Introduction to Cyanide Gold Mining. ORCR USEPA July 2012

Similar documents
Alexco Resource Corp.

Base Metal and Iron Ore Mining

NEPA & Mining Tribal Lands and Environment Forum. August 17, 2015 Minneapolis, Minnesota

CLEANER PRODUCTION GUIDELINES IN SMELTING INDUSTRIESS

IN MINING & MINERAL PROCESSING

Optimisation Study Yanfolila Gold Project Mali

Iron Mountain Mine Shasta County, California

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work

EXTRACTIVE METALLURGY

Golden Sunlight Mine Bio-Treatment of Acid Producing Waste. By Rory Tibbals Operations Superintendent

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT

MERCURY ON THE KUSKOKWIM OLD AND NEW. Kendra Zamzow, Ph.D. CSP2

Chapter 16 Minerals: A Nonrenewable Resource

Sukari revise Gold production in Egypt

Newmont Mining Corporation Water Management Standard

Mining. Mining: the extraction of valuable minerals or other geological materials from the Earth

Kumtor Gold Company 2018

Iron Mining In the Lake Superior Basin

Annapolis Lead Mine Site Iron County, Missouri

Butte Highlands Joint Venture Mine Design, Operations, and Closure Conference Mine Water Treatment Short Course

I-99 Remediation Site Centre County, Pennsylvania

Succeed at Removing Metals and Other Contaminants from Water

Pilot Study Report. Z-92 Uranium Treatment Process

The Mineral Industry Environmental Protection Regulations

Inert Atmosphere Systems A New Approach to controlling AMD Discharges from Underground Mines

SMARA Reclamation Standards Review

Civil and Geotechnical Engineering

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE

UNITED STATES FORGECRAFT

Section 2: Mineral Exploration and Mining

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Review of ML/ARD Geochemistry & Water Quality Predictions

Hardrock Mining POTENTIAL IMPACTS TO WATER, WILDLIFE, AIR AND LAND. BY BONNIE GESTRING

Summary of Preliminary Results of EPA Remedial Investigation Molycorp molybdenum mine Questa, New Mexico

RESOURCE GOLD PTY. LTD.

Copper Smelting Slideshow

Fairbanks Gold Mining Inc. 2 Modification #2, June 13, 2018 TABLE OF CONTENTS

Details of the Proposed Action

2.0 ASSESSMENT OF ALTERNATIVES 2.1 BACKGROUND 2.2 ASSESSMENT METHODOLOGY Project Alternatives Identification of Alternatives

Feasibility study for ISL mine

Aurora Water Pursues New Water Source Water rights purchase provides environmental benefits

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

Lowering the Threshold for Refractory Gold Deposits with New Biooxidation Technologies

Tar Creek Superfund Site Ottawa, Oklahoma

Kanowna Belle Pre-Oxidation Project

The Haber Gold Process HGP4 AN ENVIRONMENTALLY FRIENDLY GOLD EXTRACTION & RECOVERY TECHNOLOGY. Minerals Division

Zortman Landusky Swift Gulch Site Phillips County, Montana

Summitville Mine Superfund Site

Integration of Antapaccay Project with Tintaya progressive closure plan

Nevada Environmental Response Trust Site Fact Sheet

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

APPENDIX 22C: CYANIDE MANAGEMENT PLAN

Grassy Mountain Gold Project Environmental Evaluation - Draft Outline

Ore mineral: a mineral from which one or more metals can be extracted.

Instructions of Using Eco-Goldex E Series Reagent in E-Waste Gold Stripping and Gold Recovery Procedures

Locked Cycle Leaching Test and Yellowcake Precipitation

HIGH RIVER GOLD REPORTS FEASIBILITY STUDY RESULTS FOR THE BISSA GOLD PROJECT (All currency figures are in US dollars unless otherwise noted)

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

PREDICTED VERSUS ACTUAL WATER QUALITY AT HARDROCK MINE SITES: EFFECT OF INHERENT GEOCHEMICAL AND HYDROLOGIC CHARACTERISTICS 1

Goldfields Environmental Management Group Workshop on Environmental Management Kalgoorlie-Boulder, May 2010

Company Introduction. Management Team & Experience. Company

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Chapter 12 - Glossary

Geotube Dewatering Technology

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes

HUCKLEBERRY MINES LTD. An Overview

Crushing. Comminution

Produced by Oxus International with the help of EcoSafety, and the Biotechnology Institute of the National Academy of Sciences of the Kyrgyz Republic

A PROACTIVE REMOVAL PROGRAM AT THE BONANZA MINING DISTRICT BONANZA, COLORADO

#Disrupt Mining: Integrated Extraction and Recovery System for Complex. Ores and Wastes"

Mahd Ad Dahab Gold Mine

Abandoned Mine Waste Repositories: Site Selction, Design, and Cost

Two-stage precipitation process of iron and arsenic from acid leaching solutions

Summary of Investigations & Remedial Activities

Summary of Spill Event

Influent preheating (note that the heat will be recovered before discharge);

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

Appendix A. Detailed Project Description

BARRICK GOLD CORPORATION Denver Gold Forum Alto Chicama Update September Denver Gold Forum September 24, 2003

Water Consumption at Copper Mines in Arizona

Nomination for 2014 Hardrock Mining Reclamation Awards Colorado Mined Land Reclamation Board Colorado Mining Association


Pine Canyon Developer Guidelines

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

Investigation of secondary zinc oxides as an alternative feed to the Skorpion Zinc process: Part 2 Process considerations and economic analysis

For personal use only

Mining. Water and Mining. Impact of Mining on Water. ENSC 407* Fall Uniqueness of mining relative to other industry:

Lab 14. Distribution of Natural Resources: Which Proposal for a New Copper Mine Maximizes the Potential Benefits While Minimizing the Potential Costs?

Industrial Solutions

OUTOTEC INDUSTRIAL WATER TREATMENT

IMPACT OF MINING SOLID WASTE IN ALBANIA AND RECOMMENDATION TO DECREASE POLLUTION IN SURROUNDING AREAS. 1

Carson River Mercury Site: Community Involvement

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

From Mine to Me How copper ore becomes copper wire

5.0 PROJECT DESCRIPTION

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

DOE/PPPO/ &D1 FBP-ER-PRO-WD-RPT-0001 Revision 3 April ENVIRONMENTAL NON-RADIOLOGICAL PROGRAM INFORMATION

Transcription:

Introduction to Cyanide Gold Mining ORCR USEPA July 2012

ORE CHARACTERIZATION Gold occurs in a variety of geologic environments. Estimates of average abundance in the Earth's crust are on the order of 0.003 to 0.004 parts per million (ppm) (U.S. DOI, Geological Survey 1973). Deposits considered to be economically recoverable at current market prices may contain as little as 0.69 to 1.37 ppm [0.02 to 0.04 troy ounces of gold per ton of rock (oz/t)], depending on the mining method, total reserves, and the geologic setting of the deposit. Types of Gold Ore Deposits: Sediment- Hosted Disseminated Gold, Volcanic- Hosted Epithermal Deposits, Porphyry Copper- Related Deposits, Greenstone Gold Quartz Vein Deposits

Basic Process Steps: Newmont 1. Mining : To define the ore from the waste rock, samples are taken at set intervals along surveyed lines within the pit. These samples are assayed. Assay results are used to mark out areas of ore and waste rock, which are mined separately. Some of the harder areas require blasting to loosen the rock prior to excavation by hydraulic diggers. Dump trucks haul the rock to the primary crushers. 2. Crushing The primary crushers and a jaw crusher - located at the mine site, receive ore and waste at separate times. They break the larger rocks down to a size suitable for transport on the conveyor. 3. Transport Most mines transport ore and waste using large trucks. Some mines transport the ore and waste rock to the mill and waste disposal area via belted conveyor. 4. Grinding and Sizing Ore is stockpiled at the mill before being fed into a semiautogenous grinding (SAG) mill with lime, water and steel balls. The larger particles from this mill are returned to the SAG mill for more grinding. The finer particles receive more grinding in a ball mill.

Basic Flow Sheet Part 2 5. Leaching & Adsorption A slurry of ground ore, water and a weak cyanide solution is fed into large steel leach tanks where the gold and silver are dissolved. Following this leaching process the slurry passes through adsorption tanks containing carbon granules which adsorb the gold and silver. This process removes >90% of the gold and >70% of the silver. 6. Elution & Electrowinning The loaded carbon is fed into an elution column where the bullion is washed off. The barren carbon is recycled. The wash solution pregnant electrolyte is passed through electrowinning cells where gold & silver is won onto stainless steel cathodes. 7. Bullion Production The loaded cathodes are rinsed to yield a gold and silver bearing sludge which is dried, mixed with fluxes and put into the furnace. After several hours the molten material is poured into a cascade of moulds producing bars of doré bullion. 8. Water Treatment Some water from dewatering the mine, from the embankment underdrains and decantation from the tailings pond is recycled for use in the grinding circuit. Excess water is pumped to the Water Treatment Plant and treated to the required standards before discharge into the river. 9. Tailings Disposal Waste rock from the mine is used to build the embankment structures. The embankment retains the tailings slurry in a pond where solids settle.

Jerritt Canyon Flow Sheet

CIL (Carbon In Leach) To leach the gold out of the ore and into solution, cyanide, and oxygen must be added to the slurry. Lime is added to the grinding circuit to modify the ph of the slurry to prevent the formation of deadly hydrogen cyanide gas. Cyanide is added in liquid form to the tanks. Lead nitrate is added to the leach circuit and has the effect of accelerating the gold dissolution rate. Oxygen is added in pure form, injected down the agitator shafts. The dissolved gold in solution is adsorbed onto activated carbon. When the carbon is loaded with enough gold it is removed from the circuit and sent to elution where the adsorption process is reversed and the gold is stripped off the carbon back into solution, electrowon and smelted into bars. The remaining barren slurry reports to the tails thickener and is pumped to the tails dam. The CIL circuit consists of two separate trains of tanks, with 6-8 tanks in each train. In conventional CIL circuits, leaching takes place in the presence of carbon and therefore leaching and adsorption occur simultaneously.

CIL Tanks

Carbon Adsorption After the leaching process is complete, the soluble gold must be concentrated and separated from the process slurry. The method of recovery of gold from the process slurry is by carbon adsorption. Adsorption is a term used to describe the attraction of a mineral compound to the surface of another material. Activated carbon is used to adsorb the gold out of solution. Because the cyanide ion forms very strong complexes with gold, it is the gold cyanide complex that is loaded onto the carbon rather than being deposited as metallic gold. Gold loaded onto the carbon is then stripped using either acid or cyanide and that solution is sent to electrowinning

Gold Furnaces and Refinery After gold is washed off electrowin cathodes, it is placed in trays and dried in a furnace. This heat treatment may cause mercury emissions. After drying, the gold ore is placed into a gold refinery furnace (retort) where the ore is melted into dore gold bars. The refinery may also be a source of mercury emissions.

Wastes Generated at Gold Mines Waste Rock: these materials are deposited in waste rock piles or dumps. At surface mines, 71 percent of all material handled is discarded as waste. Constituents found in gold ores may include mercury, arsenic, bismuth, antimony, and thallium. These may occur as oxides, carbonates,and sulfides with varying degrees of solubility. Spent Ore from Tank Leaching (Tailings):Tank leaching, both CIP and CIL circuits, generate spent ore by leaching the gold values from finely ground ore. The spent ore exits the leach circuit as a slurry composed of gangue and process water bearing cyanide and cyanide- metal complexes. The tailings may be treated to neutralize cyanide prior to disposal. The slurry is typically disposed of in a tailings impoundment with some of the free liquid component being recirculated.

Wastes Generated at Gold Mines (continued) Cyanide Solution: During operation, most of the barren cyanide solution is recycled to leaching activities. However, the buildup of metal impurities may interfere with the dissolution and precipitation of gold and, therefore, require a portion of the solution volume to be bled off and disposed of. Wastes From Carbon Regeneration: generally involves an acid wash before or after extraction of the gold- cyanide complex, followed by reactivation in a kiln. Could be a source of mercury emissions.

Anticipated Environmental Impacts Mine Impacted Waters: Used to be called Acid mine Drainage or Acid Rock Drainage. See GARD Guide. Metals mobilize under neutral, acid or alkaline conditions. Mine Dewatering: Drawdown on GW and Streams Release of cyanide process or spent solutions Detoxification of Cyanide: Detoxification of cyanide using hydrogen peroxide is applicable to spent heaps, tailings, and solution ponds and tanks. The INCO process uses SO2 and air, which is dispersed in the effluent using a well agitated vessel. Acid produced in the oxidation reaction is neutralized with lime at a controlled ph of between 8 and 10

NPL Mine Sites in South Carolina: Barite Hill/Nevada Goldfields Site Summary Profile EPA ID: SCN000407714 Location: McCormick, McCormick County, SC Lat/Long: 33.8711, - 082.2972 Congressional District: 03 NPL Status: Proposed: 09/03/08; Final: 04/09/09 Affected Media: Ground water, Soil Cleanup Status: Early Action Initiated/Completed and Study Underway - Physical cleanup activities have started. Site Reuse/Redevelopment: Potential for Commercial/Light Industrial Site Manager: Candice Jackson (jackson.candice@epa.gov) Site Background The 795- acre Barite Hill/Nevada Goldfields site is located approximately three miles south of McCormick, in McCormick County, South Carolina. The site was actively mined for gold and silver from 1991 to 1995. Operations included the heap leaching of gold from ore, using a weak cyanide solution. Nevada Goldfields used seven processing ponds and one sediment pond to process the pregnant solution that contained the gold. After the closure of the mine, the approximate 10- acre Main Pit began to fill with water. At its highest, the pit contained approximately 60 million gallons of water with an average ph of 2.0 and high dissolved metals content. Nevada Goldfields pursued site reclamation activities from 1995 until filing for bankruptcy in 1999. The property was then relinquished to the South Carolina Department of Health and Environmental Control. Threats and Contaminants Former site operations resulted in the contamination of the Main Pit, ponds, sediment, surface water, and soil with arsenic, cadmium, chromium, copper, lead, mercury, nickel, selenium, silver, zinc, and cyanide. Metals were also detected in surface water and sediments of Hawe Creek and its tributaries. Because Hawe Creek is a fishery, people could have been exposed by eating contaminated fish. Additionally, Hawe Creek empties into a drinking water reservoir. There was also a risk that water in the Acid Pit will overflow and acid/metals- laden water will enter the reservoir. Site Cleanup Plan Several interim remedial actions for this site have been completed and monitoring of these efforts is underway. A final remedy for the site will be selected based on sampling and monitoring results conducted as part of the Remedial Investigation (RI). RI activities began at the site February 2011. Cleanup Progress EPA conducted a Removal Site Evaluation in 2007. Emergency response activities included demolition of a furnace building and on- site neutralization of over 2,000 lbs of acids and bases. A subsequent removal action commenced on October 15, 2007 and included a Bureau of Reclamation- designed cap for the 250,000 cubic yards of acid- producing waste rock adjacent to the Acid Pit. On February 4, 2008, efforts to neutralize the Acid Pit commenced using carbide lime combined with a patented carbon loading treatment. Grading, capping of the north and south waste rock piles, and construction of a spillway were completed by October 2008. An advanced monitoring system to monitor the waste rock cap and the Acid Pit was installed in 2009.

NPL Sites In South Carolina: Brewer Gold Mine Site Summary Profile EPA ID: SCD987577913 Location: Jefferson, Chesterfield County, South Carolina Lat/Long: 34.652190, - 080.411470 Congressional District: 05 NPL Status: Proposed: 09/23/2004; Final: 04/27/2005 Affected Media: Ground water, Surface Water Cleanup Status: Physical cleanup activities are underway Site Reuse/Redevelopment: None Site Manager: Loften Carr (carr.loften@epa.gov) Site Background The 1,000- acre Brewer Gold Mine site is located on the western border of Chesterfield County, in a rural area approximately 1- mile west of Jefferson, South Carolina. The disturbed area that supported mining activities covers 230 acres in the eastern portion of the larger property. The Brewer Gold Mine operated from 1828-1995. From 1987 through 1995, the Brewer Gold Company mined over 12,000,000 tons of ore and waste rock from several open pits. In 1990, following large rainstorms, a dam broke and allowed over 10 million gallons of cyanide solution to escape and flow into Little Fork Creek. The dam and plastic- lined pond were repaired and the company resumed mining in 1991. The State required Brewer to close and reclaim the mine. Brewer placed all the rock it had mined, including both waste rock and spent ore, back into the open pits, along with the dismantled plant and the plastic liners that had been under the heaps. They then had to cap the filled Brewer and B- 6 pits and re- vegetate the entire site. While the company was completing its closure and reclamation activities, acid rock drainage began to emerge from several seeps a few hundred feet from Little Fork Creek. Brewer Gold constructed a plant to treat the contaminated water and received a permit from South Carolina Department of Health and Environmental Control (SCDHEC) that allowed the treated water to be discharged to Little Fork Creek. Brewer operated the treatment plant from 1995-1999. Site Cleanup Plan An interim Record of Decision (ROD) for the site was issued in 2005. The ROD detailed interim cleanup activities for the site, including: Collecting contaminated seepage from several springs downgradient of the backfilled pits and injecting it into the B- 6 Pit. Pumping contaminated water out of the B- 6 Pit and from the sediment pond and storing it in a lined storage pond. Treating all contaminated water with lime in an on- site wastewater treatment plant and discharging the treated water into the Northwest Trend Pit. Periodically removing sludge from the Northwest Trend Pit, drying the sludge, and storing it in on- site piles. Evaluating the potential for contaminants to be released from sludge while it is stored. If it is determined that contaminants could be released, developing and implementing a sludge management plan pending development of a final cleanup plan. Monitoring water quality of the effluent discharge and surface water in the Little Fork Creek. Cleanup Progress In August 2005, EPA completed a focused Remedial Investigation/Feasibility Study (RI/FS) that recommended continued treatment of the contaminated water in the existing wastewater treatment plant as an interim action. Interim cleanup activities began at the site in December 2006. EPA completed a sitewide RI in 2010 and is currently conducting an FS to identify and evaluate a cleanup approach for the site.