Nashville District October 2011 Update

Similar documents
FACT SHEET. 1/ The Recovery Act stipulates that Recovery Act funds for IWTF projects will not be cost shared.

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

STATUS OF MAJOR PROJECT INVESTMENTS BRIEFING TO INLAND WATERWAYS USERS BOARD

WATERWAYS: Vital to the Nation. The benefits provided by America s waterways spread far beyond commercial navigation.

PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT

Other Beneficiaries of Inland Navigation Projects

Water Use in the Tennessee Valley for 2015 and Projected Use in 2040

WATERWAYS: Vital to the Nation. The benefits provided by America s waterways spread far beyond commercial navigation.

US ARMY CORPS OF ENGINEERS ROCK ISLAND DISTRICT RIVER INFRASTRUCTURE

Barkley L&D BUILDING STRONG

America s Inland Waterways

AGING AND FAILING INFRASTRUCTURE SYSTEMS: NAVIGATION LOCKS

Presentation to 2017 Annual Alabama Water Resources Conference. By: Larry Merrihew, Presdent Warrior-Tombigbee Waterway Association

PENNYRILE ADD. New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

Barkley L&D U.S. ARMY CORPS OF BUILDING STRONG ENGINEERS

Executive Summary. Tennessee Valley Authority Reservoir Operations Study Final Programmatic EIS

Tennessee Waterway Assessment Study

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

TENNESSEE RIVER. Waterway Management Plan 2014

INLAND WATERWAYS AND INFRASTRUCTURE PLANNING

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

Lower Ohio and Middle Mississippi Rivers Flood Management

EXECUTIVE SUMMARY...3 METHODOLOGY...4 REPORT CARD...5 AVIATION...6 BRIDGES...8 NAVIGABLE WATERWAYS...13 PARKS...26 RAILROADS...30 ROADS...

By Captain John C. Farmer Presented to: Knoxville Regional Transportation Planning Organization Technical Committee meeting January 10, 2017

BINNENSCHIFFFAHRT IN DEN VEREINIGTEN STAATEN INLAND WATERWAY TRANSPORT IN THE UNITED STATES. von / by David GRIER

Inland Waters User s Board. Mississippi River Valley Division Prioritized Backlog Maintenance

The national public policy organization advocating a modern and well-maintained system of ports and inland waterways

If any questions arise concerning this application, please contact us.

Ranger Training Program Page 1 (January 2013) I. ORIENTATION

Columbia Basin Operations and Flood Risk Management

East Branch Dam Safety Modification Project

Lake Texoma Water Management Frequently Asked Questions (FAQs)

Review of Inland Navigation Needs: Shipper and Carrier Perspectives

Master Contents Chapter 1 Purpose of and Need for Action

FINDING OF NO SIGNIFICANT IMPACT. And STATEMENT OF FINDINGS. Environmental Assessment, Supplement 3

100 th PURDUE ROAD SCHOOL. New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80

MILTON-MADISON BRIDGE REPLACEMENT

Eric Thomas Benchmark River and Rail Terminals

ENVIRONMENTAL ASSESSMENT SUPPLEMENT 3 CENTER HILL DAM SEEPAGE REHABILITATION PROJECT

CONGRESSIONAL DISTRICT: KY 04

East Branch Dam Safety Initiative

U. S. Army Corps of Engineers Charleston District Overview

C43 West Basin Storage Reservoir. Hendry County Commission January 22, 2019

Toward A Full Accounting of the Beneficiaries of Navigable Waterways

Waterways 1 Water Transportation History

Inland Waterway Navigation

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River

East Branch. April 11, Johnsonburg, Pa BUILDING STRONG

16 September Water Management Wilmington District. US Army Corps of Engineers BUILDING STRONG

Testimony of. Steve Ebke, Chairman, Production & Stewardship Action Team National Corn Growers Association

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

Honorable Louise Slaughter

Current Water Management Practices for Kerr Reservoir

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED

Ports on the Tenn-Tom Waterway

SURFACE WATER PUMPS TO IMPROVE DISSOLVED OXYGEN CONTENT OF HYDROPOWER RELEASES

Reservoir Drought Operations

GALVESTON DISTRICT DREDGING CONFERENCE

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

A Tale of Two Dams and a dry river. November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

Navigation Research and. Development

St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary

AEA - Copper Valley Electric Association Allison Creek Hydroelectric Project

Old Hickory Lake Master Plan Revision DRAFT August 2015

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project

DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

TABLE OF CONTENTS. List of Tables List of Plates. Previously Issued Design Memoranda

2017 Lake Hartwell Association

Exploring the Possibilities At Prado Dam

PREFACE PREFACE. Red Rock. Project. Master Plan Project. Master Plan 2015

Preliminary Analysis of Potential Vibration Impact to Old Hickory Lock & Dam from Proposed Quarry Operations

Preliminary Analysis of Potential Vibration Impact to Old Hickory Lock & Dam from Proposed Quarry Operations

Deep Foundations Institute Fall 2004 Fall 2004

Regional Resource Stewardship Council. September 20 and 21, 2016 Knoxville, Tennessee

Sea Level Rise and Recurrent Flooding Update

INLAND WATERWAYS USERS BOARD 17 TH ANNUAL REPORT TO THE SECRETARY OF THE ARMY AND THE UNITED STATES CONGRESS WITH APPENDIXES

Summary of Flow and Water Quality Conditions Willamette Basin Science Review February 4-6, 2014

Hydro Capacity Preservation & Expansion

National Inventory of Dams Overview

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar. SUMMARY: This notice is provided in accordance with the Council on

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

MAINTAINING AGING INFRASTRUCTURE

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

September 25, Prepared by Battelle Memorial Institute

INLAND WATERWAYS USERS BOARD 14 TH ANNUAL REPORT TO THE SECRETARY OF THE ARMY AND THE UNITED STATES CONGRESS WITH APPENDIXES

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

Marine Board Meeting April 13, The Economic Impact of the Port of Memphis. on the Memphis and Shelby County Economy by Younger Associates

CSX BRIDGE OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS. Introduction

Coal Combustion Facility Assessment Report. October 20, 2010

Small Business Industry Day Project Development Process

KANSAS CITY DISTRICT. Clinton Lake s Role in the Wakarusa Watershed. Samantha Jones, Park Manager Clinton & Hillsdale Lakes 5 November 2014

DSWR Safety Engineering Program. Core Purpose: Protect human life, health & property from dam failures. Ohio Dam Safety Responsibilities

INLAND WATERWAYS USERS BOARD TWELFTH ANNUAL REPORT TO THE SECRETARY OF THE ARMY AND THE UNITED STATES CONGRESS WITH APPENDIXES

Replacing Existing Lock 4: Innovative Designs for Charleroi Lock

Transcription:

Nashville District October 2011 Update Tom Cayce Chief of Programs and Project Management October 18, 2011 US Army Corps of Engineers

Nashville District Value to the Nation LRN 12% of inland navigable waterways (1,175 navigable river miles) 2.5% of ton miles on inland navigable waterways

Nashville District Value to the Region Great Lakes and Ohio River Division Civil Works Boundaries Southern most District in the Great Lakes and Ohio River Division 56,000 square miles (parts of 7 states) Tennessee and Cumberland River basin systems Largest storage reservoir East of the Mississippi River (Lake Cumberland) Critical support and access to major TVA power production and DOE Facilities 34 Million Visitors a year on six district lakes (Destination)

Twin River Systems Mississippi R. Ohio R. Paducah Kentucky Kentucky Lock Tennessee Tennessee R. Barkley Cumberland R. Cheatham Nashville Cumberland River Basin Kentucky Old Hickory J.Percy Priest Center Hill Major Rehab Wolf Creek Major Rehab Cordell Hull Laurel Dale Hollow Melton Hill Martins Fork Ft. Loudoun Watts Bar Knoxville North Carolina Virginia Pickwick Chattanooga Mississippi Wilson Wheeler Nickajack Chickamauga Lock South Carolina Alabama Guntersville Tennessee River Basin Georgia Lock & Dam Dam Cumberland River System - Operate and Maintain 10 Multi-Purpose Projects (4 Locks and 6 Dams) Tennessee River System - Operate and Maintain 10 Locks (Partner with for Dams and Hydro)

Concern: Deteriorating Infrastructure 10 Dams preventing $750M annually in damages 2 largest reservoirs DSAC 1 (8 million acre-feet of storage) 18 Lock chambers at 14 sites 11 Locks in operation for over 50 years Average age of locks: 59 years RISK Minimal advanced maintenance on projects (ARRA Helped) Currently Fix projects as they Fail Now moving towards Fail to Fix projects Can we afford the infrastructure in our inventory?

Budget Comparisons - FY 2007 - FY 2012 ($Millions) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 CORPS LRN CORPS LRN CORPS LRN CORPS LRN CORPS LRN CORPS LRN Invest 94.0 0.2 90.0 0.3 91.0 0.1 100.0 0.1 104.0 0.1 104.0 0.0 Construction 1,555.0 58.0 1,523.0 167.1 1,402.0 177.3 1,718.0 181.0 1,690.0 215.2 1,480.0 210.7 O&M 2,258.0 68.5 2,471.0 83.3 2,475.0 83.4 2,504.0 84.8 2,361.0 78.1 2,314.0 83.0 FCCE 81.0 40.0 40.0 41.0 30.0 27.0 GRF 164.0 177.0 180.0 190.0 193.0 196.0 TOTAL 4,733.0 126.6 4,871.0 250.6 4,741.0 260.8 5,125.0 265.8 4,939.0 293.3 4,631.0 293.7 % PB 2.7% 5.1% 5.5% 5.2% 5.9% 6.3% E&W Approp 5,340 5,592 5,402 5,445 5,055 4,631??

Cumberland River Profile 1 2 3 4 Dam Safety Action Classification (DSAC) Level

Cumberland River Basin Reservoir System Barkley Wolf Creek Laurel Martins Fork Cheatham Clarksville Cordell Hull Carthage Nashville Celina Dale Hollow Run-of-River J. Percy Priest Old Hickory Center Hill Flood Damage Reduction

Operation Watershed 4/26/2011 5/4/2011 Rainfall & Project Operations Cumberland River Basin Elevation (ft) 730 725 720 715 710 705 Operation Watershed - Wolf Creek Dam Observed Without Reductions Top of Hydropower Pool Barkley Lock & Dam Cheatham Lock & Dam Cordell Hull Lock & Dam 700 695 4/12 4/22 5/2 5/12 5/22 6/1 Wolf Creek Dam Old Hickory Lock & Dam Operation Watershed - Dale Hollow Dam 664 Top of Flood Control Pool Storage conserved in Barkley and Kentucky 4.65 feet Dale Hollow Dam Elevation (ft) 662 660 658 656 Observed Without Reductions Dale Hollow 0.51 J. Percy Priest 0.65 Center Hill 0.95 654 652 Top of Hydropower Pool 650 4/12 4/22 5/2 5/12 5/22 6/1 Wolf Creek 2.54 J. Percy Priest Dam 660 655 Observed Without Reductions Operation Watershed - Center Hill Dam 506 504 502 Operation Watershed - J. Percy Priest Dam Top of Flood Control Pool Observed Without Reductions Center Hill Dam Elevation (ft) 650 645 640 Top of Hydropower Pool 500 635 Storage at Peak Elevation Elevation (ft) 498 496 494 630 625 4/12 4/22 5/2 5/12 5/22 6/1 492 Available 490 488 Peak 4/12 4/22 5/2 5/12 5/22 6/1 Pie area scaled to storage capacity

Wolf Creek Dam Project DSAC I Classification - Karst foundation seepage $584M Total Cost, $371M Obligated, 55% Complete Barrier Wall Completion Estimated Dec 2013 Gallery Grouting Mobilizing Critical Area 1 Drilling and Grouting; Access Road; Platform Raising Technique Area 2 Complete Non-Critical Areas Barrier Wall Installation (30% complete) Rock Foundation Beneath CA 1 Current as of Sep 2011 Technique Area 1 Complete Halcomb s Landing Complete 10

Wolf Creek Dam Foundation Remediation ICOS Wall Sheet Pile Wall Elev 750 New Wall Work Platform Lake Cumberland Clay Embankment Elev 525 Elev 475 Limestone Bedrock Elev 425

Treviicos Soletanche JV Proposal Wall Dam Protective Concrete Embankment Wall (PCEW) Foundation Soil Bedrock

Timeframe Major Construction Contracts 2008-10 (1) Grouting at Embankment and Left Rim Complete 2011-14 (2) Barrier Wall at Embankment Award Sep 2011 2012-14 (3) Saddle Dam Foundation Work Award 2012 Grout & Cutoff Walls Center Hill Dam (3) Saddle Dam Embankment Appropriate Treatment TBD Main Embankment & Left Rim (1) Grouting- complete (2) Barrier Wall DSAC I Classification- Karst foundation seepage $295M Total Cost, $117M Obligated Barrier Wall Completion Jul 2014 Project Completion Dec 2014 13 Legend Grout Curtain Barrier Wall Cave Feature Sinkholes

Center Hill Grouting Program 419 260 421 Slide 14

Center Hill Barrier Wall (Looking Upstream) Encasement Wall

Roller Compacted Concrete (RCC) Stability Berm Downstream of the Saddle Dam Embankment Slide 16

Transportation Comparison Statistics Category Barge Rail Truck Fuel Efficiency (miles/gal/ton) Fatalities (ratio per ton-mile) Injuries (ratio per ton-mile) Spills (gallons per Mton-mile) Emissions HC (ratio per ton-mile) 576 413 155 1 23 155 1 125 2,171 3.6 3.9 6.1 1 1.4 1.2 Source: Texas Transportation Institute, Dec 2007

Kentucky Lock Currently longer tows must perform double lockages (increased time and money) New lock double the size New rail and road bridges Cofferdam complete Monolith walls under construction $713.4M Project FY 11: $2.9M + $55M (ARRA) FY 12 Budget: $0M IWTF Funding Challenges

Overall Project July 2011 Slide 19

BUILDING STRONG

Upstream Monolith Contract Excavation and construction of 9 of 61 monoliths for new lock. Entire critical path of project for 2 years. Awarded Base contract (Jan 2010) and 5 of 10 options $48.0M out of $57M total contract 33 Month long contract (including 5 Opt s) Remaining 5 options Each option completes a monolith to full height $8.9M required to exercise all 5 Would increase contract length to 36 months or more

Lock Excavation - 6 Oct 2011 Slide 22

Kentucky Lock Funding Status Project funding - 50% Federal & 50% Inland Waterways Trust Fund (IWTF). IWTF - revenues from a special $0.20 per gallon Federal tax on marine diesel fuel. American Recovery and Reinvestment Act (ARRA) - short term relief for KY Lock & other navigation projects not require IWTF match. KY Lock - $79.6M in ARRA funds - allowed new lock construction to resume after its halt in 2006.

KY Lock Future Funding Existing ARRA - Maintain construction activities thru 1 st Quarter FY 13 (Upstream Lock Monoliths). To meet 2016 project completion date requires additional funds in FY 12 Status of IWTF Unlikely project receives significant additional funding until at least FY 13 - Depends on the fix to the IWTF by Congress No additional funding in FY 13 Mothball project

O&M Project Review Mississippi R. Ohio R. Paducah Kentucky Tennessee Barkley Cumberland R. Cheatham Nashville Cumberland River Basin Kentucky Old Hickory Wolf Creek Cordell Hull Laurel Dale Hollow Martins Fork Knoxville Virginia Tennessee R. J.Percy Priest Center Hill Melton Hill Ft. Loudoun Watts Bar North Carolina Mississippi Pickwick Wilson Wheeler Chattanooga Nickajack Chickamauga Georgia South Carolina Alabama Guntersville Tennessee River Basin Lock & Dam Dam

O&M Funding ($ Millions) FY 08 FY 09 FY 10 FY 11 ARRA FY 12 TN River Budget TN River Approp CU River Budget CU River Approp 23.4 21.4 20.6 20.1-21.8 21.9 17.1 19.6 19.6 25.2 59.9 62.0 64.0 57.9 57.8 58.8 57.9 71.2 93.1 37.1

Hydropower O&M Major Rehabs & Uprates 9 Projects in operation with 28 units Installed Capacity of 914 Megawatts 3.4 B Kilowatt-Hours produced annually $44M/year returned to the U.S. Treasury Customer-Funded Activities FY 08 & 09 - $25.0M FY11 to FY30 MOA $30M to $50M/Year (Recently approved) Typical Work Items: Rehab Powerhouse Crane Rewind Generator (Barkley award in FY11) Replace Generator Air Coolers, Thrust Bearing Replace Turbines

Recreation #1 Federal Provider of Outdoor Recreation 34 Million Visitors per Year (More than Disney World) 4,835 Miles of Shoreline 3,379 Campsites 254 Miles of Trails 288 Boat Launch Ramps $750 Million spent by visitors at Corps projects

Nashville District Homepage www.lrn.usace.army.mil