Quality Assurance The Rest of the Story

Similar documents
An Update of Superpave (HMA)

presented during the 2006 Technical Workshop and Conference

QUALITY ASSURANCE FOR SHRP2 R06C TECHNOLOGIES

Evolution of TxDOT s Quality Assurance Programs

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

LTRC Seminar - Building Quality Pavements QUALITY. What It Is and How to Get It

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

Recommended mitigating controls

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E.

Percent Within Tolerance (PWT) Field User s Guide EFFECTIVE DATE 1/13/2017

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

NC Department of Transportation Engineering Application Services

NQA-1 Graded Approach, 55-Gallon Drum Summary

The Key AC Emphasis Areas for the Future. John D Angelo D Office of Pavement Technology

Bituminous PWT (Percent Within Tolerance)

District 61 Pilot Asphalt Specification Review 502 Mixture Design Changes

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION

Quality Assurance (QA) Stewardship Review of the Oregon Department of Transportation

2006 RPUG Changing from PI to IRI. Colorado DOT Experience Eric Prieve

Workshop Introduction

Cindy LaFleur Callanan Industries & Tilcon NY, Oldcastle Materials Companies

Regional Engineers. Jack A. Elston

150/ G Versus 150/ H Contractor Quality Control Program

Overview of Federal-Aid Program & Construction Contract Requirements

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PRICE ADJUSTMENTS ON PERFORMANCE GRADE ASPHALT BINDERS

Regional Engineers. Maureen M. Addis. Special Provision for Hot-Mix Asphalt Pay for Performance Using Percent Within Limits Jobsite Sampling

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER)

Federal Aviation FAA GUIDANCE Administration Contractor Quality Control SWIFT

Subject: Results of 2013 Review of Oregon Department of Transportation s Quality Assurance Program for Asphalt Concrete

SHRP2 Peer-to-Peer Technical Exchange Developing Performance Specifications Burlington, Vermont

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HOT MIX ASPHALT MIXTURE (WITH SAMPLING BEHIND THE PAVER)

Materials and Surfacing - Organization and Functions

SECTION QUALITY REQUIREMENTS

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR ACCEPTANCE OF HOT MIXED ASPHALT

Warranties for Pavement Preservation Treatments. Top Reasons to use a Warranty. Second: What Warranties are not 52 ANNUAL IDAHO ASPHALT CONFERENCE

Nuclear Quality Standard Association

IMPLEMENTING BUY AMERICA PROVISIONS IN TEXAS

Metrics for the Oversight of the National Bridge Inspection Program

Special Provision No. 199S53 January 2018

DBE/ACDBE Monitoring & Enforcement

GP-6 CONTROL OF MATERIAL

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PREQUALIFIED AGGREGATE SUPPLIER PROGRAM. April 15, 2016

Asphalt Pavement Association of West Virginia 2018 Fall Conference

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1066 PLASTIC PIPE ACCEPTANCE PROGRAM. October 16, 2009

Performance Specifications What are they?

1.7 Inspection, Compliance, Enforcement, Plan Modification, and Project Closeout

Bituminous Percent Within Tolerance (PWT)

2007 Summer Meeting AASHTO Highway Subcommittee on Construction Project Quality for Design- Build

(STRUCTURAL CONCRETE).

S-b04001 B Federal Aid or NHS PWT-LTS

USE GUIDELINES PERCENT WITHIN TOLERANCE (PWT) FOR BITUMINOUS PAVEMENT ACCEPTANCE

1.2 The engineer will provide Quality Assurance (QA) inspection. The role of QA is to verify the performance of the QC.

ASPHALT BINDER QUALITY PROGRAM

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM. April 18, 2008

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

TABLE OF CONTENTS. MODULE CONTENTS Page. 1 Introduction Contractor Quality Control The QC Manager s Role and Responsibilities 3-1

Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement

Supplier Quality Manual

QUALITY REQUIREMENTS

Supplier Requirements Manual

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

Student Manual Lesson 6- Specifications. Version /

Quality Management System

Quality Assurance Program for the Carolina Crossroads Project

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

Appendix X - PWT for Bituminous Pavement Projects Usage Guide Publication Edition Change 1

Development of a Sustainable Quality Assurance Program for Transportation Infrastructure

Contract Management Procedures Transportation Services Division, Works & Emergency Services Department

Appendix X - PWT for Bituminous Pavement Projects Usage Guide Publication Edition Change 1

SECTION QUALITY CONTROL

Construction Management Plan

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry

Special Provision No. 199S53 February 2012

FHWA Initiatives. Southeast Pavement Preservation Partnership

KIEWIT SUPPLY NETWORK

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

Counterfeit Parts Prevention

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT

Domestic Scan Successful Preservation Practices For Steel Bridge Coatings Desk Scan Summary Report

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

UNICEF Quality Assurance in the procurement of medicines

SBRA Modular Program Guide

QUALITY CONTROL INSTRUCTION

QUALITY ASSURANCE PROGRAM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR ACCEPTANCE OF LONGITUDINAL JOINT DENSITY IN HOT MIX ASPHALT PAVEMENTS

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

Student Services & Classroom Addition

TxDOT Design-Build Quality Assurance Program Implementation Guide

PS850110E ACCEPTANCE TESTING OF INCOMING AEROSPACE FASTENERS

The National Air Barrier Association. Quality Assurance for the Air Barrier Industry

APWA Public Works Construction Management Seminar. March 22, 2018

Developing a Quality Assurance Program for Implementing Performance Engineered Mixtures for Concrete Pavements

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES

Facilities Planning and Construction (FP&C)

Page 1 / 11. Version 0 June 2014

OKLAHOMA DEPARTMENT OF TRANSPORTATION APPROVAL PROCEDURE

Supplier Requirements Retail Information Svcs LLC Fastener Division

Standard Test Procedures Manual

Transcription:

Quality Assurance The Rest of the Story Dennis Dvorak FHWA Resource Center Olympia Fields, IL North Central Asphalt User Producer Group Meeting January 10-11, 2007

AASHTO Road Test

Payment Plan with 5% Incentive Pay Factor (%) PF=0.5PWL + 55 Estimated PWL

Payment Plan with Incentive AQL=90 Pay Disincentive 80 90 100 Estimated PWL Pay Incentive 95 100 105 Pay factors

Payment Plan without Incentive PF=100 Pay Factor (%) PF=0.5PWL + 55 Estimated PWL

Payment Plan without Incentive AQL=90 Pay Disincentive 80 90 100 Estimated PWL 95 100 105 Pay factors No Incentive

Payment Plan without Incentive AQL=90 Pay Disincentive 80 90 100 Estimated PWL 98 95 100 105 Pay factors

Overview Background Where we have been Where we are now Current Resources Where we are going Short term Long term 8

Background Why is Quality Assurance Important? Approximately 50% of construction costs are spent on the PURCHASE of materials. 9

Background Acceptance procedures Once material is in place it stays in place Only industry paying for marginally acceptable material 10

Where We Have Been Method type specs 1956-1960 AASHO Test Road Recognition of Material variability 1960s Blatnik Investigations Federal regulation on sampling and testing 1970 s Experimentation with QA specifications 1980 s Implementation of QA specifications 1990 s Use of contractor test results for acceptance 11

Where We Are Now Quality Assurance Specifications Percent Within Limits Specifications Design Build Short Term Warranty/Guarantee 12

Where We Are Now POLICY (23CFR 637.205(a)) Each SHA shall develop a quality assurance program The program must meet the criteria in 637.207 and be approved by the FHWA. 13

Quality Assurance Program 14 Acceptance Program State s Verification Testing Inspection May use Contractor test results Dispute resolution Qualified Technicians Accredited / Qualified Labs Independent Assurance Program Materials Certification

Scope Interviews DOT Headquarters, Region/District, and Project Field Offices Review Visit DOT implementation strategies, policy and procedures, and office records Construction projects to assess field procedures and practices

Where We Are Now Not enough State personnel Not enough State Verification Testing Reluctance to spend money on construction engineering not even for consultants Increasing volume of projects/workload No electronic materials testing data 18

Where We Are Now Ineffective validation procedures no independent samples no statistical comparison number of samples for comparison control of Contractor supplied data security of samples Control of random sampling location Retest provisions 19

Common Types of OIG Fraud 20 Cases Bid rigging & collusion Materials overcharging Time overcharging Product substitution Minority-owned business fraud Quality-control testing fraud Kickbacks Bribery

Common Types of OIG Fraud 21 Cases Bid rigging & collusion Materials overcharging Time overcharging Product substitution Minority-owned business fraud Quality-control testing fraud Kickbacks Bribery

Materials Overcharging Definition Contractor misrepresents how much construction material was used on the job and then charges for more material than was used to increase job profit.

The Paper Trail Asphalt Production Report Asphalt Shipped Asphalt Produced Private Jobs 23 Plant production report shows 1,380 tons more asphalt shipped than produced on this day

Quality-Control Testing Fraud Definition Contractor misrepresents QC test results to falsely earn contract incentives or avoid contract disincentives, or to avoid production shutdown or required removal of deficient material in order to limit costs or increase profits. Example After distracting the state inspector, an asphalt-paving paving crew foreman discarded road cores from random QC locations designated by the inspector and replaced them with test cores known to qualify for density-incentive incentive payments under the contract.

Quality-Control Testing Fraud Sample Indicators Contractor employees regularly contrive to take or label QC samples away from inspector oversight Contractor insists on transporting QC samples from the construction site to the lab Contractor does not maintain QC samples for later Quality- Assurance (QA) testing Contractor challenges results, or attempts to intimidate Quality Assurance inspectors obtaining conflicting results

Resources NHI Course 134042: Materials Control and Acceptance - Quality Assurance FHWA Basic PWL Workshop 2003-2005 Summary Report for QA Stewardship Review www.fhwa.dot.gov/pavement/materials/ stewardreview2006.cfm 26

Where We Are Going Short Term Reduce Risks Lots not restricted to a single day More State Verification Testing as compared to Contractor Testing Statistically Proper Validation Procedures SPECRISK and PWL-Pay Programs Specification Development Course Database Workshop 27

Why Electronic Databases Need information to develop and modify specifications Materials inputs into M-E Pavement Design Guide Tie to Pavement Management System 28

Examples of Paper Documents 29

30 Examples of Electronic Files

Evolution QA Specs Performance Specs Design Build Warrant Maintain 31

Advanced Quality Systems (AQS) Implementation Team Headquarters Offices Resource Center Division Offices 32

Where We Are Going Long Term Domestic Scan of other industries Move toward Quality Management Systems by all contractors and suppliers Beyond ISO 9000 sector specific requirement Aerospace AS9100 Automotive ISO/TS16949 Quality Based Selection and Procurement Design Build Warrant Maintain 33

Design Build Warrant Maintain - The Final QA? Long Term Warranty Performance based contract Guarantees product integrity Contractor responsible for repair of defects or replacement Warranty Period Pre specified for repair defects 34

and beyond! Cannot continue on same path of regulate and enforce Cannot continue to police contractors trying to catch them in the act System needed to match contractor s priorities in-line with agency s Quality and long term performance 35