Enable Midstream Partners Transportation & Storage Natural Gas Society of East Texas Roundtable March 19, 2015 Carol Burchfield
EMP Corporate Structure 2
Enable Midstream Partners Diverse Set of Interconnected Assets in 10 states Intrastate EOIT 2,289 miles 1.9 Bcf/d peak throughput 24.0 Bcf storage capacity Interstate MRT 1,663 miles 1.8 Bcf/d capacity 32.0 Bcf storage capacity G&P: Arkoma 2,676 miles 137,928 Horsepower 1.0 TBtu/d gathering volumes 1 processing plant 60 MMcf/d processing capacity 1.2 mm gross acres of dedication G&P: Bakken Began operations Nov 2013 Capacity up to 19,500 Bbl/d Constructing additional crude oil gathering system Capacity up to 30,000 Bbl/d G&P: Anadarko 6,729 miles 477,462 Horsepower 1.3 TBtu/d gathering volumes 9 processing plants 1.445 Bcf/d processing capacity 43 MBbl/d NGLs produced 4.7 mm gross acres of dedication Interstate EGT 5,984 miles 6.6 Bcf/d capacity 30.5 Bcf storage capacity 3 G&P: Ark-La-Tex 1,639 miles 182,892 Horsepower 1.3 TBtu/d gathering volumes 2 processing plants 545 MMcf/d processing capacity 14,500 bbl/d fractionation capacity 11 MBbl/d NGLs produced 0.7 mm gross acres of dedication Interstate SESH Own 49.9% interest 274 miles 1.0 Bcf/d capacity
Senior Management Team CEO Lynn Bourdon CCO P. Weissgarber SVP Operations P. Brewer VP E&C M. Widaski EVP General Counsel M. Schroeder CAO D. Farmer CFO R. Sailor 4
Enable Transport & Storage Overview 5
Enable Midstream Transportation & Storage Assets Interstate Pipelines Enable Gas Transmission (EGT) and Mississippi River Transmission (EMRT) operate more than 7,500 miles of pipeline and have over 62 Bcf of working natural gas storage capacity Strategically located primarily in the Arkoma, Ark- La-Tex, and Anadarko basins across 7 states Intrastate Pipelines (EOIT) More than 2,300 miles of pipeline in Oklahoma and 24 Bcf of working natural gas storage capacity Positioned to serve SCOOP, MS Lime, and Granite Wash with existing capacity Southeast Supply Header (SESH) Joint venture with Spectra connects Perryville Hub to Southeast and Northeast markets 274-mile, 1 Bcf per day pipeline 11 interconnections with existing natural gas pipelines with access to 3 high deliverability storage facilities EGT Carthage to Perryville Segment 172-mile, ~1.9 Bcf per day pipeline 6
Oklahoma Business Take away capacity is still an issue in Oklahoma EMP Open Season - 326,000/ is remaining available firm capacity from OK to Bennington, PVH and other EGT markets. Expect this to be sold due to most economical transport. - 201,000 of existing space - 125,000 of expansion requires 1 new compressor Bradley Lateral - 16 miles of 24 pipe to transport approx 600/d from OK to PVH, Bennington, and other markets on Enable s pipelines - Expect the pipe to be fully utilized with residue from Bradley Plant and other processing plants in the area. Redbud Pipeline - 125 miles of 36 pipe designed for up to 1.75 Bcf/d - Deliveries to Bennington and/or Texas 7
EMP Oklahoma Interests: NW CANA, STACK, & SCOOP Transport Options 8
East Texas Business Enable Waskom Processing Plant Waskom cryo plant has a capacity of 320,000/d and is located in Harrison Co, Texas Unlike other plants in the area, Waskom has its own fractionator and allows Producer to market NGLs by product and without additional transport cost Several downstream pipelines include EGT s core system and Enable s Line CP EGT Processing Arrangement with Producer EGT has the ability to process Producer gas delivered into F-185 under EGT s own processing arrangement at Waskom Will sell NGLs and share liquids revenue with Producer Will keep natural gas volumes whole and can deliver gas directly into EGT s South Pool or Line CP Line CP Looking at redesigning Line CP to be bi-directional Conventional flow is east to PVH for southeast utilities, LNG markets, and other interconnecting pipelines Changing market dynamics creates need to flow west to Carthage, Ship Channel, as well as Mexico markets Ideally, the flexibility to flow in either direction is preferred 9
EMP East Texas/Louisiana Assets 10
EGT East Texas/Louisiana Marketing Options South Pool Willow Springs F-185 Waskom CEFS Header System Gulf South EGT Line CP Columbia Gulf Carthage Deliveries CP Pool 11
Enable Contacts Transport & Storage, Marketing and Business Development Marketing: Linda Roberts (713) 207-3390 Linda.Roberts@EnableMidstream.com Todd Nelson (713) 207-5261 Todd.Nelson@EnableMidstream.com Business Development: Carol Burchfield (713) 207-3466 Carol.Burchfield@EnableMidstream.com Mike Joyce (713) 207-5114 Mike.Joyce@EnableMidstream.com 12