MISO-PJM Interface Pricing Post Implementation Metrics and Criteria

Similar documents
Interface Pricing Approach Whitepaper May 2015

Interface Pricing. MISO-PJM JCM Meeting March 21, 2014

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017

Alternatives for Addressing the Interface Pricing Flaw

Congestion and Marginal Losses

Joint and Common Market ITEM 4 PSEUDO TIES

FTR Forfeitures. Brian Chmielewski Manager, Market Simulation Market Implementation Committee August 8, PJM 2018

Congestion and Marginal Losses

Congestion and Marginal Losses

INCREMENTAL AUCTION REVENUE RIGHTS

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, PJM 2018

PJM M2M Market Flow Proposal. October 2014

Dispatch Signal & Locational Marginal Pricing (LMP)

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis March 19, PJM 2018

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar March 23, 2015 PJM 2015

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Analysis of the Broader Regional Markets Initiatives

Dispatch Signal & Locational Marginal Pricing (LMP)

Congestion and Marginal Losses

U. S. SPOT MARKET REGULATION

Coordination with PJM

JCM Drill Down Report -- Draft. March 21, 2014

2016 ANNUAL VRL ANALYSIS

Stepped Constraint Parameters. Issue Paper

UTC Activity Pre and Post 162 FERC 61,139: January 1, 2017 through March 8, 2018

Pseudo-Tie Congestion Overlap

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar January 20, 2015 PJM 2015

Congestion and Marginal Losses

MISO-PJM Joint and Common Market Drill Down Report

Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal

2007 State of the Market Report Midwest ISO. Midwest ISO

PJM PROMOD Overview. August 1, PJM

Transmission Congestion and Loss Only Virtual Product. Overview

MISO PJM Cross-Border Planning

JCM Drill Down Report. February 19, 2015

NYISO/PJM Market-to-Market Coordination

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

Industry Perspectives on FERC Standard Market Design

MISO-PJM Joint and Common Market Drill Down Report

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

PJM/NYISO Coordinated Transaction Scheduling

Congestion and Marginal Losses

JCM Drill Down Report. May 27, 2015

MISO-PJM Joint and Common Market Drill Down Report

Energy Markets - The Basics

Price Formation Education Session Day 1 Economic Dispatch

MISO-PJM JOA Biennial Review

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Interface Pricing Flaw in MISO and PJM

Joint and Common Market ITEM 4 PSEUDO TIES

IMM Quarterly Report: Fall 2017

Price Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve

State of the Market Report 2006

Single Schedule Market Pricing Issues

Lake Erie Loop Flow Modifications

Market Power Mitigation and Load Pricing

PJM ARR and FTR Market

STATE OF THE MARKET REPORT 2005

CRR Educational Material Overview

Contents. DRAFT Capacity Deliverability Fact Finding Summary Report

Two Settlement PJM /06/2016

PJM/MISO Day Ahead M2M Exchange BENEFIT ANALYSIS

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

Flexible Ramping Products

LMP Calculation and Uplift

NEW YORK INDEPENDENT SYSTEM OPERATOR

Future Market Implementation

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

Xcel Energy s Comments on CAISO Draft Final Straw Proposal

Briefing on intertie deviation settlement proposal

Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals

REVENUE SUFFICIENCY GUARANTEES AND COST ALLOCATION William W. Hogan i May 25, 2006

The Virtues of A Virtual RTO

Joint and Common Market II. MISO/PJM FTR COORDINATION UPDATE

Energy Imbalance Market Year 1 Enhancements

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

The New Jersey Clean Energy Conference September 26, PJM Overview. Kenneth W. Laughlin VP Markets Coordination PJM

MIDWEST ISO UPDATE. Sherman Elliott Manager State Regulatory Affairs

Congestion and Marginal Losses

Financial Transmission Rights

Generation Dispatch. PJM State & Member Training Dept. PJM /13/2017

Standard Market Design in the Electric Market: Some Cautionary Thoughts. June 20, Prepared by: Philip Hanser Metin Celebi Peter Fox-Penner

Decision on intertie deviation settlement proposal

Power Markets and Renewables Deployment in Developing Countries

5-Minute Settlements Roadmap

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Market Simulation Structured Scenarios. Energy Imbalance Market Implementation Arizona Public Service and Puget Sound Energy

Uplift in the NYISO Markets

2007 STATE OF THE MARKET REPORT

Freeze Date Straw Proposal Draft 5/18/2017

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

Pivotal Supplier Analysis Internal Interfaces

Broader Regional Markets

Pricing Enhancements Revised Straw Proposal

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal

Billing Line Items PJM /23/2017

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

PJM/MISO Joint and Common Market Stakeholder Meeting. June 2, 2005 Wilmington, DE

Transcription:

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria Contents 1 Introduction... 2 2 Real-Time Market Interchange Price Signal Effectiveness Metrics... 2 2.1 Post Implementation Pricing Monitoring Analysis... 4 2.2 Price Efficiency Metrics... 4 2.3 Constraint Shadow Price Convergence and Volatility... 4 3 Market Congestion Revenue Metrics... 5 4 Revision History... 5

1 Introduction As discussed during MISO-PJM Joint and Common Market (JCM) stakeholder meetings, there are two focus areas to monitor after implementation of the MISO-PJM Common Interface definition on June 1,2017. Focus Area Monitored Parameters Potential Mitigation Options/ Enhancement Opportunities i) Price Signal ii) Revenue Imbalance Congestion transaction incentives for M2M constraints Price signal for Non M2M constraints More granular common interface definition Additional M2M FG coordination effort Through other M2M efforts that improves shadow price convergence for M2M constraints in general Uplift or FTR imbalance Day Ahead M2M coordination Monitor the impact of commercial flow The price incentives have been the subject of stakeholder discussions with the selected approach being the common interface approach in which MISO s interface for PJM and PJM s interface for MISO are modeled as the same weighting of the same electrical locations. Figure 1: Illustrations of Interface Definition Pre (1A) and Post (1B) June 1 2017 The common approach removes overlaps as seen in figure 1A in modeling the congestion impact between MISO and PJM and thus no overlap as illustrated in figure 1B in congestion pricing which would produce distorted (too high or too low) congestion pricing incentives. The common interface approach will be monitored to provide measure of its effectiveness in meeting key objectives: i. Incremental congestion pricing improvement from status quo (Diagram 1A) ii. Balanced congestion revenue 2 Real-Time Market Interchange Price Signal Effectiveness Metrics One of the key goals of implementing the common interface approach is to provide combined MISO and PJM transmission congestion price incentives to interchange transactions between MISO and PJM which reflect the impact (and thus value) of the interchange on transmission constraints. These accurate price incentives will help incent efficient market results.

Figure 2: Transaction from RTO2 to RTO1 Consider a transaction from RTO 2 to RTO 1. The ideal per MW settlement is the incremental charge in production cost across both RTOs for an incremental transaction amount. Transaction (from RTO 2 to RTO 1 ) net price per MWh: RTO1 pays injection RTO2 charges withdrawal LMPRTO1 interface for RTO2 LMPRTO2 interface for RTO1 (MEC1+MLC@RTO2+MCC@RTO2) - (MEC2+MLC@RTO1+MCC@RTO1) Ignoring losses for this discussion, net transaction price per MWh is reduced to MEC1 - MEC2 + (MCC@RTO2-MCC@RTO1) The energy components contain congestion between marginal generators to each RTO s reference and independent from the MISO-PJM interface definition. The change to the interface definition directly impacts the congestion components. Figure 3: Illustration of MCC@RTO2-MCC@RTO1 Measurements monitored as indicators of the effectiveness of the current pricing approach in the Real-Time Market include the following direct measures of the current incentives versus established ideal values and measures impacting the overall quality of the incentives: M2M constraint MISO and PJM combined congestion pricing incentives Non-M2M constraint MISO congestion price incentives Additionally, the following measures have been identified as being important attributes of the implemented solution: M2M constraint shadow price convergence Interface price volatility The following sections describe these metrics in additional detail.

2.1 Post Implementation Pricing Monitoring Analysis MISO will preserve the traditional PJM interface definition which uses all generators inside of PJM to be used for post implantation monitoring purpose. MISO market engine will simultaneously calculate price signals with respect to the traditional PJM interface definition and the new Common Interface definition. The purposes of this analysis are: 1) identify magnitude and frequency of the price incentive change due to interface definition change; and 2) to evaluate the appropriateness of the change in price. For intervals that produce large price differential comparing the Common Interface definition to the traditional interface definition, additional shift factor analysis will be performed to evaluate the dominating constraints that drove the interface price differences. For M2M constraints, price differences are expected. As illustrated in figure 2, reference to reference is the appropriate metric to measure price efficiency against. As seen in figure 1, the common interface approach removes overlaps in modeling the congestion impact between MISO and PJM and thus no overlap in congestion pricing which would produce distorted (too high or too low) congestion pricing incentives. Large shift factor difference due to interface definition change is not expected for Non M2M constraints. The additional shift factor analysis mentioned before will verify this assumption. In case when Non M2M constraint shown a shift factor difference, MISO and PJM will investigate coordinated M2M Flowgate test. 2.2 Price Efficiency Metrics Metrics and Key Performance Indicators (KPI): Metrics for Price Efficiency KPI #1 Price Differential What is being measured LMP and MCC differential between the 2 interface definitions KPI # 2 Shift Factor Differential for Non M2M Constraints Shift factor differential between the 2 interface definitions KPI #3 Overall Performance Combination of KPI 1 and KPI2 Reporting Periodicity Bi-Monthly Bi-Monthly Bi-Monthly What is the mitigation if outside of Additional joint threshold investigation Investigate M2M Flowgate coordination test Re-evaluate the common interface definition 2.3 Constraint Shadow Price Convergence and Volatility Market-to-market coordination is an iterative construct that leverages each RTOs Security Constrained Economic Dispatch engines by exchanging the shadow prices developed in these applications. In an attempt to converge on the most efficient cross-border congestion price for each M2M flowgate, each SCED solution will receive the partners pricing of the constraint and evaluate whether its re-dispatch solution can be cheaper. Occasionally, there are situations that occur that inhibit the construct defined above, and convergence can be challenging or unachievable. Additionally, the converging construct is initiated by the Monitoring RTO, who is controlling to total flow. The Non- Monitoring RTO will consequently price the constraint after receiving the Monitoring RTO shadow price. It is not uncommon for the Non-Monitoring entity to have more effective or flexible relief that causes some shadow price volatility. By definition, this volatility will then be present in LMP solutions, including interface pricing. While this is not the only cause, PJM and MISO believe that it is a major and identifiable source of volatility and both are working to address this situation in the construct itself.

In the spirit and purpose of identifying the correct interface pricing definition, PJM and MISO will exclude the situations named above from its analysis and focus on situations where the defined constructs are working as designed. PJM and MISO see these situations defined above as opportunities to enhance the market to market coordination construct itself, and address issues at the point of inception. 3 Market Congestion Revenue Metrics A detailed background on this issue can be found in the material posted for the May, July and September 2014 JCM meetings. At this time, PJM and MISO do not plan to calculate explicit metrics associated with the impact of interface pricing on revenue adequacy, as the metrics defined above capture the heart of the issue. 4 Revision History Date Author Comment 10/17/2016 Beibei Li (MISO) Initial Draft 2/9/2017 Beibei Li (MISO) Joseph Rushing (PJM) Expanded the draft based on RTOs post implementation analysis capability