SUPPLIER QUALITY REQUIREMENTS

Similar documents
TURBO MACH A DIVISION OF VT SAA

Vendor Qualification Survey

SUPPLIER QUALITY SYSTEM SURVEY

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Vendor Quality. Requirements Manual

OPW Engineered Systems

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

Altech Machining, Inc. Terms and Conditions

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

SUPPLIER QUALITY MANUAL

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

Non Conforming Product Management

Supplier questionnaire. 1. Organisation Details (Mandatory) Quality Department Details (or representative)

Supplier Quality Requirements Document (SQRD)

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Clauses applicable only when specified by Q-number on the purchase order.

SUPPLIER QUALITY CODES

DECISION TO ACCREDIT

Vendor / Sub-Contractor General Terms & Conditions

Purchase Order Quality Clauses

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

Supplier Quality Clauses

Quality Control Manual Revision 5 1/21/2011

Supplier Quality Requirements SQR-1.0 Rev. 3

QUALITY REQUIREMENTS FOR SUPPLIERS

Purchasing- requirements Attachment A ALLEN AIRCRAFT PRODUCTS MINIMUM REQUIREMENTS FOR SUPPLIERS AGREEMENT

World Class Industries

Supplier Quality Requirements. Western Industries Inc. Plastic Products Group

BYRON PRODUCTS QUALITY TERMS AND CONDITIONS

Supplier Assessment Questionnaire Audit Date : On-Site Audit Self Assessment Audit

Rev A. Vendor Compliance Manual

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)

PURCHASING QUALITY CLAUSES

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

Our Ref. April 28, 2005 Page 1/9. 1. Introduction References Certification... 4

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with.

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

QUALITY ASSURANCE PROCEDURE: SUPPLIER QUALITY REQUIREMENTS

These requirements apply to all suppliers:

GE - Aviation, Services Supplier Quality Specification

Supplier Quality Assurance Requirements

Supplier Quality Requirements

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

Trident Precision Manufacturing

Reliance Aerospace Solutions

Supplier Quality Assurance Requirements

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

Helical Products Company

Harmonization day 2015 FSSC audit reporting

Supplier Quality Requirements

External Providers Quality Requirements.

Brinkman Precision, Inc. Supplier Quality Requirements. Document No. BPI 1000 Rev. C

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /11/2011 PAGE 1 OF 6 SUBCONTRACTOR/SUPPLIER QUALIFICATION

FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

Supplier Quality Terms & Conditions

SUPPLIER QUALITY REQUIREMENTS

Type : Quality Procedure: Q - 023CLR Titre / Title: Flow Down of Additional Requirements Revised Date: May

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

Procurement Specifications Painted, Plated and Pad Printed Parts PS002

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

0. 0 TABLE OF CONTENTS

Supplier Quality Manual

2. GENERAL REQUIREMENTS

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Supplier Quality Manual

Definitions contained in the above mentioned document and industry regulations are applicable herein.

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

QUALITY REQUIREMENTS FOR SUPPLIERS

EVANS CAPACITOR COMPANY

Intro Corporation Purchase Order General Terms and Conditions

Quality Notes. PCX Aerostructures, LLC Supplier Quality Assurance Requirements - Quality Clauses Revision 14 - January 02, 2015

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

INSPECTION SYSTEM REQUIREMENTS

Procedure Documentation

Quality Manual ISO 9001:2000

QUALITY CONTROL INSTRUCTION

SUPPLIER QUALITY CLAUSES

Rosen Aviation Supplier Quality Assurance Requirements

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

I. Development, Submittal, and Acceptance of a Quality Management System

Factory Audit Manual

Meggitt Oregon Purchase Order Quality Notes

Overview of Draft API Standard 20M

QUALITY SYSTEM MANUAL

Transcription:

SUPPLIER QUALITY REQUIREMENTS TABLE OF CONTENTS 1) PURPOSE PG 2 2) KINNEAR PURCHASE ORDER PG 2 3) USE AND COMMUNICATION PG 2 4) SUPPLIER APPROVAL PG 2 5) GENERAL REQUIREMENTS PG 3 SQD Rev 2 2014-08-13 Page 1 of 5

1.) PURPOSE THIS DOCUMENT IS APPLICABLE TO ALL SUPPLIERS OF PRODUCTS OR SERVICES WHEN SPECIFIED BY CONTRACT OR PURCHASE ORDER BY: KINNEAR REMBOURRAGE (HEREIN AFTER CALLED KINNEAR) 2.) KINNEAR PURCHASE ORDER IT IS THE SUPPLIER S RESPONSIBILITY TO UNDERSTAND AND COMPLY WITH ALL CLAUSES, TERMS AND CONDITIONS SPECIFIED WITHIN A PURCHASE ORDER, AND WITH ALL OTHER APPLICABLE REQUIREMENTS. 3.) USE AND COMMUNICATION A) BEFORE BIDDING ON, MANUFACTURING, OR DELIVERING PRODUCTS TO KINNEAR, IT IS ESSENTIAL THAT THE SUPPLIER FULLY UNDERSTAND THE REQUIREMENTS OF THIS DOCUMENT. B) ALL QUESTIONS MAY BE ADDRESSED TO THE KINNEAR QUALITY MANAGER BY E-MAIL AT: BRENT@KINNEARUPHOLSTERY.COM OR BY PHONE: (450) 452-0336. 4.) SUPPLIER APPROVAL SUPPLIER APPROVAL IS BASED UPON AND SUBJECT TO: A) KINNEAR SUPPLIER APPROVAL VIA AUDIT OR EVALUATION. B) KINNEAR CUSTOMER SUPPLIER APPROVAL AS PER THEIR SPECIFIED VENDOR LIST. C) THE QUALITY OF PRODUCT SUPPLIED. D) ON TIME DELIVERY E) RESPONSE TIME ESTIMATES F) RESPONSE TO CORRECTIVE ACTIONS G) QUALITY CONTROL MEASURES IN PLACE SQD Rev 2 2014-08-13 Page 2 of 5

5.) GENERAL REQUIREMENTS A) QUALITY SYSTEM THE SUPPLIER SHALL IMPLEMENT AND MAINTAIN A QUALITY SYSTEM THAT MEETS THE REQUIREMENTS OF THIS DOCUMENT AND ANY LAWS GOVERNING REGULATORY AGENCIES. B) QUALITY CERTIFICATION MAY BE REQUIRED OF CERTAIN SUPPLIERS WHO PROVIDE PRODUCTS USED IN THE AVIATION INDUSTRY. THE CERTIFICATION TO ISO OR AS9100 STANDARDS MAY BE NECESSARY AS PER KINNEAR CUSTOMER SPECIFICATIONS. KINNEAR MAY ACCEPT NON CERTIFIED SUPPLIERS AS LONG AS THEY HAVE A SYSTEM IN PLACE THAT COMPLIES WITH THESE STANDARDS AND OR IS NOT REQUIRED BY KINNEAR CUSTOMERS. C) SOURCE INSPECTION KINNEAR RETAINS THE RIGHT TO PERFORM SOURCE INSPECTION AT THE SUPPLIER S FACILITY OR ANY SUB-TIER SUPPLIER FACILITY. D) KINNEAR CUSTOMER / REGULATORY AUTHORITIES INSPECTION KINNEAR CUSTOMERS AND REGULATORY AUTHORITIES SHALL HAVE THE SAME ACCESS FOR INSPECTIONS AS STIPULATED IN SECTION 5-C. E) CUSTOMER APPROVED SUB-CONTRACTORS THE SUPPLIER MUST USE KINNEAR OR ITS CLIENT APPROVED SOURCES OR SUB- CONTRACTORS WHEN SPECIFIED BY CONTRACT OR PURCHASE ORDER. F) THE SUPPLIER THE SUPPLIER MUST ENSURE THAT THEIR PERSONNEL IS QUALIFIED FOR WORK DONE ON PRODUCTS SUPPLIED TO KINNEAR. SQD Rev 2 2014-08-13 Page 3 of 5

5.) GENERAL REQUIREMENTS CONT D G) TESTING OF PRODUCT WHEN TESTING OF PRODUCT IS REQUIRED THE RESULTS OF THOSE TESTS SHALL BE FORWARDED TO KINNEAR AND KEPT ON FILE BY THE SUPPLIER FOR TRACEABILITY. H) PRODUCT OR PROCESS CHANGES KINNEAR MUST BE ADVISED PRIOR TO SHIPMENT OF ANY PRODUCT OR PROCESS CHANGE AND KINNEAR AT THAT TIME MAY APPROVE OR REJECT THE SHIPMENT. I) SUB-CONTRACTOR REQUIREMENTS THE SUPPLIER SHALL ENSURE THAT ALL KINNEAR REQUIREMENTS ARE COMMUNICATED AND MET BY A SUB-CONTRACTOR HIRED BY THE SUPPLIER. J) RECEIVING INSPECTION AND STORAGE THE SUPPLIER SHALL ENSURE THAT ALL RAW MATERIALS USED FOR KINNEAR ARE INSPECTED FOR DAMAGE AND KEPT IN A PROPER ENVIRONMENT THROUGHOUT THE PRODUCTION PROCESS. K) FINAL INSPECTION FINAL INSPECTION OF PRODUCTS MUST BE DONE BEFORE DELIVERY AND RECORDS KEPT FOR TRACEABILITY. THE SUPPLIER MUST INSURE THAT PROPER PART IDENTIFICATION, DRAWING REVISION STATUS, PROCESS REQUIREMENTS AND ALL OTHER SPECIFICATIONS ARE MET AND DOCUMENTED PRIOR TO SHIPMENT. L) PACKAGING AND DOCUMENTATION PROPER PACKAGING AND ALL DOCUMENTATION RELAVENT TO THE PARTS SHALL BE INCLUDED IN THE SHIPMENT IE; PACKING SLIP, CERTIFICATE OF CONFORMANCE (IF REQUIRED) AND TEST RESULTS (IF REQUIRED). SQD Rev 2 2014-08-13 Page 4 of 5

5.) GENERAL REQUIREMENTS CONT D M) DOCUMENTATION TRACEABILITY ALL DOCUMENTS PERTAINING TO PRODUCTS SOLD TO KINNEAR, MUST BE KEPT ON FILE OR IN STORAGE AT THE SUPPLIERS FACILITY FOR A PERIOD OF 10 YEARS. AT THE END OF THIS PERIOD KINNEAR SHALL BE CONTACTED AND GIVEN THE OPPORTUNITY TO HAVE THESE DOCUMENTS TRANSFERRED TO KINNEAR S POSSESION. KINNEAR RESERVES THE RIGHT TO ALLOW THE DOCUMENTS TO BE DESTROYED BY THE SUPPLIER. N) NON CONFORMANCES ALL NON-CONFORMANCES RESULTING IN A CHANGE OR DEFECTIVE PART MUST BE IDENTIFIED, DOCUMENTED AND KINNEAR MUST BE NOTIFIED PIOR TO SHIPMENT. KINNEAR WILL ADVISE THE SUPPLIER OF THE ACTION TO BE TAKEN TO RESOLVE THE ISSUE. SQD Rev 2 2014-08-13 Page 5 of 5