A/E Design Deliverable Checklist

Similar documents
A/E Design Deliverable Checklist

DESIGN DEVELOPMENT PHASE

Design Deliverables. Item Schematic Phase Design Development Phase Construction Document Phase

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS

Building Permit Application

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

STATE UNIVERSITY CONSTRUCTION FUND

Village of Gurnee Construction Documents Submittal Requirements

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

KU West Campus LEEP II High Bay Facility Project # , A (c)

FACILITY COMPONENTS - ELEMENTARY SCHOOL

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

ADDENDUM 2 - JULY 14, 2015

Exhibit A Library Shell Construction

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

City Of Mendota Construction Procedures

FACILITY COMPONENTS - MIDDLE SCHOOL

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

FACILITY COMPONENTS - ELEMENTARY SCHOOL

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

Division 00 Procurement and Contracting Requirements

2.3.6 Design Development

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

4. Number of drawings required: ( ) Locations of nearest streets

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

COMMERCIAL PROJECT PLAN REVIEW PROCESS

GENERAL PLAN REVIEW REQUIREMENTS

Administrative Offices

Common Plan Review Rejection Reasons

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

Common Plan Review Rejection Reasons

1 data PIC location (with 2 ports) typically asf for multiple staff members

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

DESIGN & CONSTRUCTION GUIDELINES

INSTRUCTIONS FOR COMPLETING THE BUILDING PERMIT APPLICATION FOR COMMERCIAL PROJECTS

TABLE OF CONTENTS. (Δ = Rev 06/08)

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

A New Municipal Building for Limerick Township

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Communications Page 1 of 9

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

Plan Submittal Checklist 2015 I-Codes

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

Thule Prototype BIM Manual for Dormitories. February 5, 2010

Borough of Doylestown Building and Zoning Department

PROFESSIONAL DESIGN MANUAL INDEX

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

CODE COMPLIANCE PLAN REVIEW PROCEDURES

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Administration Building Needs Assessment

City of South Pasadena COMMUNITY IMPROVEMENT

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

KOCHVILLE TOWNSHIP REQUIRED INFORMATION FOR CONSTRUCTION PLAN REVIEW COMMERCIAL AND MULTI-FAMILY

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

IECC 2006 with Hawaii Amendments

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

PROJECT DESIGN COORDINATION CHECKLIST

STATE UNIVERSITY CONSTRUCTION FUND

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

CAMPUS STANDARDS HANDBOOK

Northwestern Facilities

LUFacilities Policy Service Level Agreement v1.1

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

General Building Information

Schedule of Values Cruise Terminal 2 Expansion

Permit Posting and Inspection Procedures

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

Design Manual Phase Checklist

Element Z General Design Requirements Existing Facilities Information

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

Building Permit Application ~Commercial~ *** All Drawings Must be Sealed by an Architect or an Engineer *** Company Name at Site Address.

a) For the purposes of this Section, the terms listed below shall mean:

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Transcription:

A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic Design column of the table. Design deliverables for the Construction Document phase shall include all items listed in the Construction Document column as well as those all items listed in the Design Development column of the table. Item Schematic Design Design Development Construction Document General Description Narrative documenting design concepts, project issues and major components including: site, architectural, structural, mechanical and electrical. Narrative should discuss all relationships to original Description of construction phasing Description of any proposed occupancy within construction area Description of water & vapor characteristics of roof & exterior Documentation on drawings as required by building codes List of all code variances (on drawings cover sheet) If multiple bid packages, clear indication of scope of each release program (e.g., comparison of walls Identification of construction floor areas to program). phasing, including temporary List of applicable building codes on drawing title sheet occupancy requirements during each phase Building code review List of anticipated building code variance requests Anticipated building and space occupancy schedules. Life safety (egress) with identification of security and access control points List of sustainability features incorporated into project design. Specifications System & material narrative description Outline or preliminary specifications indicating project specific features of major equipment as well as component materials. Complete specification Site Existing conditions General dimensions & Extent of construction area Page 1 of 8

Demolition elevations Area traffic plan, if existing Building outline(s) Permanent exterior signage roads/walks are impacted Future expansion Parking/roadway & Site development phasing Site entrance elevations Construction site access Roads & driveways Vehicle & pedestrian traffic Staging area Parking locations controls Construction signage Bus stop/shelter Grading plan Site details, including hardscape Loading dock location Site lighting, simulations, Profiles for underground utilities Waste/recycling collection specifications, equipment cut Pipe sizes locations sheets and photometrics Connection details Walkway locations Concept details of site fixtures Copy of local government Stairway locations & equipment review comments on utilities Emergency telephone Utility, elevations & and modifications in right(s)-ofway locations details for local governing Utility requirements agency approval Site utilities Sanitary sewer flow Preliminary grading plan calculations for Soil retention work Plan to address existing Preliminary site lighting plan hazardous/contaminated materials. Soil erosion and sedimentation control plan (for both construction and occupancy) Soil erosion and sedimentation control Dewatering plan Landscape Existing conditions Landscaping concept Existing irrigation Planting plan Irrigation plan Protection for existing trees and significant plantings during construction Soil preparation & planting specifications Guying diagrams Piping diagrams Pipe sizes Landscape and irrigation details and legends Page 2 of 8

Structural Structural scheme Foundation plan Definition of control joints Written description Typical floor framing plan Beam, column & slab Framing at unique schedules features Mechanical and electrical Main member sizing concrete house-keeping pads Structural sections Foundation details Structural details Structural notes Structural calculations Building Envelope Typical elevations All building elevations Roof-mounted equipment Fenestration layout w/dimensional heights Roof details Material designations Typical wall sections Exterior details Overall building cross-sections Parapet & coping details Flashing details Roof layout. Typical floor Roof & drainage plan Control joint definition & details (min 1/16" scale) w/ legends Exterior door details Typical window details Details of unique features Expansion joint locations Large scale building crosssections Building Interior Floor All Floor with UNL Dimensioned floor with Demolition Design Guideline compliant UNL Design Guideline Area use identification & area room numbering compliant room numbering in square ft. Enlarged at elevation Enlarged Mechanical, electrical & other changes (such as stairs) Partition details service closets & rooms Enlarged at toilet rooms Interior details Circulation paths Reflected ceiling Interior elevations Area tabulations compared to Wall types, fire ratings, smoke Finish schedules program requirements control zones Door & hardware schedules Show flexibility for expansion Plan to address existing Schedule of proposed movable & alterations hazardous materials, if equipment that is NOT Preliminary layout of major applicable indicated on documents (for spaces w/ fixed equipment Fixed seating reference) Defined seating, serving, & kitchen facilities Schedule of lab fixtures Equipment & furniture layouts Page 3 of 8

Important interior elevations Details of unique features Details of fixed equipment Preliminary finish schedule Preliminary door schedule Elevators Elevator locations Elevator shaft section Dimensioned Equipment room locations Equipment description Sections & details of hydraulic cylinder, if applicable Description of shaft sump pits Elevator car & equipment support details Description of controls & fixtures Door & frame details Interior details including lighting HVAC One-line diagrams for each air, hydronic (including chilled water), steam, condensate and all other HVAC related systems, and other materials as required to describe the fundamental design concept for all mechanical systems Indication of the amount of redundancy for all major pieces of mechanical equipment. Major equipment locations Air intake & discharge locations HVAC zoning (e.g., what air Overall building air flow diagram indicating air handlers, exhaust fans, duct risers, and duct mains Schematic diagrams showing room pressurization and/or airflow relationships in laboratories and other specialized areas. Plans indicating shaft, chase, recess requirements Duct layout for typical spaces Equipment schedules (major equipment) Equipment locations with enlarged mechanical Detailed piping and duct design with all sizes indicated Schematic one-line diagrams for all steam / hydronic systems including pipe specialties, instrumentation, valving requirements. Detailed floor of mechanical rooms w/ all components and required service access areas drawn to actual scale Cross-sections through mechanical rooms and areas where there are installation and coordination issues (e.g., handling system serves what Indication of typical locations of tight space, zoning of utilities). area). fire dampers, smoke dampers, Indicate required service Mechanical legend and combination F/S dampers access areas Special occupancy zones Outline of major control Equipment details, including Page 4 of 8

sequences of operation M/E smoke control schemes Preliminary floor of mechanical rooms w/all components and required service access areas drawn to scale Utility meter locations and design flow rates structural support requirements Penetration/sleeve details Installation details Duct construction schedule (on the drawings), indicating materials and pressure class for each duct system Detailed HVAC sequences of operation Utility meter details Plumbing Description of all major plumbing systems with indication of the amount of redundancy Main water supply, storm, and sanitary leads Major equipment locations Restroom locations Lighting General photometric levels Fixture, lamp, and controls descriptions Preliminary interior lighting Piping schematic or riser diagrams for every plumbing system as required to describe the fundamental design concept for all plumbing systems Preliminary piping (domestic & process) with indication of required service access areas Water meter locations Back flow prevention locations Fixture schedules, to include lab fixtures Equipment schedules (major equipment) Preliminary floor of mechanical rooms w/all components and required service access areas drawn to scale Typical interior lighting and control Outdoor lighting and control Fixture types and schedule Water riser diagram, including assumed fixture counts per floor connection Waste and vent riser diagrams including assumed fixture counts per floor connection Foundation drains Detailed piping design with all pipe sizes indicated Typical plumbing details, including structural support requirements Piping details Penetration/sleeve details Page 5 of 8 Interior and exterior lighting, including control systems and devices, lighting panels, switching and circuiting Lighting control system

Preliminary outdoor lighting Lighting control system and control device descriptions schematics and wiring diagrams Typical photometric calculations Lighting control system detailed sequences of Dimming, daylighting and low operation voltage control zones Installation details, including structural support details Electrical Power Distribution Electrical demolition Manhole, duct bank, and Details of power service to One-line diagrams with building entry and details building equipment ratings Normal power riser diagram Power, including primary Manhole, duct bank, and building entry locations with circuit breaker, fuse, conduit and wire sizes cable raceways, feeder conduits, electrical loads, Exterior equipment locations including transformer and Emergency power riser diagram with circuit breaker, duplex and special receptacles, and circuiting metering fuse, conduit and wire sizes Emergency power system Substation, generator and ATS Generator size, controls, and details descriptions Grounding riser diagram Connections to other building Substation and generator locations and sizes Fault current and coordination studies used to specify systems, including fire alarm and HVAC systems Preliminary service size and equipment ratings Details of non-standard location Service sized, distribution electrical installations Electric room locations and sizes equipment sized and branch panelboards sized Conduit and wire sizes for services, feeders, and special Preliminary substation and Substation standard details branch circuits generator room List of equipment on MCC elevations Panel numbering scheme emergency power Grounding details Electrical distribution and Panel schedules Roof and floor penetration branch panelboard layout Electrical equipment location details Typical electrical outlet location Plan for temporary power during construction. Electric meter location with design amps and voltage Fire Protection One-line diagrams for each Fire protection zoning extents Fire protection service Page 6 of 8

fire protection system, and Location of main headers and entrance details other materials as required to risers Location of all sprinkler zone describe the fundamental design concept for all fire Location of test headers and fire department connections valves, drains, and fire hose connections protection systems Fire pump sizing calculations Typical sprinkler installation Connection to utility details, including structural Fire service entry location support details Location of fire pump and Penetration/sleeve details controller, jockey pump and sprinkler valves Fire Alarm System description Riser diagram Detailed panel, device and Panel locations Panel, device and appliance location appliance location including duct detectors, fire/smoke dampers, sprinkler flow and tamper switches, monitor and control modules, door hold-opens, door lock releases, etc. Strobe light candela ratings General notes on conduit and wire sizes Details of connections to HVAC, fire pump, fire suppression, door hold-open, door lock Detailed operation sequences Telecommunications (Voice, Data, Video) Manhole, duct bank, and building entry locations BE and TR locations, sizes, and door swings Detailed voice, data and video outlet locations Building Entrance (BE) and local Telecomm Room (TR) locations Backboard locations in BE and TR s Raceway and grounding riser Details of telecommunications service to the building Floor box schedule Riser diagram Preliminary cable tray Page 7 of 8 diagrams Conduit and cable tray with conduit and cable tray sizes Material cut-sheets Conduit, outlet box and floor box installation details Power outlet locations in the BE and TR s Locations of non-telecom

List of equipment to share equipment in the BE and TR s telecom rooms BE and TR heat loads Typical voice, data and video outlet location Emergency phone locations and types (i.e., wall or pedestal) Courtesy phone locations Card Access, CCTV, AV and System descriptions Riser diagrams Detailed equipment location Other Specialty Electronic Panel locations Equipment location Systems Preliminary device location Equipment schedules Wiring diagrams Installation details Detailed sequences of operation Models and Graphics Renderings, models, or other graphics as necessary to clearly present concept Updated renderings, models and graphics required only as appropriate for design development Updated renderings, models and graphics required only as appropriate for construction document preparation Construction Cost Estimates Yes Yes Yes Page 8 of 8