Post-Fukushima Action Plan in Korea. WNU-SI 2011, August 11 Christ Church, Oxford

Similar documents
Post-Fukushima Actions in Korea

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP

Wolsong-1 Stress Test

Korean Perspective on Nuclear Energy after Fukushima Accident

KHNP s strategies for Multi-unit Extreme Hazards Response

Introduction and Development of Nuclear Power Technology: The Korean Experience

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C

APR1400 Safe, Reliable Technology

Enhancement of Nuclear Safety

EPR of Korea and International Assistance

Lessons Learned from Fukushima-Daiichi Accident (Safety Measures and PSA Utilization)

EDF NPPs Post-Fukushima Complementary Safety Assessments

Overview of Fukushima accident. Nov. 9, 2011 Orland, Florida

SMART Standard Design Approval inspection result July. 4 th

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited

Korean Case Study on Nuclear Power Technology

The Fukushima Daiichi Nuclear Power Station Accident

START FROM TYPICAL PROBLEMS

Role of Government & International Cooperation on Nuclear Safety and Power -Korean Experiences- Youn Won PARK. Korea Institute of Nuclear Safety

The Risk of Nuclear Power

My name is Yong Soo Kim. I have responsibility for the development of Advanced Nuclear Power

Source Terms Issues and Implications on the Nuclear Reactor Safety

Lessons Learned from the Fukushima Daiichi Nuclear Power Plant Accident

15 September Woo-Ho Lee, Seon Ho Song, Yong Lak Paek Nuclear Regulation Division. Korea Institute of Nuclear Safety (KINS)

Fukushima Daiichi Disaster. Facts and lessons learned. July Takashi Shoji Programme Director of WANO

Overview on Nuclear Power in the World

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL

Japanese Nuclear Accident And U.S. Response. April 15, 2011

Insights from PSA for the operating Nuclear Power Plants in Korea

Managing the supply chain: Challenges and Overcoming in Korean nuclear industry

Accident Management Programme for Indian Pressurized Heavy Water Reactors Chander Mohan Bhatia Nuclear Power Corporation of India Limited

Tsunami Countermeasures at Hamaoka Nuclear Power Station

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

Fukushima Event PCTRAN Analysis. Dr. LI-Chi Cliff Po. Dr. LI-Chi Cliff Po. March 25, 2011

Safety enhancement of NPPs in China after Fukushima Accident

Nuclear Power Status in Korea

An overview of what happened at Fukushima NPPs

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Application Set -

Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs

1. Korean Regulatory Framework and Technical Standards applied to Site Selection and Safety Review for NPPs

Introduction of Nation-wide Inspection and Reassessment to Chinese Research Reactors after Fukushima Accident

Korean Nuclear Infrastructure

EPR Safety in the post-fukushima context

Compilation of recommendations and suggestions

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

Korea Nuclear Power Plants and Technology

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Nuclear Accident in Japan: NRC Early Protective Action Recommendations

Information on Status of Nuclear Power Plants in Fukushima

China s HWR activities and technology development

Safety Design Requirements and design concepts for SFR

National Report on NPP I&C in Korea IAEA TWG-NPPIC May 22, 2013

KAERI Presentation Title

Current Status and Issues of Nuclear Power Generation in the World

Status & Prospects of Nuclear Power Generation and Fuel Cycles in Korea. Oct., Kun Jai Lee

KINGS Model: Achieving Sustainable Change in Nuclear Education for the Post-COP21 Era

Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead

Attachment XI-1. I. Emergency Safety Measures, etc.

Post-Fukushima Assessment of the AP1000 Plant

Lessons Learned from the Fukushima Dai-ichi Accident and Responses in New Regulatory Requirements

Information on Status of Nuclear Power Plants in Fukushima

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

RESEARCH REACTOR: A POWERHOUSE OF NUCLEAR TECHNOLOGY IN KOREA

Nuclear Safety Enhancement in China after Fukushima Event. July 11, 2013

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements

Chapter VI. VI.Situation regarding efforts to address lessons learned (28 items)

Information on Status of Nuclear Power Plants in Fukushima

Korea Electric Power Industry Code, KEPIC. Myoung Sung Sohn Secretary of Nuclear Air & Gas Treatment Subcommittee

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

Post-Fukushima WANO: The Safety Culture Challenge

SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC

Efforts for the restoration at Fukushima Daiichi Nuclear Power Plants

Information on Status of Nuclear Power Plants in Fukushima

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR

Copyright 2016 ThinkReliability. How a Reactor Works

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

Information on Status of Nuclear Power Plants in Fukushima

SAM strategy&modifications and SA simulator at Paks NPP

A Brief Overview of the APR1400 Commissioning. KHNP Sep. 13, 2017 Sang Won Lee

From the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety

NPP Safety in the aftermath of the Fukushima Accident. UK Response August 2013

in China Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August , Vienna

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

European Nuclear Stress Test

Evaluation of Safety Improvement by Hybrid Heat Pipe/Control Rod using Level 1 PSA. Seok Bin Seo, In Cheol Bang*

Information on Status of Nuclear Power Plants in Fukushima

Understanding Energy: Emergency Preparedness for Nuclear in the US

Fukushima Daiichi NPP Accident, Japan. Brief of AMEC Capabilities to Support Regulators Plant Operators and Licensees (29 March 2011)

4.2 DEVELOPMENT OF FUEL TEST LOOP IN HANARO

Development of SAMG Verification and Validation for Kashiwazaki-Kariwa(KK) Nuclear Power Station

Executive Report. BEES, Inc. Best Engineering in Energy Solutions. 1. BEES Business Areas

Information on Status of Nuclear Power Plants in Fukushima

Transcription:

Post-Fukushima Action Plan in Korea WNU-SI 2011, August 11 Christ Church, Oxford

Contents Korean nuclear overview BK Kim Government action plan BS Jeong Post-Fukushima action plan MK Jo

Nuclear Power Plants in the Silk Road Countries (2010)

KOREA JAPAN WORLD North American Plate Eurasian Plate Pacific Plate Philippine Plate [Unit : occasion / year ] 41

Nuclear Map of Korea

units 32 28 24 20 9 3 APR1400 PWR 1400 x 8 OPR1000+ OPR1000 (KSNP) Component Approach Turn-Key KORI 1 TMI PWR 1000MW x 8 PHWR 600MW x 3 KORI 3&4 WSN 1 KORI 2 Chernobyl YGN 1&2 UCN 1&2 PWR 1000MW x 4 YGN 3&4 WSN 2,3&4 UCN 3&4 YGN 5&6 UCN 5&6 PWR 900MW x 6 PWR/PHWR 600MW x 3 SWN 1&2 SKN 1&2 SKN 3&4 Fukushima SUN 1&2 SUN 3&4 SKN 5&6 PWR PHWR Planned Operation Construction 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025

Nuclear Regulatory Infrastructure in Korea Before Fukushima (KAERI) (KINAC) (KINS)

Recent changes The National Assembly passed the revised Nuclear Act, Nuclear Safety Act on June 29, 2011. The Nuclear Safety Commission moved out of MEST, placed directly under the President. NSC chairman minister s rank The nuclear regulatory agencies (KINS and KINAC) reports directly to the NSC.

After Fukushima Nuclear Safety Commission KINS KINAC President Prime Minister Atomic Energy Commission MEST Nuclear R&D (KAERI) Education and Training (Universities) MKE Nuclear Operator (KEPCO) Nuclear Industries (Doosan, Samsung, )

BACKGROUND Fukushima Accident(11, Mar) increased public concern Sudden Shutdown of KORI #1 : 12 th Apr - Aging NPP, Continuing Operation(licenced at Dec, 2007)

Urgent Safety-Inspection Safety-Inspection By Gov. Safety-Inspection On Kori #1 16 Mar ~ 18 Mar (3 days) 21 Units in Operation 44 Experts in KHNP, KEPCO E&C, KNFC Areas - Impact on ON/OFFsite Power - Integrity of core cooling system - Integrity of RV - Integrity of RadWaste Storage Tk 28 Mar ~ 13 Apr (17 days) 21 Units in Operation MEST*(KINS*) Areas : 27 Items in 6 Categories 22 Apr ~ 3 May (12 days) MEST(KINS) * MEST : Ministry of Education & Science Technology * KINS : Korea Institute of Nuclear Safety

Assumptions Earthquake event Big tsunami Loss of electric power Severe nuclear accident Areas of SI 1 Safety of structures and equipment against earthquake 2 Safety of structures and equipment against coastal flooding 3 Integrity of electric power, cooling, and fire protection systems when inundation occurs 4 Severe accident response 5 Emergency Response and Emergency Medical Systems 6 Long-term, in-service NPPs

Current Status Design Basis Earthquake : 0.2g Manually Shutdown Improvements Installing automatic seismic trip system - Shutdown > 0.18g, All NPPs, ~2012 Improving the seismic capacity of the Safe Shutdown System - 0.3g, All NPPs, ~2014

Current Status Improvements Extension of Sea Wall Heightening of Site Design Extension of Sea Wall of Kori NPP - +2.5m(equal to 10m), ~2012 Waterproof gate/drainage pump - ~2014, All NPPs

Current Status Improvements Electric Power System 2 EDGs / unit - Loss of offsite power 1 AAC DG / 2 or 4 units - Loss of cooling function(sbo) movable vehicle for generator and batteries - ~2014, All NPPs Cooling System Fire Protection System Redundancy(2 trains) SFP has multiple sources Fire hazards analysis /10 years Fire protection plans Prepare supplementary method - fire truck, etc,. - ~2013, All NPPs Improving the firefighting plan Improving fire protection facility - ~ 2015, All NPPs

Current Status TMI follow-up, Policy on Severe Accident (Aug. 2001) Hydrogen control facilities Improvements passive hydrogen removal equipment - ~2013 ventilation or depressurizing facilities in RCB - ~2015, All NPPs Install conduits for injecting nuclear reactor emergency cooling water from external sources - ~2015, All NPPs S/G Containment Pressurizer Pump Control Rod Reactor

Current Status Radiation emergency based on the APPRE* Emergency response facilities : TSC, OSC, EOF Emergency exercises ERMS : 4hours without power Improvements Amending the radiation emergency plan - emergency alert at multiple units - ~2012, All NPPs Securing additional rad-protection equipment - protecting residents near NPP - ~2012, All NPPS * APPRE : The Act on Physical Protection and Radiological Emergency TSC (Technical Support Center), OSC (Operating Support Center), EOF(Emergency Operation Facility)

Current Status A long-term, in-service inspection plan is established : confirm the integrity of the piping of major systems(rcs, etc) Improvements Drastically reinforcing the safety examinations - Ex) regular examination - ~2012, 9 NPPs Reinforcing management of components - Safety related pumps, valves and pipes - ~2012, 8 NPPs

Improvement for natural disasters Containment 1 2 Making the coastal barrier higher at Kori site Preparing a vehicle with portable EDG at each site Control Rod 3 Installing watertight doors at EDG Building Coastal Barrier Battery S/G Pressurizer 4 5 Securing the emergency battery power safe from flooding Waterproofing pumps Portable EDG 6 Installing passive H 2 removal systems operating without electricity EDG Pump Reactor 7 Installing venting and decompression equipment Sea ~$1.1 billion investment over 5 years 42

No. 1 2 3 Categories Safety of structures and equipment against earthquake Safety of structures and equipment against coastal flooding Integrity of electric power, cooling, and fire protection systems when inundation occurs (Unit : million US Dollars) NPPs NPPs under operating construction Total 98 17 115 308 17 325 183 17 200 4 Severe accident response 405 37 442 5 Emergency Response and Emergency Medical Systems 22 0.3 22 6 Long-term, in-service NPP 18-18 Total 1,034 88 1,123

Thank you 감사합니다