EXECUTIVE SUMMARY - Internal Control Review of Facilities Engineering and Project Management

Similar documents
Procurement May 2018

CITY OF CORPUS CHRISTI

Internal Audit Report

Maryland Department of Health Office of the Chief Medical Examiner

Procurement Management Internal Audit

Recommended mitigating controls

Defective Pricing- Material Pricing Deficiencies. Next Slide

Metropolitan Council

Contract and Procurement Fraud

Selection of Contractor Step 5. June 2013

Long Beach City Auditor s Office

Topics. Current Environment and Relevant Risks. Speakers. Contract and Compliance Monitoring Building a Successful Program

General Government and Gainesville Regional Utilities Vendor Master File Audit

Contract and Procurement Fraud. Collusion Between Contractors and Employees

Maryland Transportation Authority

Cancer Prevention and Research Institute of Texas

3.6.2 Internal Audit Charter Adopted by the Board: November 12, 2013

FLORIDA DEPARTMENT OF TRANSPORTATION

The University of Texas at San Antonio. Internal Audit Annual Report For Fiscal Year As required by the Texas Internal Auditing Act

What Happens When Internal Controls Fail

TEXAS BOARD OF NURSING CONTRACT PROCUREMENT AND MANAGEMENT HANDBOOK JULY 2018

UNIVERSITY OF ILLINOIS (A Component Unit of the State of Illinois) Report Required Under Government Auditing Standards. Year ended June 30, 2011

Maryland Department of Transportation Maryland Transit Administration

Follow-Up on VFM Section 3.13, 2016 Annual Report RECOMMENDATION STATUS OVERVIEW

Seattle Public Schools The Office of Internal Audit


Due Diligence And Oversight of Vendors in the Current Regulatory Environment: What Nonprofits Need to Know November 28, 2017

Work Breakdown Structure Element Dictionary Construction

Anti-Fraud Programs and Control Policy

Utilities Department Capital Projects Contract Audit

Review of Water and Wastewater Services Procurement Card Transactions

PHYSICAL PLANT DEPARTMENT MAINTENANCE AND PLANNING DIVISION AUDIT OF ALLEGED CONFLICT OF INTEREST

Acknowledgement of Aramco Overseas Company BV. Supplier Code of Conduct

Internal Auditor s Report. November 25, The County Council and County Executive of Wicomico County, Maryland:

ATTACHMENT D SCOPE OF SERVICES

Subcontractor and Vendor Kickbacks. Next Slide

K-State Athletics, Inc. Report on Internal Controls related to the Contracting, Travel, and Expenditure processes.

Comprehensive List of Fraud Indicators

Item # 6.1 ISC: UNRESTRICTED AC Attachment. Corporate Credit Card (Data Analytics) Audit

The definition of a deficiency is also set forth in the attached Appendix I.

Chapter 7 Internal Controls

Wastewater Audit Follow-up

Comptroller of the Treasury Central Payroll Bureau

NEW YORK CITY HOUSING DEVELOPMENT CORPORATION PURCHASING PROCEDURES. Updated as of November 19, 2015 (Reaffirmed on March 10, 2017)

GBAS Business Administrator Institute: Presenter: Brian Mikell, Chief Audit Executive Office of Audit and Compliance Review

WUPRPM Regulations and Procedures Effective: November 11, 2005 R. Purchasing and Financial Obligations Revision Date: July 1, 2015.

Contract Management Internal Audit Report August 17, 2018

ASSESSMENT AND EVALUATION OF THE CITY OF PHILADELPHIA S INFORMATION TECHNOLOGY GENERAL CONTROLS FISCAL 2016

GOODWILL INDUSTRIES OF COLORADO SPRINGS

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

Procurement Under the New Requirements 1

UNIVERSITY OF CALIFORNIA, SAN FRANCISCO AUDIT SERVICES. PROCUREMENT CARD Project # June 2011

ACADEMIC DEPARTMENT FISCAL REVIEW

UTSA HUB Program. Locate bids at: Agency #743

QUESTIONABLE CONTRACT MANAGEMENT

AUDIT UNDP COUNTRY OFFICE SOUTH AFRICA. Report No Issue Date: 22 September 2014 [REDACTED]

2012-A12

Internal Audit Report Accounts Payable September 2017

Improper Billing of Costs on Progress Payments 1

Managing Fraud Risks. Procurement & Contacting. John J. Hall, CPA (970)

Internal Audit Report. Non-Revenue Vehicle Program Audit

Title: PROCUREMENT Last Update: March 24, Responsible Officer: Mark Savoff I. POLICY SUMMARY

Date: December 21, Gerard Long, Assistant Vice President for Business Affairs. John Lazarine, Chief Audit Executive Internal Audit & Consulting

County of Sutter. Management Letter. June 30, 2012

Maryland School for the Deaf

INTERNAL AUDIT DEPARTMENT

Internal Audit. Orange County Auditor-Controller. Internal Control Audit: Auditor-Controller Procurement & Contract Administration

Pima County Community College District Year Ended June 30, 2008

Compliance Case Studies

APPENDIX D CONSTRUCTION PHASE CRITERIA

CODE OF BUSINESS CONDUCT AND ETHICS

CORONA-NORCO UNIFIED SCHOOL DISTRICT. Vendor Registration Packet

Department of Transportation Maryland Aviation Administration

Fiscal Oversight Fundamentals

Procurement and the Auditor (The Remix) PRESENTED BY: SHAWNISE NEWSOME, VCO AND TANESHA STOKES, VCO OF THE AUDITOR OF PUBLIC ACCOUNTS

SUBJECT: Effective Date: Policy Number: Award of Projects to Continuing Service Contractors Selected through a Qualifications Basis

CACFP - Child Care Centers New Contracting Entity Training. Child Care CACFP. Procurement. Chapter 8. Procurement 8-1

THE UNIVERSITY OF TEXAS AT DALLAS Office of Internal Audit 800 West Campbell Rd., ROC 32, RICHARDSON, TX (972)

Internal Audit Report. Contract Administration: 601CT Contracts TxDOT Internal Audit Division

University System of Maryland University of Baltimore

Final Audit Follow-Up As of May 31, 2015

SEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT. March 31, 1998

Contract and Procurement Fraud. Fraud in Procurement without Competition

VERSION #1 WRITE ON YOUR SCANTRON!!!

Contract and Procurement Fraud

AUDIT UNDP COUNTRY OFFICE KUWAIT. Report No Issue Date: 20 May 2014

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee

AUDIT UNDP SOUTH SUDAN GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No.1400 Issue Date: 6 February 2015

Discussion paper for the stakeholder meeting of 9 December 2014

STATE OF NORTH CAROLINA

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

Audit Follow-Up. Audit of Selected Departments Performing Accounts Receivable Functions (Report #1204 issued February 15, 2012)

Minneapolis Public Schools Special School District No. 1 Minneapolis, Minnesota. Communications Letter of the Student Activity Accounts.

Internal Control Program

OSHKOSH CORPORATION BOARD OF DIRECTORS AUDIT COMMITTEE CHARTER. As Amended as of May 9, 2016

Contract Management Audit June 2017 Page 1. Contract Management Audit

Internal Audit Report. Rail Project Management TxDOT Office of Internal Audit

PURCHASING DEPARTMENT PURCHASING LEGAL COMPLIANCE AUDIT JANUARY 15, 2013

Case Study: Procurement Audit

Office of the Procurement Ombudsman

Transcription:

EXECUTIVE SUMMARY - Internal Control Review of Facilities Engineering and Project We performed a limited scope audit of Engineering and Project (EPM) current and proposed processes of institutional managed construction procurements from $5,000 to $25,000. The scope of this review did not include: Institutionally managed construction projects under $5,000, Institutionally managed construction projects over $25,000, Use of Job Order Contractors for institutionally managed projects of any size, or Projects managed by the UT System Office of Facilities, Planning, and Construction (OFPC). During the investigation of the alleged fraudulent activities, the following key internal control deficiencies were discovered. CONDITION CAUSE Contractors were paid for jobs before Limited or no monitoring by anyone other work was completed. than the Project Coordinator to ensure jobs were completed. Bids were solely awarded by the Project Coordinator. No controls existed to ensure bids were requested from contractors at arm s length from the Project Coordinator. The scope of work for construction projects was vaguely written with nonspecific language. Cost Estimates prepared by Project Coordinator were inflated. Non-existent shell companies with similar addresses competed for bids with legitimate bidders. Larger projects (exceeding $25,000) were split into multiple smaller bids in order to stay under the $25,000 threshold since projects under $25,000 only require the informal bidding process. Standards had not been established by EPM management for what constitutes an acceptable project scope making it difficult to monitor project costs, work progress, and job completion. EPM did not review cost estimates and bids for clarity or reasonableness allowing for inflated bids. No established vetting of companies desiring to do business with UTSA. Once the cost estimate for the total project was approved, EPM and Purchasing did not have procedures in place to track/monitor the multiple jobs that were awarded to complete a larger project. The internal control deficiencies created an environment in which the alleged fraudulent activities could occur. We have provided EPM with suggested recommendations to assist in their effort to review and enhance processes for construction projects to ensure appropriate management oversight and segregation of duties exist, and to ensure clarity of processes, roles, and responsibilities.

BACKGROUND The Office of Institutional Compliance conducted an investigation of alleged fraudulent activity that occurred within Facilities Engineering and Project. According to UTS 118 Statement of Operating Policy Pertaining to Dishonest or Fraudulent Activities, the Office of Auditing and Consulting Services must review each investigation to determine if additional work needs to be performed in order to provide the Audit Committee and management with a basis for taking any corrective action necessary. Currently, the Institutional Project group of the Engineering and Project Department consists of 7 Project Coordinators, 3 Senior Project Managers, the Assistant Director of Institutional Projects, the Facilities Project Specialist, and the Assistant Vice President for Facilities Engineering and Project. The Project Coordinators and Senior Project Managers are currently managing 163 projects. The oversight responsibilities and expectations for each of these roles are explained in this report. Facilities Engineering and Project (EPM) has begun revising processes for procurement of construction bids from over $5,000 to $25,000 to mitigate the key control deficiencies of inadequate segregation of duties and lack of management oversight. Additionally, EPM has begun drafting roles and responsibilities for EPM staff for the procurement of construction bids from over $5,000 to $25,000. This audit report includes a summary of the three primary phases of construction projects ranging from over $5,000 to $25,000: Phase 1: Customer Work Request to Cost Estimate Phase 2: Purchasing Process Phase 3: Project Execution and Closeout Process The lack of management oversight and the lack of segregation of duties that occurred are described in each phase. Additionally, related recommendations are also described in each phase. 3

A trend in the recommendations listed in this report is the need for monitoring by EPM management of various processes. 100% monitoring of every process is not feasible and is not effective or efficient. Instead EPM management should discuss the risks or vulnerabilities within each process and determine the factors that warrant more oversight. should be mindful of the scope limitations of this review and should consider conducting additional reviews to determine if other internal controls are needed to reduce fraud risk. Internal Control Review Results PHASE 1: CUSTOMER WORK PLAN AND COST ESTIMATE WEAKNESSES ENHANCEMENTS When a department has a work request, an Engineering and Project (EPM) Project Coordinator works with the customer to create a Work Plan, which is a document of the scope of the work to be performed. After the customer agrees that the project scope in the Work Plan is accurate, a Project Coordinator creates a Cost Estimate. The Project Coordinator creates the Cost Estimate based on their knowledge of similar work done in the past. Next, the Cost Estimate is sent to the department and the department acknowledges the project cost and provides a funding source. When the alleged frauds occurred, the Project Coordinator performed most of the project scope and cost estimate tasks without segregation of duties or management oversight. No oversight allowed for inflated Cost Estimates to be created which allowed for inflated bids to be obtained later in the process. Additionally, the lack of oversight for the project scope descriptions creates a process weakness in which it becomes difficult to monitor project costs (including reasonableness), work progress, and job completion. Since the alleged frauds occurred, EPM has begun to develop standards outlining the level of detail necessary for the project scope that is included in the Work Plan and the Cost Estimate. Additional oversight of the Cost Estimate created by the Project Coordinator is warranted. At a minimum, the Cost Estimate should be reviewed for reasonableness of cost based on the 4

scope. The clarity of the scope should also be reviewed. However, 100% review by EPM of all Cost Estimates created by Project Coordinator or Senior Project Coordinators is neither effective nor efficient. The decision on the level and depth of oversight should be based on an analysis of which projects have greater potential for mismanagement. It is recommended that any review include samples of cost estimates and project scopes created by all Project Coordinators to ensure thorough oversight/monitoring. Additionally, management should develop trend analysis tools for monitoring cost estimates and project scope descriptions. For example, the comparison of cost estimates for similar projects for reasonableness could assist management in providing oversight. Recommendation 1: Develop, document, and train EPM management and staff on procedures for creating cost estimates and on project scope description standards. EPM management has developed procedures for creating cost estimates and verifying project scope, and has developed a plan to train management and staff. Since project scopes vary greatly, EPM management has developed other procedures to review project scope instead of creating project scope description standards. Completed May 16, 2013 Recommendation 2: Clarify EPM responsibility for oversight of project scope descriptions and cost estimates. Additionally, develop trend analysis/ monitoring tools for EPM management to utilize in the oversight of project scope descriptions and cost estimate reviews. EPM has developed a process to improve oversight of scope descriptions and cost estimates. 5

EPM plans to develop trend analysis/ monitoring tools to utilize in the oversight of project scope descriptions and cost estimate reviews. Compliance with this recommendation is dependent upon being able to develop the appropriate query in PeopleSoft. A completion date of November 2014 is required to ensure that PeopleSoft is fully implemented, and to develop the query. November 30, 2014 PHASE 2: PURCHASING WEAKNESSES For procurement in the $5,000 to $25,000 range, one procurement method UTSA uses is informal bidding. Informal bidding allows the department purchasing representative to create a bid to acquire pricing from no less than three vendors (two must be HUB designated). For procurements greater than $25,000, a formal bid is required. Formal bidding requires a buyer in the Purchasing Department to create a bid to be solicited with a firm bid closing/opening date. Formal bids are posted electronically for public view to the Electronic State Business Daily (ESBD). When the alleged frauds occurred, the Engineering and Project (EPM) Project Coordinator sent the Request for Estimate to contractors to bid on the project. The Project Coordinator was expected to award the work to the lowest bidder. When the Project Coordinator decided on the contractor, the process to create a Purchase Order began in EPM. Finally, the Purchasing Department approved and issued the Purchase Order to the contractor selected by the Project Coordinator. No management oversight or segregation of duties existed within the bid awarding process. Evidence from the Institutional Compliance investigation that supports this includes: The Project Coordinator was able to create fictitious bids from what appear to be legitimate companies. (Note: It is unclear whether these companies were aware of the bid 6

submissions). No oversight was found to ensure the bid scope matched the project scope and/or contained measurable details to substantiate the proposed costs. No review or inquiries were made regarding contractors located at the same address or next door to one another. Once the cost estimate for the total project was approved, EPM was tracking that multiple jobs were awarded to complete the project in a database but was not monitoring the multiple jobs for compliance with procurement processes. In at least a couple of instances, the majority of the work was awarded to one main contractor through the formal bidding process. However, the Project Coordinator had the ability to informally bid smaller jobs that were within the scope of the overall project to other contractors. The Project Coordinator was able to informally bid the smaller jobs without EPM management oversight. Additionally, Purchasing does not have procedures to identify the smaller informally bid projects were part of the larger project that did require a formal bid. ENHANCEMENTS ADDITIONAL ENHANCEMENTS Discussions have occurred between EPM and Purchasing on which department the bid award process should occur in and how the bid should be awarded (lowest cost or best value). EPM and Purchasing are in agreement that the bid award process will occur in Purchasing, and that the bid always be awarded to the lowest bidder. EPM Project Coordinators will develop scope with EPM management oversight, and Purchasing will ensure that the low bidder does not take exception to the scope. 100% review by EPM of all project bids and awards and related Purchase Orders are neither effective nor efficient. The decision on the level and depth of oversight should be based on an analysis of which bids, awards, and Purchase Orders have greater potential for mismanagement. However, it is recommended that any review include bids and Purchase Orders created by all Project Coordinators to ensure thorough oversight/monitoring. Additionally, management should develop trend analysis tools 7

for monitoring bidding process standards. Examples include: Comparing the number of contracts awarded to the same contractor by the same Project Coordinator, and The percentage of contracts awarded right under $25,000 by each Project Coordinator. Furthermore, management should explore other process enhancements to mitigate / deter fraud. For example, notification to the non-winning bidders may decrease the submission of fictitious bids. Recommendation 3: Develop, document, and train EPM management and staff and Purchasing staff on bidding process standards including but not limited to: Verifying the project scope is detailed, measurable, and matches throughout the process from the cost estimate, to the bid (purchase order) scope, to the scope included in the contractor s proposal. Reviewing contractor addresses in the review of bids received. Purchasing personnel are trained and certified on all necessary aspects of the bidding process. Such training includes required continuing education courses. EPM staff training described previously includes training on the bidding process standards and essential elements of project cost and scope. Bidding process standards, and the training related to bidding process standards, do not include the review of contractor addresses. Purchasing and EPM does not agree that a review of addresses should be included in the review of bids received, as believes this will not effectively contribute to improving the bid review process. Completed May 16, 2013 8

Recommendation 4: Clarify EPM responsibility for oversight and segregation of duties exist in the bid awarding process. Additionally, develop trend analysis/ monitoring tools for EPM management to utilize in the oversight of bidding process standards. EPM and Purchasing have agreed on appropriate segregation of duties in the bid awarding process. Also, a monthly meeting between EPM and Purchasing has been established as a monitoring tool. Completed May 16, 2013 Recommendation 5: Develop a method to monitor the total project cost to ensure the formal bidding process occurs when required and that bid splitting does not occur. EPM has developed a method to monitor total project cost. Completed May 16, 2013 Recommendation 6: Determine if EPM and/or Purchasing should develop a process to selectively notify contractors who bid on a project but were not selected. has determined that the cost of such notifications would far outweigh the benefit, if there would be any benefit at all, of such notifications. No Action Planned 9

PHASE 3: PROJECT EXECUTION AND CLOSEOUT WEAKNESSES The contractor creates an invoice for payment when the project is complete. The invoice should go to Disbursements but oftentimes goes to the Engineering and Project (EPM) Project Coordinator. As the project is in the final stages of completion, the Project Coordinator coordinates various inspections and then approves the invoice. The Project Coordinator gives the approved invoice to Facilities Business Operations to create the receiving report to send to Disbursements for payment. Disbursements performs a three way match between the Purchase Order, Invoice, and Receiving Report and processes payment. When the alleged frauds occurred, the Project Coordinator performed most of the project close out tasks without segregation of duties or management oversight. There was limited or no monitoring by anyone other than the Project Coordinator to make sure jobs were completed in accordance with the agreed upon project scope. The Project Coordinator is solely responsible for coordinating final inspections before the final close out. Facilities Business Operations has no assurance the project is complete other than the Project Coordinator stating the project is complete. For one of the alleged frauds that occurred, the Project Coordinator was able to award a bid to a contractor he had a relationship with and on the same day the Project Coordinator was able to submit a self-approved invoice to be paid, stating that the project was complete. ENHANCEMENTS Since the alleged frauds have occurred, EPM has agreed to add management oversight and segregation of duties to the Project Execution and Close Out Process. One key change made is that all invoices approved by the EPM Project Coordinator are submitted to their Senior Project Manager before submitting the approved invoice to Facilities Business Operations to create the receiving report. Additionally, the Senior Project Managers are being trained to randomly inspect work associated with the invoices they receive. 10

100% review by EPM of the execution and close out of all projects is neither effective nor efficient. The decision on the level and depth of oversight should be based on an analysis of which projects have greater potential for inappropriate handling. EPM should also develop trend analysis tools for monitoring execution and close out of all projects. Recommendation 7: Develop, document, and train EPM management and staff on procedures for project execution and close out standards, including but not limited to: Verification that the project was completed in accordance with the project scope. Ensure the contactor sends the final invoice to Disbursements as stated on the Purchase Order. EPM has completed the development and documentation of training relating to project execution and closeout, and will provide training to all project management staff at least annually. Completed May 16, 2013 Recommendation 8: Clarify EPM responsibility for oversight and segregation of duties exists in the project execution and close out process. Additionally, develop trend analysis/monitoring tools for EPM to utilize in the project execution and close out process. EPM has established clear responsibility and segregation of duties for the project execution and close out process. Completed May 16, 2013 11

OVERALL ES CONFLICTS OF INTEREST LEGITMATE VENDORS Overarching improvements should also occur. Even though conflict of interest disclosure statements are completed by various Engineering and Project (EPM) staff, inappropriate relationships with contractors still occurred. EPM should train and monitor staff on importance and necessity to not have improper relationships with contractors. There is no process established to determine the legitimacy of the vendor. To create a purchase order or payment voucher, a taxpayer identification number is needed to complete these transactions within our accounting system; therefore, a W-9 form is collected from the vendor. However, the W-9 does not provide any assurance that a company is legitimate. EXPAND REVIEW Finally, Business Affairs and The Office of Facilities should considering expanding the processes for procurements not in the $5,000 to $25,000 range. Recommendation 9: Train and monitor all EPM management and staff on the importance and necessity to not have improper relationships with contractors and to disclose relationships that may appear to be a potential conflict of interest. EPM has developed Fraud Awareness and Conflict of Interest training and has formalized guidance to project management staff. Completed July 24, 2013 12

Recommendation 10: Business Affairs should determine the due diligence required by EPM, Purchasing, or other Business Affairs departments to assess vendor legitimacy. Business Affairs has determined that it is not reasonably possible to assess whether vendors are legitimate construction contractors because they are not required to be licensed by the State of Texas, and there are no known methods to assure, with reasonable certainty, the legitimacy of vendors. Assistant Vice President for Facilities Engineering and Project No Action Planned Recommendation 11: Consider applying the same spirit of the recommendations given for institutionally managed construction procurements between $5,000 to $25,000: Institutionally managed construction projects under $5,000, Institutionally managed construction projects over $25,000 The changes EPM has implemented and is developing will apply the same spirit of these recommendations to other projects that are outside the purview of this review. Assistant Vice President for Facilities Engineering and Project Completed May 16, 2013 13