Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

Similar documents
SADC ENERGY PROGRAMMES AND PROJECTS.

1 INTRODUCTION 1.1 TERMS OF REFERENCE

HYDROPOWER EXPLOITATION AND INDUSTRIAL DEVELOPMENT OF AFRICA

PRESENTATION TO 7 th GERMANY- AFRICAN ENERGY SUMMIT APRIL 2013, GERMANY

Embedded Generation: A Private Sector Perspective

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

Overview of the Southern African Power Pool (SAPP) energy programme for the Southern African Development Community (SADC)

Rapid Hydropower Assessment Model Identify Hydroelectric Sites Using Geographic Information Systems

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

ZAMBIA REFIT POLICY 2015 GENERAL OVERVIEW

SECURITY OF POWER SUPPLY

HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY

Chris le Grange & Pierre Pisterman Project Manager Hydro Tasmania & CEO HPP South Africa & France

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

EUR 1,4 billion invested. since 2003

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

AN OVERVIEW OF TANAHU HYDROPOWER PROJECT. Presented by: Achyut Ghimire TANAHU HYDROPOWER PROJECT TRADE TOWER, THAPATHALI, KATHMANDU

BURUNDI, RWANDA, TANZANIA

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

Background. Become well establish energy producing company in Nepal.

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Issues in Financing Hydro Plants

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

INFRASTRUCTURE. US$2.27 billion 17% MW

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

More Creek Hydroelectric Project Prefeasibility Study

ENERGY, ECOSYSTEMS AND LIVELIHOODS IN EASTERN AND SOUTHERN AFRICA

Background. Become well establish energy producing company in Nepal.

Background. Become well establish energy producing company in Nepal.

For personal use only

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

SECTOR ASSESSMENT (SUMMARY): ENERGY

Powering a Green Africa:

CONCENTRATED SOLAR POWER POTENTIAL OVERVIEW

Small Hydropower Projects (SHPP) Training Workshop Project Documentation for Project Assessment. Yerevan, 12./

HYDROPOWER AND WATER RESOURCES

10 Project Cost Estimation

Background. Become well establish energy producing company in Nepal.

MEETING ENERGY NEEDS WITH CLEAN AND RENEWABLE POWER

PRESENTATION TO 6 TH GERMAN-AFRICAN ENERGY FORUM, 23 RD APRIL 2012, GERMANY

2.24 VIENGPHOUKA THERMAL PROJECT

POWER INDABA CONFERENCE

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

Energy Policy in Lao PDR

South Africa s hydroelectricity success. A case study of the first hydro power project in South Africa since the mid 1980 s.

Climate Change and Energy Vulnerability Country dashboard Quick View. Zambia - Draft 21 September 2012

Developing Mini-grids in Zambia How to build sustainable and scalable business models?


GET FiT Programme: Leveraging private investments in renewable energy. Bank aus Verantwortung

World Renewable Energy Technology Congress

Renewable energy: Investing in Africa

BACKGROUND INFORMATION DOCUMENT (BID)

5 Muskrat Falls Project

2. Andhikhola Hydro Electric & Rural Electrification Project (5.1MW):

FEASIBILITY STUDIES FOR THE UPGRADING OF LUSIWASI HYDRO POWER STATION IN SERENJE DISTRICT OF ZAMBIA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name. CM PRG for Kribi Gas to Power Project (FY09) Region

Hydropower & Dams Services

ANDHIKHOLA HYDRO ELECTRIC & RURAL ELECTRIFICATION PROJECT (5.LMW):

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

ENERGY SECTOR PRIORITIES PROJECTS AND INVESTMENT OPPORTUNITIES

Ministry of Infrastructure The Republic of Rwanda AFRICA ENERGY FORUM JW MARRIOTT HOTEL, DUBAI 9 th JUNE, 2015

More Creek Hydroelectric Project Prefeasibility Study

A presentation of the Zambia Development Agency

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

The women in our village want solar panels so their children can study at night.

Technical considerations for integration of distributed renewables on the grid

Regional Rusumo Falls Hydroelectric Project. Terms of Reference for the Project Manager

CONTENTS 1.1 BACKGROUND AND PROGRESS OF IMPLEMENTATION OF SHP 1.2 POWER SUPPLY POSITION

Profiles of 12 proposed Mainstream developments in the LMB

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Fast Tracking Hydro Infrastructure Build in Developing Economies. BJ Rochecouste Collet Technical Director Aurecon South Africa

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Water to wire environmentally and socially sustainable small hydro power plants in Zimbabwe Andy Eaton, Hydro Sales Engineer, Gilkes, UK Gianluca

The Jeffreys Bay Wind Farm

Africa Clean Energy Corridor. Yong Chen Programme Officer for Asia and the Pacific Suzhou, 8 November 2015

Hydropower retrofitted onto existing water infrastructure assets

The global financial crisis and its impact on the Southern Africa Power Pool (Part 2)

2.32 XESET 2 HYDROPOWER PROJECT

Gender Mainstreaming in ADB s Energy Projects in Nepal. Pushkar Manandhar 2 October 2017

TECHNICAL ASSISTANCE - SMALL HYDRO DEVELOPMENT IN KENYA Andrew Njoba Team Leader, Clean Energy Promotion KENYA ASSOCIATION OF MANUFACTURERS KENYA

Techno-Economic Assessment Study Rogun HPP. Phase II Considerations. Riparian Consultations

HYDROPOWER DEVELOPMENT AND REGIONAL INTEGRATION FOR NEPAL

SUSTAINABLE ENERGY MIX PORTFOLIO FOR. Namibia. By: BJ Mbuere ua Mbuere. 15 March 2018

Susitna Hydro Evaluation Project

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT

Ncondezi Project Update

SOLAR PHOTOVOLTAIC ENERGY PROGRESS IN ZAMBIA: A REVIEW

For personal use only

AFRICA CLEAN ENERGY CORRIDOR Infrastructure for Renewable Power. Kudakwashe Ndhlukula Programme Officer, IRENA

2 Demanding Markets. 3 Competitive Solutions. 4 International Presence. 6 Gas Turbines and Combined Cycle Plants. 10 Steam Power Plants.

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

1. Background Provisioning Regulating: Cultural:

HYDROPOWER DEVELOPMENT IN NORTH AFRICA

KINGSTON SOLAR LP. Sol-Luce Project Overview. August 13, 2014

Clean Energy Development in Sri Lanka

Transcription:

Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

Western Power Company Western Power Company (WPC) is a Zambian Independent Power Producer which is working for the development of Zambia through electricity generation which is sustainable, clean, efficient and cost effective. Currently focussed on developing the Ngonye Falls Hydroelectic Scheme in the Western province of Zambia, WPC has a strategy to build and operate a portfolio of modern renewable energy plants in Zambia and across the Southern African Region. Western Power is headquartered in Lusaka and managed by a team of skilled Zambian and international professionals with expertise in engineering, infrastructure development, finance and construction.

Ngonye Falls Hydroelectric Scheme The Ngonye Falls on the Zambezi River in western Zambia present an opportunity which is unique for the Western Province for rapidly delivering cost effective and minimal environmental impact hydro-power generation. The site, which has excellent existing road access, is located close to growing load centres as well as interconnectors to the power grids of Namibia, Botswana and Zimbabwe. WPC has been undertaking feasibility and design for the Ngonye Falls site since 2009 under an exclusive license from the Zambian Ministry of Mines, Energy and Water Development. The company is now finalising the technical, economic, social and environmental studies required to bring the project to financial close and start of construction during 2016.

Ngonye Falls - Location

Ngonye Falls - Location

Ngonye Technical Summary 50-80MW installed capacity for 350-435GWhr per year of energy Barrage across the main east bank river channel with radial gates for sediment scouring, intake control and and flood passing Embankments for flood control Trapezoidal canal 3km in length from intakes to powerhouse Pit type powerhouse 50m from the river bank Two or three double regulated Kaplan turbine generating units of around 25MW output each Surface mounted switchyard and transformers to convert generated power to transmission voltages Capital cost estimate for construction: US$180m

Ngonye - Power House The power house will be mostly buried below the original ground level to reduce the visual impact of this infrastructure.

Ngonye - Hydrology High flow, lower head during flood stage peak during March: 12m of head and >4000cumecs of total river flow. Low flow, higher head during low stage lowest in December: 23m of head and 213cumecs of total river flow. Need to safeguard the aesthetics of the Ngonye falls and the aquatic environment minimum environmental base flow through reduced generation and flow intake control. Need to maximise economic power generation: From head during low flow periods and from flow during low head periods.

Capacity and Energy

Ngonye Grid Location

Ngonye Power Evacuation Power Evacuation study completed in 2013 in conjunction with ZESCO Transmission Transmission line alignment survey completed in 2014 including social, environmental and technical assessment Optimum configuration determined as 110km of new 220kV transmission line from Ngonye to Sesheke substation to utilise an existing spare 220kV substation bay at Sesheke New alignment inland of the Zambezi river to bypass settlements and agricultural land Approximately US$ 40m construction cost Further studies required include dynamic and transient analysis and contingency analysis

Ngonye Falls National Benefits Early contribution to the national power generation gap Generate power equivalent to 7 times the current total consumption of Western Province Strengthen and stabilise the Zambian power network and reduce power flows and losses from Southern Zambia to Western Zambia and neighbouring countries Ideally placed to export power to the SAPP region Demonstration of private sector capability to work with government to deliver new power infrastructure in Zambia A foundation stone for economic growth in Western Province

Ngonye Community Local communities will see tangible and sustainable benefits from this major infrastructure development. WPC has committed to long term community improvement through equity participation and a Community Development Fund. The Community Development Fund will be maintained from a percentage of gross energy revenue and administered by a trust with broad local membership and conforming to international governance requirements. The Development Fund will identify projects which are community led, accountable and matched to the needs of the communities they support. WPC is working with the Rural Electrification Authority (REA) and the national utility (ZESCO) to facilitate the delivery of electrification to the Sioma District where the project is situated.

Ngonye Work to Date CORPORATE, PERMITTING and COMMUNITY Securing of an exclusive right to undertake feasibility studies for Ngonye from Ministry of Mines, Energy and Water Development through the Office for Promoting Private Power Initiatives (OPPPI). MoU negotiated and completed with the Barotse Royal Establishment, traditional representatives of the community of the Western Province securing long-term cooperation for development of the project. MoU completed with Zesco, Zambia s national power utility covering corporate and technical interactions between WPC and Zesco. Expression of interest from Zesco for power take-off and equity participation. Implementation Agreement drafting in process and pending negotiations with Zambian Government. Discussions with possible power purchasers including Zesco, Nampower (Namibia) and Escom (South Africa).

Ngonye Work to Date TECHNICAL Scoping Study to understand the scale and general feasibility of the scheme complete by URS. River gauges installed to take daily measurements of Zambezi river levels above and below the falls. Base mapping of all topographic features, infrastructure, social and cultural features performed to build a project geographic information system Layout Options Study undertaken by URS to analyse possible power generation infrastructure options including first pass design of intake structures, canals and power house. Power evacuation study and transmission line alignment study completed Detailed site investigations specified by Norplan Hydropower completed including diamond core drilling, seismic survey, test pits, bathymetric and topographic survey and associated lab testing Interim Technical and Economic Feasibility study due for completion November 2014 Hydrodynamic modelling of the river system under way Full Technical and Economic Feasibility Study (TEFS) well advanced.

Ngonye Falls Work to Date SOCIAL AND ENVIRONMENTAL Environmental and Social Impact Assessment (ESIA) commissioned from DH Engineering Consultants and in process. Scoping meetings held with local community to explain the ESIA process and to outline the project, its impacts and benefits. Terms of Reference (ToR) submitted to Zambia Environmental Management Agency (ZEMA) and approved for completion of the EISA. Social baseline studies completed to survey all members of the locally impacted community to determine social and cultural structures and livelihoods. Dry and wet season environmental baseline studies undertaken to comprehensively study the land, water and air environments and flora and fauna they support.

FINANCIAL and FUNDING Ngonye Work To Date Market analysis and financial modelling completed to determine the project economic viability, funding requirements and projected financial returns. Scoping stage funding provided by the Zambian project initiators Early project preparation funding secured from Development Bank of Southern Africa (DBSA). Additional early stage debt and equity funding secured from private investors. DBSA committed to $1million for pre financial close activities Negotiations ongoing with technical and financial partners for provision of construction equity, debt and O&M services

Ngonye Falls The Way Forward

Ngonye Falls The Way Forward Technical and Environmental Completion of Environmental and Social Impact Assessment and additional work required for upgrading to meet IFC standards Q1 2015 Completion of Technical and Economic Feasibility Study Q1 2015 Completion of transmission line studies and design Q1 2015 Agreements and Permitting Implementation Agreement with the Zambian Government - GRZ / OPPPI Water and land rights issuance with community collaboration as enshrined in the Community MoU. Power Purchase Agreement negotiation and completion with ZESCO Connection Agreement including financial and technical aspects of ZESCO participation in transmission line Endorsement Agreement and Generation License

Ngonye Falls The Way Forward Financial Completion of debt and equity funding negotiations for construction finance Financial Close expected Q4 2015 Design and Construction EPC selection and contracting Detailed design with EPC contractor O&M selection and contracting Construction 24-30 months from 2016

Western Power Company Western Power Company Ltd Fig Tree House 1 Warthog Road Box 320181, Kabulonga Lusaka Zambia Tel: +26 0211 262 773 Web: www.westernpower.org Email: info@westernpower.org Engineers: Norplan Hydropower Lead Environmental Consultants: DH Engineering Energy Consultants: Energy Management Services Legal Advisors (international): DLA Piper Legal Advisors (Zambia): Chibesakunda and Company