The Responsible Person AKA Technical Person with Executive Functions

Similar documents
The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas

IECEx OPERATIONAL DOCUMENT

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) MAINTENANCE STANDARD

IECEx OPERATIONAL DOCUMENT

Subject: Guidance on Corrosion Assessment of Ex Equipment

IECEx 03 Service Facilities Program. John Allen Dowding & Mills

INTERNATIONAL STANDARD

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT

ASI National Structural Steelwork Compliance Scheme. A Guide for Clients, Builders and Prime Contractors

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Compiled by: Figure 2: Fire triangle. Successfully suppressing or separating one or more of these three components can avoid a fire or explosion.

EPS AUSTRALIA SERVICES HAZARDOUS AREA CAPABILITY

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

ExMC/1291/DV August 2017

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) VERIFICATION DOSSIER STANDARD

EX SCHEME IMPLEMENTATION - PETRONAS EXPERIENCE

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

CASS TOES FOR FUNCTIONAL SAFETY MANAGEMENT ASSESSMENT (IEC : 2010)

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) COMPETENCY STANDARD

IACS. Recommendation 74 A GUIDE TO MANAGING MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS OF THE ISM CODE. (April 2001) (Rev.

Process Safety Management and Functional Safety Management. Spot the difference

Document 2007 Rev 0 December 2005 Page 1 of 8

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

ISO/IEC 17025:2017 Working Document Instruction Page

INTERNATIONAL STANDARD

Integrity Management Program for

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

IECEx Certificate of Conformity

PROOF/ÉPREUVE A ISO INTERNATIONAL STANDARD. Environmental management systems Specification with guidance for use

ISO INTERNATIONAL STANDARD. Cranes Safe use Part 3: Tower cranes

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

ISO 9001:2015 Readiness Review

MASS MANAGEMENT ACCREDITATION STANDARDS

WELMEC European cooperation in legal metrology

NORSOK STANDARD Z-008 Edition 3, June Risk based maintenance and consequence classification

NORSOK STANDARD Z-008 Edition 3, June Risk based maintenance and consequence classification

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE GENERIC STANDARDS TRAINING SERVICES THE ROUTE TO ISO 9001:2015 AVOIDING THE PITFALLS

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

GUIDE 60 Conformity assessment Code of good practice

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

Specific Accreditation Criteria Infrastructure and Asset Integrity ISO/IEC and ISO/IEC Annex. Lifting equipment assessment

INS QA Programme Requirements

4. General requirements 4.1 Impartiality and independence F Organisation s SANAS No/s. Date/s of evaluation

INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Non-destructive testing Qualification of personnel for limited applications of non-destructive testing

IECQ PUBLICATION IECQ IEC Quality Assessment System for Electronic Components (IECQ System)

INTERNATIONAL ELECTROTECHNICAL COMMISSION SYSTEM FOR CERTIFICATION TO STANDARDS RELATING TO EQUIPMENT FOR USE IN EXPLOSIVE ATMOSPHERES

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

Operating Manual itag100-7, itag100-7-cb itag100-7d, itag100-7d-cb

Our Ref. April 28, 2005 Page 1/9. 1. Introduction References Certification... 4

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements

Operating and Maintenance Manual. for. HADEF locking device for monorail trolleys

OAİB PRODUCT CONFORMANCE SPECIFICATIONS -PUMPS- e - m a i l : i n f t u r q u m. c o m

Introduction and Revision of IEC 61508

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices

IMAS Post-clearance documentation

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

SANAS Accr. No/s. F Date/s of evaluation

General requirements for the competence of testing and calibration laboratories

INTERNATIONAL STANDARD

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

WELMEC European cooperation in legal metrology

INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL

IECEx OPERATIONAL DOCUMENT

ISO INTERNATIONAL STANDARD. Quality systems Medical devices Guidance on the application of ISO and ISO 13488

INTERNATIONAL STANDARD

Assessor Assessment Pack

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

Materials and Qualification Procedures for Ships

IECQ PUBLICATION QC IEC Quality Assessment System for Electronic Components (IECQ System)

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 2: Comprehensive quality requirements

SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland

Red Tractor Farm Assurance Fresh Produce GLOBALG.A.P (Supplement) RT/GG Supplement 2016/17

ISO INTERNATIONAL STANDARD. Specification for security management systems for the supply chain

INTERNATIONAL STANDARD

Chevron North Sea Limited (CNSL) operates more than 25 pipelines across three operated assets in the UK North Sea: Alba, Captain and Erskine.

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

Standards and accreditation. Tools for delivering better regulation

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES

ASTATT1 Prepare to carry out air tightness testing

USER INSTRUCTIONS. Installation Operation Maintenance. Valtek Mark 3 Sealed Metallic Pumps

Pipeline Operational Status. API Recommended Practice 1181 First Edition

IEC System for Certification to Standards relating to Equipment for use in Explosive Atmospheres (IECEx System)

Medical Device Directive

HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

Spirax Sarco Services Maintaining steam systems for peak performance.

ENVIRONMENTAL CLIMATE CONTROL EQUIPMENT & SOLUTIONS OIL & GAS - MARINE.

ISO INTERNATIONAL STANDARD. Welding coordination Tasks and responsibilities. Coordination en soudage Tâches et responsabilités

ISO INTERNATIONAL STANDARD. Industrial fans Tolerances, methods of conversion and technical data presentation

Transcription:

Peter Roberts Explosive Atmospheres Essential Guidance Series EGS 0035 Edition 1 Supplement for the CompEx Ex 14 training course. The Responsible Person AKA Technical Person with Executive Functions ExVeritas

Copyright Notice & Disclaimer ExVeritas assumes no liability to any party, for any loss, expense or damage occasioned by the use of this information. Whilst due care has been taken during the preparation of this document, the author cannot be held responsible for the accuracy of the information herein or for any consequence arising from it. Persons using this document are encouraged to seek current advice on their specific needs before acting upon any of the content. This publication is intended, as a reference document only, and is not a substitute for the current IEC/EN standards applicable to the topic. The author assumes no liability to any party, for any loss, expense or damage occasioned by the use of this information. This booklet may not be reproduced and distributed in whole or in part to third parties without the express permission of Exveritas Ltd. Prefix Throughout this document, standards where they have been referenced have been listed against the International Electrotechnical Commission (IEC). For countries who are part of the European Union then the standards are prefixed with EN (European Norm) a harmonized standard for use within Europe, for locations outside the European Union i.e. rest of the world, then the standards referenced should be prefixed by IEC rather than EN, however after saying that, both standards are technically identical. Copyright Exveritas 2016 Page 2 of 10 Egs 0035 Responsible Person

Ex Inspection Management being the responsible person under IEC 60079-17 standard. Ex inspections will always make the plant safer and can also lead to lower running costs. The recently updated inspection and maintenance standard IEC 60079-17, at the time of writing this article this is Edition 5 of the standard dated 2013, gives additional details about how these inspections should be carried out and the responsibilities of inspectors. Introduction Installations in hazardous areas possess features specially designed to make them suitable for operations in such atmospheres. It is essential that in these potentially explosive atmosphere, the integrity of those special features is maintained throughout the life of such installations, The IEC 60079 series of standards for electrical equipment in explosive atmospheres covers three very important areas that engineering personnel have to be aware of: Design, Selection and Erection (IEC 60079-14), Inspection and Maintenance (IEC 60079-17) and Repair and Reclamation (IEC 60079-19) The inspection and maintenance standard IEC 60079-17 provides the details for the inspection and also the maintenance of electrical Ex equipment. In earlier editions of Copyright Exveritas 2016 Page 3 of 10 Egs 0035 Responsible Person

the standard it did not inform us about was the actual methodology and strategy of how the inspections should be completed. Time-Based Inspection Methodology The most common approach for implementing periodic inspections is as a time-based inspection methodology (TBIM), this incorporates a visual or close inspection or a combination of both, which may then be supplemented by a percentage of detailed inspections at a set inspection period. A great deal of experience and knowledge is required even to set a simple time-based approach to inspection. Environmental conditions, for example, must be known and thoroughly analysed and monitored. Major factors affecting the deterioration of equipment include: susceptibility to corrosion; exposure to chemicals or solvents; likelihood of accumulation of dust or dirt; likelihood of water ingress; exposure to excessive ambient temperature; risk of mechanical damage and exposure to undue vibration. Other service factors may include training and experience of personnel and the likelihood of unauthorised modifications or inappropriate maintenance. The person who sets the initial and subsequent inspections, and verifies the suitability and effectiveness of the inspection regime is referred to in IEC 60079-17 as the Technical Person with Executive Function (TPEF) or the Responsible Person (RP). This person must provide technical management of the skilled personnel (the inspection and maintenance team). They must have adequate knowledge in the field of explosion protection, having familiarity with the local conditions, be familiar with the installation and who has overall responsibility and control of the inspection system for the electrical equipment within hazardous areas. Copyright Exveritas 2016 Page 4 of 10 Egs 0035 Responsible Person

The TPEF/RP is responsible for the maintenance and the inspection documentation (now referred to as the verification dossier in IEC 60079-14) including any modification records and the following items shall be recorded in the verification dossier: Ex analysis a) Zone classification of areas and, and if included, the equipment protection level (EPL) required for each location. b) Gas and Dust equipment group (IIA, IIB or IIC and/or IIIA, IIIB or IIIC) and temperature class requirements and maximum surface temperature as required. c) Equipment characteristics e.g. temperature ratings, type of protection, IP rating, corrosion resistance, vibration resistance etc. d) Records sufficient to enable the explosion protected equipment to be maintained in accordance with its type of protection (see IEC 60079-14), for example list and location of equipment, spares, certificates, technical information. e) g) Copy of the initial and subsequent inspection records as detailed in IEC 60079-14/17 and details of any repairs or maintenance. Details on other aspects covered by IEC 60079-17 should also be included, including sealing (for area classification), mechanical maintenance on Motors (refer to Annex D of IEC 60079-17:2013) and the acceptance of equipment in old installations. A Fitness-for-purpose assessment is defined in Annex C of IEC 60079-17:2013 for equipment where no certificate of conformity is available or the origin of a certificate cannot be verified. Fitness-for-purpose usually requires a full audit and assessment of the equipment, the equipment assessor must produce a technical report to justify the Copyright Exveritas 2016 Page 5 of 10 Egs 0035 Responsible Person

continued use of the equipment and a labelled with the report number shall be affixed to the equipment. In order to retain and review the required information, an Ex register is required. This will normally be some form of electronic database that records all Ex Assets (including safe area equipment: Ex i barriers and overload tripping devices used on some increased safety motors, etc.) and all of the Ex equipment to be logged. This should now include protective systems, mitigation devices and non-electrical equipment (certified or risk assessed). Risk Based Inspection Methodology Whilst the time-based inspection methodology (TBIM) approach may be adequate, it may not be the most appropriate methodology. It may not, for example, be best from a safety point of view and also from a commercial or cost position. Ex Inspections is designed to be preventative maintenance, but if you inspect something annually (yearly) and find an ignition-capable fault, the fault may have been there for 364 days! If you fix it (for example replace a gasket) it may be that the fault re-occurs quickly due to some common environmental condition (such as the atmosphere degrading a certain type of neoprene seal) and the equipment may be almost permanently unsafe, despite being inspected regularly. Simply put, high risk equipment located in high risk areas should have a greater frequency of inspection. Low risk equipment located in low risk areas should be inspected at a lesser frequency of inspection. Copyright Exveritas 2016 Page 6 of 10 Egs 0035 Responsible Person

Based on the above the risk based inspection methodology (RBIM) approach has been introduced, and although still in its infancy this approach will increase in the coming years because of the benefits. Asset recording Many people confuse zones (classified areas) with risk. A zone is simply a threedimensional bubble in a defined location identifying the likelihood and duration of an event e.g. how often the event (release) occurs and if it does occur how long it lasts, release, and we also attach a dimension to that release. A risk is a combination of the likelihood of the release combined with the likelihood of the ignition being present. - we now refer to this as the EPL- Equipment Protection Level - multiplied by the consequence of the explosion. So in terms of risk, a large Zone 2 IIC area may be a higher risk than a small Zone 1 IIA area and the proximity of people or other fuel storage areas (the potential domino effect) may also create a far higher risk than a zone might indicate. The Energy Institute (EI) introduced a guidance document in October 2008: Guidelines for managing inspection of Ex electrical equipment ignition risk in support of IEC 60079-17. This guide has been produced in conjunction with the UK HSE and major users such as BP, Total and Shell. The EI methodology is the Risk Based Inspection (RBI) approach, which can reduce inspections and shutdowns and provide increased frequency between inspections without compromising safety or reliability. The benefits of RBI include improved risk management results, increased plant availability and reduced unplanned outages. This is based on the fact that equipment which is more critical to safety is inspected at a greater frequency than equipment that may have a lesser impact on safety of personnel or plant integrity. The RBI examines the health and safety environment and business risk of active and potential damage to assess and rank failure probability and consequence. This ranking is used to optimise inspection intervals based on site-acceptable risk levels and operating limits, while mitigating risks as appropriate. Copyright Exveritas 2016 Page 7 of 10 Egs 0035 Responsible Person

Organisations should always look at previous inspections and maintenance and apply the lessons learnt to the future. Annual integrity reports should be in place so that modifications and repetitive faults can be trended and hence eliminated. Photo 1: Main Fan inspected every six months Photo 2: Standby Fan inspected every four years Copyright Exveritas 2016 Page 8 of 10 Egs 0035 Responsible Person

Summary It is not enough just to conduct Ex Inspections - you must have policies, strategy and programmes that identify a clear and concise route, not only the for inspection, but also for the maintenance and including corrective actions, which should be undertaken on the facility. You must be able to demonstrate that your strategy and programmes are effective and that they maintain (or ideally reduce) the level of risk which has been deemed acceptable for your plant, people and inventory. The responsible persons or Technical Persons with Executive Function have an absolutely key role in the explosion safety of a plant. The minimum knowledge requirements for a person in such a role are covered by IEC 60079-17 and are: a) A general understanding of relevant electrical engineering; b) A practical understanding of explosion protection principles and techniques; c) The ability to assess engineering drawings (area classification, P&ID etc.); d) A working knowledge and understanding of area classification, installation and repair; e) A basic knowledge of quality assurance, including the principles of auditing, documentation, traceability of measurement and instrument calibration. The competency of people in these key safety roles has to be verified and attributed, at intervals not exceeding five years on the basis of sufficient evidence that the person is competent across the specified range of activities and has the relevant knowledge and understanding underpinning the competency. To assist with competency assessment, the HSE has worked with CompEx to produce the CompEx Ex14 - Responsible Person Module. This aims to assist responsible persons meet their legal obligations with regard to maintaining an Ex asset and inspection register and implementing a practical approach to the inspection and maintenance of equipment in explosive atmospheres using IEC 60079 Parts 14 & 17 and offering the basis of best practice in this regard. Copyright Exveritas 2016 Page 9 of 10 Egs 0035 Responsible Person

Units 16-18 Abenbury Way Wrexham Industrial Estate Wrexham LL13 9UZ UK Telephone: +44 (0)845 862 2447 Facsimile: +44 (0)845 862 2426 http://www.exveritas.com/ex14-responsible-person-module/ Copyright Exveritas 2016 Page 10 of 10 Egs 0035 Responsible Person