A/E Design Deliverable Checklist

Similar documents
A/E Design Deliverable Checklist

DESIGN DEVELOPMENT PHASE

Design Deliverables. Item Schematic Phase Design Development Phase Construction Document Phase

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS

Building Permit Application

STATE UNIVERSITY CONSTRUCTION FUND

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Village of Gurnee Construction Documents Submittal Requirements

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

KU West Campus LEEP II High Bay Facility Project # , A (c)

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

FACILITY COMPONENTS - ELEMENTARY SCHOOL

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

ADDENDUM 2 - JULY 14, 2015

City Of Mendota Construction Procedures

Exhibit A Library Shell Construction

FACILITY COMPONENTS - MIDDLE SCHOOL

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

FACILITY COMPONENTS - ELEMENTARY SCHOOL

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

COMMERCIAL PROJECT PLAN REVIEW PROCESS

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

Division 00 Procurement and Contracting Requirements

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

4. Number of drawings required: ( ) Locations of nearest streets

Common Plan Review Rejection Reasons

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Common Plan Review Rejection Reasons

2.3.6 Design Development

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Administrative Offices

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

Borough of Doylestown Building and Zoning Department

TABLE OF CONTENTS. (Δ = Rev 06/08)

DESIGN & CONSTRUCTION GUIDELINES

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

1 data PIC location (with 2 ports) typically asf for multiple staff members

GENERAL PLAN REVIEW REQUIREMENTS

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

INSTRUCTIONS FOR COMPLETING THE BUILDING PERMIT APPLICATION FOR COMMERCIAL PROJECTS

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

PROFESSIONAL DESIGN MANUAL INDEX

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

Communications Page 1 of 9

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

A New Municipal Building for Limerick Township

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

Plan Submittal Checklist 2015 I-Codes

CODE COMPLIANCE PLAN REVIEW PROCEDURES

Thule Prototype BIM Manual for Dormitories. February 5, 2010

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

LUFacilities Policy Service Level Agreement v1.1

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

STATE UNIVERSITY CONSTRUCTION FUND

City of South Pasadena COMMUNITY IMPROVEMENT

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

CAMPUS STANDARDS HANDBOOK

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

IECC 2006 with Hawaii Amendments

KOCHVILLE TOWNSHIP REQUIRED INFORMATION FOR CONSTRUCTION PLAN REVIEW COMMERCIAL AND MULTI-FAMILY

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT

Administration Building Needs Assessment

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

General Building Information

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

Commercial and Residential Projects (after appropriate Board approvals have been made if necessary):

PROJECT DESIGN COORDINATION CHECKLIST

Element Z General Design Requirements Existing Facilities Information

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

Telecommunication Spaces

Permit Posting and Inspection Procedures

a) For the purposes of this Section, the terms listed below shall mean:

Design Manual Phase Checklist

Transcription:

A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic Design column of the table. Design deliverables for the Construction Document phase shall include all items listed in the Construction Document column as well as those all items listed in the Design Development column of the table. Item Schematic Design Design Development Construction Document General Description Narrative documenting design concepts, project issues and major components including: site, architectural, structural, mechanical and electrical. Narrative should discuss all relationships to original Description of construction phasing Description of any proposed occupancy within construction area Description of water & vapor characteristics of roof & exterior Documentation on drawings as required by building codes List of all code variances (on drawings cover sheet) If multiple bid packages, clear indication of scope of each release program (e.g., comparison of walls Identification of construction floor areas to program). phasing, including temporary List of applicable building codes on drawing title sheet occupancy requirements during each phase Building code review List of anticipated building code variance requests Anticipated building and space occupancy schedules. Life safety (egress) with identification of security and access control points List of sustainability features incorporated into project design. Specifications System & material narrative description Outline or preliminary specifications indicating project specific features of major equipment as well as component materials. Complete specification Site Existing conditions General dimensions & Extent of construction area Page 1 of 9

Demolition Building outline(s) Future expansion Site entrance Roads & driveways Parking locations Bus stop/shelter Loading dock location elevations Permanent exterior signage Parking/roadway & elevations Vehicle & pedestrian traffic controls Grading plan Site lighting, simulations, Area traffic plan, if existing roads/walks are impacted Site development phasing Construction site access Staging area Construction signage Site details, including hardscape Profiles for underground utilities Waste/recycling collection specifications, equipment cut Pipe sizes locations sheets and photometrics Connection details Walkway locations Concept details of site fixtures Copy of local government Stairway locations & equipment review comments on utilities Emergency telephone Utility, elevations & and modifications in right(s)-ofway locations details for local governing Utility requirements agency approval Site utilities Sanitary sewer flow Preliminary grading plan calculations for Soil retention work Plan to address existing Preliminary site lighting plan hazardous/contaminated materials. Storm water pre and post construction calculations. Soil erosion and sedimentation control plan (for both construction and occupancy) Soil erosion and sedimentation control Dewatering plan Storm Water Evaluate existing Conditions (soils, flow paths, predevelopment flow rates) Layout site, protecting sensitive areas and leaving room for permanent postconstruction BMPs. Provide models and calculations demonstrating that 1) Water Quality Requirement: minimum water quality volume requirements are met or exceeded (first 0.5 inch); 2) Water Quantity Goal: to the extent feasible, post- Structural and non-structural post-construction BMP details Maintenance and inspection plan for post-construction structural BMPs Page 2 of 9

development flow rates do not exceed pre-development conditions (24-hr, 100-year storm event) Structural and non-structural post-construction BMP selection If site constraints preclude meeting the required water quality control volume, select alternate site/location for BMPs that will achieve substantially equivalent stormwater performance. Landscape Structural Existing conditions Landscaping concept Existing irrigation Landscape Protection Plan Structural scheme Written description Page 3 of 9 Planting plan Irrigation plan Foundation plan Typical floor framing plan Framing at unique features Main member sizing Structural sections Protection for existing trees and significant plantings during construction Soil preparation & planting specifications Guying diagrams Piping diagrams Pipe sizes Landscape and irrigation details and legends Definition of control joints Beam, column & slab schedules Mechanical and electrical concrete house-keeping pads Foundation details Structural details Structural notes Structural calculations

Building Envelope Typical elevations Fenestration layout Material designations Overall building cross-sections Roof layout. Typical floor (min 1/16" scale) w/ legends Building Interior Elevators Floor Demolition Area use identification & area in square ft. Mechanical, electrical & other service closets & rooms Circulation paths Area tabulations compared to program requirements Show flexibility for expansion & alterations Preliminary layout of major spaces w/ fixed equipment Elevator locations Equipment room locations Page 4 of 9 All building elevations w/dimensional heights Typical wall sections Parapet & coping details Roof & drainage plan Exterior door details Typical window details Details of unique features Expansion joint locations Large scale building crosssections All Floor with UNL Design Guideline compliant room numbering Enlarged at elevation changes (such as stairs) Enlarged at toilet rooms Reflected ceiling Wall types, fire ratings, smoke control zones Plan to address existing hazardous materials, if applicable Fixed seating Defined seating, serving, & kitchen facilities Equipment & furniture layouts Important interior elevations Details of unique features Details of fixed equipment Preliminary finish schedule Preliminary door schedule Elevator shaft section Equipment description Roof-mounted equipment Roof details Exterior details Flashing details Control joint definition & details Dimensioned floor with UNL Design Guideline compliant room numbering Enlarged Partition details Interior details Interior elevations Finish schedules Door & hardware schedules Schedule of proposed movable equipment that is NOT indicated on documents (for reference) Schedule of lab fixtures Dimensioned Sections & details of hydraulic cylinder, if applicable Description of shaft sump pits

Elevator car & equipment support details Description of controls & fixtures Door & frame details Interior details including lighting HVAC One-line diagrams for each air, hydronic (including chilled water), steam, condensate and all other HVAC related systems, and other materials as required to describe the fundamental design concept for all mechanical systems Indication of the amount of redundancy for all major pieces of mechanical equipment. Major equipment locations Air intake & discharge locations HVAC zoning (e.g., what air handling system serves what area). Mechanical legend Special occupancy zones Page 5 of 9 Overall building air flow diagram indicating air handlers, exhaust fans, duct risers, and duct mains Schematic diagrams showing room pressurization and/or airflow relationships in laboratories and other specialized areas. Plans indicating shaft, chase, recess requirements Duct layout for typical spaces Equipment schedules (major equipment) Equipment locations with enlarged mechanical Indication of typical locations of fire dampers, smoke dampers, and combination F/S dampers Outline of major control sequences of operation M/E smoke control schemes Preliminary floor of mechanical rooms w/all components and required service access areas drawn to scale Utility meter locations and design flow rates Detailed piping and duct design with all sizes indicated Schematic one-line diagrams for all steam / hydronic systems including pipe specialties, instrumentation, valving requirements. Detailed floor of mechanical rooms w/ all components and required service access areas drawn to actual scale Cross-sections through mechanical rooms and areas where there are installation and coordination issues (e.g., tight space, zoning of utilities). Indicate required service access areas Equipment details, including structural support requirements Penetration/sleeve details Installation details Duct construction schedule (on the drawings), indicating materials and pressure class for each duct system Detailed HVAC sequences of operation Utility meter details

Plumbing Description of all major plumbing systems with indication of the amount of redundancy Main water supply, storm, and sanitary leads Major equipment locations Restroom locations Lighting Electrical Power Distribution General photometric levels Fixture, lamp, and controls descriptions Preliminary interior lighting Preliminary outdoor lighting Electrical demolition One-line diagrams with equipment ratings Page 6 of 9 Piping schematic or riser diagrams for every plumbing system as required to describe the fundamental design concept for all plumbing systems Preliminary piping (domestic & process) with indication of required service access areas Water meter locations Back flow prevention locations Fixture schedules, to include lab fixtures Equipment schedules (major equipment) Preliminary floor of mechanical rooms w/all components and required service access areas drawn to scale Typical interior lighting and control Outdoor lighting and control Fixture types and schedule Lighting control system and control device descriptions Typical photometric calculations Dimming, daylighting and low voltage control zones Manhole, duct bank, and building entry and details Normal power riser diagram with circuit breaker, fuse, Water riser diagram, including assumed fixture counts per floor connection Waste and vent riser diagrams including assumed fixture counts per floor connection Foundation drains Detailed piping design with all pipe sizes indicated Typical plumbing details, including structural support requirements Piping details Penetration/sleeve details Interior and exterior lighting, including control systems and devices, lighting panels, switching and circuiting Lighting control system schematics and wiring diagrams Lighting control system detailed sequences of operation Installation details, including structural support details Details of power service to building Power, including primary cable raceways, feeder

Manhole, duct bank, and building entry locations Exterior equipment locations including transformer and metering Substation, generator and ATS descriptions Substation and generator locations and sizes Preliminary service size and location Electric room locations and sizes Preliminary substation and generator room Panel numbering scheme Electrical distribution and branch panelboard layout Energy Fire Protection Estimated peak (design) and monthly energy usage for all energy inputs. Typically, this will include steam, chilled water and electricity for buildings located on campus. One-line diagrams for each fire protection system, and other materials as required to describe the fundamental design concept for all fire protection systems conduit and wire sizes Emergency power riser diagram with circuit breaker, fuse, conduit and wire sizes Generator size Grounding riser diagram Fault current and coordination studies used to specify equipment ratings Service sized, distribution equipment sized and branch panelboards sized Substation standard details List of equipment on emergency power Panel schedules Electrical equipment location Typical electrical outlet location Plan for temporary power during construction. Electric meter location with design amps and voltage Estimated peak (design) and monthly energy usage for all energy inputs. Fire protection zoning extents Location of main headers and risers Location of test headers and fire department connections Fire pump sizing calculations conduits, electrical loads, duplex and special receptacles, and circuiting Emergency power system, controls, and details Connections to other building systems, including fire alarm and HVAC systems Details of non-standard electrical installations Conduit and wire sizes for services, feeders, and special branch circuits MCC elevations Grounding details Roof and floor penetration details Fire protection service entrance details Location of all sprinkler zone valves, drains, and fire hose connections Typical sprinkler installation Page 7 of 9

Connection to utility Fire service entry location Location of fire pump and controller, jockey pump and sprinkler valves details, including structural support details Penetration/sleeve details Fire Alarm Telecommunications (Voice, Data, Video) System description Panel locations Manhole, duct bank, and building entry locations Building Entrance (BE) and local Telecomm Room (TR) locations Riser diagram Preliminary cable tray Riser diagram Panel, device and appliance location BE and TR locations, sizes, and door swings Backboard locations in BE and TR s Raceway and grounding riser diagrams Conduit and cable tray with conduit and cable tray sizes Material cut-sheets List of equipment to share telecom rooms BE and TR heat loads Typical voice, data and video outlet location Detailed panel, device and appliance location including duct detectors, fire/smoke dampers, sprinkler flow and tamper switches, monitor and control modules, door hold-opens, door lock releases, etc. Strobe light candela ratings General notes on conduit and wire sizes Details of connections to HVAC, fire pump, fire suppression, door hold-open, door lock Detailed operation sequences Detailed voice, data and video outlet locations Details of telecommunications service to the building Floor box schedule Conduit, outlet box and floor box installation details Power outlet locations in the BE and TR s Locations of non-telecom equipment in the BE and TR s Page 8 of 9

Emergency phone locations and types (i.e., wall or pedestal) Courtesy phone locations Card Access, CCTV, AV and Other Specialty Electronic Systems Models and Graphics System descriptions Panel locations Preliminary device location Renderings, models, or other graphics as necessary to clearly present concept Riser diagrams Equipment location Updated renderings, models and graphics required only as appropriate for design development Construction Cost Estimates Yes Yes Yes Detailed equipment location Equipment schedules Wiring diagrams Installation details Detailed sequences of operation Updated renderings, models and graphics required only as appropriate for construction document preparation Page 9 of 9