The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

EXHIBIT 2-2-C SCHEDULES

Estimating and Scheduling

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

Timely Time Extensions: The Owner s Duty

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract

For years, on-screen quantity takeoff has been the trusted

Planning & Scheduling CSTM 102

Project Forecast Survey Results Good Scheduling Practices June 2016

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS]

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Consulting Newsletter

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

TECH REPORT 3 SANTA ROSA JUNIOR COLLEGE STUDENT CENTER. Alternative Methods Analysis. Dan Vallimont 2009 SENIOR THESIS

Lessons Learned Schedule Updating and Maintenance using Primavera P6

Retained Logic and Progress Override in Primavera P6

Principles of Schedule Contingency Management

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

Office Building. Analysis #2: Utilizing a Matrix Schedule

Schedule Design Planning for Schedule Development

Can I change an activity from an 8-hour workday to a 10-hour workday in my schedule?

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

Small House Extension Project

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

PLANNING. Ahmed Elyamany, PhD

Application & Management of CPM Schedules

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

Week 5 Project Work Plan

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

Practical Strategies to Make Your Next Project Profitable

PMP Exam Preparation Course Project Time Management

Project Controls Expo

The Effective Management of Time Patrick Weaver PMP Mosaic Project Services Pty Ltd 17 th August 2010

James M. Bolin and Andrew Avalon, P.E., PSP

Schedule Compression

Schedule Compression

White Paper. Duration Estimating

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

Contingency Planning

Project Controls. The art of predicting project completion. A good baseline schedule is not enough. Patrick Weaver PGCS 2016.

MnDOT Project Management Office Presents: Impact Schedules. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

LONG INTERNATIONAL. Richard J. Long, P.E., Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA

Massport Capital Programs Enterprise Schedule Management. Document 11 A. Primavera Schedule Toolkit Vertical Projects. July 2017 Version 1.

6 PROJECT TIME MANAGEMENT

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams

Estimating Project Schedule-Time and Cost

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

Design & Development of a Schedule Management Plan. Session #PRJ10

Chapter 3 Managing Systems Projects

2016 National Tribal Transportation Conference

MSP How to guide session 3 (Updating)

Managing Takt Plans using vplanner

Project Planning & CPM Scheduling using MS Project. APWA NorCal 2018 Annual Conference

// Improving Project Plans using a Schedule Maturity Framework

Construction Planning and Scheduling

Reap the Benefits Using Construction Specific Accounting Software BY MIKE ODE

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE. CFS:BD 1 of 14 APPR:MB:JJG FHWA:APPR:

Time Management PLANNING

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

A Framework for Schedule Design Planning for Schedule Development

Cashflow. Total price. Total cost. Contract completion. Predicted revenue (2) Total price. Total price. Total cost. Total cost. Contract completion

BA /14/2010. PSU Problem Solving Process. The Last Step 5. The Last Step 8. Project Management Questions PLAN IMPLEMENT EVALUATE

39 Years of Learning the Hard Way. Mark A Etrheim, Mastercraft Homes Inc

Value of Failure! Students Course! Module 4: Preventing Failure!

Project Scope Management

Schedule Margin. Contingency for Schedulers. John Owen, Product Manager Schedule and Risk, Deltek

Andrew Avalon, P.E., PSP

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006

CHAPTER 1. Basic Concepts on Planning and Scheduling

CDR.493. Forensic Schedule Analysis: Example Implementation, Part 2

Week 5 Project Work Plan

Week 5 Project Work Plan

December 25, 2017 CHAPTER 4 SUPPORTING PLANNING AND CONTROL: A CASE EXAMPLE

Richard J. Long, P.E.

Copyright 2012, Business Directors New Zealand Limited, Graeme Owen,

MANAGING CONSTRUCTION SCHEDULES. Kelly Selman, P.E. Dallas District. Date. Dallas District October 10, 2017

Building Successful Teams Marc Elpel, December 23, 2006

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

PS.06. Claims Analysis Nested in Schedule Updates

The Project Planning Process Group

Plan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology

THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION

User Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

White Paper Using S-Curves to improve Project Performance

Unit 3: Traditional Project Delivery Using IT Applications

ENGINEERING MANAGEMENT (GE

Project Time Management

The 10 Big Mistakes People Make When Running Customer Surveys

MAINTAINING & UTILIZING AN INTEGRATED MASTER SCHEDULE FOR A FEDERAL CONTRACT

Cost of Quality. Appendix 2B. Copyright 2006, The McGraw-Hill Companies, Inc.

Two Keys to a Dry, Mold-Free Finished Basement: Vapor Barriers and a Dehumidifier

Benefits of Lean Management in Liquid Waste Operations - One Company's Journey Rodney Blackmon and John Windham Savannah River Remediation, LLC

Transcription:

BRIEF People often are confused with the term - Out-of-Sequence, and use them in inappropriate ways. While we talk about Out-of-Sequence, we also need to discuss the difference between Retained Logic and Progress Override. Almost all scheduling specifications require the use of Retained Logic. Unfortunately, some specifications or Owners (or their representatives) require the use of Progress Override. Hopefully, the following examples will improve some people s understanding. SOLUTION Out-of-Sequence? Of What? Speaking of the term Out-of-Sequence, we often use them in two environments: Scheduling software and the legal environment. They really mean different things in each environment. CPM software such as P3 uses the term - "Out-of-Sequence progress" to simply depict the situation that the successor activity starts before its predecessor finishes. When Out-of-Sequence is used as a legal term, it essentially means a disruption to the Contractor s schedule. For example, the crews lost time in hopscotch from one floor to another floor as the Contractor is held up by owner s interference. However, to quantify the labor inefficiency due to such situation is very difficult. The other extreme example is that the Contractor is forced to work on floor covering such as carpet before painting walls. As a result, the flooring may need to be protected or replaced. The Contractor then incurred the additional expenses. It is hard to believe that any Contractor would choose to do that without the Owner s approval to pay for the extra. However, the Contractor should have carefully evaluated their options before putting themselves in such situations. If the hold-up is caused by the Owner. The Contractor would normally just wait for the decision and give the delay notice to the Owner, which will then become a simple delay case. On the other hand, most General Contractors may perform works out-of-sequence slightly to mitigate various delays among his subcontractors. Page 1 of 6

The Level of Detail When a Baseline schedule is setup, the logic ties of Finish-to-Start are often used to establish the required duration to complete the tasks. In reality, those activities should have been "staggered" each other with the logic ties of Start-to-Start, especially when those activities are depicting more generic area such as floor. For example, in each room (or space) Framing always proceeds before the Drywall. Well, it can t be the other way around in this case. However, if the schedule activities were depicting a large area such as floor, the drywall construction would certainly have started before the last stud faming is completed. Therefore, the schedule update will show that Drywall has been started before the Framing is completed, which is a normal construction situation. This is an out-of-sequence progress situation in P3 environment. However, this is definitely not an out-of-sequence performance from legal point of view. On the other hand, if the schedule activities are depicted by each room, an out-of-sequence progress may certainly be an out-of-sequence performance situation. Unfortunately, the level of detail in a normal construction schedule is often determined by the economy of project and the accuracy of the update, not by the technical requirements. Retained Logic vs. Progress Override As a result of out-of-sequence progress, P3 suggest two ways to calculate the schedule. One is Retained Logic; the other one is Progress Override. It is important to note that Retained Logic or Progress Override affects a schedule only if one or more activities with the conventional Finish-to-Start ties show out-of-sequence progress. By default, the Retained Logic is used for schedule calculation. When Retained Logic is chosen, P3 schedules the Early Finish date of a progressed activity according to network logic, which calculates the Early Finish date with the consideration of the remaining durations of the incomplete predecessors with Finish-to-Start relationship. Page 2 of 6

When Progress Override is chosen, P3 ignores network logic and schedule the Early Finish date of a progressed activity based upon it's own remaining duration. In other words, its predecessor relationship of finish to start is invalidated, which means the progressed activity can be forecasted to be completed earlier than its predecessor. Unfortunately, some people think that out-of-sequence progress need to be corrected by setting schedule calculation to Progress Override instead of Retained Logic in P3. By doing that, it actually forecasts an impossible situation such as drywall can be completed before framing, even worse, it can forecast an earlier completion date, which can be misleading. Please see the following examples: 1. Assume the following is an approved Baseline. Owner approves the logic and the fact (most importantly) that this project will start on 3/26/02 and complete on 4/22/02,which will take 20 working days to complete. 2. This is the update as of 4/9/02: On the day 10 (4/9/02), Activity Stud Framing is on schedule, 5 days of work remained. Activity - Drywall has started on 4/8/02. However, it still needs 5 days to finish its work. Based on "Retained Logic" calculation, the forecast completion date is still 4/22/02, which makes sense. 3. However, if the schedule is calculated by using "Progress Override", the forecast completion date becomes 4/15/02, which is making no sense. First, it is false to conclude that the project is ahead of schedule. Secondly, Contractor is being "penalized" by no reason, which his entitlement has been cut short by 5 days. Page 3 of 6

Let s see another example: 2B. Assuming the project is slightly behind schedule as of 4/9/02. On the day 10 (4/9/02), Activity Stud Framing is behind schedule, 8 days of work remained. Activity - Drywall has started on 4/8/02. However, it still needs 5 days to finish its work. Based on "Retained Logic" calculation, the forecast completion date is 4/25/02, which makes sense. 3B. However, if the schedule is calculated by using "Progress Override", the forecast completion date becomes 4/18/02, which is making no sense. First, the Drywall activity is to be completed before the Stud Framing activity. Secondly, the calculation is showing ahead of schedule progress while the project is actually behind schedule. Page 4 of 6

Out-of-Sequence Progress in Cyclical Network The other situation which causes some confusions is when out-of-sequence progress involves with a number of cycles of a group of activities such as concrete slab/wall pour cycles are different from the originally planned schedule. The decision to use Progress Override to correct out-of-sequence progress is definitely invalid. After all, the Contractor should diligently update the schedule per the current sequence and plan even though this may be a tedious process. Please see the following examples: 1. Assume the following is an approved Baseline. Owner approves the logic and the fact (most importantly) that this project will start on 3/26/02 and complete on 5/6/02,which will take 30 working days to complete. To simply this example, each activity represents a group of activities. 2. After the baseline is approved, the Contractor decided to pour wall pour # 2 first, then Pour # 3 and 1. On the day 10 (4/9/02), Activity FRP Wall # 2 is complete. Activity FRP Wall # 3 just started. Based on "Retained Logic" calculation, the forecast completion date is still 5/6/02 without changing any logics, which is still making sense. However, the forecast dates for the rest of pours are definitely not correct. 3. However, if the schedule is calculated by using "Progress Override", the forecast completion date becomes 4/22/02, which is making no sense. First, it is false to conclude that the project is ahead of schedule. Secondly, the Contractor is being "penalized" by no reason, which his entitlement has been cut short by 10 days. Page 5 of 6

4. The best approach is to change the logics to reflect the current sequence and calculate the schedule by using Retained Logic as illustrated below. Conclusion Out-of-sequence progress (I mean a P3 term) and Retained logic are not that bad at all. However, it is important to update schedule diligently to reflect the current plan. Those who review contractors schedules do not just hand over a list of out-of-sequence report from P3 to the Contractor, and ask them to correct each out-of-sequence situation. You have to do your homework. After all, it is not that difficult to figure out which activities are actually performed out-of-sequence (I mean a legal term). Page 6 of 6