TL 9000 R6.0 REQUIREMENTS

Similar documents
Today s presentation will be recorded Due to the large number of attendees, all attendees have been muted. For questions, please Chat

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000

QuEST Forum. TL 9000 Quality Management System. Requirements Handbook

R6.1 Requirements. Point Release. Change Summary. November 2017

TEC APR 17 Rev D

TEC Quality Specification 1. SCOPE 2. APPLICABLE DOCUMENTS

84 Ways To Go Beyond ISO Rick Hill 13 October 2017

Correlation Matrix & Change Summary

ISO/TC 176/SC 2 Document N1224, July 2014

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9

ISO 9001: 2015 Quality Management System Certification. Awareness Training

Transition to ISO 9001:2015

9100 Team July, IAQG is a trademark the International Aerospace Quality Group. Copyright 2014 IAQG. All rights reserved.

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

Code of Practice for the TL 9000 Certification Process Release 8.0

ISO 9001:2015 Readiness Review

ISO 9001:2015 Revision overview

9110 Correlation matrices

Summary of ISO 9001:2015 New and Changed Requirements

This is a preview - click here to buy the full publication. IEC Quality Assessment System for Electronic Components (IECQ System)

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST

Quality Safety Environment

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO/DIS 9001: 2014 comparison with ISO 9001:2008. ISO 9001:2015 Updates. (Based on Draft International Standard, DIS) ISO/DIS 9001 ISO 9001:2008

Contact: URS Certification Services LLC, P O Box , Dubai, UAE Ph , web:

ISO 9001:2015. Presented By: ASEAN Eng. DEXTER T. CHUA, PIE. Conference Room, University of Mindanao March 17, 2017

Executive Overview. Transitioning to ISO 9001:2015 Quality Management System. Biafore Associates Inc. Overview Objectives

ISO 9001:2015. October 5 th, Brad Fischer.

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

ISO 9001:2015 Transition Presentation. Presented by Fredric Leung

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

ISO 9001:2015. Quality Management System. Manual

ISO 9001:2015 Revision overview

ISO 9001:2015 Expected Changes

INTERNATIONAL STANDARD

Correlation Matrix. ISO 9001:2008 and ISO 9001: INTRODUCTION CORRELATION MATRIX ISO 9001:2008 AND ISO 9001:2015

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

How to manage the transition successfully ISO 9001:2015 TOP MANAGEMENT - QUALITY MANAGERS TECHNICAL GUIDE. Move Forward with Confidence

LMS Certification Ltd. ISO 9001 and ISO Transition

LMS Certifications Pvt. Ltd. ISO 9001 and ISO Transition

ISO 9001:2015 what will change, and why? Dr Nigel H Croft

ISO 9001:2015. Presented By: ASEAN Eng. DEXTER T. CHUA, PIE. November 25, Business Systems Consulting ( )

New ISO/IEC 17025:2017 Update Course (based on DIS Version) Dr. George Anastasopoulos Director, Conformity Assessment ISO/CASCO WG 44 Member

NOT YOUR FATHER S STANDARD. Wali Alam Quality Institute of America ASQ-Houston Section 1405-May

WHATS NEW IN ISO 9001:2015

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

Fitting ISO 9001:2000 into a 20 Element Quality System

ISO 9001:2015 GAP GUIDE

ISO 9001:2015 Update. March Presented by Emily Delisle VP of Accreditations

ISO 14001:2015 Transition Presentation. Presented by Fredric Leung

IATF 16949:2016 TRANSITION INFORMATION

We are a global classification, certification, technical assurance and advisory company Ungraded

INTERNATIONAL STANDARD

DOCUMENT CONTROL INFORMATION

Overview of Draft API Standard 20M

ISO 13485:2016 Medical Devices-Quality Management Systems- Requirements for Regulatory Purposes. Theresa McCarthy

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

It s time. To transition your QMS (Quality Management System) to ISO 9001:2015

ASQ Madison, WI Section Using your ISO 9001:2008 QMS to Plan for the 2015 Changes

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

INTRODUCTION TO ISO 9001:2015. A One-Day Awareness On ISO 9001:2015 Quality Management Systems And The Impact On The Work Place

INTERNATIONAL STANDARD

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

Vendor Qualification Survey

PRESENTATION OVERVIEW

A practical guide to ISO 14001:2015

Update on the revision of ISO/IEC 17025

INTERNATIONAL STANDARD

AS9101 Revision E Understanding the Changes

Integrated Management System Manual

TL Product Information.

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

ISO 9001: Understanding the changes

VINÇOTTE INTERNATIONAL

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

Document: ISO/TC 176/SC 2/N 730. Our ref

ISO 9001:2015. Main changes in the world s most popular QMS standard SAFER, SMARTER, GREENER. DNV GL 2015 rev 2

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU

QUALITY POLICIES HANDBOOK

Summary of changes between ISO 9001:2008 and ISO/CD 9001

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Pre Audit Transition Gap Analysis QMS (ISO 9001 Only)

ISO Introduction and Background

ISO 9001 REVISION INTRODUCTION TO ISO/FDIS 9001

Quality System Manual - Section 00

Quality System Manual

Laboratory Quality Assurance Manager & Laboratory Assessor RULES & HANDBOOK

CAPITAL AVIONICS, INC. Quality Manual

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Moving from ISO/TS 16949:2009 to IATF 16949:2016. Transition Guide

Quality Commitment. Quality Management System Manual

Awareness Session for Transition to IATF 16949:2016

Connecticut Valve & Fitting Co.

Why Is ISO 9001:2015 the Best Blueprint for Building the Most Powerful QMS. Presenter: Michael Prior, CQA

FDIS ISO Overview of Changes

Quality Manual ISO 9001:2000

CMI Guidance Document

Transcription:

Logo or heading here TL 9000 R6.0 REQUIREMENTS Nancy Patterson Nokia Tom Yohe - Consultant

TL 9000 CONTAINS ALL OF THE AUDITABLE CLAUSES OF ISO 9001:2008 http://tl9000.org/alerts/alerts.html#10

QUEST FORUM QuEST Forum is also a member of: ISO CASCO and ISO CASCO STAR USTAG Liaison Group

HANDBOOK PRODUCTION PROCESS

ISO 9001:2015 STRUCTURE COMPARISON WITH ISO 9001:2008 ISO 9001:2015 ISO 9001:2008 ISO 9001:2015 follows a new high-level structure called Annex SL that will be used for all future management system development

Conceptual Changes a shift to risk-based thinking to support and improve the process approach fewer prescribed requirements less emphasis on documents improved applicability for services a requirement to define the boundaries of the QMS increased emphasis on organizational context increased leadership requirements greater emphasis on achieving desired outcomes to improve customer satisfaction June 2014 (c) TCA Global 2014 6

Detailed Changes procedures and records are not mentioned instead maintain documented information and retain documented information A quality manual and a management representative are no longer required products and services replaces products ISO 9000 will be updated to address changes in terms & definitions applicability replaces exclusions June 2014 (c) TCA Global 2014 7

TL 9000 R6.0 REQUIREMENTS HANDBOOK TIMELINE SUMMARY Map R5.5 adders to ISO 9001:2015 DIS Done Review ISO content vs TL adders Done Collect general feedback/suggestions Done Section teams work on alignment/wording Done FDIS published Done Review impact of changes in FDIS on draft Done Full Forum review Done Scrub, Forum vote, and publish Done Effective Sept 15, 2016 Mandatory (NOTE 2 YEAR TRANSITION) Sept 15, 2018

SUGGESTION PROCESS Suggestions were received from: QuEST Forum member companies Subteams set up for each major section of the Handbook Other sub-teams Sustainability Subteam Contact Us Questions Suggestions reviewed and formal proposals for changes submitted to IGQ IGQ reviewed proposals Draft was completed 9

CURRENT STATUS Initial draft Handbook completed Full Forum Review completed Comments resolved Final formatting and editing completed Official approval vote completed Printing completed Available for purchase July 1, 2016 printed, June 15 electronic Formal delta training available July 1, 2016 Effective date September 15, 2016 10

USAGE (BASED ON CURRENT SCHEDULE) May use for audits conducted on and after September 15, 2016 Must be certified to R6.0 by September 15, 2018 Matches September 15, 2018 ISO 9001:2015 transition end 11

TL 9000 R6.0 REQUIREMENTS CHANGES Changes presented here are based on the released TL 9000:2016 (R6) Handbook The Measurements Handbook R5.0 is not changing now Requirements Handbook R6.0 Measurements Handbook R5.0 12

SUMMARY OF CHANGES Modified = requirement has changed Terminology = no change to the requirement Reworded = wording changed for clarity only TYPE ADDERS NOTES Deleted 8 9 New 2 4 Modified 13 1 Reworded 19 6 Terminology 24 6 No real change Adders Notes 67 35 Renumbered Only 20 23 Moved from Section 3 2 0 Combined 4 0 TOTAL R5.5 92 45 Split from adder - 1 TOTAL R6.0 84 41 13

NEW REQUIREMENT 9.1.3.C.3 Sustainability Assessment The organization should assess the status of its sustainability efforts as appropriate to its organization, products, and services. 9.1.3.C.3 NOTE A sample sustainability assessment model is available at tl9000.org. 14

NEW REQUIREMENT 9.2.2.C.1 Internal Audit Program Planning The internal audit program shall include all applicable Requirements and Measurements Handbook requirements. 15

MOVED TEXT AND NEW NOTES Problem Severity Classification 7.2.3.C.1-NOTE 2 4.3.C.1 Declaration of Requirement and Measurement Applicability The organization shall declare in its registration profile any requirements determined as not applicable, as well as any measurement exemptions claimed. 4.3.C.1-NOTE 1 - It is not necessary for an organization to declare a TL 9000 requirement as not applicable if the requirement is outside the scope of the TL 9000 registration specialty option(s) the organization has selected. Also, it is not necessary for an organization to declare as not applicable any TL 9000 requirement where the requirement itself or an associated note states the requirement is not applicable to the organization s product or service category type. 4.3.C.1-NOTE 2 See Measurements Handbook [5] for definition of measurement exemptions. 16

MOVED TEXT 4.3.C.2 TL 9000 Profile and Scope - An organization seeking certification shall determine, in coordination with its Certification Body (CB), the TL 9000 scope statement, ISO 9001 scope statement, requirements determined as not applicable, measurement exemptions, registration specialty options, NACE codes, product categories, locations or sites, ISO 9001 version, TL 9000 Requirements and Measurements release levels, and use of Advanced Surveillance and Reassessment Procedure (ASRP). All the registration information shall be recorded and maintained on QuEST Forum s Registration Management System (RMS) in a registration profile. The certificate issued by the CB shall reference the registration profile on the RMS by the TL ID number assigned to the registration by the TL 9000 Administrator when the profile is created. The scope statement shall include a) an identification of the organization being registered, which may encompass the entire organization, an organizational unit, or a combination of units, and b) products/product lines covered by the registration. If not all products/product lines are included in the registration, then either the included or excluded products/product lines shall be listed. The scope statement shall not include a) product category codes, b) locations or sites, c) ISO 9001, Requirements Handbook and Measurements Handbook release levels, d) registration specialty option, and e) other parameters identified as individual fields in the registration profile..2.3.c.1-note 2

CHANGED SCOPE Three previously Software only Requirements were changed to None 18

R5.5 COMBINED ADDERS 7.3.1.HS.2 Design and Development Process Quality Measurement Planning and Implementation 7.2.3.HS.2 Design and Development Process Quality Measurements Data Reporting R6.0 8.3.2.HS.3 Design and Development Process Quality Measurement Planning and Implementation 19

R5.5 COMBINED ADDERS 7.3.2.H.1 Content of Requirements R6.0 8.3.3.C.2 Design and Development Requirements 7.3.2.C.2 Design and Development Requirements 20

R5.5 7.5.1.S.1 Patching Procedure(s) COMBINED ADDERS R6.0 8.5.5.S.1 Software Patching Information 7.5.1.S.2 Patch Documentation R5.5 8.4.HS.1 Field Performance Data R6.0 9.1.3.C.2 Performance Data 8.4.V.1 Service Performance Data 21

DELETED ADDERS BUT INTENT STILL EXISTS 5.2.C.1 Customer Relationship Development 6.4.C.1 Work Areas 7.1.V.1 Service Delivery Plan 7.2.2.C.1 Closure Tracking 7.3.2.S.1 Identification of Software Requirements 7.5.1.C.1 Customer Service Resources 7.5.1.S.3 Replication 8.5.1.C.1 Continual Improvement Program(s) 22

6.2.2.C NOTE 7.1.HS.1 NOTE 7.2.3.C.1 NOTE 2 7.3.1.C.1 NOTE 1 7.3.1.C.2 NOTE 7.3.2.C.1 NOTE 7.3.2.C.2 NOTE 7.4.1.C.1 NOTE 8.5.1.C.1 NOTE DELETED NOTES 23

MODIFIED ADDERS R5.5 R6.0 4.2.3.C.1 Control of Customer-Supplied Documents and Data 7.5.3.2.C.1 5.4.2.C.1 Long- and Short-Term Quality Planning 6.2.2.C.3 5.4.2.C.2 Customer Input 6.2.2.C.1 6.2.2.HV.1 Qualification of Personnel 7.1.C.2 Disaster Recovery 7.2.3.C.3 Problem Report Feedback 7.3.1.C.2 Requirements Traceability 7.3.3.V.1 Services Design and Development Output 7.3.7.C.2 Informing Customers of Design Changes 7.4.1.C.2 Supplier Performance Management 8.2.1.C.1 Customer Satisfaction Data 8.2.3.C.1 Process Measurement 8.2.4.HV.1 Inspection and Test Documentation 7.2.HV.1 7.1.1.C.1 8.2.1.C.3 8.3.2.C.3 8.3.5.V.1 8.3.6.C.2 8.4.1.C.2 9.1.2.C.1 9.1.1.C.1 8.6.HV.1 24

7.5.3.2.C.1 (was 4.2.3.C.1) Control of Customer-Supplied Documents and Data The organization shall establish a documented procedure to control all customer-supplied documents and data (e.g., network architecture, topology, capacity, installation termination assignments, drawings, and databases) if these documents and data influence the realization and/or support of products and/or services.

6.2.2.C.3 (was 5.4.2.C.1) Long- and Short-Term Quality Planning The organization s quality planning activities shall include long- and short-term plans with goals for improving quality and customer satisfaction plans to achieve long- and short-term quality objectives. The plans shall address business factors relevant to the organization and its customers, including performance objectives established jointly with selected customers. Performance to these goals quality objectives shall be monitored and reported to top management. Top management shall demonstrate their active involvement in long- and short-term quality planning.

6.2.2.C.1 (was 5.4.2.C.2) Customer Input The organization shall implement methods for soliciting and considering customer input for quality planning activities. The organization should establish joint quality improvement programs with selected customers.

7.2.HV.1 (was 6.2.2.HV.1) Qualification of Personnel Operator Qualification and Requalification NOW - The organization shall identify activities for which operator qualification and requalification are necessary. Qualification and requalification requirements shall be established for identified activities. At a minimum, these requirements shall address education, experience, training, and demonstrated skills. The organization shall communicate this information to all those affected. WAS - The organization shall establish personnel qualification and requalification requirements for all applicable processes. Qualification requirements shall address employee education, experience, training, and demonstration of skills.

7.1.1.C.1 (was 7.1.C.2) Disaster Recovery Business Continuity Planning The organization shall establish and maintain documented plans for continuity of operations, disaster recovery, infrastructure, and security restoration (see 6.3.C.1) to ensure the organization s ability to continue to support its products and services recreate and service the product throughout its life cycle. Disaster recovery Business continuity plans shall include, at a minimum, crisis management, disaster recovery, and information technology. Disaster recovery and infrastructure security restoration Business continuity plans shall be periodically evaluated for effectiveness and reviewed with appropriate levels of management.

8.2.1.C.3 (was 7.2.3.C.3) Problem Report Feedback The organization shall provide the customer with feedback on problem reports in a timely and systematic manner.

8.3.2.C.3 (was 7.3.1.C.2) Requirements Traceability The organization shall establish and maintain establish and maintain a method documented information to trace each documented requirement through design and test.

8.3.5.V.1 (was 7.3.3.V.1) Services Design and Development Output The required output from the services design and development shall contain a complete and precise statement of the service to be provided. Design and development outputs shall should include, but are not limited to a) documented service delivery information procedures, b) resource and skill requirements, c) reliance on external providers suppliers, d) service characteristics subject to customer evaluation, and e) standards of acceptability for each service characteristic.

8.3.6.C.2 (was 7.3.7.C.2) Informing Customers of Design Changes The organization shall establish a documented procedure to ensure that customers are informed when design changes affect contractual commitments

8.4.1.C.2 (was 7.4.1.C.2) Supplier External Provider Performance Management The organization shall plan and perform supplier external provider performance management and development activities so that a) suppliers are qualified to established criteria, b) evaluation results are considered during supplier selection activities, c) suppliers are periodically re-evaluated using established criteria, a) supplier external provider quality performance is tracked and feedback is provided to suppliers external providers to drive continual improvement, and b) for identified key suppliers external providers, alignment toward conformity to TL 9000 requirements and measurements or other appropriate quality management systems for the supplier s external provider s products and services occurs, with a preference toward TL 9000.

9.1.2.C.1 (was 8.1.2.C.1) Customer Satisfaction Data NOW - The organization shall collect data directly from customers. This data shall be trended and analyzed for improvement opportunities. WAS - The organization shall establish and maintain a method to collect data directly from customers concerning their satisfaction with provided products. The organization shall also collect customer data on how well the organization meets commitments and its responsiveness to customer feedback and needs. This data shall be analyzed and trended.

9.1.1.C.1 (was 8.2.3.C.1) Process Measurement Process measurements shall be identified, documented, and monitored at appropriate points to ensure continued suitability and promote increased effectiveness of processes. This includes the establishment of appropriate design process measurements. Key process measurements that impact conformity to product requirements should have specific targets or control limits established. When planned results are not achieved, correction and corrective action shall be taken, as appropriate.

8.6.HV.1 (was 8.2.4.HV.1) Inspection and Test Documentation Each inspection or testing activity throughout the product life cycle performed during production, operation, maintenance, and disposal of products or cessation of services shall have detailed documentation. Details should include, but are not limited to a) parameters to be checked with acceptable tolerances, b) the use of statistical techniques, control charts, etc., c) sampling plan, including frequency, sample size, and acceptance criteria, d) handling of nonconformities, e) documented information to be retained (see 7.5.3), data to be recorded (see 4.2.4), f) defect classification scheme, g) method for designating an inspection item or lot, and h) electrical, functional, and feature testing.

RENUMBERED All of the adders have been renumbered since they have been repositioned to match the new ISO sections and also due to the deletion of some adders 38

TERMINOLOGY CHANGES 24 adders and 6 notes have been changed to match the new ISO terminology Products and services in place of products Documented information in place of procedure Retained documented information in place of record 39

QUESTIONS? Use the Contact Us function on any page of questforum.org or tl9000.org. (note that the Contact Us function is useful for Any question or problem you may have and is Continually monitored to ensure a response) 40

Contact Information: Nancy Patterson Nokia +1 (972) 477-6712 nancy.patterson@nokia.com