Key Knowledge Generation Publication details, including instructions for author and Subscription information:

Similar documents
Key Knowledge Generation Publication details, including instructions for author and Subscription information:

Practical Standard Methods of Measurement Cost Estimating in the Design Stage

Key Knowledge Generation Publication details, including instructions for author and Subscription information:

Key Knowledge Generation Publication details, including instructions for author and subscription information:

Risk Assessment Techniques

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

This article was downloaded by: Publisher: KKG Publications Registered office: 18, Jalan Kenanga SD 9/7 Bandar Sri Damansara, Malaysia

CHAPTER 1 INTRODUCTION

MALAYSIA S PRODUCTIVITY CHALLENGE: IN WHAT WAYS CAN MALAYSIA INCREASE PRODUCTIVITY TO REMAIN COMPETITIVE by HJ. SHAMSUDDIN BARDAN EXECUTIVE DIRECTOR

Survey and Analysis of Energy Consumption in University Campuses

Comparing Suitability of NEC and FIDIC Contracts in Managing Construction Project in Egypt

Slight drop in Malaysia s job outlook confidence expected in Second Half 2008, reports JobStreet.com

COMPATIBILITY OF BIM BASED BOQ FOR SRI LANKAN CONSTRUCTION INDUSTRY

Introduction. HC BiM QS 2016 And Beyond

Design Build: CCDC

SIFULAN Malaysian Access Federation. Identity Federation Policy [DRAFT] Copyright. Mohd Ishan Last Modified 17 January, 2018 Version 1.

2012 APAA Trademark Committee Special Topics

Legal Execution Department Ministry of Justice, Thailand. Country Report

Jean Pierre Segers a a Small Business Research Institute, Brussels, To link to this article:

Herbert Woratschek a, Chris Horbel b & Bastian Popp a a Department of Services Management, University of Bayreuth,

The Changing Face of Quantity Surveying Practices in Construction Industry

Unit 3: Traditional Project Delivery Using IT Applications

The Potential of the Method of Measurements used by Engineers and Contractors in Tendering and Subsequent Contract Administration

Building Information Modeling (BIM) and Legal and Contractual Considerations

Awareness, readiness and challenges of architectural Firmin Indonesia in entering ASEAN Economic Community (AEC)

Sent electronically through the at IVSC Exposure Draft of Proposed New International Valuation Standards

Tariff No.: U Published on 10 November UNIFIED CARRIER LICENCE TELECOMMUNICATIONS ORDINANCE (Chapter 106)

Hristo Kyuchukov a b a St. Elizabet University, Bratislava, Slovakia

Apply accounting and finance skills. And lead within the organisation

Chapter 2 Parties to the Contract

To link to this article: PLEASE SCROLL DOWN FOR ARTICLE

A PRELIMINARY BIM IMPLEMENTATION FRAMEWORK FOR CONSULTANT QUANTITY SURVEYOR FIRMS IN A DEVELOPING COUNTRY

Supply Chain Management

Agreeing the Terms of Audit Engagements

UEFA National Associations Match Video Distribution and Storage

Tilburg University. Published in: International Public Management Journal. Document version: Publisher's PDF, also known as Version of record

A Comparative Analysis of the Building Information Modeling Guides of Korea and Other Countries

Partnering: A good approach to dispute resolution in construction management

Hikmahanto Juwana Professor of Law University of Indonesia. Copyright by Hikmahanto Juwana

ConsensusDocs. Catalog. Updated Docs Inside

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

Interim Report. Study Council for Promoting Translation of Japanese Laws and Regulations into Foreign Languages

Work Health and Safety Consultation, Cooperation and Coordination

Evaluation on the Application of Quality Management System in Tanzania Building Construction Projects

CHAPTER 4 ANALYSIS AND DISCUSSION OF RESULTS

Kong, China however, there has been some successful results from the informal process (see the Hong Kong, China local study) Consideration of wo

Phase II IN ASEAN. I. Background. the case of. redress. Consumer Protection, particula ASEAN" establish or. provide. available.

- Preparation and Presentation of Consolidated Financial Statements in the Malaysian Context (12 & 13 December 2007 at Sime Darby Convention Centre)

PROFESSIONAL TECHNICAL ADVISORY BOARD

Section 13(c) and Joint Employment

Please read the Notes below before using the BIM Particular Conditions.

AD Amsterdam, The Netherlands Published online: 15 Jun 2005.

APES 305 TERMS OF ENGAGEMENT

Procedia - Social and Behavioral Sciences 202 ( 2015 ) 76 88

HERMES MICROVISION, INC. Corporate Social Responsibility Best Practice Principles

DRAFT MALAYSIAN STANDARD

Corporate Social Responsibility Best Practice Principles of ASPEED Technology

ESCAP Transport Division

1 GENERAL 1.1 Fraxion (Pty) Ltd is a software development, licensing and related professional services company.

Consumer Protection Laws in Asia: Prevailing Trends & Commonalities

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

Construction Services: Contribution to Sustainable Development and Issues on Trade in Services. Emily MBURU DITC-UNCTAD

Construction Law Update

Brief Reflections on the Practice of Labor Arbitration in El Salvador

Agreeing the Terms of Audit Engagements

IMPLEMENTING ARRANGEMENT TEMPLATE (Model for Government-to-Government Joint Procurement Procedure)

Legal Updates: Minimum Wage Postponement

Terms & Conditions for Octopus Online Payment Service

STUDY ON THE MANAGEMENT OF EPC PROJECTS

Partnering In Construction: Improvementthrough. Integration And Collaboration

WCO Origin Conference January 2014, Brussels, Belgium. Presented by Duk-soo Lee Korea Customs Service

ADVISORY. Indonesia s New Construction Law. Overview. Main Provisions. 26 January 2017

5D BIM Implementations in Hong Kong and Mainland China

Elements of abnormally low tenders: A comparative analysis of EU procurement directive and case law

ADVERTISING TERMS AND CONDITIONS

Disclosure of information to trade unions for collective bargaining purposes

ASEAN Guidelines on Good Industrial Relations Practices

AMERICAN BAR ASSOCIATION SECTION OF SCIENCE & TECHNOLOGY LAW SECTION OF INTERNATIONAL LAW SECTION OF BUSINESS LAW REPORT TO THE HOUSE OF DELEGATES

BIM in Hong Kong: Time to Leap. Ivan WONG Senior Manager Council Services

NTA Metropolitan Mass Transit System. To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project. Addendum No.

INTERNATIONAL STANDARD

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON ADVERTISING SERVICES

APPLICATION OF SUPPLY CHAIN PERFORMANCE MEASUREMENT IN SCOR MODEL AT BUILDING PROJECT

Management Finance Measurement

TERMS OF USAGE & PRIVACY POLICY

ISO/IEC INTERNATIONAL STANDARD. Systems and software engineering System life cycle processes IEEE

TERMS AND CONDITIONS OF CARRIAGE

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.

Andrés Monzón, Floridea Di Ciommo.

Ombudsman Services response to the Consumer Focus consultation. Proposals for Design principles for the Regulated Industries Unit

Proposed fourth edition of the ASX Corporate Governance Council s Principles and Recommendations

Proposition 4 Auditing Knowledge

APEC Occupational Standards Framework. Draft 1.2

Five tips for large assembly performance

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

Thus, let s focus on 35% 30% 25% 20% 15% 10%

Network Neutrality Regulation Across South Asia: A Policy Brief Towards an Evidence Based Research Agenda

MEDIA ADVISORY. Tokyo, January 29, 2007

Best Employers - Asia 2016

Quality of Documents Workshops A REPORT FROM THE CCA STANDARD PRACTICES COMMITTEE

Transcription:

This article was downloaded by: Publisher: KKG Publications Registered office: 18, Jalan Kenanga SD 9/7 Bandar Sri Damansara, 52200 Malaysia Key Knowledge Generation Publication details, including instructions for author and Subscription information: http://kkgpublications.com/technology/ The Importance of Standard Method of Measurement in Indonesian Construction Industry SENG HANSEN 1, ARDITYA RESTU SALIM 2 1, 2 Podomoro University, APL Tower 5th Floor Jakarta Indonesia Published online: 05 December 2015 To cite this article: S. Hansen, A. R. Salim, The importance of standard method of measurement in Indonesian construction industry, International Journal of Technology and Engineering Studies, Vol. 1, no. 4, pp. 123-128, 2015. DOI: https://dx.doi.org/10.20469/ijtes.40003-4 To link to this article: http://kkgpublications.com/wp-content/uploads/2015/12/ijtes-40003-4.pdf PLEASE SCROLL DOWN FOR ARTICLE KKG Publications makes every effort to ascertain the precision of all the information (the Content ) contained in the publications on our platform. However, KKG Publications, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the content. All opinions and views stated in this publication are not endorsed by KKG Publications. These are purely the opinions and views of authors. The accuracy of the content should not be relied upon and primary sources of information should be considered for any verification. KKG Publications shall not be liable for any costs, expenses, proceedings, loss, actions, demands, damages, expenses and other liabilities directly or indirectly caused in connection with given content. This article may be utilized for research, edifying, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly verboten.

International Journal of Technology and Engineering Studies IJTES Vol. 1, no. 4, pp. 123-128, 2015 THE IMPORTANCE OF STANDARD METHOD OF MEASUREMENT IN INDONESIAN CONSTRUCTION INDUSTRY SENG HANSEN 1*, ARDITYA RESTU SALIM 2 1, 2 Podomoro University, APL Tower 5th Floor Jakarta Indonesia Keywords: Standard Method of Measurement Advantages Challenges Indonesia. Received: 16 August 2015 Accepted: 18 October 2015 Published: 05 December 2015 Abstract. Nowadays, Standard Method of Measurement (SMM) is one of the most important standardizations in construction industry. It provides a foundation about the measurement principles which can be used to measure the design drawing s volume as well as the actual work s volume. As a country that has an enormous increase in construction outputs, this standardization will be able to minimize any misunderstanding or miscalculation between owners and contractors in Indonesian construction industry, and therefore it provides the same measurement principles for both parties. However until today Indonesia still doesn t have a Standard Method of Measurement. Therefore this research has two objectives, i.e. (1) to identify the advantages of implementing Standard Method of Measurement in Indonesia and (2) to identify the challenges in implementing this Standard Method of Measurement in Indonesian construction industry. The research method used for this report was a comprehensive literature from several countries that have already adopted this Standard Method of Measurement and field observations. The results are presented in tables and we can conclude the benefits of adopting this Standard Method of Measurement as a means to advance Indonesian construction industry. 2015 KKG Publications. All rights reserved. NTRODUCTION Construction industry has always been considered as a high risk industry where there are so many inter-dependent factors that influence each other. One of these risks is the costrelated risk. As what has been practiced worldwide, in entering a construction project and getting the estimated construction cost, a precise and detailed Bill of Quantity (BQ) is needed. In short, a Bill of Quantity can be defined as a document which lists all required materials, parts, and labor for a construction project to be done. Two important aspects are always there to be sought by the quantity surveyors, i.e. the volume (quantity) and the unit rate of the work item. Volume can be taken off from the drawings while the unit rate comes from the unit rate analysis for each work items. However the problem arises when there is no standardization in measuring the work item s volume from the drawings. When there is no standard which governs how a drawing can be taken off and measured, the quantity calculation may become error or non-uniform which at the end will constitute a risk. This risk actually can be minimized with the availability of a Standard Method of Measurement (SMM). A Standard Method of Measurement (SMM) can be defined as a document which is recognized by the government as a guidance in measuring the construction work. It will set up uniform principles in measurement so that it will give both parties (employer and contractor) the same perspective in measuring the work. Therefore, SMM is one of the most important standards in construction industry. Without it, the analysis and comparison of construction costs may involve a tedious work. Several countries have already published their own versions of Standard Method of Measurement, such as the United Kingdom (with SMM7, CESMM3, and MESMM), Hong Kong (with SMM7 and SMM for building elements), Australia (with SMM5), Malaysia (with SMM2, CESMM3, and My CESMM), and South Africa (with Standard System of Measuring Building Works). Meanwhile as a country that has an enormous increase in construction outputs, Indonesia still does not have a Standard Method of Measurement that will provide a foundation about the measurement principles which can be used to measure the design drawing s volume as well as the actual work s volume. Without the availability of this standard, there are many quantity-related arguments and cost-related disputes that arise from the execution of a construction project. Both parties to contract and their quantity surveyors may have some arguments in doing the measurement works and there is no reference for them to settle their arguments. This will lead to confusion and even disputes which will decrease the productivity and value of the construction process. * Corresponding author: Seng Hansen E-mail: seng.hansen@podomorouniversity.ac.id Content from this work is copyrighted by KKG Publications, which permits restricted commercial use, distribution and reproduction in any medium under a written permission. Users may print articles for educational and research uses only, provided the original author and source are credited. Any further utilization of this work must maintain attribution to the author(s), the title of the work and journal citation in the form of a proper scientific referencing.

124 S. Hansen, A. R. Salim The Importance 2015 Having identified this problem, Indonesia needs to start developing this standard. Especially with the government s plan to increase construction projects for 2015 2019 development, this standard does not solely serve for efficient construction measurement, but it also can be used to control the project s finance as well as to prevent corruption. LITERATURE REVIEW With the implementation of standardization, consistency will be achieved. This will result in decrease of conflict among the parties involved in a construction project. According to [1], the main purpose of adopting standardization is to develop a specific level of conformity. According to them, standardization has contribution to increased productivity. Moreover, Standard Method of Measurement is a standard document that is being localized in order to fit with the local custom and industry practice [2], [3], [4]. However the implementation of this standard in several countries is not without their critics. Different perspectives on this issue have been discussed by professionals and practitioners in the industry. For example [5] identified that inadequate industry consultation during the development of Standard Method of Measurement contributed to the ineffectiveness of SMM implementation. Another critique is attributed to [6] which stated that if the method of measurement is not delivered in detail, it can cause disputes. [7] examined the methods of utilization of standard methods of measurement in some developed countries and proposed new directions for the domestic standard method of measurement in South Korea. The result of the current status of the SMM of each country they researched is shown in the table 1 below. Country Australia Canada Ireland United Kingdom Singapore TABLE 1 CURRENT STATUS OF SMM IN SEVERAL COUNTRIES Comparison Analysis To provide a uniform basis of measurement Work measured as net in position Allows for the provision of Location Drawing and Bill Diagrams to aid the descriptions of time Location to be provided in descriptions unless evident from drawings or other information required to be provided by these rules To provide a uniform basis of measurement and to enable the exchange of date between SMM, National Productivity and Quality Specifications CAD drawings [8, 9] have investigated the current industry issues which are surrounding the application of current Malaysian Standard Method of Measurement (MySMM) as a single standard system of measurement. Literature review and an exploratory semi-structured interview approach were conducted. The outcome is that there are several issues in SMM implementation which need to be overcome. They are as follows: a) Complicated rules and description which will confuse the users. b) Lack of clarity in describing the meaning of the items and the rules of measurement. c) Some of the important measurement rules or items of work are not highlighted. d) Existence of construction terms which are not user-friendly to some non-technical persons. e) Some elements fail to acknowledge builder s knowledge, measurements are not in line with the nature of contractor s costing. f) Heavily biased towards tendering rather than administrative cost control purposes. g) Inadequate industry consultation during the development process. h) Paragraph format is not in line with QS software technology (BIM). There is little literature that describes the benefits and necessity of Standard Method of Measurement in Indonesia. [10] described several benefits of this standard, namely: a) to minimize the potential of conflict arisen from the different interpretation of measurement method and work description, b) both parties (employer and contractor) will understand the minimum requirements of the construction project when they are making the BQ, c) risk distribution between both parties will be easily understood, d) it will improve the effectiveness of construction project control and contract administration, e) since the contractors will use the same measurement method, tender price will become more competitive and tender documents can be easily compared with one another. Moreover, Hansen also suggested that in drafting and developing this Standard Method of Measurement in Indonesia, the drafting team must adapt it to the construction industry s local wisdom and practices so that it will be easily socialized, accepted and implemented by all players in the industry. METHODOLOGY The research method used for this study is mainly based on literature reviews and field observation. Literature review is

2015 Int. J. Tec. Eng. Stud. 125 based on books, journals and standards that aimed to develop research insights. In order to make a comprehensive and effective review, the selection of literature was based mainly on those relevant researches in the last past 13 years (2002-2015) and from the various standard methods which have already been implemented in several countries. Field observations were done during the periods when the first researcher became a practitioner in a government-owned construction company for 5 (five) years. Two more in-depth observations were made when he was involved in Quantity Surveying Awareness Program conducted by Indonesia Ministry of Public Works and Public Housing in September October 2015 period. First observation was done in Padang City (7-8 September 2015) and second observation was done in Gorontalo City (22-23 October 2015). Program participants included ministry s employees, contractors, and consultants. Group discussions were conducted in order to gain participants opinions regarding the current condition and the necessity of implementing a Standard Method of Measurement in Indonesia. RESULTS The Current Condition The current condition in Indonesia is that there is still no Standard Method of Measurement which applies nationwide. Generally the players in this industry (both employers and contractors) have their own in-house departments which produce their own version of Standard Methods of Measurement. Besides, they may hire professional QS firms which have already produced their own versions of this standard. These standards differ greatly from one another and therefore they do not resolve problems related to measurement conflicts and cost-related disputes. Knowing this problem, the Indonesian government through the Ministry of Public Works and Public Housing has already attempted to facilitate the development of QS awareness and one of them is by preparing a standard method which will be implemented in Indonesia. However there are still many different opinions which questioned whether or not this standard method should be applied in Indonesian construction industry. This study is conducted in order to answer this question. The Advantages of Implementing Standard Method of Measurement in Indonesia The major benefit is that it will provide a foundation for measurement principles in the construction industry. It will set out a more efficient way in doing taking-off and drafting a detailed Bill of Quantity. The benefits can be classified into 2 (two) categories, i.e. the direct benefits and the indirect benefits. TABLE 2 THE DIRECT & INDIRECT BENEFITS OF IMPLEMENTING STANDARD METHOD OF MEASUREMENT Direct Benefits of Implementing Standard Method of Measurement For all parties involved: Provide consistency, accuracy, and uniformity for measurement principles Provide efficient cost control Provide efficient reviewing process by third party Provide better Bill of Quantity arrangement Provide data for cost analysis Improve productivity Minimize unnecessary disputes For employer: Provide competitive tender price Provide reliable tender price Provide efficient control of the payment For contractor: Provide a fair tender price where almost all risks have already been set out Assist in pricing Saved from costly exercise Indirect Benefits of Implementing Standard Method of Measurement Provide a good source for public education especially in construction/built environment discipline Provide a good reference for third party (the court, the arbitrator, the negotiator) to settle cost-related disputes Advance the construction industry practice

126 S. Hansen, A. R. Salim The Importance 2015 The Challenges in Implementing Standard Method of Measurement in Indonesia Since Indonesia still does not have any Standard Method of Measurement which is applied nationwide, the need for adopting and implementing a Standard Method of Measurement becomes imperative. However this is not without any challenges. Several challenges are shown in table 3 below. TABLE 3 THE CHALLENGES IN IMPLEMENTING STANDARD METHOD OF MEASUREMENT IN INDONESIA No regulation and enforcement body Applicability Difficulty in developing a simple, precise, compact, and detailed SMM Acceptable which will be easily understood Lack of understanding Adaptability Lack of socialization Local conformity Various informal SMM versions by in-house or outside QS firms Reluctant to change the current practice DISCUSSION & CONCLUSION The main benefit of implementing a Standard Method of Measurement is that it will provide a foundation for measurement principles such as consistency, accuracy and uniformity. Consistency means that with the usage of standard method, it will produce a Bill of Quantity which is far more consistent since works are adequately itemized and described in a regular way. Moreover, since this standard method is developed by all key players and professionals in the industry, almost all considerations that are related to the accuracy of the measurement have been considered. While uniformity means that this standard method will provide a uniform basis for the measurement of construction works as well as for the presentation of measurement units in Bill of Quantity no matter who will draft the bill. This in fact will ease the quantity surveyor or cost estimator in making a Bill of Quantity since the work item will normally be the same with the ones in standard method. By implementing this standard method of measurement, efficient cost control can be achieved. Moreover, with the same understanding of measurement principles, it will absolutely help for the reviewing process by third party such as arbitrators or judges when cost-related disputes arise. Since it will create a systematic and uniform structure for the bill, it will eventually produce a better Bill of Quantity arrangement. This especially can be identified with the usage of coding system and simplification. Furthermore, this coding system will simplify computerized data processing which is part of construction development trend that cannot be avoided. Due to the detailed nature of Standard Method of Measurement, it also serves as data for cost analysis by quantity surveyors. For many, it will increase productivity by saving time in doing measurement and calculation. With the same understanding over measurement principles, both parties will be less likely to argue over unnecessary disputes. It will minimize variation orders since almost all work items have already been provided in this standard. Overall, it will improve the effectiveness and productivity by minimizing the conflict of miscalculation. As for the employer s benefits, with the implementation of this standard it means that contractors who are participating in a tender will submit more reliable tender prices which are close enough to the employer s estimation. In preparing their tender prices, contractors will use the same Standard Method of Measurement and therefore their tender prices will be close to each other. For the employer, this creates a competitive tender price. On the other hand, employer will have the easiness to justify which contractor gives the best offer. When contractor has been appointed and project has been started, employer can use this standard to calculate and evaluate any contractor s progress, payment claims, variation orders, and final account. It will serve as a fair and convenient basis for valuing the payments so that employer will easily manage his financial condition. Meanwhile, this standard will assist contractors in pricing their tenders. Contractors will use the same method of measurement which means that their measurement will be more reliable and can be accepted by the employer. With the usage of this standard, contractors are saved from costly and timely exercise which was normally done before. Contractors can also minimize their risks of miscalculating and misunderstanding over work items, so that contractors can concentrate fully on finishing their job rather than engaging in unnecessary disputes. Since Indonesia still does not have this kind of standard, its implementation will serve as a guidance and reference for parties involved in the construction industry especially when there is a conflict regarding measurement principles. It will provide a good reference for third party (i.e. the court, arbitrator or negotiator) to settle quantity and cost-related disputes. It can also be used by students in construction related disciplines such as civil engineering, architecture, and construction management to gain a fundamental understanding of measurement principles for construction works. At the end, the implementation of this standard will advance Indonesian construction industry practice.

2015 Int. J. Tec. Eng. Stud. 127 However the implementation of this standard is not without critics. Major disadvantage of this standard is that it will always need to be revised and updated. There are several reasons for this i.e. the need to provide a more balanced and detailed work item description, the need to provide a more systematic structure of bill s items, the need to improve the contents of BQ, and the need to consider the recent techniques, technologies, and new conditions of contract. The implementation of this standard also faces some challenges. Table 4 below shows some challenges in implementing this standard method in Indonesia. TABLE 4 CHALLENGES IN IMPLEMENTING STANDARD METHOD OF MEASUREMENT IN INDONESIA Challenges No regulation and enforcement body Difficulty in developing a simple, precise, compact, and detailed SMM which will be easily understood Lack of understanding Lack of socialization Various informal SMM versions by in-house or outside QS firms Applicability Acceptability Adaptability Local conformity Reluctant to change the current practice Description Since there is still no regulation which governs and enforces the usage of this standard in Indonesian construction industry, it poses major challenge for the industry that is reluctant to change today s practice. Therefore government should make it mandatory for the implementation of this standard and regulate the usage of this standard. Since this standard will be used nationally, the government and the team who will develop and draft this standard method will need to make this standard as simple, precise, compact, and detailed as possible. The drafting team also needs to realize the difficulties to make a realistic relationship between construction work method, quantity, and cost in detail. Therefore the team should consist of professionals and practitioners who are experts in this industry. Lack of understanding of the importance and beneficial effects of implementing Standard Method of Measurement. This study aims to provide the answer related to the importance and advantages of implementing a Standard Method of Measurement. If this standard has already been published to be used nationally, then government and enforcement body need to socialize this standard so that it can be beneficial as it should be. Socialization should be gradual and sustainable, and it should involve various stakeholders including the government, the industry, and the related educational institutions. The current practice is that there are various standard methods which differ greatly from one another. These standards are produced by in-house QS departments (of big developers or contractors) and professional QS firms. This means that the standard being made must be applicable enough for the construction industry. Therefore in making this standard, government and the drafting team must come from professionals and practitioners who are experts in this industry. This means that the standard must be acceptable to all players in this industry. Therefore equality and fairness in terms of measurement for both employer and contractor need to be considered. This standard must be free from conflict of interest and it must be of neutral nature. This standard also needs to be able to adapt to any construction procurement types. For more advance development, this standard can be published in 3 (three) distinct standard methods, i.e. Standard Method of Measurement for building works (SMM), Standard Method of Measurement for civil engineering works (CESMM), and Standard Method of Measurement for mechanical, electrical and plumbing works (MEPSMM). The best practice is to adopt the international standard methods. However in adopting international standard methods, the drafting team needs to understand the local wisdom and practices in Indonesia so that they can produce a standard which is compatible with Indonesian construction industry practice. By doing so, the socialization and enforcement of this standard will be easier and more acceptable to all players in this industry. One of the major challenges is the lack of understanding so many players are reluctant to change the current practice. Some players may find that Indonesia does not need this standard yet and find difficulties in learning this new standard. Therefore, government should enforce and regulate the use of this standard. The focus of this research is the importance of Standard Method of Measurement which is expected to be introduced and implemented nationwide in Indonesia. The findings show that there are at least 13 (thirteen) direct benefits and 3 (three)

128 S. Hansen, A. R. Salim The Importance 2015 indirect benefits of implementing Standard Method of Measurement in Indonesia. The main benefit is to provide a foundation for measurement principles in the construction industry. This research has also identified 10 (ten) challenges in implementing this standard method. Solutions are provided for each challenge which essentially seek to promote the benefits and usage of Standard Method of Measurement in Indonesia. Since developing and implementing standard method has never been done before in Indonesia, further researches must be conducted on the effect of implementing Standard Method of Measurement in Indonesia and the necessity of developing various Standard Methods of Measurement i.e. for building works, for civil engineering works, and for mechanical-electrical-plumbing works. REFERENCES [1] V. R. Perumal and A. H. A. Bakar, The needs for standardization of document towards an efficient communication in the construction industry, Acta Technica Corviniensis-Bulletin of Engineering, vol. 4, no. 1, pp. 23, 2011. [2] G. Nani, P. J. Edwards, T. Adjei-Kumi, E. Badu and P. Amoah, Customisation and desirable characteristics of a standard method of measurement for building works in Ghanna, The Australian Journal of Construction Economics and Building, vol. 8, no. 2, pp. 30-40, 2008. [3] G. Nani, A. Mills and T. Adjei-Kumi, Misconception about the use of the standard method of measurement in developing countries: a Ghanaian perspective, In Past, Present and Future: Inaugural Construction Management and Economics Conference, pp. 1175-1182, 2007. [4] W. P. Utama, M. Peli and D. Y. Jumas, Standardization of Measurement Quantity Construction Jobs in Indonesia: An Idea, http://ftsp.bunghatta.ac.id/artikel-1- standardisasi_pengukuran_kuantitas_pekerjaan_konstruksi_di_indonesia suatu_gagasan.html, 2008. [5] H. B. Goh and L. Chu, Developing national standards for the classification of construction information in Singapore, Presented in International Council for Research and Innovation in Building and Construction CIB w78 Conference, 2002. [6] J. Molloy, Civil engineering measurement claims in Hong Kong, Strategic Integration of Surveying Services, FIG Working Week, pp. 13-17, 2007. [7] C. Jae-Ho, C. Woo-Chul, S. Hyung-Wook, T. Seung-Won, L. Jea-Sauk and C. Jae-Youl, Practical standard methods of measurement cost estimating in the design stage, Building Resilience, pp. 95, 2008. [8] A. R. N. Akbar, M. F. Mohammad, M. Maisyam and E. W. W. Hong, Desirable characteristics of malaysian standard method of measurements (mysmms) in meeting industry quality standards, ASEAN-Turkey ASLI (Annual Serial Landmark International) Conference on Quality of Life 2014, ABRA International Conference on Quality of Life, AQoL2014, pp. 26-28, Istanbul, Turkey, 2014. [9] A. R. N. Akbar, M. F. Mohammad, N. Ahmad and M. Maisyam, Adopting standardization in construction environment: standard method of measurement (SMMs), Procedia Social and Behavioral Sciences, vol. 170, pp. 37-48, 2014. [10] S. Hansen, Construction Contract Management: A Practical Guide to Managing Construction Projects. Jakarta: PT. Gramedia Pustaka Utama, 2015 This article does not have any appendix.