KETTERING ICE ARENA STRUCTURAL & MEP STUDY

Similar documents
PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

STATE UNIVERSITY CONSTRUCTION FUND

Property Condition Assessment

Building Inspection Report

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

Section 4 - Design and Construction Overview

CONSTRUCTION REQUIREMENTS

Delco Activity Center Site Summary

ADDENDUM 2 - JULY 14, 2015

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Borough of Doylestown Building and Zoning Department

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

TABLE OF CONTENTS Public Safety Building

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:

KU West Campus LEEP II High Bay Facility Project # , A (c)

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Assessment Report Burgess Park Gymnasium. Summary

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Gerald R. Ford Museum

Building Safety Inspection Report Form STRUCTURAL

Administration Building Needs Assessment

Draft Feasibility Study for the Expansion of Southeast Library

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Element Z General Design Requirements Existing Facilities Information

TRANSPORTATION AND OTHER DAMAGE

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

GENERAL FRAME INFORMATION

Minuteman Regional Vocational Technical School

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT

Timberglen Recreation Center Summary

A/E Design Deliverable Checklist

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Project Design Overview

GROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall

Energy Reduction Strategy Through 2020

City of Westerville Guide to Commercial Inspections

Chilled Water Plant Assessment & Criteria Design

Figure 10-1 Elevated Mechanical Mezzanine Room Location

Building Permit Application

1733 TW ALEXANDER DRIVE

Appendix J - Custom Uniformat for EDU Migration

TABLE OF CONTENTS. (Δ = Rev 06/08)

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

Overall Existing Conditions Summary

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

MAINTENANCE & OPERATIONS

Facility Condition Assessment

Design Manual Phase Checklist

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013

Schedule of Values Cruise Terminal 2 Expansion

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

NEWPORT OFFICE CENTER Washington Boulevard, Jersey City, New Jersey

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

STATE UNIVERSITY CONSTRUCTION FUND

Building Architecture

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

200 Minuteman Drive. New Design for Additional Floors and Vibration Sensitive Equipment. Brent Ellmann. Structural Option

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

Telecommunication Spaces

Table of Contents. City of Plattsburgh City Beach Property

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Architectural Inspection Pitched Roofing

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Bowie Ice Arena: Executive Summary Council Meeting

CONTRACT NO. DOL-ETA-16-C-0043

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

Disaster Prevention and Protection Checklist

RFP /ME - ADDENDUM 2

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

Welcome to the Texas Institute of Building Design

K.B. Polk Recreation Center Summary

Building Systems and Design Elements included in SliDeRulE

Mechanical Systems Project Proposal

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

HOUSE ADDITIONS A guide to the plans required when applying for a Building Permit

Transcription:

KETTERING ICE ARENA STRUCTURAL & MEP STUDY PREPARED BY: HEAPY ENGINEERING MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY 1400 WEST DOROTHY LANE DAYTON, OHIO 45409-1310 HEAPY PROJECT NO. 2013-07046 MARCH, 2014 Cleveland Columbus Dayton Findlay Lawrenceburg Indianapolis 1400 W Dorothy Lane Dayton, OH 45409 (937) 224-0861 www.heapy.com An ISO 9001-2008 Certified Company FS 98575 Heapy Engineering All Rights Reserved Form F4.1-03, Rev. 5, 12/21/12 2013-07046 Report 3/5/2014 12:58 PM

CITY OF KETTERING KETTERING ICE ARENA STRUCTURAL & MEP STUDY MARCH, 2014 TABLE OF CONTENTS I. EXECUTIVE SUMMARY... 1 II. STRUCTURAL TECHNICAL ASSESSMENT... 9 III. ROOFING TECHNICAL ASSESSMENT... 12 IV. FIRE SUPPRESSION/PLUMBING TECHNICAL ASSESSMENT... 14 V. HVAC TECHNICAL ASSESSMENT... 18 VI. ELECTRICAL TECHNICAL ASSESSMENT... 25 VII. ICE MAKING AND ASSOCIATED EQUIPMENT... 29 VIII. APPENDIX A (SHELL AND MEYER STRUCTURAL INFORMATION)... 35 IX. APPENDIX B (COMMAND ROOFING INFORMATION)... 35 X. APPENDIX C (DANIS INFORMATION)... 35 XI. APPENDIX D (CUT SHEETS)... 35 XII. APPENDIX E (ICE MAKING CHILLER, OPTION NO. 1, CIMCO)... 35 XIII. APPENDIX F (ICE MAKING CHILLER, OPTION NO. 2, SERV-ICE)... 35 XIV. APPENDIX G (ICE MAKING CHILLER, OPTION NO. 3, WAIBEL TRANE)... 35 2013-07046 TOC

I. EXECUTIVE SUMMARY The technical assessment of the City of Kettering, Kettering Ice Arena consists of field visits and review/evaluation of the building Structural, Roofing, Plumbing, Fire Suppression, HVAC, and Electrical systems and components. The assessment includes a description of each system and its components and, more importantly, the evaluation of each. The following lists show the major items for each system that require attention. Under each system type, the recommendations are further categorized by the urgency for the recommended work. A. STRUCTURAL RECOMMENDATIONS 1. Option No. 1: Maintain Current use of Existing Roof Structure a) The existing roof trusses and purlins over the main ice arena are currently loaded to their maximum capacity. We do not recommend adding any additional weight to the existing roof structure. b) The existing roof structure can safely support the weight of a new roof however; the old roof, insulation and ceiling must come off prior to reroofing. This includes removal and replacement of the existing corrugated metal roof deck with a new metal deck of the same size and thickness to maintain the structural integrity of the roof diaphragm. c) The existing roof purlins should be re-evaluated by a structural engineer for damage prior to re-roofing. The purlins were not fully visible during the initial structural evaluation; therefore, the current structural conditions are unknown at this time. Given the age of the structure and the past history of roof leaks, some corrosion of the steel purlin supports is to be expected. Any existing purlins found to have suffered structural damage should be replaced before installing the new roof deck. d) A new insulated roof system with insulation values of either R-20 or R-30 may be safely supported by the existing roof structure. e) The probable construction cost of Option No. 1 is included in section I (H) of this report and is included in further detail in Appendix A of this report. 2. Option No. 2: New Conventionally Framed Steel Roof a) Remove the existing structural steel roof framing down to the top of the sloped concrete pedestal above the existing footings. Remove the top portion of the pedestal above the floor line to provide a level surface for the new columns. b) Install new structural steel columns and beams to support new long-span steel bar joists, metal decking, rigid insulation and roofing across the existing ice rink. c) Install new structural steel braces on each side of the building to laterally brace the roof structure. d) Install new light-gage metal framing and siding between the new columns to enclose each side of the building. 2013-07046 PAGE 1

e) The probable construction cost of Option No. 2 is included in section I (H) of this report and is included in further detail in Appendix A of this report. 3. Option No. 3: New Rigid Frame and Steel Purlin Roof a) This type of roof framing system is not recommended for use in existing buildings due to the extensive amount of structural modification required to reinforce the existing foundation for the additional horizontal thrust generated by the long span of the roof. A cost estimate was not provided for this option as it was not recommended for this space. 4. A combined structural and roofing estimate is included in section I (H) of this report. B. ROOFING RECOMMENDATIONS 1. Option No. 1: Maintain Current use of Existing Roof Structure a) If structural Option No. 1 is selected, the recommendation for the roofing type would be the adhered systems because of the physical challenges of running the seam welder on the steep slope, although in later conversations, this was less of an issue. 2. Option No. 2: New Conventionally Framed Steel Roof a) If structural Option No. 2 is selected, it will result in a more traditional 'flat' roof that will make future maintenance and replacement much easier. The total cost to the owner is obviously a lot higher but should result in a much nicer facility. One consideration to make sure was incorporated would be a roof hatch or outside access ladder with this option. 3. A combined structural and roofing estimate is included in section I (H) of this report. C. COMBINED STRUCTURAL AND ROOFING 1. Scope of work (Option No. 2 as discussed with Danis) a) Demolish trusses and support framing/install new steel truss system. b) Demolish roof/install new flat roof system with steel framing and supports. c) Remove existing concrete pedestals above floor/install new concrete piers for structural columns. d) Furnish and install metal wall panels on all four sides. e) Furnish and install perimeter beams. f) Furnish and install new columns. 2. Exclusions to scope (Option No. 2 as discussed with Danis) a) All mechanical systems are to be removed and replaced by others. b) We exclude any hazardous material removal and/or remediation. c) Fireproofing is not included in this estimate. d) Any existing ice rink equipment is to be removed by others prior to construction. e) No roof drains, scuppers or downspouts are included in this estimate. 2013-07046 PAGE 2

f) Rooftop tie-offs are not included in this estimate. 3. The probable construction cost of Option No. 2 as priced by Danis is included in section I (H) of this report and is included in further detail in Appendix C of this report. D. PLUMBING/FIRE SUPPRESSION RECOMMENDATIONS 1. Replace fire suppression piping with new black steel schedule 40 piping. 2. Install refrigerated air dryer for dry pipe fire suppression system. 3. Replace dry pipe sprinklers and piping in ice rink arena. 4. Replace electric water heater serving the Zamboni room. 5. The probable construction costs for the plumbing / fire suppression items listed above are included in section I (H) of this report. E. HVAC RECOMMENDATIONS 1. Replace cooling tower and associated condenser water pump. Assess cooling tower s current location for proper operation relative to maintenance and clearance requirements. 2. Replace chiller and associated chilled water pumps. Provide ASHRAE 15 compliant refrigerant leak detection alarming and purge system. 3. Replace existing gas-fired infrared heating system around the perimeter of the Arena. 4. Replace indoor air handling units and associated air terminal units with new. 5. Replace existing Arena dehumidification units and exhaust fans with new. 6. The probable construction costs for the HVAC items listed above are included in section I (H) of this report. F. ELECTRICAL RECOMMENDATIONS 1. Replace main switchboard MD-1 with new. Replace all original electrical distribution equipment during the replacement of MD-1. Install metering to monitor the differing loads of the Ice Rink, Water Park, Senior Center and the Work out Center. 2. Replace existing feeders and branch circuitry during gear replacement. 3. Replace the lighting in the ice rink with new energy efficient fixtures and new lighting control. 4. Replace the lighting in the rest of the facility with energy efficient fixtures. 5. The probable construction costs for the electrical items listed above are included in section I (H) of this report. 2013-07046 PAGE 3

G. ICE MAKING EQUIPMENT 1. Replace the existing chiller, cooling tower, pumps, cooling tower sump, water heaters, dehumidification equipment, etc. associated with the ice making equipment. 2. The probable construction costs for the ice making equipment are as listed in section I (H) of this report. Three manufacturers were consulted and all three costs are indicated. H. COST OPINION SUMMARY Probable Cost of Construction for the renovation of the Kettering Ice Arena (systems as noted) Item Probable Cost of Construction Notes Structural and Roofing Option 1 Structural Roofing Replacement, Option 1 $ 82,200 $ 82,200 a, e Roofing Replacement, Option 1 $ 360,000 $ 400,000 Removal of existing roofing system $ 15,000 $ 40,000 Gutters and downspouts, assumes existing storm is sufficient to handle $ 6,150 $ 10,000 e Roofing Option 1 Sub Total $ 463,350 $ 532,200 Low High a, e, h Option 2 Structural Roofing Replacement Option 2 $ 765,200 $ 765,200 b, e Roofing Replacement Option 2 $ 360,000 $ 400,000 Removal of existing roofing system $ 75,000 $ 125,000 b, e, i Gutters and downspouts, assumes existing storm is sufficient to handle $ 6,150 $ 10,000 e Roofing Option 2 Sub Total $ 1,206,350 $ 1,300,200 Option 3 Roofing Option 2 as priced by Danis Building Construction $ 1,704,201 $ 1,704,201 g 2013-07046 PAGE 4

Ice Rink Equipment Option 1, Cimco Replace Chiller, cooling tower and pumps with new NA NA j Replace ice rink dehumidification units and exhaust fans NA NA j Labor for installation of equipment, misc piping $ 350,000 $ 450,000 m Provide ventilation in mechanical room $ 10,000 $ 10,000 Remove existing floor and dispose $ 208,140 $ 208,140 k Replace floor, including piping in floor for refrigeration $ 479,730 $ 479,730 k Ice Rink Equipment Option 1 Sub Total $ 1,047,870 $ 1,147,870 Option 2, Serv-Ice Replace Chiller, cooling tower and pumps with new $ 330,000 $ 330,000 Replace ice rink dehumidification units and exhaust fans $ 144,000 $ 144,000 Labor for installation of equipment, misc piping $ 350,000 $ 450,000 m Provide ventilation in mechanical room $ 10,000 $ 10,000 Remove existing floor and dispose $ 208,140 $ 208,140 k Replace floor, including piping in floor for refrigeration $ 479,730 $ 479,730 k Ice Rink Equipment Option 2 Sub Total $ 1,521,870 $ 1,621,870 Option 3, Waibel Trane Replace Chiller, cooling tower and pumps with new $ 387,771 $ 387,771 Replace ice rink dehumidification units and exhaust fans $ 144,000 $ 144,000 Labor for installation of equipment, misc piping $ 350,000 $ 450,000 m Provide ventilation in mechanical room $ 10,000 $ 10,000 Remove existing floor and dispose $ 208,140 $ 208,140 k Replace floor, including piping in floor for refrigeration $ 479,730 $ 479,730 k Ice Rink Equipment Option 3 Sub Total $ 1,579,641 $ 1,679,641 2013-07046 PAGE 5

Floor Replacement Replace existing floor with new $ 687,870 $ 687,870 k Replace piping in floor $ 105,000 $ 105,000 l Labor for piping replacement $ 50,000 $ 75,000 Plumbing Sub Total $ 842,870 $ 867,870 d Fire Suppression Replace fire suppression piping in rink (dry pipe system) $ 75,000 $ 75,000 Replace fire suppression piping (not in ice rink) $ 30,250 $ 30,250 Install new air dryer on fire suppression piping system $ 3,000 $ 5,000 Install new gas line to the building NA NA f Fire Suppression Sub Total $ 108,250 $ 110,250 d Plumbing Add boiler to Zamboni melting pit $ 15,000 $ 20,000 Replace electric water heater serving Zamboni $ 32,000 $ 37,000 Plumbing Sub Total $ 47,000 $ 57,000 d HVAC Replace cooling tower and pump $ 131,000 $ 131,000 Replace chilled water pumps and refrigerant monitoring system $ 145,000 $ 145,000 Replace infrared heating system $ 40,000 $ 40,000 Replace indoor air handlers (2) and air terminal units $ 155,000 $ 155,000 c Replace ice rink dehumidification units and exhaust fans $ 144,000 $ 144,000 Upgrade HVAC controls to DDC, extension of existing system $ 150,000 $ 250,000 HVAC Sub Total $ 765,000 $ 865,000 d 2013-07046 PAGE 6

Electrical Replace main switchboard $ 68,000 $ 68,000 Replace feeders and branch circuitry $ 370,000 $ 370,000 Replace lighting in ice rink, including controls $ 94,500 $ 125,000 Replace lighting in remainder of ice facility $ 48,000 $ 60,000 Electrical Subtotal $ 580,500 $ 623,000 d Totals (Materials and Labor only, no design costs included) $ 5,627,462 $ 5,906,962 This assumes taking worst cast for each section Notes a. Cost does not include temporary shoring or bracing for the demo work to take place. Also, the cost for the demolition is based upon RS Means data, a more accurate estimate will depend on the exact makeup of the roofing and structural system. b. Cost does not include temporary shoring or bracing for the demo work to take place. Also, the cost for the demolition is based upon RS Means data, a more accurate estimate will depend on the exact makeup of the roofing and structural system. c. Exact quantity of air terminal units depends on programming and design, for cost estimating purposes, ten (10) air terminal units were estimated (eight (8) units are in place today per the drawings) d. Cost does not include architectural adjustments or fees. e. Cost derived from RS Means f. Refer to report, not enough information at this time for pricing by Vectren. g. Details of this estimate are included in Appendix C of this report h. Cost from Danis to remove existing roof is approximately $93,000 i. Cost from Danis to remove existing roof and structure is approximately $151,000 j. As of March 3, 2014, no cost has been received from Cimco. k. Cost estimate from Danis l. Cost estimate is from ice mats, in floor piping costs perceived to be similar. m. Cost for installation is based on historical data. Typical installation is equal to equipment costs for receiving, setting, piping, permits, etc. Summary: The replacement of the structure and roof includes information from Shell and Meyer, Command Roofing as well as Danis Building Construction. Option No. 2 is the largest cost option and is what is included in the total. The replacement of the chiller system to create the ice has a varied price range. The budget includes the worst case cost for the system of $1,679,641. This cost does not include water treatment for the cooling tower system. The floor replacement is an option but due to the age and the cost of the remainder of the replacement, is recommended. 2013-07046 PAGE 7

Costs for fire suppression work are all recommended items and include areas generally pertaining to the ice arena only, unless otherwise noted. We did not include pricing for current restroom or locker room replacement work. Costs for the plumbing work are all recommended items and include areas pertaining to the ice arena only. We did not include pricing for current restroom or locker room replacement work. Costs for the HVAC work are all recommended items and include work throughout the ice arena as well as the remainder of the ice building. Costs for the electrical work are all recommended items and include work throughout the ice arena as well as the remainder of the ice building. The total cost estimate is approximately $5.6M to $5.9M for the items as listed above. Design costs for architectural, structural, civil, plumbing, mechanical and electrical design are estimated at 9% of the estimated construction cost for an additional $530,000. The total cost estimate for the work highlighted in this report would be $6.43M. We understand that there is additional work, not included in this report that will be performed during the renovation. These areas include the locker rooms, offices, lobby, restrooms, or other similar spaces. A design cost to carry for these areas is 9% of the construction cost. 2013-07046 PAGE 8