Sagar Khadka, MBP, Fairfax, VA Tom Hyland, Ohio DOT, Garfield Heights, OH. Tuesday, October 27, :00 AM 11:30 AM

Similar documents
CONSTRUCTION MANAGEMENT CORE COMPETENCIES

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

Infrastructure Planning and Management. Construction, Operation and Maintenance of Infrastructure

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

Design & Development of a Schedule Management Plan. Session #PRJ10

Risk Driver Method Applied to Integrated Cost Schedule Risk Analysis Hulett & Associates, LLC David T. Hulett, Ph.D.

Schedule Design Planning for Schedule Development

Principles of Schedule Contingency Management

Reflections on Planning & Scheduling By Chris Carson, PSP, CCM, PMP

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract

Project Controls Expo

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

Course List 2008 Civil Engineering Commercial Training

Schedule Guidance Document

Ascertaining Key Risks in the Construction Projects From Stakeholder and Life Cycle Perspectives

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

EXHIBIT 2-2-C SCHEDULES

Deltek Acumen 7/15/16. Learning Objectives. Introduction to Project Risk Analysis. Planning, Risk, Acceleration. The 5 steps. Worked examples Q&A

Project Controls for Optimal Execution

LONG INTERNATIONAL. Richard J. Long, P.E., Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA

1/24/2014. Schedules Schedule of Values Submittals Payment Applications Requests for Information Change Order Requests Change Orders

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

Utility Bill Data Accounts Payable s Secret Weapon for Managing Costs and Addressing Stakeholder Questions

CDR.493. Forensic Schedule Analysis: Example Implementation, Part 2

Building Contract Closeout. Ahmed Abd Alla Gouda, Chief Contracting Officer

2.0 SCHEDULE DEVELOPMENT

A Framework for Schedule Design Planning for Schedule Development

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams

Progressive Design Build

Mark Ellis Senior Project Manager. APTA Bus and Paratransit Conference Memphis, Tennessee May 23, 2011

2016 Business Continuity / Disaster Recovery Internal Audit Report

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

BA /14/2010. PSU Problem Solving Process. The Last Step 5. The Last Step 8. Project Management Questions PLAN IMPLEMENT EVALUATE

Risk Informed Project Management & Risk Assessments. John Holak Risk Assessment Manager Urban Engineers, Inc. (PMOC) Philadelphia, PA

Time to Shipment MRP Guide DBA Software Inc.

Bioclimatic Design Approach Integration into Architectural Design: a Library Case Study

INVITATION FOR BID (IFB):

SAME Orange County Post Federal Business Opportunities Symposium Amanda Barber, PE CDR, CEC, USN Assistant Operations Officer, NAVFAC SW

Risk Mitigation: Some Good News after the Cost / Schedule Risk Analysis Results

Construction CPM Conference

Risk and Opportunity Management - Overview

5 Essential Legal Project Management Metrics Every Law Firm Should Track

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

DAVID T. HULETT, PH.D., FAACE

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

A62 UT PRE-CONSTRUCTION MEETING AGENDA

Document No: SB002-P3 Revision No: Last Updated: April

FIGURE 8-8 Computer Printout of Sewer Line Activities Only (Sort of Activities List by Code Digit #I Equal to One).

FIDIC Workshops. Amman, Jordan January :00 am 05:00 pm. Engineers Training Center is a FIDIC Accredited Training Supplier

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

Can I change an activity from an 8-hour workday to a 10-hour workday in my schedule?

Target Setting in Transit: Using Data to Involve Staff Across an Agency

YOUR GUIDE TO A SUCCESSFUL TENANT IMPROVEMENT BUILD-OUT

Enterprise Risk Management

A62 PRE-CONSTRUCTION MEETING AGENDA

Differentiating between activities and work = Resource Optimization

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Project Forecast Survey Results Good Scheduling Practices June 2016

Dulles Corridor Metrorail Project

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

CM470 Legal Issues in Construction [Onsite]

Meeting the Standard of Care in an Evolving Project Delivery Environment

Scheduling Challenges in the Industrial Construction Sector

State of Ohio. Department of Transportation ~ Innovative Contracting Manual

EJCDC Contract Documents for America s Infrastructure Buy online at

Richard J. Long, P.E.

How can you improve your ability to identify, respond and adapt to significant operational interruptions?

Notice of Public Hearing

BIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES

RELIABILITY AND STABILITY BUFFERING APPROACH IN CONCURRENT DESIGN AND CONSTRUCTION PROJECTS

Consulting Newsletter

APWA Public Works Construction Management Seminar. March 22, 2018

Causes of Delay in Construction of Bridge Girders

The Pharmaceutical Industry s Supply Chain Planning Reliability and Risk Management

Kanban Cadences and Information Flow

Identification Selection Definition Execution. Schedule.

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP

Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

Contract No. EX CS001 - Construction of an Annex to Baptist Lui Ming Choi Secondary School at Yuen Wo Road, Shatin, New Territories.

Columbia University School of International + Public Affairs Center on Global Energy Policy Project Construction Logistics.

Week 5 Project Work Plan

UIC Human Resources. Strategies for Managing Projects

Using your EAC as a GPS 6 Characteristics of a Good EAC. Kim Koster, Senior Director IPM

Estimating and Scheduling

Chapter 6, Construction

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

ROLES AND RESPONSIBILITIES

Program Management Effectiveness

Evaluation of Occupational Health & Safety Management System

GEORGE T. MCLAUGHLIN, PMP, CCM

Introduction to Lean Construction: What is Lean Construction and How Can It Benefit You?

George V. Voinovich Bridge Project

Microsoft Project Workshop. Contents are subject to change. For the latest updates visit

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

JOB SITE FOREMAN - SAFETY RESPONSIBILITIES

Pavement Management s Role in an Asset Management World

FIDIC Claims: Management of Claims and Resolution of Disputes

Transcription:

Project Risk Management: Integrating it in Transportation Projects from Planning through Design and Construction to Minimize Cost and Schedule Overruns Session 15 Room: C120 122 Tuesday, October 27, 2015 11:00 AM 11:30 AM Sagar Khadka, MBP, Fairfax, VA Tom Hyland, Ohio DOT, Garfield Heights, OH

Presentation Outline Perspective (3 min) Project Risk Management (PRM) (7 min) Implementation of PRM at Cleveland Innerbelt (10 min) Quantitative Risk Analysis (6 min) Summary (1 min) Q & A (3 min) 2

Perspective Construction Projects: On time, within budget? Risk Management and Construction Industry Experience Background 3

Construction Projects: On Time, within Budget? Perspective A study of 258 transportation infrastructure projects* Completed between 1927 and 1998 Five Continents Findings from Study 20 Countries Cost overruns found in almost 9 out of 10 projects $90 Billion in (1995 prices) Affected projects in all 20 countries Schedule Overrun: MBP s own research from a review of over 2,500 schedules did not find instances of cost > 100% and time < 100%! Is there a way to identify these risks early on? Is there a way to avoid/ mitigate them? 4 *Bent Flyvbjerg, Mette Skamris Holm, and Søren Buhl Journal of the American Planning Association, Vol. 68, No. 3, Summer 2002. American Planning Association, Chicago, IL.

Risk Management and Construction Industry Perspective Since the 1970 s, extensive literature published on Risk Management Technical Papers White Papers Case Studies Best Practice Guides Standards of Practice Text Books Major Conferences (CMAA, AACEI, ASCE, PMI) dedicated track on Risk Management 5

Experience Background On-Going ($5.6B) Phase 2 of Cleveland Innerbelt Bridge Project, Cleveland, OH Dominion Boulevard Improvement Project, Chesapeake, VA Dulles Corridor Metrorail Project (Silver Line), Phase 2, Dulles, VA Cannon House Office Building, Washington, DC National Air and Space Museum, Smithsonian Institution, Washington, DC US Capitol Dome Restoration Project, Washington, DC Perspective Completed ($3.4B) Phase 1 of Cleveland Innerbelt Bridge Project, Cleveland, OH Customs and Border Protection Project, Washington, D.C. National Geospatial-Intelligence Agency, East Campus, Fort Belvoir, VA State Department Embassy and Consulate Projects, around the world Capitol Visitor Center, Washington, D.C. Risk Analysis/Management Types & Requirements Project Risk Management: On-going Projects Cost Risk Analysis Schedule Risk Analysis Integrated Cost-Schedule Risk Analysis Risk Workshops Federal Transit Administration (FTA) U.S. Government Accountability Office (GAO) 6

Project Risk Management Types of Risk Management Risk vs. Issue Processes & Tools Project Risk Management Model 7

Types of Risk Management Project Risk Management Traditional Risk Management Project Risk Management Allocation of Risk via Contract Insurance Coverage Surety Bonds Safety & Accident Prevention Plan Warranties Dispute Resolution Provisions Indemnification Provisions Lien Waiver Provisions Force Majeure Definition Change Order Definition Professional Liability. Incomplete Design Defective Plans & Specification Inadequate Site Investigation Unrealistic Schedule (Schedule Risk) Unrealistic Budget (Cost Risk) Supplier s Ability to Deliver Subcontractor s Ability to Perform Utility Coordination Permit Requirements Public Relations Weather, Inflation Unforeseen conditions. 8

Risk vs. Issue Project Risk Management Risk If the locations of existing under ground utilities are not properly surveyed and marked before starting work in XYZ intersection, there is a risk of hitting the gas line and other utilities, which might result in a delay due to disruption and have a cost impact associated with the repair, replacement and project delay. 9

Risk vs. Issue Issue Project Risk Management 10

What is Project Risk Management? Project Risk Management Project risk management is an active and forward looking tool used to: identify foreseeable risk events (things that could go wrong) in the project, analyze the potential impact of each risk event on the project, prioritize risks based on the severity of impact through the use of a Risk Matrix and Risk Register create problem solving strategies in advance to mitigate (recover from) risk impacts, and keep an eye on each until the risk event is averted, mitigated, or resolved. 11

Key Attributes Project Risk Management In its simplest form, a potential risk event has three key attributes: 1. Probability: Likelihood of risk actually occurring in the project. Unlikely (21 to 40%); Possible (41 to 60%) Likely (61 to 80%) Almost Certain (81 to 100%) 2. Impact to the cost and/or schedule. Low Medium High 3. Time Horizon (when is the risk event likely to occur?) Near Term Mid Term Long Term 12

Project Risk Management Master Risk Register (risk prioritization) High Probability, High Impact Low Probability, Medium Impact 13

Project Risk Management Model Project Risk Management 14

Implementation of PRM at Cleveland Innerbelt Project, Phase 2 (CCG2) Built on Phase 1 Success Started with Project Risk Workshop Master Risk Register Individual Risk Report Risk Monitoring and Control Risk Mitigation Success Stories (Examples) 15

Implementation of PRM at CCG2 Built on CCG1 Success Project Risk Management was implemented as value added service by MBP for CCG1 Maintained Robust Risk Register Identified and Mitigated a Number of Risks Positive Feedback from All Parties 16

Implementation of PRM at CCG2 Started with Project Risk Workshop Held on December 10, 2013 Participation from Contractor, Designer, ODOT, Consultants Each Participant Asked to Submit My Top 5 Risks Over 50 Risks Consolidated and Vetted in Risk Workshop Master Risk Register Generated Attendees: Lead Superintendents, estimators, Lead project engineers, Lead designers, Project Managers for Owner and Contractor 17

Outline 18

19 Outline

Implementation of PRM at CCG2 Risk Monitoring and Control Follow on Project Risk Workshops Part of Agenda in Bi Weekly CCG2 Progress Meetings Monthly Updates on Risks and Risk Mitigation Strategies Monthly Input from Action Officers Update Fed into Risk Database New Monthly Reports Generated and Shared Among Parties Keep Project team aware of identified risks New risks added, as they become evident: (Risk ID: 0148 Potential shutdown of CCG2 due to Republican Nation Convention in July 2016) 20

Implementation of PRM at CCG2 Risk Mitigation Success Stories Risk ID: 0146 Steel Delivery access issues Valley area o Contractor identified o Impacts Substantial Completion Date RISK ID: 0117 Structural Steel fit up issues during erection o ODOT identified o Potential damage to spliced members and/or delays to remedy Risk ID: 0139 Responding to Scope Modifications o ODOT and Contractor mutually identified o Distracts from Critical Activity Focus and Schedules 21

Quantitative Risk Analysis Schedule Risk Analysis Why do construction projects rarely finish on time? Cost Risk Analysis Why do projects almost always overrun the budget? Brief discussion on why by way of Schedule Risk Analysis 22

Schedule Risk Analysis Quantitative Risk Analysis Typical CPM Schedule Baseline Schedule Longest Path 23 CPM Schedule: A day of slippage on any of the Longest Path activities will delay the project completion date by a day.

Schedule Risk Analysis Quantitative Risk Analysis 35 Days Deterministic Duration Any number of factors could influence the duration of concrete work Formwork Inadequate labor Rebar Rain Concrete batch Heat Concrete delivery Access Given above factors, are we still absolutely certain about 35 days? 24

Schedule Risk Analysis Quantitative Risk Analysis 35 Days Deterministic Duration Given the possibility that any number of factors (formwork, rebar, concrete batch, concrete delivery, access to jobsite, labor availability, rain, heat, predecessor activities, etc.) could become real issue when construction begins, we can no longer be certain that the concrete work will be competed in precisely 35 day. What would be a reasonable duration then? 40? 45? Even 30? Who knows for sure? 25

Schedule Risk Analysis Quantitative Risk Analysis 35 Days Deterministic Duration 35 Days (most likely) 30 Days (min) 50 Days (max) Minimum, Most Likely, Maximum Duration 26

Schedule Risk Analysis Quantitative Risk Analysis Minimum, Most Likely, Maximum Duration

Schedule Risk Analysis Quantitative Risk Analysis Sample Project - March 2013 Recovery Schedule Schedule Risk Analysis Entire Plan : Finish Date 350 100% 17-Sep-14 95% 26-Aug-14 300 90% 22-Aug-14 85% 20-Aug-14 Simulation Run 5,000 Times 80% 19-Aug-14 75% 18-Aug-14 Probability of Hits 250 200 150 70% 15-Aug-14 65% 14-Aug-14 60% 13-Aug-14 55% 12-Aug-14 50% 12-Aug-14 45% 11-Aug-14 40% 08-Aug-14 Cumulative Frequency completing by June 30, 2014 = 0% 80% Confidence Date = August 19, 2014 35% 07-Aug-14 100 30% 06-Aug-14 25% 05-Aug-14 20% 04-Aug-14 50 15% 01-Aug-14 10% 31-Jul-14 5% 29-Jul-14 0 23-Jul-14 02-Aug-14 12-Aug-14 22-Aug-14 01-Sep-14 11-Sep-14 Dates 0% 16-Jul-14 28 Probability Distribution Graph

Summary Integration of Project Risk Management Tools Planning Design Construction Quantitative Risk Analysis Schedule Risk Analysis: Will my project complete on time? Cost Risk Analysis: Will I be able to stay within budget? Project Risk Management Incomplete Design Defective Plans & Specification Inadequate Site Investigation Unrealistic Schedule, Budget Unforeseen conditions. On going Project Risk Management by Tools Project Team Plan, identify, analyze, monitor and mitigate risks Prioritize and allocate resource where it is needed most Schedule Risk Analysis Cost Risk Analysis Relatively tiny effort and cost on a major project, compared to the cost of an ad hoc reaction Risk Register & on going Project Risk Management 29

Questions? Risks are inherent in construction projects Thank you! 30