LEGO Paperweight Instruction Manual

Similar documents
HydroCycle Vertical NFT Lettuce & Herb Systems

PORTRAIT WARNING HOT GLASS WILL CAUSE BURNS. DO NOT TOUCH GLASS UNTIL COOLED. NEVER ALLOW CHILDREN TO TOUCH GLASS. 569 Ledge Front


ix Stage stage platform

East Lyme Middle School EAST LYME MIDDLE SCHOOL

Primo Brick Cube Build Manual

Basic Suspension Systems

Mbrico Tile Rooftop/Raised Floor Installation Guidelines

At last! Construction bracing made easy...

Please read through the usage and service instructions outlined in this owner s manual before operating the unit. Warnings Diagrams...

1 of 3 3/29/2016 4:07 PM

Modular Coldroom Installation Manual

Palas. Catalogue of Questions and Answers.

MWF Pro Truss. User Guide. Last Updated on November 9 th 2015

DETAIL INSTRUCTION No. 1

Brick Math Series TEACHING FRACTIONS USING LEGO BRICKS. Dr. Shirley Disseler

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

Instruction Guide. FreeSpan SR. English

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

DRAWING INDEX Description

Stressing The Elements

Building Division Informational Handout

RailRider Pro. September Education and Training Center RailRider Date 9/15/2015. Page 1

JASPER. PAGE 2: 2x2 T-GRID INSTALLATION. PAGE 3: 2x2 SRI SHEETROCK INSTALLATION. PAGE 4: 2x2 IEM INSTALLATION

SECTION HVAC GRAVITY VENTILATORS

Original Scandinavian rainwater system

Strengthened and rehabilitation of Transylvanian saxon house

NanaScreen Table of Contents

Chapter 7. Roof Framing

Chapter 13 - Finish Framing

Framing Methods Structural Components

Vento Render Build Manual

Installation Instructions

Free 17'x6' Chicken Run Plan. Designed for up to 11 chickens

3 October 2017 Page 1 of 5 BellHawk Systems Corporation

Up to 25'w Backdrop = 2 Backdrop LIFTs + 5 sections of 5' Truss

Issue no: 10 Date: March Operation and Maintenance Manual Access Technologies Limited All rights reserved. 1 of 20

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

Method Statement FM MS 09 SSCB

Workshop Activity: Build a Bridge

Metal Door Frames & Meter Boxes

Metal Scaffolds. (1) Metal scaffolds shall be designed to support all dead, live, and wind loads to which they will be subjected.

Highfield Humanities College in Blackpool, England, with the IDEALVARIABEL. Project Report: façade design with clay roofing tiles ROOFDESIGN

Mounting systems for solar technology

AXIOM Direct Light Coves Assembly and Installation Instructions

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

Section PANEL SIGNAGE

ARCHITECTURAL ELEMENTS

GARAGE STORAGE & ORGANIZATION

Issue Date: April 2003 Release: I. Product Specifications

Glass Block Installation System. simple, quick, safe, mortar-free. Glass Block Installation System

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

Fin and Phe s Wedding Quilt

UNI Roof Catalogue CTG001-

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

Architectural GFRC. Project Gilbert Christian High School. L. Smith / H & S International LLC. general contractor. S T O N E Location Gilbert, Arizona

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

SECTION LIGHTNING PROTECTION SYSTEM

Operation Manual Assembly of the MA shuttle container

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Deck Tile Installation Guide. v

INVITATION TO TENDER ( ITT ) NO. PS SKYLIGHT REPLACEMENT: VANCOUVER CITY HALL & ART GALLERY LOBBY ADDENDUM NO. 1

SECTION CHAIN LINK FENCING

Rainwater system Complete with guttering and downpipes.

ALL GUIDETION W ALLAINST RIVERCREST

RoverBot Assembly. The following pages show assembly plans for the RoverBot using the Consumer MindStorms or School Team Challenge Lego kit.

Page 1 of 21

Student Handout. Authors: NAWIC Education Foundation, Jessica Frichtel & Tim Bingham. Experiential Learning Opportunity

MASONRY ANCHORS AND CONNECTORS May 6, 2014

SUPRAFRAME BOX STUD SITE REFERENCE. Construction of a SUPRAFRAME Boxed Stud Wall Framing System. 600 mm stud spacing. Tile Roof.

Problem 1.5.9a Playground Design Problem Teacher Support Document

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

HOW TO BUILD A 1/144 SCALE FIREPLACE By Fran Sussman May 13, 2014

STAND LAYOUT AND INSTALLATION

Nu-Wool U382 2 Hour Firewall Guide Please note that this firewall can only be installed by approved Nu-Wool U382 installers

R&M Floor Systems Compact:

Construction Procedures

2.7 LOGIX WALL CONSTRUCTION

STANDARD PRODUCTS - CUSTOM LOOK

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

Linear Drainage ZF806 ZF812

Fundamentals of Insulated Panel Installation. MBCEA 2016 Clearwater, FL

METALWORKS RH215 Faceted Custom Hook-on Panels

No Fault Safety Tile Dimensions

BUYING GUIDE ALGOT. Storage across the home. DESIGN Francis Cayouette

Changes in the 2007 Supplement to the 2006 International Building Code That Affect Component Manufacturers

CHAPTER III DYNAMIC BEHAVIOR OF A LABORATORY SPECIMEN

A. Submit the following in addition to the standard requirements.

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 High Rise Anatomy Revised

With a Multiple-Point Measuring System

DIY Block Drone. User Manual. Model: PFBD102

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

FSR - Roof Guardrail with Rubber Counterweights. Fold down option available. Lockinex. ea i, ea u i R2_11/17

JACKING PIPE GUIDELINES West 400 North Orem, Utah Telephone: (801) Fax: (801)

RESIDENTIAL GARAGE AND DRIVEWAY

ThermaSteel Corporation ASSEMBLY MANUAL

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

Transcription:

LEGO Paperweight Instruction Manual Gabriel Ortiz English 2575 November 2, 2017 1

Table of Contents Introduction 3 List of Materials 3 Safety Concerns 3 Instructions 4 9 Foundation 4, 5 Pillars 5 First Level 6, 7 Second Level 7 9 2

Introduction A majority of existing paperweights are simply bland, uninteresting, and lack a sense of personal achievement. To counter this problem, LEGO Paperweight is a designed product to be aesthetically interesting, and provide a sense of personal achievement after its creation. This LEGO paperweight also strives to serve as a form of stress relief, as picking apart and reassembling the LEGO paperweight has shown tendencies to relieve stress in several individuals. List of Materials Official LEGO Name Item Description Quantity Plate 2x10 2x10 2 Brick 1x8 1x8 3 Brick 2x4 2x4 9 Brick 1x1 1x1 12 Brick 1x1 W. 1 Knob 1x1 with a knob on the side 8 Brick 2x3 3x2 4 Brick 2x2 2x2 3 Brick 1x2 2x1 4 Roof Tile 2x2/45 2x2 Roof tile with a 45 6 WARNING: CHOKING HAZARD SMALL PARTS NOT FOR CHILDREN UNDER 3 YEARS! 3

Foundation 1. Place two Plate 2x10 pieces approximately one inch apart from each other. 2. Take two Brick 1x8 pieces and connect them on the ends of the Plate 2x10 pieces. The outline of the structure should now resemble a square. Then place another Brick 1x8 piece on the fourth peg of the Plate 2x10 pieces. 3. On the middle Brick 1x8 piece, place two Brick 2x4 bricks. One side of both bricks should be connected to the Brick 1x8 piece entirely. The remaining sides should not be connected to anything. Both bricks should be position so that the top view of the structure should reveal 3 pegs length on each side of the Brick 2x4 bricks. 4

4. On the middle of the Brick 1x8 piece that is located on the opposite sides of the structure, place a Brick 2x4 piece on both side. Pillars 5. There are four pillars in total to be built. Each pillar consists of two Brick 1x1 pieces and one Brick 1x1 W. 1 Knob. [Note: Brick 1x1 W. 1 Knob has a peg on the side.] 6. From bottom to top, the arrangement of the pieces are the following: Brick 1x1 piece, Brick 1x1 piece, and a Brick 1x1 W. 1 Knob. Assemble four of these pillars. After Assembly 5

First Level 7. Place one pillar on the outer Brick 1x8 pieces on each corner of the structure. The peg on the connector should face outwards and opposite direction of the pillar on its left/right. 8. Place a Brick 2x4 brick on the Brick 1x8 piece and between both pillars. The hanging side of the Brick 2x4 bricks shall be faced towards the inside of the structure. There should be one peg of space between the pillars and the Brick 2x4 bricks on both sides. Step 7 to Step 8 9. Place two Brick 1x1 pieces on the corner of the Brick 2x4 bricks that is between the pillars. The pillars and the Brick 1x1 piece should be aligned. Repeat on the other side. 10. Place a Brick 2x4 brick 1 peg diagonally from the Brick 1x1 piece that was recently placed in the previous step. This brick should be connected to the outer Brick 2x4 brick and both of the Brick 2x4 bricks in the middle of the structure. Repeat this step for the other side. Step 9 to Step 10 6

11. Place a Brick 2x1 on both sides of the Brick 2x4 bricks that are facing left and right. 12. Place two Brick 2x3 on the north and south side of the structure. Step 11 to Step 12 Second Level 13. Place a Brick 2x2 directly on both Brick 2x3 that are between the two pillars. 14. Place two Brick 2x4 bricks beside each other on the middle of the structure. Step 13 to Step 14 7

15. Place a Brick 2x4 brick on the middle. This Brick 2x4 brick should take up half of both Brick 2x4 bricks under it. 16. Add four Roof Tile 2x2/45 on the corners of the structure. The slanted part of each piece should face the same direction as the Brick 1x1 W. 1 Knob piece below it. Step 15 to Step 16 17. Place a Brick 2x2 on top the center brick. 18. Then add two Brick 2x1 on top of the Brick 2x2. Step 17 to Step 18 8

19. Add two Roof Tile 2x2/45 pieces on top of the central Brick 2x1 pieces. 20. Add four connectors on the outermost corners of the outermost Roof Tile 2x2/45 pieces. You have finished building the LEGO Paperweight. Step 19 to Step 20 9