA 3,c

Research on the Risk Assessment of Food Cold Chain Logistics Based on Entropy Weight and Fuzzy Comprehensive Evaluation Model

Journal of Chemical and Pharmaceutical Research, 2014, 6(5): Research Article

Research on the Compensation Design of Civil Servants under Fairness Perspective Empirical Analysis Based on a County in Liaoning Province

Research of development goals on highway transportation safety in inner mongolia for building a moderately prosperous society

A New Approach Towards Intelligent Analysis for Competitive Intelligence *

Great Wall Automobile H6 Sales Forecast based on Exponential Smoothing Method

The Construction of Indicator System for Performance Measurement of Chinese Enterprises Based on Balanced Scorecard

Analysis and design on airport safety information management system

Dynamic management and cost optimization control of construction project cost

An Artificial Neural Network Based Short-term Dynamic Prediction of Algae Bloom

Research on the Optimization of Green Suppliers Based on AHP and GRA

Research of Load Leveling Strategy for Electric Arc Furnace in Iron and Steel Enterprises Yuanchao Wang1, a*, Zongxi Xie2, b and Zhihan Yang1, c

Product quality evaluation system based on AHP fuzzy comprehensive evaluation

Exploration of Maintenance and Support Organization Flexibility Analysis Method

LEGAL SYSTEM FOR PUBLIC-PRIVATE PARTNERSHIPS PROJECTS IN CHINA: INTERPRETATION, ANALYSIS AND RECOMMENDATIONS

Use of Back Propagation Artificial Neural Network to Predict Passenger Volume of Beijing Subway

E-Commerce Logistics Mode Selection Based on Network Construction

China. Keywords: Automotive manufacturing, Servitization, Total factor productivity (TFP), Research and development (R&D).

Establishment of Wheat Yield Prediction Model in Dry Farming Area Based on Neural Network

A Multi-theory Based Definition of Key Stuff in Enterprise

Cold Chain Logistics Development and Analysis of Necessity

Financial Performance Evaluation of Grid Enterprises Based on IPA Model -- Taking XX Power Supply Bureau as an Example

Multi-factor Stock Selection Model Based on Adaboost

Journal of Chemical and Pharmaceutical Research, 2014, 6(6): Research Article

Artificial Neural Network Model Prediction of Glucose by Enzymatic Hydrolysis of Rice Straw

A Study on the Relationship Between Job Satisfaction and Contextual Performance of Knowledge Workers

Research on Evaluation of Enterprise Performance Based on BP Neural Network Improved by Levenberg-Marquardt Algorithm Wanyin Du

Computer Aided Drafting, Design and Manufacturing Volume 27, Number 1, March 2017, Page 63

The Information System Development Research Based on the Middle Managers Competency Evaluation

The Problems and Countermeasures of the E-commerce Enterprise Internal Audit Informationization Hu Xiaoqing, Zhang Chengqian

The Research of the Project Proprietor s Management Control of Engineering Change

A New Risk Forecasting Model of Financial Information System Based on Fitness Genetic Optimization Algorithm and Grey Model

Study on evaluation index system of graduates' employment quality based on labor rights

APPLICATION OF MATHEMATICAL MODELING IN MANAGEMENT ACCOUNTING

Empirical study of software project risk factors

Liuzhou, Guangxi, China. *Corresponding author. Keywords: Manufacturing process, Quality management, Information technology.

ISSN: ISO 9001:2008 Certified International Journal of Engineering and Innovative Technology (IJEIT) Volume 3, Issue 9, March 2014

Research on a Novel Heat Recovery Method for Flue Gas Qing HAO 1, a, Yue YANG 2, b

Shanghai Industrial Enterprise R&D Development Level and Allocation Efficiency Research

Application Research on the Project Management Method in the Development of Tianjin Vocational Training Package

Analysis of DG Influences on System Losses in Distribution Network

A System Dynamics Model for SMS Governance

Research of Comprehensive Evaluation on E-Commerce Model B2B

Application of green bio-mining technology for coal under villages in environmental protection

Study on the Relationship between Entrepreneurship Intellectual Capital and the Enterprise Performance

Journal of Chemical and Pharmaceutical Research, 2015, 7(6): Research Article

Personalized Recommendation-based Partner Selection for SDN

100192, China 2 School of Mechanical and Electrical Engineering, BISTU, Beijing, , China

Research on Enterprises Vertical Merger Based on Transaction Cost Theory

A Railway Warehouse Information Acquisition System Based on Passive RFID Tag

The Application of Agile Management in Software Project

Discussion on the Integrated Financing Mode of EMC and Carbon Trading

Synergistic Model Construction of Enterprise Financial Management Informatization Ji Yu 1

Evaluation research of small and medium-sized enterprise informatization on big data

Design and implementation of Statistical Process Control based on MES Liu Sha1, a, Li Peng1, Hu Guolinag1, Duan Bin1

A Framework of Dynamic Environmental Risk Assessment and its Evolution Forecast of Hazardous Chemicals Accidents

Analysis on the Influence Factors of Wind Power Accommodation

AGENT-BASED WHEAT SIMULATION MODEL COOPERATION RESEARCH

Research on Influencing Factors of Internet Business Models Based on Web2.0

Research on Security Assessment Model of Water Supply System Based on Leakage Control

A Study of Financial Distress Prediction based on Discernibility Matrix and ANN Xin-Zhong BAO 1,a,*, Xiu-Zhuan MENG 1, Hong-Yu FU 1

TEMPERATURE FIELD SIMULATION RESEARCH ON THE LEAKAGE INDUCTANCE TRANSFORMER

Journal of Chemical and Pharmaceutical Research, 2013, 5(12): Research Article

Research on First-Class Financial Management of Power Grid Enterprises Based on IPA: Taking XX Power Supply Bureau as an Example

Forecasting the Quantity Trend of Human Resources with Higher Education in China Based on Correlation Regression Analysis

Transcription:

Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2013, 5(12):108-112 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Enterprise IT application evaluation based on BP neural network in Tianjin city 1 Yijie Liu and 1,2 Rongsheng Lv 1 College of Management and Economics, Tianjin University, Tianjin, China 2 Management College, Tianjin University of Technology, Tianjin, China ABSTRACT IT plays an important role in enterprises development. This study, evaluating enterprisesit application, solve the problems as follows: understand enterprises IT applying degree, identify main influence factors of IT application, and hope to improve the ability of enterprises applyingit.the significance of solving above problems can promote enterprises to apply IT better, advance enterprises developing and improve enterprises marketing competitiveness. In this paper, based on enterprises IT application data of Tianjin in 2011-2012,BP neural network analyzes the constructed index system of enterprisesit application,evaluate and rank random 15 companies. The empirical results show that the IT application of enterprises in Tianjin has reached a certain level. The core innovation of this paper is to make sure the degree of applyingitis closely linked with applying software developing, system process integration and economic benefit. Compared with previous work, this paper selects main influence factors to improve IT application from management perspective, according to index weight and proposes a scientific and operable method, which has verified the consistent between evaluation result and practical result. Keywords: Information Technology (IT); BP Neural Network; Evaluation Index; Application Evaluation INTRODUCTION In today's information society, with the extensive application of the fierce competition and enterprise information technology, enterprise IT has become academic and business issues of common concern. Within the enterprise, make full use of information technology is to enhance the competitiveness of enterprises effective factor [1,2]. Therefore, if we can acknowledge the application degree of IT effectively, reform the current condition of IT application in enterprises with the major factors, and then we can improve the enterprises comprehensive strength. Meanwhile, the evaluation of enterprises IT application status, strong and helps to straighten their corporate position, but also a major factor promoting the application of information technology companies to take advantage of timely adjustment of internal IT applications. This paper uses BP neural network method to rank enterprises according to IT application condition. The significance of this paper is to promote enterprises to apply IT better according to the main influence factors, as IT is an indispensable factor for enterprises development. Category affecting factors of enterprise it application Paper selected as the application of information technology companies in Tianjin evaluated, focusing on a random sample of 15 enterprises IT application status. On the basis of previous practice and theory [3,4], to determine the first level evaluation index, and Select 14 second evaluation indexes are showed in Table 1.The index can reflect both companies in technology, production and management of internal IT applications, but also to reflect the impact of the external business environment. By refining indicators, the city can be more fully reflect the enterprise IT application status. 108

Table 1: Tianjin 15 evaluation index system of enterprise information technology applications Goal The first index The second index Enterprises IT applications degree evaluation system I IT indicators I 1 information management I 2 operational process metrics I 3 market environment indicators I 4 network and communications technology I 11 applications software development I 12 IT standards I 13 information demand I 14 information configuration management I 21 IT progress control I 22 IT personnel quality I 23 production performance I 31 system runs integration I 32 business process reengineeringforce I 33 scheme design level I 34 sales performance I 41 customer satisfaction I 42 product demand I 43 Qualitative indicators Index character Ration indicators In this paper, Tianjin enterprise IT applications, for example, determined business-related data collection, qualitative indicators based on expert scoring method, quantitative indicators are selected from within the enterprise data. Select 15 IT application enterprises as the evaluation object, research enterprise IT application status. Table 2 shows the raw data. Table 2: Enterprise IT application original training sample data No. IT indicators information management operational processmetrics market environment indicators I 11 I 12 I 13 I 14 I 21 I 22 I 23 I 31 I 32 I 33 I 34 I 41 I 42 I 43 1 0.78 0.67 0.78 45.2 0.81 0.82 0.69 897 0.51 0.89 0.92 699 0.83 650 2 0.60 0.63 0.79 38.3 0.80 0.80 0.66 600 0.48 0.78 0.76 360 0.82 500 3 0.57 0.64 0.82 31.0 0.81 0.76 0.65 918 0.56 0.87 0.90 677 0.89 470 4 0.53 0.68 0.75 41.5 0.84 0.79 0.62 991 0.61 0.91 0.92 698 0.90 440 5 0.51 0.73 0.84 29.9 0.78 0.75 0.64 997 0.46 0.78 0.79 962 0.76 420 6 0.48 0.74 0.78 22.9 0.79 0.73 0.66 318 0.55 0.92 0.93 152 0.91 400 7 0.47 0.68 0.76 40.0 0.74 0.77 0.66 800 0.49 0.90 0.91 376 0.93 390 8 0.46 0.71 0.74 37.7 0.75 0.78 0.65 220 0.47 0.95 0.96 101 0.94 380 9 0.45 0.73 0.81 16.8 0.77 0.72 0.61 594 0.46 0.74 0.75 267 0.80 380 10 0.46 0.79 0.83 60.0 0.78 0.77 0.64 300 0.43 0.69 0.68 138 0.62 370 11 0.69 0.72 0.77 50.9 0.82 0.81 0.66 910 0.42 0.69 0.78 698 0.74 570 12 0.63 0.77 0.80 29.5 0.83 0.79 0.64 987 0.44 0.78 0.75 911 0.70 520 13 0.51 0.74 0.81 40.9 0.79 0.74 0.63 330 0.62 0.91 0.83 168 0.86 420 14 0.50 0.73 0.79 36.6 0.78 0.73 0.65 300 0.49 0.87 0.86 150 0.80 420 15 0.47 0.75 0.82 59.7 0.77 0.73 0.66 370 0.54 0.90 0.95 174 0.96 380 BP NEURALNETWORK BP (Back Propagation) neural network is a group of scientists, led by the Rumelhart and McCelland made in 1986, is one of the most widely used neural network model. BP neural network input layer (input layer), hidden layer (hide layer), the output layer (output layer) of three levels, between layers with no coupling and connection. Input signal propagation from the input layer to the hidden layer node function after treatment of the role of the spread of the hidden layer to the output layer node output signal from the output node and the final output layer node processing results. Usually transfer function(node cell characteristics) for the Sigmoid function, with continuous, differentiable characteristics [5]. Function is expressed as: 1 f ( x) = where 0 <A 20 (1) Ax 1 + e (1) Determining the number of nodes in the input layer and the processing of input data samples. Standardize 109

processing, the index data between 0 and 1 for easy data entry and calculations BP neural network. Standardized values: X io = X Xi i max X X i min i min (2) As Xi is the ith index value; X io is astandardized indicator of the value of the ith; index values; i min is theith minimum index values. X Xi max is the ith largest value (2)Determine the number of hidden layer nodes Currently the number of hidden layer nodes is the most widely used N H = n + m +a(3) Which NH is the number of nodes in the hidden layer, nis the input layer nodes number, m is the output layer nodes number, aisa random constant from 1 to 10. In this paper, input node number is 17, output node number m is 1, so the number of hidden layer BP neural network nodes in the range of 6-15[6,7]. After repeated testing training, determines the number of hidden layer nodes is 13. (3)Determine the level of output and Evaluation Analysis and evaluation of the results in order to meet the needs of the expected output y l digital visual instructions between 0-1 (Table 3), and accordingly set the very,, fair,, very five levels to illustrate the results of the evaluation of energy-saving boiler equipment. Table 3: Enterprise IT degree Rank Expected output 0.8 y l 1.0 0.6 y l<0.8 0.4 y l<0.6 0.2 y l<0.4 0.0 y l<0.2 Evaluation level very fair very Table 4: Evaluation of Enterprise IT Recognition Evaluation of the output range 0.8 y l 1.0 0.6 y l<0.8 0.4 y l<0.6 0.2 y l<0.4 No. Evaluatio n output - - Expecti ng Evaluat ion Absolute error - - 1 0.7043 0.70 0.0043 11 0.6459 0.64 0.0059 12 0.6193 0.61 0.0093 3 0.4969 0.50 0.0031 5 0.4917 0.49 0.0017 4 0.4564 0.46 0.0036 2 0.4475 0.45 0.0025 13 0.4071 0.40 0.0071 14 0.3815 0.38 0.0015 15 0.3404 0.34 0.0004 8 0.3258 0.33 0.0042 10 0.3219 0.32 0.0019 7 0.3152 0.31 0.0052 6 0.2556 0.26 0.0044 0.0 y l<0.2 9 0.1414 0.140 0.0014 level very fair very Enterprises it application and analysis According to BP neural network has been designed structural model, we use learning and training model with the first 10 sets of data and verify the predict accuracy of the model with later five sets of data. In this paper, MATLAB software toolbox running for 15 sets of raw data were normalized surveyed, 144 times in training, network training 110

error achieve the objectives and requirements, BP neural network stops running, the output value of 15 sets of data evaluation as shown in Table 4. From the evaluation process, basing on selected evaluation index, we canacknowledge the enterprise IT application status. However, although the indicators are factors that affect the business applications of information technology, but also further analyze the size of the index weight, to enable enterprises to improve IT applications targeted. There are many ways to determine the weight. The objective method we use is indicators of empowerment variance method. Applying standardized data to calculate the standard deviation for each indicator and weight. The calculations we get in Table 5 and Table 6. Table 5:Enterprise IT application quantitative index weights Ration indicators I 14 I 31 I 41 I 43 Weights 0.068 0.073 0.069 0.066 Table 6:Enterprise IT applications qualitative indicators weights Qualitative indicators I 11 I 12 I 13 I 21 I 22 I 23 I 32 I 33 I 12 x 46 Weights 0.073 0.086 0.070 0.071 0.072 0.060 0.085 0.073 0.065 0.069 The highest index weight is applying software developing, as 0.086, and the lowest index weight is controlling massage process, as 0.060. Thus, the heavier the weight, the more attention we need to pay. And we should develop more applying software and integrate information system to improve the application of IT in enterprises. CONCLUSION Table 4 showed the grade of 15 enterprises IT application evaluation, within the permissible error range.number1,11,12enterpriseinformation technology under evaluation in a better state level, and number evaluation for enterprise IT application level 9 in condition, and other businesses in general and states. Score higher enterprise has the following characteristics:first, under the same market conditions, the higher the level of their own management and technology, the higher degree of information technology applications; secondly, fundamental purpose of the enterprise for profit, only the application of information technology will help improve production performance and business performance, enterprise information technology the extent of the application will be higher. BP neural network method, after BP neural network training, by determining the number of nodes in the hidden layer, and repeated a lot of training, training results and expectations within allowable error range of 15 sets of data can be effectively evaluated 10 sets of data to sort through. Table 3 shows the output of the BP neural network evaluation and assessment expectations maximum difference of 0.0093 within an acceptable range. So, in the data enrichment station, the evaluation results through BP neural network trained with credibility. BP neural network can either evaluate IT application enterprise based on time-series data, and also be used to predict the degree of IT application in enterprises. This paper, using BP neural network method to analyze the impact factors of ITapplyingin enterprises, attempts to provide reasonable suggestions of promoting application of IT; on the other hand, 15 companies in Tianjin Empirical studies based on 14 kinds of IT application factors presented above, according to the expert scoring and statistical data within the enterprises, the use of econometric methods to explore the 15 enterprises IT application status ranking, to provide enterprises with an IT application quantitative basis. Future research should also note that the following aspects of the problem: (1) Information technology factors that affect the application of data acquisition, qualitative data is obtained through expert scoring, with a certain degree of subjectivity, the calculation would have some impact. Meanwhile business is the development, future research should be dynamic, should fully consider the impact of the time value of IT applications, data reflect only a point in time enterprise IT application status and rank, where there is no persistence. (2) In this paper, although the general evaluation of enterprise IT applications, but each industry has its own characteristics and personality, to better corporate IT applications, on the need for enterprise IT factor analysis for each industry characteristics. (3) In this paper, BP neural network evaluation, but in the actual process, when many factors influence the relationship between corporate IT complexity while on the subject and uncertainties and involve a number of interest conflicts, you also need to try and use the new research methods. Or consider the time sequence, or to expand the panel data. 111

Acknowledgement The authors would like to thank for the enterprises that provide data. The authors also thank for the support by industry-university-research cooperation base for the providing opportunity. REFERENCES [1] Cheng Gang, Yun Qiaoyun. Management Commend. 2009, 21:98-103,120. [2] Wang Nianxin, Zhong Weijun, Mei Shu e. Journal of Management Science, 2010, 23: 52-64. [3] Si Linsheng, Wang Ju, Wei mingxia. Forecasting, 2007, 2:36-40. [4] Lin Danming,Ye Hui, Xie Weimin, et al. China Industrial Economy, 2006, 1:106-112. [5] Zhang Jun, Cao Jing, JIANG Shizhong. Neural Network Practical Guide. In: Mechanical Industry Press, 2008, 2: 31-34. [6] Kung S Yetal. IEEE, 2003, 86 (4):1244-1272. [7] Shi Yan, Han Liqun. Inexpensive small pro-neural network design methods and case analysis. In: Beijing University of Posts and Telecommunications Press, 2009, 12: 23-28. 112