SUSTAINABILITY. Washington Metropolitan Area Transit Authority. Office of Planning Sustainability Sustainability

Similar documents
METRO SUSTAINABILITY. Washington Metropolitan Area Transit Authority. sustainability

How Walking, Cycling and Transit Can Save The World. November 13, 2014 Rachel Healy

Policy on LEED Certification

Anaheim Resort Transportation

This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends

April 12 Town Hall Meeting: Action Items. Customer Service, Operations and Safety Committee May 19, 2005

Appendix 2016 Sustainability Inventory

Customer Service and Operations Committee. Board Information Item IV-A. June 12, 2014

What is greenlv? North Las Vegas is a City that has HOPE!

Strategies Region-wide Implementation Example Elements

Northern Virginia Region Draft Needs Summary

Washington Metropolitan Area Transit Authority INVITES YOUR INTEREST IN THE POSITION OF CHIEF ENGINEER

Prioritization of Capital Needs Inventory

Summary of transportation-related goals and objectives from existing regional plans

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

NEED ECONOMIC TRANSPORTATION LOCATIONS EXAMPLE

Regional Bus Rapid Transit

Transit Development Plan. January 2016 Update

Operations Guidelines for Metrobus in. Bus Rapid Transit/Light Rail Transit/Streetcar Corridors. Final Report

Highest Priority Performance Measures for the TPP

Appendix C: Greenhouse Gas Reduction Calculations

GreenDOT Advisory Group

ADDENDUM TO RECOGNITION APPLICATION APTA SUSTAINABILITY COMMITMENT

Transit Works. Improving the quality of life for all Californians.

DC Circulator Fare Adjustment Plan. April 2018

FCEDA MarComm Session SWOT Workshop. September 18, 2012

Massachusetts GreenDOT: Sustainability and Stewardship

Safety and Operations Committee. Information Item IV-A. December 13, 2018

MARC Brunswick/Frederick Line Improvement Proposal

MBTA: Moving Forward with Sustainability John Markowitz

2017 Sustainability Progress Report Building a better tomorrow JUNE 2018

SILVER LEVEL AWARD WINNER. City of Carson Sustainability Best Practices Activities

Conduct an energy audit of municipal facilities and implement the recommendations. Implement an energy tracking and management system.

Sustainability 2014 Annual Report

Notice of Public Hearing

The following item was handed out at the October 4, 2018 NVTC Meeting.

SALT LAKE CITY GREEN. Municipal Action on Climate Change. Presented by: Salt Lake City Mayor Rocky Anderson

2004 FEASIBILITY STUDY UPDATE

Alexandria City Council Arlington County Board Joint Work Session

ECO-AMBASSADORS SESSION #2. Medford Campus February 18, 2014

I-95 / I-395 Integrated Corridor Management. Hari Sripathi, P.E. Regional Operations Director

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation

100% Renewable Energy Agenda

TRANSIT SYSTEM SUMMARY REPORT

Vital Signs Scorecard of Operational Performance KPIs

Columbia Pike Service Evaluation

Maryland Smart Energy Communities: Program Overview

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

Coalitions and Green Pledges

Using Payment Innovation to Improve Urban Transportation Networks

SILVER LEVEL AWARD WINNER. City of Artesia Sustainability Best Practices Activities

WELCOME. Schedule. Contact Information. Please Provide Written Comments

2013 Progress Report. Duke s Sustainability Strategic Plan

MONITORING IMPLEMENTATION AND PERFORMANCE

FY 2020 Proposed Budget Budget Work Session Follow-up 4/16/2019 ******************************************************************************

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

CHAPTER 2: Goals, Objectives & Standards

SUSTAINABILITY BASELINE ASSESSMENT

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

Transit Land Use Multiplier Analysis: A Kentucky Example

Public Hearing for April 2018 Major Service Changes. January 4, 2018

MANAGING CONTAMINATION FOR THE METROPOLITAN WASHINGTON AIRPORT AUTHORITY (MWAA) RAIL PROJECT

Sustainable Transportation & Land Use Integration Study

2016 Sustainability Progress Report Building a better tomorrow MAY 2017

2018/ /21 SERVICE PLAN

Safety and Service Delivery Committee. Action Item III-A. January 11, 2018

College of Lake County Sustainability Center

Target Setting in Transit: Using Data to Involve Staff Across an Agency

Metrorail and Metrobus Fare Structure Model

VIA Long Range Plan Glossary

Evaluation of Alternatives

TransLink Green Bond Framework

2014 Sustainability Progress Report

Continued reiteration of best practices delivered in 2010 training sessions. Signage posted in driver areas and on school property

sustainability at missouri state university A better tomorrow starts with wise decisions today

DC Circulator. Proposed Major Service Adjustment Plan. April 2018 Service Changes

TI Corporate Citizenship Topic Brief. Climate change

Asheville, North Carolina s Sustainable Operations Plan Going Green in the Blue Ridge Mountains

Part 6 Appendices & Schedules

EVALUATION OF ALTERNATIVES CARRIED FORWARD

Transit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017

APPENDIX B - GLOSSARY FEBRUARY 2017

Transit Investment Direction and Plan Introduction. Transportation Advisory Board October 18, 2017

CUTRIC-OPTA RESEARCH PROPOSAL

Status of Projects to Reduce the Impacts of Transportation on Stormwater using Common Transportation Control Measures

School District Carbon Neutral Action Report Executive Summary

BEST PRACTICE AREA 3: GREENHOUSE GAS REDUCTIONS

ARLINGTON COUNTY, VIRGINIA

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Vital Signs Report. A Scorecard of Metro s Key Performance Indicators (KPI) th Quarter Results. Chief Performance Officer

TRANSPORTATION AND LAND USE

Lake Oswego to Portland Transit Project Health Impact Assessment

Columbia Pike Transit Initiative

The Village s Strategic Plan for established being

CLIMATE ACTION REVENUE INCENTIVE PROGRAM (CARIP) PUBLIC REPORT For Reporting Year = 2011

Title VI Required Service Standards, Policies and Definitions

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Hanford Site Sustainability Program, Richland, Washington 12464

Growth in the Fresno Metro Area

Appendix W Energy Technical Memorandum DRAFT ENVIRONMENTAL IMPACT STATEMENT

Transcription:

METRO SUSTAINABILITY Washington Metropolitan Area Transit Authority www.wmata.com/sustainability Office of Planning Office of Planning Sustainability Sustainability www.wmata.com/sustainability

General Manager/CEO Message Metro is at a critical point where significant improvements must be made to provide the safe, effective and reliable service our region deserves. As Metro s new General Manager, I have confronted many hard truths about the organization and set out an action plan to move us forward and restore pride in the Metro system. This plan of action focuses on three areas: increased safety and security, improved service reliability, and financial stability. Metro s Sustainability Initiative keeps Metro on track to achieve financial and environmental goals while improving safety and reliability. Programs like Metro s Sustainability Lab allow the Authority s creative minds to show what is possible as we improve the system. I encourage these programs and will look for financiallyresponsible, environmentally-friendly projects as improvements are made throughout the system. Sustainable practices will be incorporated as we rebuild The actions we take to improve the system help get riders out of their cars and onto our trains and buses, and as a result reduce greenhouse gas emissions regionwide. And wherever possible, sustainable practices will be incorporated as we rebuild. I recognize that sustainability can lead to real financial savings, and our new railcars, buses, and facility improvements are helping Metro lead the way. Paul J. Wiedefeld General Manger/CEO Washington Metropolitan Area Transit Authority 1

Performance Targets Metro s Sustainability Agenda commits the Authority to 10 core sustainability targets: REGIONAL 25% 10% Increase in Ridership by 2025 Increase Transit, Bike and Walk Mode Share Connect Communities Increase in Greenhouse Gas Displacement by 2025 INTERNAL 15% 50% 30% 20% 100% 100% Reduction in Energy use per Vehicle Mile by 2025 Reduction in Greenhouse Gas Emissions per Vehicle Mile by 2025 Use of Renewable Electricity by 2025 (as financially feasible) Reduction in Water Use per Vehicle Mile by 2025 On-Site Stormwater Management for Facilities and Stations - no target date Waste Diversion Rate - no target date 2

2016 SUSTAINABILITY Metro is ramping up efforts to increase the efficiency of existing operations. Building upon work initiated in 2015, the projects planned for 2016 include: Sustainability Lab savings: Install on-site solar carports at selected Metro parking lots Complete an Authority-wide energy audit to identify energy saving opportunities Establish an Authority-wide utility management platform to monitor and reduce utility operating costs Build on a successful pilot of train braking energy capture and re-use as part of traction power upgrades Continue to incubate resource efficient technology upgrades through the Sustainability Lab $700,000 in operating costs over the next 5 years 3 Sustainability Lab Metro s Sustainability Lab is dedicated to piloting cost-saving green technology and practices across the Authority. Since 2014, the Lab has implemented projects related to the use of energy, water, and waste disposal that are expected to save the Authority $700,000 in operating costs over the next five years. Employee Recognition Employees are critical to achieving Metro s Sustainability Initiative targets. Through an annual award program, Metro rewards staff and projects that bring cost saving, sustainable business practices to the Authority.

Battery-Electric Bus Pilot In 2016, Metrobus will begin testing a batteryelectric bus on selected routes in the region. The battery-electric drive train offers nearly silent and emissions-free bus operations. It also provides fuel and maintenance savings for Metro The electric bus stores energy in on-board lithium-ion batteries. Metrobus will evaluate this propulsion technology for potential wider adoption as battery-electric technology continues to mature 4

Ridership and Mode Share In 2015, ridership on Metrorail and Metrobus declined by a combined total of 3%. Problems with service reliability, reduced federal transit benefit, and low gasoline prices contributed to this decline, particularly on long-haul routes. In areas closer to the downtown core with transit-oriented development - such as Navy-Yard Ballpark and NoMa-Gallaudet - ridership increased. Regional Transit Ridership By the end of 2015, Metro improved service by: Bringing 80 state-of-art 7000-series railcars into revenue service Opening the Silver Spring Transit Center Completing mezzanine lighting upgrades at 12 rail stations Extending car sharing service to all Metrorail stations with parking In 2016, Metro will focus on delivering reliable service to riders while maintaining increased safety and security throughout the system. 500 Annual Ridership Millions of Riders 400 300 200 100 Target Legend Metrorail Metrobus 0 2013 2014 2015 2016 2017 2018 2019 2020 Year 2021 2022 2023 2024 2025 5

Service Delivery The reliability of Metro service is a key driver of customer satisfaction. When rail on-time performance dropped last year to 84% and mechanical failures doubled the number of late trains, it was not surprising that Metro ridership declined. Now, Metro is undertaking a wide range of actions to deliver better service and win back our riders. That includes implementing a rail service reliability plan to ensure trains arrive as scheduled, fixing our railcars to reduce delays and offloads, and accelerating delivery of new 7000-series railcars. Metro also plans to strategically position platform attendants to assist customers in key transfer stations during peak travel and continue station improvements to signage, lighting, elevators and escalators. Metro is partnering with regional and state departments of transportation to introduce traffic signal prioritization in key bus corridors to reduce travel times, and will improve Metrobus and Metro Access reliability through continued introduction of new vehicles. Delivering reliable service while maintaining safety and security 6

Connect Communities This year the newly developed Connecting Communities key performance indicators were added to Metro s Vital Signs Report. These indicators measure how effectively communities with transit service take advantage of transit infrastructure investments. The two metrics are: Density Around Stations: Measures household and job concentrations around Metrorail stations Station Walkability: Measures how much of the ½ mile area around Metrorail stations is accessible on foot While the Connected Communities metrics measure the performance of areas around transit, Metro is also a partner in accessibility and development improvements. In 2015, Metro improved access and connections to rail stations and bus services by: Upgrading the bus loop and parking garage at the Dunn Loring-Merrifield Metrorail station Moving forward with transit-oriented development at Fort Totten Metrorail station Increasing bicycle infrastructure with a total of 2,400 bicycle racks and 1,300 bicycle lockers, now available throughout the system In 2016, Metro will construct new secure Bike & Rides at Vienna and East Falls Church stations, and replace 200 bike lockers throughout the system that have reached the end of their useful life. To continue progress on pedestrian investments, Metro will complete a station area strategic investment plan with an online mapping tool that helps municipal agencies prioritize pedestrian and bicycle infrastructure around Metrorail stations. Percentage of Stations Achieving Density Threshold 80 60 % +9% 2015 Density 40 20 0 City of Alexandria A 100 80 20 +25% ARL ARLINGTONFAIRFAX Arlington County Fairfax County District of Columbia DCMONTGOMERY PRINCE GEORGE'S Montgomery County Prince George s County Percentage of Stations Achieving Walkshed Target 4 +25% +7% +8% 11 10 40 11 15 +7% Legend Legend 2040 Density Target 60 2015 % # Total Number of Metrorail stations 40 0 City of Alexandria Arlington County Fairfax County District of Columbia Montgomery County Prince George s County 7

Making Connections If the region increases the number of riders where transit already exists, this means transit is being efficiently utilized and the cost of transit to taxpayers is reduced. By making improvements to pedestrian and bicycle networks surrounding our stations, Metro can also support non-motorized access to the system and reduce the need for parking and/or bus services. Improve Access Improve Service Grow Near Transit Regional Growth Near Transit 8

Climate Change Metro measures the net amount of greenhouse gas (GHG) avoided (displaced) when customers use transit instead of personal vehicles. In 2015, Metro s GHG displacement declined by 2% due to a declining ridership and increases in service related to the first full year of Silver Line operations. Greenhouse Gas Benefits of Transit In 2015, Metro continued to address climate change in the region by: Improving Metrobus service efficiency by adjusting bus routes Receiving the first of five new 40-foot compressed natural gas (CNG) buses under a large order of nearly 300 buses to replace Metro s oldest diesel buses Supporting in the Metropolitan Washington Council of Governments regional GHG reduction efforts Area growth trends and Metro s current investments in improving service reliability will help build ridership over the next decade. Combined with Metro s continued investment in energy efficient projects, this suggests that Metro s GHG displacement rate will increase by 2025. 500,000 Regional GHG Displacement Target Metric tons of carbon dioxide (C0 2e ) prevented 400,000 300,000 200,000 100,000 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Adding two extra cars to a six-car Metrorail train is the equivalent to widening I-66 through Arlington by two lanes 9 Year

67kg of carbon dioxide emissions are prevented by the average Metrorail rider each week The Transit Advantage Transit reduces vehicle-based greenhouse gas (GHG) emissions in two ways: 1. Shifting People From Cars to Transit Metro takes cars off the road, avoiding emissions from cars idling in traffic jams. Transit moves people with fewer GHG emissions than most automobiles. The average Metrorail ride cuts a typical car commuter s emissions by half and an average bus ride gets nearly 40 miles/gallon. 2. Sustainable Land Use Patterns Metro helps the region grow in ways that are pedestrian and bike-friendly and has allowed people to travel less one can live, work, shop, and enjoy recreation opportunities in places closer to each another. Orange Line trains today normally run at around 35 miles per hour, while congested travel speeds on I-66 average around 18 miles per hour Metro supports a sustainable region 10

Energy Consumption In 2015, Metro s energy consumption per vehicle mile remained steady - consolidating the efficiency gains from 2014 and staying on target for 2025. Facility natural gas and electricity consumption continued to decline, but these gains were offset by increases in energy consumed for rail service and by the Metrobus CNG fleet. Track Switch Heaters Metro continued to take steps to reduce energy consumption in 2015 by: Completing Leadership in Energy & Environmental Design (LEED) Silver certification for Metro s Transit Police Department (MTPD) II Police Station and Range Training Facility Receiving new 7000 Series railcars that are 30% more efficient at recovering and reusing braking energy Piloting new energy efficient equipment such as hot water heaters and shop compressed air systems Reducing energy consumption at Metro parking garages by nearly 70% as high efficiency Light Emitting Diode (LED) lighting upgrades continue throughout garages This coming year Metro plans to advance energy efficiency through station lighting upgrades at Shaw-Howard U, U Street, Columbia Heights, and Georgia Avenue stations, data center infrastructure replacement at support facilities, and the implementation of an Authority-wide energy management program. 40 Annual Energy Consumption per Vehicle Mile Energy Consumption per Vehicle Mile (MBtu) 30 20 10 11 0 2013 2014 2015 2016 2017 2018 2019 2020 Year 2021 2022 2023 2024 2025

Sustainability Lab Pilot A Sustainability Lab funded pilot of new high efficiency switch heaters estimated to produce energy savings of $135,000 annually is now underway. Switch heaters provide switch protection in cold weather to enable switches to remain operational. If this pilot proves successful, Metro has 285 yard switches that could be converted. Energy Consumption Support/Service Delivered - 2015 Natural Gas (Facility) Electricity (Facility) Gasoline (Non-Revenue Vehicles) Diesel (Other) Diesel (Bus) support 5,482,231,000 MBtu service CNG (Bus) Electricity (traction) Energy Management To reduce operating costs and improve efficiency as Metro rebuilds and expands to serve regional growth, an Authority-wide initiative to make facilities and fleet more energy efficient is needed. By incorporating the management of energy across the Authority as part of business, Metro will remain on track to achieve its energy reduction targets. An Authority-wide energy audit will be completed in 2016 12

Greenhouse Gas In 2015, Metro s greenhouse gas (GHG) emissions per vehicle mile decreased by 2% but still remains above targeted reduction levels. This reflects less GHG intensive regional electrical power sourcing combined with a stabilization of overall Metrobus fleet emissions. This year Metro has reduced GHG emissions by: Continuing to increase Metrobus fuel economy and reducing operating costs to $1.64 per mile Achieving a 77% reduction in monthly natural gas consumption at Metro headquarters following conversion to a high-efficiency on demand hot water heater Equipping non-revenue vehicles (NRV) with automatic vehicle location systems to ensure usage, and therefore fuel consumption, is aligned with business needs Completing a solar asset assessment to guide future deployment of on-site electricity generation In 2016, Phase 1 of Metro s solar program will begin installation. Solar canopies will provide new lighting and covered surface parking and generate clean renewable energy. Metro anticipates issuing a Phase II on-site solar procurement in late 2016. Kilograms of carbon dioxide (C0 2e ) per vehicle mile 4 3 2 1 Annual GHG Consumption per Vehicle Mile Target Lowering emissions Metro has set a target of sourcing 30% of its electricity supply from renewable sources (where cost effective) by 2025. A full report detailing Metro s plans for on-site solar generation is available at wmata.com/sustainability. Metro continues to investigate opportunities for cost-effective off-site renewable power purchases. GHG Emissions by Support/Service Delivered -2015 Electricity (Facility) Gasoline (Non-Revenue Vehicles) Natural Gas (Facility) Diesel (Other) support 564,619,000 kg C0 2e service Diesel (Bus) CNG (Bus) Electricity (traction) Fac Vehi 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 13 Year

On-Site Solar Underway Metro s Largo Water Treatment Facility produces approximately 20,000 kwh of energy each year. The facility pumps an estimated 27,000 gallons of water per day from Metrorail tunnels near the Largo Town Center Station The solar generation potential at Metro is extensive; however Metro s on site solar development locations are not all currently economically feasible. Metro continues to investigate opportunities for sourcing offsite economically beneficial renewable energy generation to achieve its 30% renewable target by 2025 14

Water and Stormwater In 2015, Metro s water consumption per vehicle mile declined by 4%. This reflects water savings from improved chiller equipment and water treatment processes. Metro remains on track to achieve its 2025 target. This year Metro has actively sought to reduce water consumption and improve stormwater management through: Upgrading seven chiller plants by adding a water treatment system that reduced water consumption by 500,000 gallons or $10,000 per station. Following this successful Sustainability Lab pilot, a full system roll out is estimated to produce over $500,000 in water savings each year Continuing a system-wide program of chiller replacement at Crystal City, Metro Center and Potomac Avenue stations to be ready for the 2016 chilling season Installing stormwater best management practices at new facilities such as the MTPD II Police Station and Range Training Facility In 2016, the Authority plans to continue to make improvements to the efficiency of train and bus wash operations, improve water sub metering, and evaluate pilot locations for facility rainwater harvesting. 1.0 Annual Water Consumption per Vehicle Mile Water Consumption per Vehicle Mile (Gallons) 0.8 0.6 0.4 0.2 Target 15 0.0 2013 2014 2015 2016 2017 2018 2019 2020 Year 2021 2022 2023 2024 2025

Chiller Water Treatment/Monitoring Water treatment upgrades now completed at Capitol Heights, Crystal City, Farragut West, Metro Center, Navy Yard- Ballpark, Pentagon City, Potomac Avenue, U Street, and Woodley Park stations Chiller plant water chemistry monitoring technology reduces water consumption and improves chiller performance New efficient station chillers save an estimated $15,000 in annual energy costs per station 16

Waste and Supply Chain In 2015 Metro Recycled : 19 Miles of Running Rail 6,700 Rail Ties 3,200 Gallons of Antifreeze In 2015, Metro implemented auditing of the Authority s waste stream at the point of disposal. This revealed that station waste recycling numbers were inaccurate and resulted in an additional 100 tons of recycling now being classified as solid waste. As a consequence of corrected data, Metro s waste diversion rate declined by 7%. This year, Metro actively sought to reduce waste and improve supply chain operations through: Eliminating paper farecards and moving solely to the reusable SmarTrip farecard media Initiating a trash pickup and removal contract for track construction waste Awarding a contract for the salvage and decommissioning of obsolete railcars Generating $2.9 million in asset recovery and disposal revenue Eliminating the printing of approximately 10,000 timetables annually by moving to a print-on-demand model In 2016, the Authority plans to continue to make improvements to the efficiency of station waste recycling, expand revenue generating recycling to new waste streams such as cardboard, and continue to enhance supply chain operations to reduce overall waste flow. 56,000 Gallons of Oil 1,600 Tons of Scrap Metal Waste Diversion Rate % 100 80 60 40 20 Facility Waste Diversion Rate Target Legend Facility Waste Station Waste Overall Recycling 17 0 2013 2014 2015 2016 2017 2018 2019 2020 Year 2021 2022 2023 2024 2025

Paperless Fare Media By moving to paperless farecard media paper use from 9 million farecard sales will be eliminated SmarTrip gives customers the benefit of balance protection, online account management and AutoReload of value and passes More than 450 fare vending machines in every Metrorail station now dispense SmarTrip cards only Over the past three years, Metro sold more than 38 million paper farecards. Stretched end-to-end, that s enough to go from Washington, DC to Las Vegas 18

Office of Planning Sustainability www.wmata.com/sustainability This Report was printed on paper Certified by the Forest Stewardship Council (FSC)