MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA

Similar documents
MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7 MMTPA LNG TRAINS

Liquefied natural gas. Trust the industry s longest-serving turnkey contractor

MLNG DUA DEBOTTLENECKING PROJECT

LNG PROCESS USES AERODERIVATIVE GAS TURBINES AND TANDEM COMPRESSORS

Enhancement of LNG Propane Cycle through Waste Heat Powered Absorption Cooling

LNG Technology Session & Panel General Electric Company - All rights reserved

DYNAMICS OF BASELOAD LIQUEFIED NATURAL GAS PLANTS ADVANCED MODELLING AND CONTROL STRATEGIES

Yemen LNG Operational feedbacks

YAMAL LNG: MEETING THE CHALLENGES OF NATURAL GAS LIQUEFACTION IN THE ARCTIC

The following sub-systems are provided and the integration of these is described below:

Low Emissions gas turbine solutions

Explanation of JCM Feasibility Study in Thailand & Applicable Low CO2 Emission Technology

LARGE CAPACITY LNG TRAINS TRAINS GNL DE GRANDE CAPACITE

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG

GASTECH 2OO2. Jeff Sawchuk, BP Global Gas Technology. Richard Jones, BP Global Gas Technology. Pat Ward, BP Global Gas Technology

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

PROPANE PRECOOLING CYCLES FOR INCREASED LNG TRAIN CAPACITY CYCLES DE PREREFROIDISSEMENT AU PROPANE POUR DES CAPACITES AUGMENTEES DE PRODUCTION DE GNL

ARCTIC LNG PLANT DESIGN: TAKING ADVANTAGE OF THE COLD CLIMATE

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY

Technical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

EBARA INTERNATIONAL CORPORATION Cryodynamics Division. Cryogenic Turbine Expanders. cryodynamics. Cryogenic Expanders for Liquefied Gas

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE

Gas Turbine Inlet Air Cooling System

Carbon Capture Options for LNG Liquefaction

OPTIMUM COMPRESSOR CONTROLS FOR CLOSED LOOP REFRIGERATION

LNG Basics for Petroleum Engineers

Freeport LNG Liquefaction Project

Advanced Centrifugal Compression and Pumping for CO 2 Applications

Title slide. LNG Technology. Compiled by PD.Supriyadi

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004

A NOVEL DESIGN FOR MTPA LNG TRAINS

DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN

Development in the Air Separation Unit Addressing the Need of Increased Oxygen Demand from the Oxy-Blast Furnace

Turbine Inlet Air Chilling

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Power Recovery in LNG Regasification Plants

Process Integration for Power-dominated Cryogenic Energy Systems 1. Introduction 2. Multi-period Synthesis of Power Systems

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

District Heating and Cooling with Large Centrifugal Chiller Heat Pumps

PUMPSENSE. Fluid Engineering Pvt. Ltd. Services for the users of Centrifugal Pumps

Precooling strategies for efficient natural gas liquefaction

Energy Efficiency and Recovery at Large Scale Cryogenic Plants: A Survey

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

TECHNICAL VALIDATION AND SELECTION OF THE SIEMENS INDUSTRIAL TRENT 60 DLE FOR COMPRESSOR DRIVE SERVICE FOR THE LAKE CHARLES LIQUEFACTION PROJECT

Large scale hydrogen liquefaction in combination with LNG re-gasification

"Leveraging Cross-Industry Know-How for Thermodynamic Cycles & Turbomachinery Component Innovation"

CAES2 2 nd Generation Compressed Air Energy Storage Technology Presented at SmartEnergy Canada Toronto, February 15, 2011

Turbine Air Systems. The Industry Leader in Turbine Inlet Chilling. economic. clean. energy.

GLADSTONE LNG leads the way with its first LNG shipment in 2012

High Technology Energy Savings Guide

Optimising. the LNG process. The rapidly expanding global LNG industry continues. Projects

Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes. Gastech 2017

POST COMBUSTION CO 2 CAPTURE SCALE UP STUDY

LATEST ADVANCES IN LNG COMPRESSORS

Draft Results Capital Cost and Performance of New Entrant Peaking Unit

Enhanced Heat Transfer Solutions. Energy efficiency and compactness for the oil and gas industry

Combined Heat and Power

Sustainable Development Initiatives of Power, Cooling and Water in UAE Energy intensive Industrial Facilities

Application of an Integrally Geared Compander to an sco 2 Recompression Brayton Cycle

Turbine Inlet Chilling & Generation Storage Best Practices. 8 Oct 14 Trey Sims Turnkey Sales Manager

LIQUEFIED NATURAL GAS LIMITED

Standardized, Modular Liquefaction Equipment and Technology

Development of a New High efficiency Dual cycle Natural Gas Liquefaction Process

Our technology and expertise are ready to work toward your LNG future today

Siemens at LNG 16 News from Siemens Energy Oil & Gas

How to Evaluate an Existing NGL Recovery Plant Before Finalizing a Process Retrofit Design

S-CO 2 Brayton Loop Transient Modeling

DRIVING EXPANDER TECHNOLOGY. Atlas Copco Gas and Process Solutions

THE CONCEPT OF INTEGRATED CRYOGENIC ENERGY STORAGE FOR LARGE SCALE ELECTRICITY GRID SERVICES. Finland *corresponding author

Equipment and Solutions NATURAL GAS AND SMALL SCALE LIQUEFACTION APPLICATIONS

Alaska Gasline Development Corporation Observation on Current Plant Design

LNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen

Intake Housing and Components Route Map and Summary. Gas Turbine Air Treatment Decision Guide

ZR-LNG TM Dual Expander Methane Cycle Liquefaction Technology Applied to FLNG

DETERMINING THE MAXIMUM LNG PRODUCTION RATE BY PROCESS SIMULATION MODELLING OF LOW TEMPERATURE NATURAL GAS SEPARATION UNIT

ENERGY MANAGEMENT INITIATIVE AT PETRONAS LNG COMPLEX

Data Reconciliation in LNG Tank Farm Allocation

GEOTHERMAL SPACE COOLING

Recent and future needs on the operation of combined cycle power plants. Kilian Link, Siemens, Energy Sector

Highview Enterprises Limited, Liquid Air Energy Storage (LAES)

A quantum leap in testing

Simple Dew Point Control HYSYS v8.6

Mechanical Seals for. Ramesh Krishnappan AESSEAL ICEPIM 2015

An Introduction to the Patented. VX TM Cycle. Small-Scale Production of LNG from Low-Pressure Gas by Methane Expansion

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION

WEBINAR #5: Best Practices for Wet Compression. Call In Number: or Access Code: #

INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT

Maximising LNG revenue by operating at peak performance

VANDOR S EXPANSION CYCLE: The VX Cycle

THE VALUE OF REPLICATION RASGAS EXPERIENCE IN THE EXECUTION OF LNG TRAINS 3, 4, AND 5

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

Green FSRU for the future

Energy Saving Efforts in Indian Ammonia Urea Plants

HEAT PUMPS FOR THE EXPLOITATION OF GEOTHERMAL SOURCES IN MILANO. University of Brescia. Studio Associato di Ingegneria - Milano

Water-side Systems. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Best Practices for Fogging Systems for Capacity & Efficiency Enhancement of Combustion Turbines During Hot Weather

Transcription:

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA <Title LNG of Presentation> TRAINS Nicholas White <Date> & Divyesh Master RasGas April 2013

RASGAS INTRODUCTION 17 th INTERNATIONAL CONFERENCE & EXHIBITION RasGas acts as the operating company for and on behalf of the owners of the LNG projects RL, RL (II), RL 3, AKG Projects and Barzan Gas Company Limited (Project Owners) RasGas has developed world-class facilities for the extraction, storage, processing and export of LNG, and a global portfolio of customers RasGas produces approximately 37 million tonnes per annum (MMTPA) of LNG from 7 LNG trains <Date> RasGas delivers LNG via a fleet of long-term chartered LNG vessels Major Shareholders: Qatar Petroleum (QP): 70% ExxonMobil: 30%

PROJECT 17 th INTERNATIONAL BACKGROUND CONFERENCE AND & OBJECTIVE EXHIBITION Background: Train 3 is designed for rich LNG and Trains 4/5 are designed for rich and lean LNG production of 4.71 MMTPA Due to seasonality impact, LNG production reduces during summer by ~5% Project Objective: To remove the seasonality impact The project consisted of three main <Date> aspects: 1. Revision of process conditions 2. Design for more gas turbine power LP/MP-MR string Gas turbine power reduced due to ambient air temperature and hot air recirculation 3. Design a restaged propane compressor

LNG 17 th PRODUCTION INTERNATIONAL CONFERENCE SEASONALITY & EXHIBITION <Date>

PROJECT 17 th INTERNATIONAL TEAM CONFERENCE ORGANISATION & EXHIBITION Project Team: RasGas (Company) Elliott Group (Compressor OEM) General Electric (GT OEM) and APCI (Refrigeration Licensor) Chiyoda Corporation (EPC Contractor) Project Management: RasGas Venture Planning department acts as focal point for RasGas Chiyoda Corporation acts as focal point for various vendors <Date>

PR-MR 17 th INTERNATIONAL LIQUIFACTION CONFERENCE PROCESS & EXHIBITION Re-stage compressor FCW Frame 7 GT/PR (75~85 MW) PR MR/3 Helper Motor (12 MW) FCW Feed Gas Inlet Chilling FCW MR <Date> Main Cryogenic Heat Exchanger LNG Frame 7 GT/MR (75~85 MW) MR/1 MR/2 Helper Motor (12 MW)

17 th INTERNATIONAL STUDY FOCUS CONFERENCE AREAS & EXHIBITION 1. Hot air recirculation to GT 2. Cooling water system 3. Cryogenics 4. Power augmentation 5. PR re-staging <Date>

17 th INTERNATIONAL CONFERENCE & EXHIBITION HOT AIR-RECIRCULATION ANALYSIS <Date>

17 th INTERNATIONAL CONFERENCE & EXHIBITION COOLING WATER CAPACITY EVALUATION Existing sea water (SW) and fresh cooling water (FCW) system subject to additional heat duty SW In FCW IN All CW users SW & FCW system has capacity to handle the additional heat load to remove seasonality impact SW/FCW Exchanger FCW Out <Date> SW Out FCW Pump Assessment concluded that it is feasible to select centralised or local IAC

17 th INTERNATIONAL CONFERENCE & EXHIBITION CRYOGENICS ANALYSIS SUMMARY Liquefaction Process Licensor Study Results: (Train 4 & 5 Lean LNG) Case LP-MP MR Required MW LP-MP MR Available MW Power from IAC MW IAC, USRT PR Required MW PR Available MW Comments Summer 84.30 80.26 4.04 800 78.14 79.55 3636 rpm Minimum LNG required to remove seasonality Summer - max (August) 84.67 80.26 4.40 960 78.34 79.55 3636 rpm Maximum LNG with 960 USRT Chiller 85.50 3534 rpm <Date> Winter 88.16 88.94 0 None 64.8 Wintermax (May) 88.26 82.49 5.77 960 74.26 81.18 3616 rpm Current Winter LNG rate LNG production limited by 7% stonewall margin on Propane Compressor Extreme Summer 76.17 73.81 2.36 800 69.58 70.31 3551 rpm LNG production limited by power available to Propane- HPMR compressor. Train 4 Re-rating Cases 1, 2 and 3 with modified propane compressor and inlet air cooling on LP/MP-MR turbine

LNG TRAIN MAJOR COMPRESSION STRINGS PR/HP-MR String 88M8-5 56MB5 DLN1, 79 MW Site Rated PR Compressor HP/MR Compressor Helper Motor, 12 MW Rated LP/MP-MR String 88M4 60M4 DLN1, 79 MW Site Rated LP/MR Compressor MP/MR Compressor Helper Motor, 12 MW Rated NGL String (Train 4 & 5) DLN1, 27 MW Site Rated RGC Compressor Gear Box Helper Motor, 9.7 MW Rated

LP/MP-MR STRING POWER AUGMENTATION Local Chiller Plant per GT Unit

LP/MP-MR STRING POWER AUGMENTATION GT Air Inlet Filter-house with Cooling Coils pulse filter cooler coils silencer trash screen

PROPANE COMPRESSOR LAYOUT AND DESIGN 88M Centrifugal Compressor Horizontally Split Casing 3 Sideloads 4 Stages 5 Impellers Pressure Rise 1.1 to 16.3 bara Temperature Rise -38 to 63 degc Discharge Mass Flow 637 kg/s Total Power Consumed 56.2 MW

PROPANE COMPRESSOR RESTAGE Flow Limitation & Previous Impeller Failures RasGas has suffered 4 identical failures between 2007 and 2012 Restaging: Reason 1 to remove the restriction on LNG production Stonewall region Reason 2 to enhance the reliability of the compressor and therefore, LNG Train Numerous cases have been reported over the past 10 years of impeller failures for large heavy gas compressors running in the vicinity of overload (stonewall).

PROPANE COMPRESSOR RESTAGE HHP (4 th) Stage Results)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL SUMMARY GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION Seasonality production loss was identified to be caused by: 1. LP/MP-MR string power constraint during summer (Trains 3, 4 & 5) 2. Propane Compressor HHP (4 th ) Stage Stonewall (Trains 4 & 5) A total investment of approximately 150M$ was estimated, producing an IRR of ~33%. <Title <Title of of Presentation> Overall project schedule of 42 months <Date> Retrofit of the propane compressor was estimated to require approximately 20 shutdown days to complete

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED ACKNOWLEDGEMENTS NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION Authors would like to acknowledge the following for supporting this paper: RasGas Management & Technical Teams Chiyoda Corporation Air Products Inc. Elliott Group ABB <Date> General Electric Turbine Air Systems

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL BACKUP GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION <Date>

LP/MP-MR STRING POWER AUGMENTATION GT Power Output and Chiller Temperature Reduction

PROPANE COMPRESSOR RESTAGE HHP (4 th Stage Results) Performance and Mechanical Integrity Validation: Detailed CFD study by OEM Impeller Modal Frequency Tests Cold Eyes Review by independent 3 rd party Regular contact with OEM and preliminary design review

PROPANE COMPRESSOR RESTAGE Redesigned Components: Stage 2 - diaphragm and return channel Stage 3 - diaphragm, return channel, side load wall and impeller Stage 4 - diaphragm, return channel, side load wall, 2 impellers and volute wall Discharge volute Balance piston