Effect of Scheduling towards increase agricultural production in Libya.

Similar documents
Chapter 2 The Project Management Life Cycle

Schedule Compression

Schedule Compression

Fractal Exercise. Fractals, task farm and load imbalance

// How Traditional Risk Reporting Has Let Us Down

Chapter 3 Project Management

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT

Information Systems. Rationale Aims & Objectives. Rationale Aims & Objectives. Introduction to Project management. Ruel Ellis

COMM 391. Learning Objective 1. Learning Objectives. Introduction to Management Information Systems

BSB41515 Certificate IV in Project Management Practice. The Project Life Cycle. V1.0 Produced 29 March 2016

Program Evaluation and Review Technique (PERT)

Chapter 4 Project Management

International Association of Certified Practicing Engineers

FACTFILE: GCE DIGITAL TECHNOLOGY

Chapter 5 Project Scheduling. (Source: Pressman, R. Software Engineering: A Practitioner s Approach. McGraw-Hill,

EXECUTIVE STRATEGIES FOR RISK MANAGEMENT BY STATE DEPARTMENTS OF TRANSPORTATION EXECUTIVE SUMMARY

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar

E2-E3: MANAGEMENT. CHAPTER-3 PROJECT MANAGEMENT (Date of creation: )

Chapter 5 Software Project Planning

WORK MANAGEMENT SURVEY Executive Summary and Full Report

A Study on Business and Technology Strategy in Achieving Business Objectives

Unit 3: Traditional Project Delivery Using IT Applications

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

The Development of the Critical Factor Index Method

CHAPTER 7: BUSINESS SKILLS FOR TECHNICAL PROFESSIONALS

Project Planning & Scheduling

ISSN Number: Modelling Time-Constrained Software Development. Dr. Antony Powell Department of Management Studies, University of York

MGT/437. Project Management. Session #2 University of Phoenix 02/12/2004 Brian Smithson. 02/12/2004 MGT/437 #2 -- Brian Smithson 1

COMPETENCY MODEL FOR PERSONNEL RESEARCH ANALYST CLASS CODE 1739

Organizational Transformations Enabling And Sustaining Change

IO6 PILOT TRAINING GUIDELINES (for employers)

Chapter 2 Analyzing the Business Case

Staff Performance Appraisal using Fuzzy Evaluation

COMPUTERIZED VALUE STREAM SYSTEM (CVSS) TO REDUCE WASTE IN LEAN MANUFACTURING OPERATION

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

Effective Absence Management. Kristen Coady, Director- Absence Management Solutions S2E Conference October 7 th, 2015

Challenges of implementing Sustainability in Malaysian Housing Industry

Open Access Author Manuscript

Lecture- 10. Project Scheduling. Dronacharya College of Engineering

Employers Confederation of Latvia (LDDK) has carried out interviews in 30 companies in Latvia from 19 th November, 2015 to 8 th January 2016.

MEDICAL APPOINTMENT APPLICATION

Competency Mapping: Need for the Hour

Obstacles to Applying Total Quality Management to Sport Clubs in Al-Jouf, Saudi Arabia

How Business Analysis Can Improve Sales and Marketing Outcomes

Scheduling. Adapted from John Musser

An Introduction to Academic Strategic Planning

Project and Program Management in ehealth

Optimize Assembly Production Line using Line Balancing

Information Technology Project Management, Seventh Edition

CHAPTER 4 ANALYSIS AND DISCUSSION OF RESULTS

Project Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition

MEDICAL APPOINTMENT APPLICATION

Understanding and Managing Uncertainty in Schedules

IDENTIFY RISK AND APPLY RISK MANAGEMENT PROCESSES CANDIDATE RESOURCE & ASSESSMENT BSBRSK401A

We all know that what you measure gets done. But what if you are. measuring the wrong things and doing the wrong things as a result?

Q&As. Managing Projects with Microsoft Project Pass Microsoft Exam with 100% Guarantee

Chapter 1 The Manufacturing Plant as a Business System

Importance of Stable Velocity in Agile Maintenance

The Development of Condition Assessment for Heritage Building

Forecasting low-cost housing demand in Pahang, Malaysia using Artificial Neural Networks

Chapter 24. Software Project Scheduling

1. Have you tried opening a meeting? 2. What do you usually do to ensure everyone s time in the meeting is productive?

. Lokman Hakim Ismail, Magda Sibley and Izudinshah Abdul Wahab

// Improving Project Plans using a Schedule Maturity Framework

Project Management Courses

Elicitation of Requirements for a knowledge-based Framework in Product Development Process

Uncertain Supply Chain Management

Agile Projects 7. Agile Project Management 21

THE ITERATIVE ENGAGEMENT MODEL A CALCULATED RISK AND A WHOLE LOT OF REWARD. By Mikhail Papovsky CEO, Abraic, Inc.

Management of Multi Construction Projects using Primavera

Project Planning, Scheduling and Preparation of Quality Assurance Control Documents

ASSESSMENT OF PLANNING, SCHEDULING AND RESOURCE MANAGEMENT TECHNIQUE FOR RESIDENTIAL PROJECTS IN AHMEDABAD

Administrator s Institute Handbook

Adapting the Approach of Management by Projects in the Manufacturing Industry: A Conceptual Framework

Current Performance Measurement Practices Studies in the United Kingdom (UK) and Malaysia

5.3 Supply Management within the MES

Green Practice Knowledge Profiling among the Technical and Vocational Education Masters Programme Students

The Basic Waterfall Model. Software Process Models. Concurrent Development. (Concurrent Development) The Agile Critique of the Waterfall

Essity Engagement Survey 2018

Toolkit. The Core Characteristics of a Great Place to Work Supporting Framework and Tools. Author: Duncan Brodie

Getting Started with OptQuest

PROJECT SCHEDULING & CONTROL

Your answers are based upon how strongly you agree or disagree, and are constructed for the respondent to be able to form an overall opinion.

Management science can be used in a variety of organizations to solve many different types of problems; such as manufacturing and service

03/23/2016. Presented for Boston College Employee Development Office March 23, 2016 by Denise M. Guérin, JD, MS-PPM, PMP. Q&A from Session #1

ENGR 310. Project Planning. Lecture Mar 2008

Research Report IT barometer 2007

Project Management. Minsoo Ryu. Hanyang University.

Strategic Plan Roadmap

Microsoft Excel or Microsoft Project? Why Microsoft Office Project 2007 is Easier and More Effective for Managing Projects

Introduction to Systems Analysis and Design

Guidance on project management

Welcome to lecture 4 of Topic 2.9. In this lecture we focus on Phase 2 of the Project Management Lifecycle the planning phase

Proven Project Risk Management Techniques for Increased Project and Organizational Success

L & L Mitigation Aid for Effective Project Management System

PERFORMANCE APPRAISAL

Project Management The Challenges & Their Resolutions

Fifteen Undeniable Truths About Project Cost Estimates, or Why You Need an Independent Cost Estimate

COUNTRY REPORT. Conduction of Online Survey in Estonia /O1/

L2 The requirement study. Requirement Engineering. Fang Chen

Transcription:

International Refereed Journal of Engineering and Science (IRJES) ISSN (Online) 2319-183X, (Print) 2319-1821 Volume 1, Issue 1 (September 2012), 65-70 Effect of Scheduling towards increase agricultural production in Libya. Ahnaish Muftah Ahmad & Dr. Seow Ta Wee Faculty of Technology Management, Business and Entrepreneurship University Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, Malaysia Abstract :In project management, a schedule consists of a list of a project's terminal elements with intended start and finish dates. Terminal elements are the lowest element in a schedule, which is not further subdivided. Those items are often estimated in terms of resource requirements, budget and duration, linked by dependencies and scheduled. Project scheduling looks at which tasks need to be performed for a project and assigns deadlines for their completion. The project scheduler sets these deadlines by calculating how long each task should take to perform. Scheduling requires a comprehensive understanding of which action steps and possibilities need to In all phases of the project I. Introduction Project schedule is a strategic and an important tool in a project manager's portfolio for guiding a project successfully to its target completion date. For simple projects, a project schedule is basically a timeline or calendar which lists tasks and activities with expected start and finish dates. For more complex projects, a project schedule can be layered with different details to enable project managers to direct and manage resources more smoothly, communicate more frequently and effectively with stakeholders, and identify and monitor dependencies and constraints between tasks to avert preventable delays. The project schedule can be expressed in several display forms depending upon the purpose of the schedule, the stage of the development of the project Failure to meet schedule goals is most often due to unrealistic deadlines, passive project execution, unforeseen problems, or things overlooked in the plan. Studies indicated that the agricultural sector in Libya suffers from many difficulties, including the misuse of human and material resources, low productivity, high costs and the continuing decline in production levels. In addition, low and weak administrative and financial control, which led to the phenomenon of corruption in public projects, which led to a lack of access to the target of production in the agricultural sector? First National Conference for Public Policy at the University of Libya, Benghazi Garyounis Issa Abdul-Latif (2007) The studies indicated. That Project scheduling looks at which tasks need to be performed for a project and assigns deadlines for their completion. The project scheduler sets these deadlines by calculating how long each task should take to perform. Scheduling requires a comprehensive understanding of which action steps need to get done and when. (Moehring et al. 2000) Scheduling is an inexact process in that it tries to predict the future. While it is not possible to know with certainty how long a project will take, there are techniques that can increase the likelihood of being close (Brucker et al. 1999). If the organization is close in its planning and estimating, it can manage the project to achieve the schedule by accelerating some efforts or modifying approaches to meet required deadlines. One key ingredient in the scheduling process is experience in the project area; another is experience with scheduling in general. In every industry area there will be a body of knowledge that associates the accomplishment of known work efforts with time duration (Dorndorf et al. 2000 and Moehring et al. 1998). In some industries, there are books recording industry standards for use by cost and schedule estimators. Interviewing those who have had experience with similar projects is the best way to determine how long things will really take In this study we tried to know what the schedule application in agricultural projects in Libya. As one of the important factors in the production process. And try us out with findings and recommendations useful to work in agricultural projects in Libya 65 Page

II. The problem statement The basic problem in this study is the lack of production quantities of agricultural projects in general in Libya. Where there are many factors that affected the quantities of production and in this paper we will study one of the most important of these factors, a worker scheduling of agricultural operations and its significant impact in controlling the completion of the work required in the time allotted III. The objective of this paper Objective of this study is to investigate the processes in the scheduling of agricultural projects and how to take advantage of the time factor to increase production in agricultural projects in Libya IV. Methodology Will form an integral part of this methodology is to conduct basic research in order to further demonstrate the relationship between the schedule in agricultural projects in Libya and its effects on productivity The size of the study sample included 179 of staff and workers in the agriculture sector in Libya. Was chosen as the 5 agricultural projects in Libya. Has been asking some questions about scheduling operations in agricultural projects. And will provide results that are obtained through the assessment of respondents to the questionnaire as a whole is fixed by the figures, graphs or any other form of graph that would be relevant and useful to provide this information. Been Guidance them some questions. Then took the results, and then the data were analyzed by statistical software packages (SPSS). Statistical analysis were performed where the task and of the arithmetic mean and standard deviation of percentages and ratios to the samples. It will allow the respondent put one option for each statement according to the Liker scale. Are as follows. 1 - Strongly Agree 2 - tend to agree 3-undecided.4- tend to Disagree5 - Strongly Disagree. According to the following questions Q1 Is there a table of quantities and specifications in the workplace In question 1, we ask the participants if there is a table of quantities and specifications in the workplace, the result of our survey showed that among the 179 participants; (8 workers strongly agree, 9 workers tend to agree, 28 workers undecided, 73 workers tend to disagree, and 61 workers strongly disagree), The overall percentage of workers; (4.50% strongly agree, 5.00% tend to agree, 15.60% undecided, 40.80% tend to disagree, 34.10% strongly disagree) as shown in Fig-1 below. Fig-1 (A chart showing quantities and specification) It is obvious form the above chart, the majority of workers affirms that no table of quantities available at work, this lead to unorganized operations at work, and most of the participants confirm there are no table of quantities and specification, they never have received any kind of such details about specification or quantities with production, they have never been introduced on how to schedule their works. It is significant to know that 40.80% tend to disagree, 34.10% strongly disagree, if we sum both percentages of groups who either tends to 66 Page

disagree or strongly disagree then the sum equal to 74.90%, it means that the current scheduling is very bad at site of works in public agricultural projects. The statistical mode value (the most frequent number) equal to 4 (tends to disagree), in this question the statistical mode value is equal to the mean value (3.9497 4) with a higher standard deviation (1.05081 1), which is equal to one. We conclude from this result that biggest number of the study sample tend to disagree with the current situation regarding scheduling the daily activities in table of quantities and specifications, the other numbers are distracted far away from the mean value and have quite opposite opinion The basic relationship between scheduling practices and project outcome success is transferable to other categories of projects and other stages in the project life (Dr. Andrew F. Griffith, PE, 2005). Few workers were not decided have uncertainty about this issues. According to that the study emphasize on the fact that public agriculture projects in Libya have very weak scheduling techniques and workers must received detailed information about what they should do and what is the specification of their work exactly, neglecting to do so will delay production and in many cases cause series problems to the supply chain which is directly affected with the supply of products from the public agriculture projects Q2 Is there a schedule before the start of agricultural operations In question 2 we ask the participants if they receive work schedule before starting of agricultural jobs, the result of our survey showed that among the 179 participants; (8 workers strongly agree, 17 workers tend to agree, 58 workers undecided, 58 workers tend to disagree, and 38 workers strongly disagree), The overall percentage of workers; (4.50% strongly agree, 9.50% tend to agree, 32.40% undecided, 32.40% tend to disagree, 21.20% strongly disagree) as shown in Fig-2 below. Fig-2 (A chart showing scheduling the operation) We understand from this chart and percentages that we have a double statistical mode values (the most frequent numbers), both number 3 (undecided) and number 4 (tend to disagree) are the mode of the sample. The multi-modal outcome would require some tie-breaking procedure to take place in order to know exactly the most frequent decisions of the participant about scheduling the operations. The mean value (3.5642>3) and a high standard deviation (1.06531 1) shows that part group of workers tends to disagree or strongly disagree, whereas the other away from the mean and tends to agree. Operation scheduling and control refers to the planning, diagrams to identify critical activities and calculate the scheduling and control of projects operations, which consist of minimum time required for their completion and in the case numerous activities. (Blazewicz, J., K.H., Ecker, 1996). Most of the workers agreed that no schedule at all has been submitted to the workers. Workers did not know what is the exact date and time to finish their operation daily and monthly. This is a series issue that needs to be solved by the CEOs and head managers in public agriculture projects in order to let the workers the value of time. Without providing a time schedule to accomplish the daily operation, workers will behave careless about their time and this matter will affect the productivity very much. 67 Page

The chart above showed that 32.4% are undecided and the same percentage is tending to agree, and 21.22% strongly agree there is no operation schedule at all. Whereas only 4.50% and 9.5% of workers believe there is such a schedule for doing daily and monthly operation, but this percentage is very small and not reliable. This is one of the main reasons why productivity is always facing delay, and the distribution channels of agriculture products is directly affected by the delay resulting from non-scheduled production. Q3 is there a start the agricultural operations in a timely manner and have the specified In question 3, we ask the participants if they is there a start the agricultural operations in a timely manner and have the specified, the result of our survey showed that among the 179 participants; (0 workers strongly agree, 24 workers tend to agree, 50 workers undecided, 80 workers tend to disagree, and 25 workers strongly disagree), The overall percentage of workers; (0% strongly agree, 13.40% tend to agree, 27.90% undecided, 44.70% tend to disagree, 14.00% strongly disagree) as shown in Fig-3 below. Fig-3 (A chart showing time schedule) The mean value (3.5922>3) and the standard deviation (0.89074<1), this result shows correlated opinions to the mean value. Workers in public agriculture projects declare they have not be notified about exact timing to start and finish their daily works, and they did not know what is the exact quantities need from them in a daily bases. The chart below showed that 45% of workers do not know what is the exact time to start their job or operation daily, and 14% are strongly believe there is no information has been giving to them before about when exactly to start and end their daily operations. If we combine both percentage and consider it one group then it will be equal to 59%, and this is big value. The time factor is very important to achieve the desired goals and accomplish projects with delays. Time is a very critical factor and the most valuable resource in a project. Every delivery in public or private projects is to make is time-bound. Therefore, without proper time management, a project can head towards a disaster. When it comes to project time management, it is not just the time of the project manager, but it is the time management of the project team. 68 Page

Scheduling is the easiest way of managing project time. In this approach, the operations of the project are estimated and the durations are determined based on the resource utilization for each operation. Some activities of project are critical in the sense that delay in their commencement will delay the overall project completion time. Therefore, management and scheduling of projects is inevitable. (S.M. Fahimifard and A.A. Kehkha, 2009). In addition to the estimate and resource allocation, cost always plays a vital role in time management. This is due to the fact that schedule over-runs are quite expensive. Q4 Is the completion of the agricultural operations on time In question 4, we ask the participants whether the completion of the agricultural operations was in time, the result of our survey showed that among the 179 participants; (0 workers strongly agree, 8 workers tend to agree, 44 workers undecided, 65 workers tend to disagree, and 62 workers strongly disagree), and the overall percentage of workers; (0% strongly agree, 4.50% tend to agree, 24.60% undecided, 36.30% tend to disagree, 34.60% strongly disagree) as shown in Fig-4below. - Fig-4(A chart showing project accomplishing) The mean value is (4.0112>4) and the standard deviation (0.88043<1), we understand from this result that participants have relatively close opinions to the mean in regards executing the agricultural operations in time. The result shown in the chart below shows that the majority of workers (36.30%, and 34.60%) both agreed groups, they declare that all agriculture operations were delayed and not in time, the study emphasize that this is a series problem need to be solved and its impact on the supply chain for agriculture products is great. The absence of project schedule will produce delays and all farm operations will face disruption and incomplete tasks. In every project including agriculture projects the uncertainty is involved, the schedule should be reviewed regularly, and it is often revised while the project is in progress. It continues to develop as the project moves forward, changes arise, risks come and go, and new risks are identified. The time schedule essentially transforms the project from a vision to a time-based plan. According to that the study emphasize on the importance of providing clear time schedule to accomplish the daily operation by farm workers. The survey result shows that 36% and 35% do not believe that the daily operations were accomplished in time, where only 4 % of workers believe so. Project professionals should use these findings to help explain the benefits of sound planning and scheduling to project sponsors and team members. The results should also be used to help acquire the resources needed to develop and use a comprehensive project schedule (Dr. Andrew F. Griffith, PE) 69 Page

The final statistics of schedule survey is shown in table-1 below Descriptive Statistics N Minimum Maximum Mean Std. Deviation Is there a table of quantities and specifications in the workplace 179 1.00 5.00 3.9497 1.05081 Is there a schedule before the start of agricultural operations is there a start the agricultural operations in a timely manner and have the specified Is the completion of the agricultural operations on time 179 1.00 5.00 3.5642 1.06531 179 2.00 5.00 3.5922.89074 179 2.00 5.00 4.0112.88043 Valid N (listwise) 179 Table -1 (Descriptive Statistics of schedule) V. Summary There are a number of ways to improve the schedule, including adding more people to the schedule of daily operation. Additional staff must be added early in the agriculture project. The result shows that the weak productivities of public agriculture projects is the result of bad scheduling or no schedule at all. The public agriculture projects in Libya needs to review schedule dependencies and look for opportunities to overlap tasks or make serial tasks concurrent or parallel activities. This requires greater coordination and sometimes involves increased risks which need to be managed carefully. References [1] Andrew F. Griffith.(2005).Scheduling Practices and Project Success,Transactions,.. Success: Use of Activity Code Structure for Project Schedule. [2] Blazewicz J.; KH; Ecker (1996). Today for the planning and for the control of complex projects and operations in... The integration of Planning (Production Planning and Control) systems, WEB, simulation and optimization. [3] Brucker et al (1999 ).Related articles Project scheduling is concerned with single-item or small batch production... European Journal of Operational Research 112 [4] Dorndorf et al., (2000).Project Scheduling Problem with minimum and maximum time lags. [5] Fahimifard and A.A. Kehkha(2009).Application of Project Scheduling in Agriculture(Case Study: Grape Garden Stabilization) Department of Agricultural Economics Engineering, University of Zabol, Zabol, Iran. [6] Moehring et al.. (2000). Approaches to scheduling resource -constrained projects comprise exact procedures. [7] Moehring et al. (1998).Solving project scheduling problems by minimum cut - Cited by 112. 70 Page