Status of Decommissioning Preparation for Kori #1

Similar documents
Introduction. Status of Worldwide Nuclear Power Plants*

KHNP s strategies for Multi-unit Extreme Hazards Response

The ROK s Nuclear Energy Development and Spent Fuel Management Plans and Options

Status & Prospects of Nuclear Power Generation and Fuel Cycles in Korea. Oct., Kun Jai Lee

EPRI Research and Development Projects for NPP Decommissioning

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP

Managing the supply chain: Challenges and Overcoming in Korean nuclear industry

A Brief Overview of the APR1400 Commissioning. KHNP Sep. 13, 2017 Sang Won Lee

START FROM TYPICAL PROBLEMS

The Status of Radiation Protection and its Prospect in KHNP

Nuclear Power Status in Korea

Remediation and Decommissioning Technology

Current Status of Nuclear Power Plant Decommissioning Safety Regulations

Korean Perspective on Nuclear Energy after Fukushima Accident

Ignalina NPP. Ignalina NPP decommissioning activities are co-financed by European Union

Spent Fuel Management and Research Activities in Korea

Overview on Nuclear Power in the World

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

COMPONENTS DISMANTLING AT NOVOVORONEZH UNITS 1, 2 SHUT DOWN FOR DECOMMISSIONING

Wolsong-1 Stress Test

Development of technologies for the processing and disposal of radioactive waste

TROJAN DECOMMISSIONING STATUS. OPUC Meeting March 8, 2005 (draft)

Countermeasures for the Falsification of Quality Verification Documents

15 September Woo-Ho Lee, Seon Ho Song, Yong Lak Paek Nuclear Regulation Division. Korea Institute of Nuclear Safety (KINS)

My name is Yong Soo Kim. I have responsibility for the development of Advanced Nuclear Power

Management of Radioactive Waste The third priority of nuclear industry

Maria Taranger Foto: Kävlinge Municipality

Revised Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO s Fukushima Daiichi NPP Units 1-4

ROMANIA National Commission for Nuclear Activities Control (CNCAN) Report. on in Decommissioning Activities. Dr. Lucian BIRO Director General

DECOMMISSIONING LICENSING PROCESS OF NUCLEAR INSTALLATIONS IN SPAIN

Comparison of estimated and actual decommissioning cost of José Cabrera NPP

Post-Fukushima Actions in Korea

Joint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria

Progress of Medium- and Long-term Efforts to Decommission Fukushima Dai-ichi NPP of TEPCO (Statement)

Mid-and-long-Term Roadmap towards the Decommissioning of Fukushima Daiichi Nuclear Power Units 1-4, TEPCO Digest Version

SMART Standard Design Approval inspection result July. 4 th

Copyright BKW Energie AG

Current Status of Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO (Revised edition)

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C

ICEM DEVELOPMENT OF THE ENVI SIMULATOR TO ESTIMATE KOREAN SNF FLOW AND ITS COST

Information on Status of Nuclear Power Plants in Fukushima

Integrated Regulatory Infrastructure Support Service (IRISS)

Implementation Plan of the measures to be taken at Fukushima Daiichi Nuclear Power Station designated as a Specified Reactor Facility (outline)

The EnBW Strategyfor Decommissioningand DismantlingofNuclearPower Plants»

X. Future Efforts to Settle the Situation regarding the Accident

Information on Status of Nuclear Power Plants in Fukushima

D ECO M M I S S I O N I N G O F KOZ LO D U Y NPP UNITS 1 4 P RO G R E S S & C H A L L E N G E S

THE DESIGN CHARACTERISTICS OF ADVANCED POWER REACTOR Advanced NPP Development Office Korea Hydro & Nuclear Power Co., Ltd.

Organizational and Managerial Aspects of Decommissioning after an Accident

Information on Status of Nuclear Power Plants in Fukushima

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

Occupational Radiation Protection in Radioactive Waste Management

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

Decommissioning Studies for the Oskarshamn and Forsmark Nuclear Power Plants in Sweden

Thailand Power Development Plan ( ) TANONGSAK WONGLA

Geological Disposal Option and Institutional Issues

RANCHO SECO TRANSITION TO FULL DECOMMISSIONING. Dennis E. Gardiner, Decommissioning Project Manager, SMUD John M. Newey, CHP, President, NewRad, Inc.

Constructibility Assessment of APR1400

Information on Status of Nuclear Power Plants in Fukushima

Decommissioning the Philippine Research Reactor (Under R2D2P): Updates and Challenges

Past Experience and Future Plan in Korea

DECOMMISSIONING OF NUCLEAR FACILITIES IN UKRAINE

Information on Status of Nuclear Power Plants in Fukushima

EDF DECOMMISSIONING PROGRAMME - A PREREQUISITE FOR THE ERECTION OF NEW NUCLEAR POWER PLANTS IN FRANCE

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

Future Challenges in Decommissioning of NPPs Worldwide

Lessons learned from ongoing decommissioning project of Fugen NPS

Japan s Activities for Environmental Remediation after Fukushima Daiichi Nuclear Power Plant Accident

Information on Status of Nuclear Power Plants in Fukushima

NATIONAL PROGRESS REPORT INDONESIA

Information on Status of Nuclear Power Plants in Fukushima

Japan s Challenges for Fukushima Daiichi D&D

Greifswald Project Introduction/Experience summary Axel Bäcker

DOOSAN Heavy Industries & Construction Co., Ltd KUKDO Chemical Co., Ltd

The Strategies of Research and Education on Decommissioning of Nuclear Facilities in the University of Fukui

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES SLOVENIA [2013] NATIONAL NUCLEAR ENERGY CONTEXT

Implementing Waste Led Decommissioning in Practice - Experiences from a Research Facility

INPP Decommissioning Overview Darius Janulevičius

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Factors Impacting Decommissioning Costs 13576

Introduction and Development of Nuclear Power Technology: The Korean Experience

Development Status of Dismantling Technology for Old Steam Generator & RV in Kori unit 1

IAEA Activities to support Operating Nuclear Power Plants and Newcomers

Zion Project Overview S. Chris Baker VP EH&S

Lessons Learned from EPRI Decommissioning Program Decommissioning Pre-Planning Overview

DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE. M. S. Terrell, D. McGee, Duke Engineering and Services (USA)

The Disposal of Large Components Strategies

high-level radioactive waste in Korea include Law No "Nuclear Safety Act", Nuclear Safety Commission Regulation No. 14 "Rules on Technical Stan

State of the Nuclear Industry Decontamination & Decommissioning Are We Ready. April 25, Presented by: Michael Frediani

Post-Fukushima Action Plan in Korea. WNU-SI 2011, August 11 Christ Church, Oxford

DECOMMISSIONING EXPERIENCE IN SPAIN. Manuel Rodríguez Silva

Carbon Free Islands in South Korea

Decommissioning three main strategies: Immediate dismantling, Safe enclosure (Deferred dismantling), Entombment

San Onofre Unit 1 Decommissioning

Decommissioning Planning

Information on Status of Nuclear Power Plants in Fukushima

Modernisation of existing NPPs in Switzerland

Release and demolition of buildings and concrete structures on the Greifswald site

Background Information of the Contaminated Water Management at TEPCO s Fukushima Daiichi NPS

Transcription:

Status of Decommissioning Preparation for Kori #1 http://www.khnp.co.kr December 6, 2017

KHNP Overview (1/2) AA (S&P), Aa2 (Moody s)

KHNP Overview (2/2) Power Plants Operational status in Korea 24 22,529 35 600 16 4,700 20 28 81 27,857 5 7,000 Hydro Power Unit: 35 Capacity: 600MW Pumped-Storage Unit: 16 Capacity: 4,700 MW Hanul NPP Unit: 6 Capacity: 5,900 MW Shin Hanul #1~2 : 1,400MW X 2units Wolsong and Shin Wolsong #1,2 NPP Unit: 6 Capacity: 4,779MW Hanbit NPP Unit: 6 Capacity: 5,900MW Shin Kori #3 NPP Unit: 1 Capacity: 1,400MW Shin Kori #4~6 : 1,400MW X 3units Kori#2~4 & Shin Kori #1~2 NPP Unit: 5 Capacity: 4,550MW Kori #1 : Permanent Shutdown Under construction

History of Kori 1 Background Oct. 5, 2015 Government: Announcement of The Policy Direction for June 16, 2015 Promotion of NPP Decommissioning Industry KHNP: Decision on the permanent shutdown of Kori 1 Nov. 28, 2015 KHNP: Establishment of the master plan for of Kori 1 May 31, 1972 Approval for construction and operation Apr. 29, 1978 Commercial operation Jun. 18, 2007 End of design life Dec. 11, 2007 Approval for life extension Jun. 18, 2017 Permanent shutdown Dec. 11, 2015 KHNP : Establishment of a roadmap for developing technologies for nuclear June 18, 2017 KHNP: Permanent shutdown of Kori 1

Overview of Kori-1 Decommissioning Decommissioning Option: Immediate Dismantling End Site State : Brown Field (site release criterion : 0.1 msv/yr) Total Decommissioning Period : 15.5 years Transition Period : 5 years Decontamination & Dismantling(D&D ) : 8.5 years Site Remediation : 2 years Others Ensuring of safe operation of Kori-2 Initiation of demolition of radioactive System-Structure- Components(SSCs) after completion of Spent Fuel transfer

Main Schedule for Decommissioning of Kori 1 Application for approval of permanent shutdown Permanent shutdown (June 2017) Operation Stage I DP preparation Public hearing with residents Application for Approval for approval of (2022) SF transfer complete(2025) Dismantling Complete(2030) Shutdown management and cooling/removal of spent fuel Removal of radioactive systems and structures - Approval for - Preparation for Establishment of waste treatment facility Treatment of radioactive wastes ㅇ Removal of non-radioactive systems & structures, and demolition of other areas, etc. Stage Ⅱ Stage Ⅲ-1 Stage Ⅲ-2 Report on completion of Completion of (2032) Site restoration Stage Ⅳ In connection with Kori 2 operation

Main Schedule for Decommissioning of Kori 1 (Cont d) Stage Ⅰ NPP operation Preparing the Permanent shutdown Establishing strategies and plan SF safety management. Comprehensive design Final plan Site restoration work Final status survey Termination of operation license Shutdown management & preparation for Stage Ⅱ Stage Ⅳ Site restoration and completion of the processes Commencement of process Stage Ⅲ-1 Stage Ⅲ-2 Dismantling contaminated facility and Radwaste treatment Dismantling of the non-radioactive facilities Installing radioactive waste treatment facilities Removal of spent fuels in the SFP Removal of radioactive systems and structures Radwaste treatment (decontamination, cutting, volume reduction, packing, etc.)

Project Conditions Lack of Infrastructure Developing technologies not in possession, No supply chain in the market in Korea Regulatory Standards/guidelines Decommissioning Funds Developing regulatory standards, review/inspection guidelines, etc. Need to establish regulatory standards for the management of shutdown NPPs Use the accumulated funds toward the project expenses Global Decommissioning Market Growing the overseas market 2020 Need to develop the necessary capabilities

Site-Specific Issues 1 Spent Fuel Final disposal site for high-level wastes has not been decided yet Spent fuel needs to be stored in onsite dry storage system after at least 5 years cooling The Storage site should be discussed with the regulatory body 2 SSCs shared by Units 1 & 2 Evaporator in Liquid Waste Disposal System / Condenser Vacuum Pump / Diesel Driven Fire Pump in Fire Service System / Service Air System / Main Steam System / Waste Transfer Piping / Storage Buildings Needed to delete connection of those SSCs between units 1 & 2 Decommissioning activities of Unit 1 can affect the safe operation of Proximity of Units 1 Unit 2 3 Not easy to secure a sufficient on-site space for handling, packing & 2 and transport of wastes produced; leading to a delay in schedule

Decommissioning Organizations Restructuring and expanding the Headquarter organization (Office (Feb. 2013) Department (Dec. 2015)) Newly establish Decommissioning Team (Central Research Institute) and the Decommissioning Preparation Team (Kori Site) CRI Research on end-of-life technology for NPPs Headquater Manage the project and develop technologies Manage the storage facilities for SF Kori 1 Manage the NPP and prepare for Decommissioning Team Post- Management Strategy Team Decommissioning Technology Team Decommissioning Project Team Decommissioning Preparation Team Prepare a Final plan Research tasks related to International convention Education and training Management of fund Development of technologies supply chain for Manage projects Engineering work for Preparation for of Kori 1

Development of NPP Decommissioning Technologies Establishment of a roadmap for developing commercialized NPP technologies (Dec. 2015) and a detailed implementation plan (March 2016) Identified the necessary commercialized technologies for and technologies not yet in possession. Currently pursuing the development of 13 out of the 17 technologies not yet in possession To launch the development projects for the rest Establishment of a equipment development plan reflecting the as-is analysis of the domestic and overseas situations (March 2017)

Development of NPP Decommissioning Technologies (Cont d) Shutdown (June 2017) Preparation of plan Public hearing with residents Request approval of plan Approval of plan SF transfer complete Termination of operation approval Approval of / Preparation of plan Design approval Decommissioning of S.S.C Site restoration Development of a final plan for Kori 1 Development of technologies for analyzing the risks and assessing difficulty level of the process Decontamination & Development of system and component decontamination technologies Waste treatment & site restoration Development of technologies for cutting the reactor vessel(rv), reactor vessel internals(rvi) and activated concrete Development of technologies for reducing and treating radioactive wastes Equipment Development of technologies for site restoration and assessing the possibility of reusing the site Development of equipment for cutting the RV/RVI and activated concrete Development of waste treatment facilities and equipment of measuring radioactivity Development of soil decontamination and automatic classification equipment

Preparation for Final Decommissioning Plan Definition Final plan(fdp) A plan to request approval of the NPP project in accordance with Article 28 (1) of the Nuclear Safety Act Development background Legal matters related to the shutdown of Kori 1 (within 5 years of shutdown) Need to prepare a comprehensive plan for safe and economical work Implementation status/plan Establishment of a plan to development a FDP for Kori 1 Development of the initial draft for the FDP Collect opinions from residents and apply for approval Approval of of Kori 1

Reinforcement of Decommissioning Capacity Building domestic and overseas networks for cooperation Secure channels for the exchange of technologies and information Hosted a nuclear business forum KHNP-EPRI nuclear workshop Registered in the cooperation program under OECD/NEA Signed MOUs with overseas organizations April 2016 / Busan Nov. 2016 / Daejeon Jan. 2017 NDA (UK, April 2017) ENRESA (Spain, Mar. 2017) Provide information on the domestic industries Acquire information on overseas technologies Formation of networks with international organizations Formation of networks with overseas organizations

Reinforcement of Decommissioning Capacity (Cont d) Nurture professionals in the field Establish and implement education and training programs Establishment of HR development programs at domestic enterprises Dec. 2016 / SMEs Establishment of an education & training program at KHNP and commissioned education at domestic & foreign institutes 2016 / Domestic and overseas educational institutes Development of a comprehensive database on the enterprises (Sept. 2016; 63 enterprises) Plans to update the database and to establish a potential supplier management system (Oct. 2017) Paving the foundation for the sector A total of 11 programs

Thank you.