RCRA Corrective Action Inspection Training

Similar documents
Efficiencies in the Environmental Restoration Operations at Sandia National Laboratories, New Mexico

RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series

Risk Based Corrective Action Approach. Managing Change and Superfund Delisting

What is Ethylene Dibromide (EDB)?

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016

Development of a Treatability Study Work Plan for Testing Nanoparticles at a US DOE Superfund Site

EPA Region 6 Corrective Action Strategy

American Creosote Works Site

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields

Site Closure Strategy for Contaminants in Fractured Crystalline Rock Air Force Plant 6, Marietta, GA

FACT SHEET RCRA: SUBTITLE C CORRECTIVEACTION

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

The Cleanup Process. Operation and Maintenance Construction Completion Post Construction Completion NPL Deletion Reuse

CHAPTER 1 INTRODUCTION

NEGOTIATING AND IMPLEMENTING. RCRA 3008(h) ORDERS ALBERTO A. GUTIERREZ AND TRENT H. THOMAS

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See For More Information to Learn How.

Development of a Treatability Study Work Plan for Testing Nanoparticles at a US DOE Superfund Site

Region 7 - Environmental Remediation Project Information

PROPOSED PLAN for Amendment to Record of Decision

Treatment Technologies for Site Cleanup: Annual Status Report (Twelfth Edition)

DEC HAZARDOUS WASTE REGULATION OF THE WEST VALLEY SITE

Section 2.0 REMEDIAL ACTION PLAN TECHNICAL GUIDANCE

Draft. Scope of Work. Task 1 RCRA Facility Investigation and Corrective Measures Study

Summary of Investigations & Remedial Activities

EPA Region 6 CORRECTIVE ACTION STRATEGY

REMEDY OPTIMIZATION OVERVIEW

Questions and Answers. A1: The budget from the Commerce Street Plume Remedial Design Oversight grant from EPA is below:

Conceptualization and Cost Estimate for Remediation Alternatives Cotter Mill Site Cañon City, Colorado

OSWER DIRECTIVE Role of the Baseline Risk Assessment in Superfund Remedy Selection Decisions

5 SURVEY PLANNING AND DESIGN

6.1 Koppers Oroville Wood Treatment Facility, California

Soil Vapor Extraction O&M Report Camp Stanley Storage Activity, Texas

Moving Towards Sustainable Remediation: Overview and Concepts

Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities

Alternatives for Managing the Nation s Complex Contaminated Groundwater Sites

OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS

4.1 Evaluation Criteria

I. Statewide Application of Wisconsin's Quality Assurance/Quality Control Program for Environmental Data Collection

REPORT ADDENDUM ENVIRONMENTAL INVESTIGATION, RISK ASSESSMENT AND ALTERNATIVES ANALYSIS FORT DES MOINES DES MOINES, IOWA

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD

Monthly Status Report W. R. Grace Superfund Site Acton, Massachusetts June 29, 2009

ARCADIS/Malcolm Pirnie May 24, 2012

Proposed Plans for Soil, Sediment, and Surface Water at. Anchor Test Area and Building 1200

Department of Environmental Protection Bureau of Remediation & Waste Management RCRA Program. Standard Operating Procedure Change Record

Letter Health Consultation

MNA CLOSURE STRATEGY AT A REDEVELOPED MGP SITE IN FLORIDA Jacksonville Recycling Facility Former MGP Site in Florida September 2018

Proposed Plan Closed Sanitary Landfill

Handbook of Groundwater Protection and Cleanup Policies for RCRA Corrective Action

Lessons Learned from the Installation and Monitoring of a Permeable Reactive Barrier at the Lake City Army Ammunition Plant, Independence, MO

North Railroad Avenue Plume Superfund Site Update September 11, 2018

U.S. Environmental Law Overview

Ground Water Remediation Optimization: Benefits and Approaches

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES

LONGHORN ARMY AMMUNITION PLANT TEXAS EPA ID# TX

Corrective Action: LEANing in a New Direction

Site Profiles - View. General Information. Contaminants: Site Hydrology:

STATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL DIVISION OF AIR AND WASTE MANAGEMENT HAZARDOUS WASTE MANAGEMENT BRANCH

\=Otm BACKGROUND. Office of Emergency and Remedial Response Hazardous Site Control Division 5203G. Quick Reference Fact Sheet

CORRECTIVE ACTION COMPLETION REPORT

Community Input on the Cleanup of the MEW-Moffett Regional Plume Mountain View, California

U.S. AIR FORCE RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) CORRECTIVE ACTION GUIDE

Mill Street Corridor Assessment/Cleanup Overview

A Long-Term Stewardship State Conceptual Framework to Estimate Associated Cost

Environmental Risk Assessments of Coal Ash Impoundments

McCormick and Baxter Superfund Site Long-Term Performance Monitoring

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition

Watershed Enforcement Environmental Services (ESD)

Navy s Portfolio Optimization: In Situ Remediation Sites Presented By Mike Singletary, P.E. Naval Facilities Engineering Command (NAVFAC) Southeast

3.1 Stakeholder Comments and Lead Agency Responses

Definitions and Project Evaluations. (Tab A)

Treating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA

Quality. Data Quality Objectives Process for Hazardous Waste Site Investigations. EPA QA/G-4HW Final

Brownfield Redevelopment In Georgia Past, Present & Future. Presented by: Dan Grogan

Waste Management Activities

Water Quality, Public Works and Nitrate Contamination

DRAFT COVENANT DEFERRAL REQUEST FORMER NAVAL STATION ROOSEVELT ROADS CEIBA, PUERTO RICO

Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation.

FACT PATTERN THE RESERVATION

i-admin /15/14 2 of 3 Doc Type: Board Memo/Issue Statement

Remedy Optimization at Navy Restoration Sites

Technical Impracticability Waiver as a Component of a Site-Wide Remedy at a Fractured Bedrock Superfund Site in New England

CORRECTIVE ACTION GUIDANCE DOCUMENT

Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range

If you have any questions regarding this policy and/or guidance, please contact:

DOE Response Actions:

2013 Environmental Awards DLA Tracy Site, Path to Construction Complete Status

EMERGING CONTAMINANTS AT LANDFILLS: OCCURRENCE, MIGRATION, AND REMEDIATION

WM07 Conference, February 25 March 1, 2007, Tucson, AZ

Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups

Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract

May 5, Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118

Informational Meeting: Onsite and Offsite Response Action Plans

Best management practices for vapor investigation and building mitigation decisions

Receive Site Fact Sheets by . See "For More Information" to Learn How.

Santa Susana Field Laboratory

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Monitored Natural Attenuation of Groundwater Contamination at Voluntary Cleanup Program Sites

Developing an Environmental Compliance Plan

Hudson River PCBs Superfund Site Second Five-Year Review. Community Advisory Group Workshop May 5, 2016

U. S. Army Corps of Engineers In Situ Air Sparging Subsurface Performance Checklist

Transcription:

RCRA Corrective Action Inspection Training August 12, 2015 Training at ASTSMWO Joint Hazardous Waste and Materials Management Conference U.S. Environmental Protection Agency 1

Course Outline 1. Introduction 2. Typical Corrective Action (CA) Process Steps 3. Preparing for a CA Inspection 4. Conducting a CA Inspection 5. Preparing a CA Inspection Report 6. Developing the Case U.S. Environmental Protection Agency 2

Section 1: Introduction What are the goals of this training? Provide a fundamental understanding of the corrective action process Describe how to inspect a facility to help ensure compliance with corrective action requirements U.S. Environmental Protection Agency 3

Intro: Who is the Audience? Corrective Action Project Managers (PMs) from EPA region or authorized state RCRA regulatory and corrective action inspectors Permit writers who have responsibility for corrective action Attorneys who have responsibility for corrective action U.S. Environmental Protection Agency 4

Intro: The State of the Program Focused on nearly 4,000 facilities across the nation Includes chemical manufacturing plants, oil refineries, lead smelters, wood preservers, steel mills, commercial landfills, and others Facilities range in size from less than one acre to 2 million acres U.S. Environmental Protection Agency 5

Intro: The State of the Program 43 states are authorized to implement the RCRA corrective action program Oversight responsibilities primarily rest on the states and EPA regions 43 States Authorized for RCRA CA (gray) U.S. Environmental Protection Agency 6

Intro: Corrective Action Oversight Definition: management by the lead agency of all activities related to corrective action at the site reviewing, commenting on, and approval or disapproval of required documents visiting and inspecting facilities tailored to site-specific circumstances U.S. Environmental Protection Agency 7

Intro: Corrective Action Inspection Definition: an evaluation of a site s compliance with the corrective action requirements of a permit or order. also known as Corrective Action Compliance Evaluation (CAC) is a component of corrective action oversight may be conducted concurrently with other types of inspections U.S. Environmental Protection Agency 8

Intro: Corrective Action Inspection Differences between RCRA Credentialed Inspector and Corrective Action Project Manager U.S. Environmental Protection Agency 9

Section 2: Typical CA Process Steps Where is it? What is it? Is it a risk? RCRA Facility Assessment RFA RCRA Site Investigation RFI U.S. Environmental Protection Agency 10

Section 2: Typical CA Process Steps Interim Measures IMs Corrective Measures Study CMS Statement of Basis Public Comment Period Final Decision/Response to Comments Corrective Measures Implementation CMI Corrective Action Complete U.S. Environmental Protection Agency 11

Typical CA Process Step 1 RCRA Facility Assessment (RFA) is an initial facility assessment that is used to identify: Solid Waste Management Units (SWMUs) Hazardous Waste Management Units (HWMUs) Areas of Concern (AOCs) All other readily available or observable information about environmental conditions at and from the facility U.S. Environmental Protection Agency 12

Typical CA Process Step 2 RCRA Facility Investigation (RFI) Determine nature and extent of migration of hazardous waste or hazardous constituents from SWMUs, AOCs, or other source areas Gather data to support Corrective Measure Study (CMS) or potential Interim Measures (IMs) U.S. Environmental Protection Agency 13

Typical CA Process Step 2 RCRA Facility Investigation (RFI) Common Sampling Types General sampling Groundwater Surface soil Subsurface Soil gas Air Surface water Benthic sediment U.S. Environmental Protection Agency 14

Case Example Arkansas facility manufactured refrigerators, trash compactors and ice makers Main COC is trichloroethylene (TCE) Confirmed elevated levels of TCE in the soil and groundwater Groundwater plume has TCE levels greater than MCL U.S. Environmental Protection Agency 15

Case Example: Conceptual Site Model U.S. Environmental Protection Agency 16

Typical CA Process Step 3 Interim Measures (IMs) Control or abate ongoing threats to human health or the environment May become part of the final Corrective Measures U.S. Environmental Protection Agency 17

Typical CA Process Step 3 Interim Measures (IMs) Corrective Action Management Units (CAMUs) RCRA cap in Kent, WA U.S. Environmental Protection Agency 18

Typical CA Process Step 3 Interim Measures (IMs) SWMU and/or AOCs U.S. Environmental Protection Agency 19

Case Example At the same site in Arkansas, interim measures involved Hot Spot removal of TCE contaminated soils on site with the intent to lower the concentration in the groundwater U.S. Environmental Protection Agency 20

Case Example: Plume map before removal U.S. Environmental Protection Agency 21

Case Example: Future In-Situ Chemical Oxidation Locations U.S. Environmental Protection Agency 22

Typical CA Process Step 4 Corrective Measure Study (CMS) Identify and evaluate potential alternatives for the remediation of releases of hazardous waste or constituents that have been identified at and moving from the facility U.S. Environmental Protection Agency 23

Typical CA Process Step 4 Corrective Measure Study (CMS) Bench Study: small laboratoryscale treatment study Pilot-Scale Study: treatment study based on actual site conditions U.S. Environmental Protection Agency 24

Case Example Pilot Tests On-site pilot test In Situ Chemical Oxidation (ISCO): Effectiveness limited by aquifer transmission Off-site pilot test In Situ Chemical Oxidation (ISCO): Effectiveness limited by aquifer transmission U.S. Environmental Protection Agency 25

Case Example: Plume Map 2012 U.S. Environmental Protection Agency 26

Typical CA Process: Decision on Final Remedy Statement of Basis Public Comment Period Decision on Final Remedy / Response to Comments U.S. Environmental Protection Agency 27

Typical CA Process Step 5 Corrective Measures Implementation (CMI) Implement chosen corrective measures: often a combination of treatment and disposal of remediation waste on and off of the facility, measures above and below the surface, and often involves engineering and institutional controls U.S. Environmental Protection Agency 28

Typical CA Process Step 5 Corrective Measures Implementation (CMI) Common Activities U.S. Environmental Protection Agency 29

Remedies Evaluated No Actions Institutional controls Soil: Containment Removal Case Example Groundwater: Extraction In situ chemical oxidation (ISCO) Permeable texture beds In situ enhanced bio degradation Monitored natural attenuation (MNA) U.S. Environmental Protection Agency 30

Chosen Remedy Case Example Site-wide institutional controls (ICs) Soil with asphalt cover with soil gas monitoring Groundwater with in situ chemical oxidation (ISCO) and monitored natural attenuation (MNA) U.S. Environmental Protection Agency 31

Case Example: Soil gas monitoring U.S. Environmental Protection Agency 32

Section 3: Preparing for a CA Inspection Begin with the end in mind... Prepare early, at least 30 days before the inspection U.S. Environmental Protection Agency 33

Preparing: Coordination Communicate with all appropriate offices: Permitting Compliance Enforcement Corrective action U.S. Environmental Protection Agency 34

Preparing: Define Purpose and Scope Determine inspection objectives If not in 2020 CA Universe Identify any releases Check permit and order status of facility U.S. Environmental Protection Agency 35

Preparing: Define Purpose and Scope Determine CA activity being conducted by owner/operator Review Environmental Indicators U.S. Environmental Protection Agency 36

Preparing: Define Purpose and Scope Identify specific resources necessary to conduct on-site inspection U.S. Environmental Protection Agency 37

Preparing: Review Background Info The Inspector should be familiar with: Regulatory / permitting / order status Site uses EPA tracking databases Potential hazards at the facility U.S. Environmental Protection Agency 38

Preparing: Review Facility Documents Review key facility documents such as: Permits or Orders CA Work Plans or Reports Existing SWMU/AOC Maps Previous inspection reports and notes U.S. Environmental Protection Agency 39

Preparing: Obtain Other Information Contact other federal, tribal, state and local agencies Use web-based search engines Review reports and data submitted under other programs U.S. Environmental Protection Agency 40

Preparing: Develop a Checklist Objectives of inspection Facility background Priority areas to review including operation and maintenance (O&M) areas Tasks to be performed Quality Assurance Project Plan (QAPP) Sampling Analysis Plan Health and Safety Plan Resources (personnel and equipment) Compliance Schedule Performance Monitoring Remedy Optimization Institutional controls (ICs) Financial assurance (FA) requirements U.S. Environmental Protection Agency 41

Section 4: Conducting a CA Inspection Accessing facility... Checking records... Inspecting / touring... Documenting... U.S. Environmental Protection Agency 42

Conducting: Access to Facility U.S. Environmental Protection Agency 43

Conducting: Review Documents Controlling document Permit, Order or Work Plan Relevant facility documents Reports U.S. Environmental Protection Agency 44

Conducting: Identify and Document Releases Look for releases Gather information about the release U.S. Environmental Protection Agency 45

Conducting: Inspect and Review Each SWMU or AOC Each CAMU U.S. Environmental Protection Agency 46

Conducting: Other Elements Verify land/groundwater uses Management of remediation waste Other issues U.S. Environmental Protection Agency 47

Conducting: Document Document Document Be organized!!! Complete the checklist Keep detailed notes Collect evidence Maintain chain of custody Take accurate statements Copy pertinent documents U.S. Environmental Protection Agency 48

Section 5: Preparing a CA Inspection Report - Tell the Story Remember... begin with the end in mind Use a narrative description Support the story with evidence Confirm any non-compliance Identify potential problems Coordinate with legal staff and CA PM U.S. Environmental Protection Agency 49

Reporting: Use an Outline Example Outline of Inspection Report A. General Information B. Narrative Summary of Inspection C. Identify Potential Problems D. Appendices U.S. Environmental Protection Agency 50

Reporting: Use an Outline Example Outline of Inspection Report A. General Information U.S. Environmental Protection Agency 51

Reporting: Use an Outline Example Outline of Inspection Report B. Narrative Summary of Inspection U.S. Environmental Protection Agency 52

Reporting: Use an Outline Example Outline of Inspection Report C. Identify potential problems and deviations from requirements U.S. Environmental Protection Agency 53

Reporting: Use an Outline Example Outline of Inspection Report D. Appendices U.S. Environmental Protection Agency 54

Section 6: Developing the Case Work closely with case attorney to develop enforcement case Each violation needs to have supporting evidence to back it up U.S. Environmental Protection Agency 55

Developing: Select the Best Tools Determine if enforcement action is necessary If necessary, select the best tools to ensure compliance U.S. Environmental Protection Agency 56

Determine Developing: Make the Case Penalty Any relief necessary Appropriate corrective action Consider Supplemental Environmental Projects (SEPs) Financial assurance Criminal referral if egregious U.S. Environmental Protection Agency 57

Case Example Facility X was subject to a RCRA Section 3008(h) interim status corrective action order Order required pumping and treating groundwater Failed to maintain pumps Led to drinking well contamination Consent agreement final order with civil penalty for $650,000 U.S. Environmental Protection Agency 58

Additional References Groundwater Sampling Guidelines for Superfund and RCRA Project Managers (May 2002, EPA-542-S-02-001). [PDF file] Handbook of Groundwater Protection and Cleanup Policies for RCRA Corrective Action (April 2004 updated, EPA/530/R- 01/015 Low-Flow (Minimal Drawdown) Groundwater Sampling Procedures (April 1996, EPA/540/S-95/504. [PDF file] RCRA Ground-water Monitoring: Draft Technical Guidance [PDF, 2.87 MB, 236 pages, About PDF] (November 1992) Recommended Procedure for Low-Flow Purging and Sampling of Groundwater Monitoring Wells (October 15,1997, Bulleting No. QAD023 U.S. Environmental Protection Agency 59

Summary Corrective action inspection process Preparation Inspection Reporting Developing case if necessary Questions? U.S. Environmental Protection Agency 60