Alcoa Mosjøen Harbor Remediation Project Information and Fender Design

Similar documents
Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101

PIANC Commission Working Group Report Reviews

PIANC/Marine Civil Engineering Day 27. May 2017 Marine Civil Engineering specialization - courses. by Øivind Arntsen NTNU

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2011

Barometer Report 4 FOR CONTRACTORS AND CONSULTANTS

SHIP TO SHORE PORT INTERFACE

Kinetic Energy: E= ½. M. V2 10/5/2017. A simple and an effective tool. Presented by Rolf Dahlqvist Trelleborg Marine Systems (Sweden)

V International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals

A new Port Facility at Waitangi

Preparing for the Impacts of Climate Change on Facilities and Channels

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures

Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR

I213. Westhaven Tamaki Herenga Waka Precinct

BS 6349:Part 1.1: 1: General Code of practice for planning and design for operations. David Veale

Local sediment management - always the best economical solution? Jens Laugesen 8 April 2011

Where the Ocean Meets Land. Coastal Engineering

Effect of ULCVs on Cranes and Infrastructure

Odd E. Gjørv. Norwegian University of Science and Technology, Trondheim, NORWAY

CONSTRUCTING MODERN PORTS WITHOUT STEPPING ON WATER by

Conversion of Kurnell refinery to a fuel import terminal

EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

Improvement of Technological Solutions for Sheet Piling Walls Made of U-Shape Piles

Massachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes

F5. Coastal Minor Port Zone

The general design of a LNG-terminal. Background

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

Cai Mep International Terminal (CMIT)

Statement of evidence of Stephen Lee (wharf design and construction methods)

Case study seismic design and soil-structure interaction of a critical wharf facility in soft soils

I202. Central Wharves Precinct

SOLUTIONS FOR THE BUILT WORLD. Assess & Prioritize. Keys to Asset Management. Carl J. Larosche, PE.

Louisiana Transportation Research Center Seminar Series Bridge Structures

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

The Effect of Ultra Large Container Vessels on Cranes and Infrastructure

HANDBOOK OF PORT AND HARBOR ENGINEERING

Enabling LNG Infrastructure

APP 100 th Annual Conference, Redwood City, CA. Presented by Bill Partridge, Manson Construction Co. and Erik Soderberg, Liftech Consultants Inc.

Analysis and Design of Dock Berth Structure

Safety of LNG-Shipping around Ports and Terminals

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

CHALLENGES AND CONSIDERATIONS IN SELECTION, ANCHORAGE DESIGN, AND INSTALLATION OF QUICK-RELEASE MOORING HOOKS ON EXISTING STRUCTURES by

proserve Berth Scour Protection - Using Concrete Mattress MARINE CONSTRUCTION ENGINEERS Berth Scour Aprons

SOLUTIONS SOLUTIONS BROCHUREPORT

Public Notice of Application for Permit

PORT OF FUJAIRAH, UNITED ARAB EMIRATES

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

The effectiveness of sustainable floating structures in the Gulf Region (Middle East)

DUNLOP GRG Flexible Containment Solutions LP PNEUMATIC FENDERS

Growth In Container Volumes

PortMiami Wharves Strengthening Program AAPA 2013 Facilities Eng. Seminar & Expo

Panama City Marina City of Panama City, Florida

Paper 153 Renovation of the liquid bulk terminals La Plata Port

Fender Application Design Manual

I208. Port Precinct I Precinct description

40 YEARS OF MARINE OPERATIONS & ENGINEERING IN HAWAII. Makai Research Pier, Waimanalo, Hawaii. 863 N. Nimitz Hwy, Honolulu Harbor

F3. Coastal Marina Zone

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator

Capability Statement Ports and Harbours Delta Marine Consultants

About Viadukt. Our vision. Our mission

DRAFT. Point Hudson. Marina Breakwater Rehabilitation Task 1 Design Refinement. Port of Port Townsend. August 30, 2017

PORTS INTEGRAL TO A STRONG ECONOMY

Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse

Description. Need Statement

ADB BRIEFS. Sustaining Harbor Operation and Maintenance in Maldives NO. 105 INTRODUCTION KEY POINTS DECEMBER 2018

Distribution Restriction Statement Approved for public release; distribution is unlimited.

South Quay. hayle harbour : : regeneration. Development Proposal for South Quay/Foundry Yard Hayle Harbour. Quay Walls Restoration Method Statement

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment

15.8 Multipurpose Terminal Project Preparing Alternative Terminal Plans

BS 6349: Maritime Works Moving into the New Era

Performance verification of marine fenders USER GUIDE

LOCATION: At 12 Port of Everett locations in Port Gardner at Everett, Washington.

Dredging for Climate Change and Transport in the Netherlands

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Canaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design

APPENDIX E. Project Description Detailed Elements

Onshore terminal plants

SLOPE PROTECTION UNDER PILED QUAYS M. Hawkswood 1 and M. King 2

APPENDIX 8-A. Valued Component Selection Rationale

PUBLIC NOTICE for Permit Application

Managing Extreme Sea Level Rise Scenarios Tony Gioiello Chief Harbor Engineer

SOLUTIONS BROCHURE INFRA SOLUTIONS

AAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015

For personal use only

General Santos, PHILIPPINES

Perspectives from the Beneficial Use Working Group. Nick Buhbe, M.S., Mission Environmental LLC Rebecca Gardner, P.E., Anchor QEA

Capability Statement: Materials Technology for Marine Structures Jon Knights Materials Consulting Ltd

OPEN CELL. (800) SWC 120. SWC Weld-on. Charts and Pictures courtesy of: 120 o

EARTHQUAKE DAMAGE INVESTIGATION OF GRAVITY-TYPE QUAY WALLS IN IBARAKI PORT

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

MARINA PHASING AND COSTS

Determining the Capacity of Aged Assets. Scott Branlund, SE Senior Project Manager/Diving Officer BergerABAM Inc.

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants

Sustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide. Tim Van Wormer Port of Portland

Focused area. Strategy on environmental management and CSR at IØT. Relevant issues. Overall research challenges

BOSKALIS OFFSHORE MINING

TrelleBorg MArINe SYSTeMS Corporate Overview

Transcription:

Alcoa Mosjøen Harbor Remediation Project Information and Fender Design Trygve Isaksen and Maiken Eng, Norconsult 1

Content Short presentation of Norconsult, Port and Coastal Engineering and Trygve Introduction to the Alcoa Mosjøen Harbour Remediation Project Design challenges regarding fenders with focus on: Sheet pile structures without backfill Maneuvering Protecting the sheet pile structure filled with contaminated sediments LNG vessels Rubber quality

Trygve Isaksen, Head of Port and Coastal Engineering MS, NTNU 1985 31 years In Norconsult Head of Port and Coastal Engineering the last 15 years Experience with Design of offshore structures, bridges and quays, both design, project management and company responsible Member of Executive Council in the Norwegian Concrete Association in the period from 1992 to 1998 and 2013 - present. Member of several technical committees for design and repair of concrete structures, focus on marine concrete structures and CP E18 Highway in Vestfold 3

Short about Norconsult 3 250 20 000 4,2 Employees Projects Sales MRD NOK 52 Countries with projects E18 Highway in Vestfold 4

Market Architecture Buildings Energy Environment Industry IT Oil and Gas Planning Risk Management Transport Water 5

Port and Coastal Engineering Norconsult has Norway s largest base of knowledge within Port and Coastal Engineering, with between 25 and 30 employees working full time on port and coastal planning and design. We have completed more than 1000 port and coastal projects. The projects are both domestic and international, and within the following main fields: Pre-engineering and feasibility studies Detail design of all sorts of quay structures Condition analysis, rehabilitation and strengthening Wave analysis Breakwaters Mooring analysis Etc. 6

The Port and Coastal Engineering Team Picture from our Annual Technical Seminar 7

Alcoa Mosjøen Harbor Remediation 80 m 96 m 38 m 278 m 8

Alcoa Mosjøen Harbor Remediation 9

Alcoa Mosjøen Harbor Remediation 10

Alcoa Mosjøen Harbor Remediation LNG Berth? Intermediate Quays 11

Wharf Mitigation Structures New sheet pile wall with soil anchors. Dredged sea bottom in front of wharf. New depth at Alcoa Quay: - 11,0 m (LAT) - 12,8 m (MSL) 12

CDF (Confined Disposal Facility) 6 sheet pile cells with diameter 23 m 13

Alcoa Mosjøen Fender Solutions 14

Design vessels 15

Fender Solution Mitigation Structure Before After 16

Solution to accomodate for the Pitch Vessel 17

Fender Solution Mitigation Structure 18

Fender Solution Mitigation Structure 19

Fender solution CDF 20

Fender solution CDF 21

Fender Solution LNG Berth 22

Rubber Sample Analysis All fenders specified as Trelleborg fenders or equivalent Recommended specifications regarding rubber was discussed but not implemented due to commercial issues Contractor ordered fenders from supplier X Analyses of rubber samples showed that supplier X did not meet the recommendations from Trelleborg regarding carbon black and ash content Test Trelleborg Recommendation Result Supplier X Polymer % Min. 45% 47,6/49,3 Carbon Black % Min 30% 27,5/27,8 Ash % Max 5% 17,0/15,9 23

Rubber Quality in PIANC Recommendations In order to ensure sufficient rubber quality we believe compund composition should be included in recommendations from a neutral party such as PIANC Status? WG 145 Berthing Velocities and Fender Design (Expected for publication in 2016) 24

Conclusions Good dialogue with the Client is very important To define design vessels To understad how the vessels are mauvering in the port Fender solutions on sheet pile wall with no backfill requires complicated and costly strengthening. From a consultant s point of view it would have been better if requirements to rubber quality was recommended by a neutral party such as PIANC. 25

Thank you