You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

APC Step-Down Transformer. Models: AP9626, AP9627, and AP9628

E-Series Installing E-Series U Cabinet

Power Distribution Module Replacement Instructions

BESTMOVE STANDING TRANSFER AID

Sun Fire E25K/E20K Systems Unpacking Guide

Conergy SolarFamulus II

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

HP 3-7U Quick Deploy Rail System Installation Instructions

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

Powerware 9390 Integrated Accessory Cabinet IAC-D Configuration Installation and Operation Manual. For use with kva and kva UPS Models

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

Risk of fire and electrical shock. DISCONNECT POWER AT ELECTRICAL PANEL before installing or servicing this product.

Universal Tilting TV Mount 32" to 60" Installation Instructions

VP2 SidePOD Instructions

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

BESTMOVE STANDING TRANSFER AID

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

42U SmartRack White Standard-Depth Rack Enclosure Cabinet with doors, side panels & shock pallet packaging

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Agilent 1220 Infinity LC Mobile Upgrade Kit

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

Rough-in frame and flush-mount panel installation instructions

Power Distribution Center. Model: SUDC208V42P

INDeX Rack Installation Notes

BESTMOVE STANDING TRANSFER AID

Rack-in-a-BoxTM INSTALLATION MANUAL

SKATEWHEEL FLOW RACK

TeraFrame HD Cabinet System Supplemental Installation Guide

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Ultra-Thin LED/LCD TV Mount 23" to 42" Installation Guide

Instruction Manual. Modular Attenuator Assembly

Implementation Services. 1.0 Executive Summary

Clutch Installation Kinze row unit

EPS Receiving and Unpacking 06/

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

Preference Slimline 5537 Utility Console I NSTALLATION GUIDE

Assembly Instructions Legacy Basic Acoustical Shell

4400 Series UPS Seismic Adapter Kit Installation Instructions

Clutch Installation John Deere row unit

VERsacourt LED Light System Installation Instructions

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

Symmetra PX 160 Classic Battery Cabinet

Enclosure Installation Manual

1. Installation Preparatory work Equipotential bonding Floor installation Connection of several modules...

Installation and Operation Manual

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

Galaxy VM kva 400 V Receiving and Unpacking 06/

OPO-SHORT Installation Instructions Manual Version

5485HT 5650H 5660H 5660HTS 5665HTS Instruction Kit Same Deutz-Fahr Flow Sensor 5SW models Flow Sensor 6SW models

Enclosure Installation Manual

Smart-UPS X-Series External Battery Pack Installation and Operation

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

Bravo Platform Unpacking Guide

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

Com-Tray. Under Floor

Symmetra PX kw 208 V. Receiving and Unpacking 08/2015.

9000 Series Rack Products Reference Guide. Third Edition (July 2001) Part Number Compaq Computer Corporation

Leveling Foot RB210. Leg Extender RLT66

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

LIB System for UPS Installation Manual (136S)

PC-PH SERIES BTUH

SK2000 Boltless Pallet Rack Installation and Assembly Manual

Platform stair lift PLG7

TABLE OF CONTENTS. Vacuum Cleaner. Model No. MC-CG Bagless Canister Red North America

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions.

EXPRESS5800/1080Xd. Installation Procedures

SK3000 Structural Pallet Rack Installation and Assembly Manual

Statement of Work. 1.0 Executive Summary. Assembly Service. Implementation Services. Table of Contents. 1.0 Executive Summary. 2.0 Features & Benefits

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel

Operating Instructions April 2010 milltronics WD600

XAP Series Busduct Storage, Installation, and Maintenance

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

MGE Galaxy /50/60/80/100/130 kva. The recommended power protection for all critical applications

Installation. Natrix

Repackaging the Router

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

C Series Mechanical Pit Levelers. P.O. Box 338 Spring Hill, Tennessee fax:

Installation guidelines for users of Magnum DS Low-Voltage Front-Access Switchgear Assemblies for seismic applications

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

Quick Adjustable Height Stands

LIFT FRONT CURVED GLASS HOT FOOD/DELI MERCHANDISERS Hot Temperature Service Display Cases

Universal Projector Ceiling Mount - Black Installation Instructions

SA808 INSTRUCTION MANUAL

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Full-Motion LCD TV/Monitor Mount 10" to 24" Installation Instructions

PORTRAIT WARNING HOT GLASS WILL CAUSE BURNS. DO NOT TOUCH GLASS UNTIL COOLED. NEVER ALLOW CHILDREN TO TOUCH GLASS. 569 Ledge Front

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

Exterior System installation instructions

Dandy Leveler UDLV-150 & UDLV-500 (New Style)

LIB System for UPS Installation Manual (136S)

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

Gerber. Scientific Products. Dear Gerber Sabre Customer:

Transcription:

Installation Smart-UPS VT in Parallel 10-40 kva 380/400/415 V 208/220 V 200/208 V

Contents Safety... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS.............................. 1 Prepare for Floor-Anchoring (optional)....................... 2 System arrangements.................................... 2 Hole positions for a stand-alone UPS enclosure with L-shaped anchoring brackets....................................... 3 Hole positions for up to four UPS units in parallel with U-shaped anchoring brackets....................................... 4 Prepare for Parallel Communication Cables... 5 Three different ways of routing cables....................... 5 Schematic overview of the PBus cables layout................ 5 Remove the front panel................................... 6 Remove the top cover.................................... 6 Remove the batteries..................................... 7 Install the interconnection plates (optional).................. 7 Run the Cables... 10 UPSs apart without Conduits and Interconnection............. 10 UPSs bayed together without Conduits...................... 12 UPSs apart or bayed together with Conduits.................. 13 Final Mechanical Assembly... 15 Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries...................................... 15 Level the enclosures with the leveling feet.................. 15 Install battery-securing and floor-anchoring brackets......... 16 Reinstall the top cover and the front panel.................. 16 Smart-UPS VT 10-40 kva 380/400/415 V - 208/220 V - 200/208 V i

Power Connections (Overview)............................. 17 380/400/415 V input...................................... 17 Breaker sizes 380/400/415 V............................... 18 200/208/220 V input...................................... 19 Breaker sizes 200/208/220 V............................... 20 Contact Information...................................... 21 ii Smart-UPS VT 10-40 kva 380/400/415 V - 208/220 V - 200/208 V

Safety IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Warning: ALL safety instructions in the Safety Sheet (990-2822) must be read, understood and followed prior to installation. Failure to do so could result in equipment damage, serious injury, or death. Warning: Parallel operation is not available when the system is set up for 3-wire operation, which only applies to Japanese systems. Caution: All electrical power and power control wiring must be installed by a qualified electrician, and must comply with local and national regulations for maximum power rating. Note: The cables must be routed by the electrician but not attached. The field service engineer from APC by Schneider Electric will install the parallel communication box and attach all cables to the UPSs. Note: Up to four UPS units can run in parallel. See also: For information on UPS specifications on the Smart-UPS VT series, see part nos. (available from the document storage in the UPS): 990-1986 Installation 380/400/415 V 990-1598 Installation 208/220 V 990-2360 Installation 200/208 V 1

Prepare for Floor-Anchoring (optional) Note: If floor anchoring and battery securing is required, read this section. If not, see Prepare for Parallel Communication Cables on page 5. Note: Allow for enough working space behind the enclosure for electrical work to be carried out (e.g. if you want to install a conduit box or if you want to connect an XR Battery Enclosure at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable national and local codes. 600 mm (23.6 in) is recommended. Note: The L-shaped floor anchoring brackets that secured the enclosure to the pallet during shipment may be used for a stand-alone UPS enclosure to enhance stability. See this chapter for hole positions and see also Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries on page 15. The L-shaped floor anchoring brackets are not necessary when baying enclosures together. Instead, the three U-shaped floor anchoring brackets from the baying kit are used. Note: Hole positions are only intended as a guide. System arrangements APC recommends the following arrangements of UPS units and XR Battery Enclosures (XR) in parallel. Examples with two parallel systems using baying kits. UPS XR XR XR XR UPS XR XR XR XR UPS XR XR XR XR UPS XR XR XR XR XR XR XR XR UPS UPS XR XR XR XR UPS UPS UPS UPS Note: UPS units and their respective XR Battery Enclosure must be bayed together. XR Battery Enclosures must never be shared in a parallel UPS system. 2

Hole positions for a stand-alone UPS enclosure with L-shaped anchoring brackets Note: Recommended minimum number of screws per enclosure for the L-shaped brackets is four; one in each corner. Recommended floor bolt size: M8. Model width: 352 mm (13.85 in) and 523 mm (20.59 in). Conduit box (if applicable) Minimum rear clearance: 100 mm (3.93 in) Floor anchoring hole Note: Rear service clearance must comply with applicable national and local codes. 600 mm (23.6 in) is recommended. 3

Hole positions for up to four UPS units in parallel with U-shaped anchoring brackets. Note: Recommended minimum number of floor screws for the below two configurations is 10. Model width: 352 mm (13.85 in). Top view Floor anchoring brackets 90 mm (3.54 in) 160 mm (6.29 in) 60 mm (2.36 in) 60 mm (2.36 in) 60 mm (2.36 in) 60 mm (2.36 in) 160 mm (6.29 in) 90 mm (3.54 in) 352 mm (13.85 in) 0 323 mm (12.71 in) 675 mm (26.56 in) 1027 mm (40.41 in) 1379 mm (54.26 in) Model width: 523 mm (20.59 in). Top view Floor anchoring brackets 90 mm (3.54 in) 160 mm (6.29 in) 60 mm (2.36 in) 60 mm (2.36 in) 60 mm (2.36 in) 60 mm (2.36 in) 160 mm (6.29 in) 90 mm (3.54 in) 523 mm (20.59 in) 0 494.5 mm (19.46 in) 1017.5 mm (40.05 in) 1540.5 mm (60.46 in) 2063.5 mm (81.23 in) 4

Prepare for Parallel Communication Cables Three different ways of routing cables Note: The enclosures in a parallel system can be kept apart, or they can be assembled with interconnection plates (SUVTOPT011 APC Smart-UPS VT Parallel Operation Baying Kit). If the enclosures are kept apart the communication cables can be run in conduits (if applicable). The routing of cables between the UPSs can be done in three different ways: 1. UPSs apart (without conduits and without interconnection plates) 2. UPSs bayed together (without conduits and with interconnection plates) 3. UPSs apart or bayed together (with conduits and optional interconnection plates). Schematic overview of the PBus cables layout Note: The cables must be run by the electrician but not attached. The Field Service Engineer from APC by Schneider Electric will attach all cables to the UPS(s) and install the parallel communication box. Note: The PBus cables run from UPS 1 to UPS 2 to UPS 3 to UPS 4 if your configuration consists of 4 UPSs. Note: The PBus cables are labelled PBus 1 and PBus 2. Note: PBus 1 cables must be kept together and PBus 2 cables must be kept together. If you by mistake run a cable between a PBUS1 terminal and a PBUS2 terminal you will be notified by the display. Note: If the configuration consists of only two UPS units, the terminators must be installed in UPS 1 & 2. With three UPS units the terminators must be installed in UPS 1 & 3. 5

This schematic overview shows the cable layout: Terminators Pbus 2 cables( must be kept together) Pbus 1 cables (must be kept together) Remove the front panel 1.Turn the screw to the right to the unlocked position. 2.Lift the front panel upwards to free it from the enclosure frame. Remove the top cover 1.Loosen the six screws of the top cover (four at the front and two at the back). 2.Lift up from the back and push forward to free the cover. 3.Leave the cover unattached on top of the UPS. Note: Remove the battery compartment cover (only applicable to Japanese systems). 6

Remove the batteries Note: See Operation manual 990-2282. Install the interconnection plates (optional) Note: If the UPS units are kept apart, the interconnection plates are irrelevant. Please instead move to Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries on page 15 or use the U-shaped anchoring brackets (described below) for floor anchoring. If the UPS units are kept together, please proceed with the below installation procedure of the interconnection plates. UPS 1 UPS 2 1.Remove the side panels from the enclosure(s) to get access to the holes in the bottom frame. Note: If the UPS system is going to be anchored to the floor, drilling holes for anchoring is recommended to take place at this stage. See Prepare for Floor-Anchoring (optional) on page 2. Note: Make sure that the enclosures are level to be able to anchor the enclosures to each other. 7

2. Position two U- shaped floor anchoring brackets under one enclosure; one in each side. U-shaped floor anchoring bracket Front of enclosure Front of adjacent enclosure Note: The U-shaped anchoring brackets are 1-2 mm higher than the opening below the enclosure to inactivate the casters. Therefore, the enclosure must be tilted when placing the U- shaped anchoring brackets under the enclosure. 3. In each side of the same enclosure insert a maximum of nine and a minimum of two M8 screws (not provided) through holes in the bottom of the enclosure and through holes in the U-shaped floor anchoring brackets, and into the pre-drilled floor holes. 4. Fasten the screws. 5. Move the adjacent enclosure on its casters close to the enclosure with the U- shaped floor anchoring brackets. Note: If the adjacent enclosure is on its levelling feet, use a forklift or pallet jack to move it into position. 8

UPS 1 UPS 2 6.Insert the interconnection plates between the two enclosures. One is positioned toward the front and the other toward the rear. Note how the wings on the interconnection plates rest in slots at the top of the inner panel. 7.Align the two enclosures and level the three marked rows of bolt holes in UPS 1 with the holes in UPS 2. 8.Push the two enclosures firmly together. Back Topview Topview 9.Bolt the two enclosures together, using the six M6x25 mm screws and nuts supplied in the kit; join one hole at the front and one hole at the rear of the enclosures on three levels. Front UPS 1 UPS 2 10.Position the last and third U-shaped floor anchoring bracket under the adjacent enclosure (see previous graphics) and insert a minimum of two floor anchoring M8 screws (not provided) through holes in the bottom of the enclosure and through holes in the U-shaped floor anchoring bracket, and into the predrilled floor holes, and then fasten the screws. 9

Run the Cables UPSs apart without Conduits and Interconnection Note: If the UPS system is going to be anchored to the floor, drilling holes for anchoring is recommended to take place at this stage. See Prepare for Floor-Anchoring (optional) on page 2. UPS 1 UPS 2 Parallel communication box installed by field service engineer from APC by Schneider Electric 1. Remove the front panel if not already done under Prepare for Parallel Communication Cables on page 5. 2. Loosen the two screws from the cable-inlet plates at the bottomxplate of UPS 1 and UPS 2, and remove the plates. 10

3. From UPS 1: Run the two PBus cables to the slots on the left side of the enclosure and down inside the panel. 4. From the lowest slot fish out the cables from the side panel andxrun them down through the cable inlet and through the round hole at the bottom. 5. Run the PBus cables to UPS 2 and to the slots on the left side of the enclosure, and up inside thexpanel. 6. Fish out the PBus cables and leave them unattached to the parallel box. 7. Run the ABus cable from the Maintenance Bypass Panel to the slots on the left side of the enclosure and up inside the panel the same way as for the PBus cables. 8. Reattach the cable-inlet covers. 9. Fasten the cables with cable ties. Note: Proceed the routing of cables into UPS 3 and UPS 4, if applicable. 11

UPSs bayed together without Conduits Note: If the UPS system is going to be anchored to the floor, drilling holes for anchoring is recommended to take place at this stage. See Prepare for Floor-Anchoring (optional) on page 2. Note: See Install the interconnection plates (optional) on page 7 for instructions on how to assemble the enclosures with interconnection plates.. UPS 1 UPS 2 UPS 1 1. Remove the front panel and the top cover if not already done under Prepare for Parallel Communication Cables on page 5. 2. Loosen the two screws from the cable-inlet plates at the bottomxplate of UPS 1 and UPS 2, and remove the plates. 12

3. From UPS 1: Run the two PBus cables to the slots on the left side of the enclosure and down inside thexpanel. 4. From the lowest slot fish out the cables from the side panel, run the cables across and through the cable inlets of thextwo side panels. 5. From the bottom of UPS 2, run the PBus cables to the slots onxthe left side of the enclosure and up inside the panel. 6. Fish out the PBus cables and leave them unattached to the parallel box. 7. Run the ABus cable from the Maintenance Bypass Panel to the slots on the left side of the enclosure and up inside the panel the same way as for the PBus cables. 8. Reattach the cable-inlet cover plates. 9. Fasten the cables with cable ties. Note: Proceed the routing of cables into UPS 3 and UPS 4, if applicable. UPSs apart or bayed together with Conduits Note: If the UPS system is going to be anchored to the floor, drilling holes for anchoring is recommended to take place at this stage. See Prepare for Floor-Anchoring (optional) on page 2. Note: When enclosures are assembled with interconnection plates and bolted together, the PBus cables can be run inside the enclosures and then only the ABus cable has to be run in a conduit (if applicable). Note: See Install the interconnection plates (optional) on page 7 for instructions on how to assemble the enclosures with interconnection plates. 1.Remove the front panel and the top cover if not already done under Prepare for Parallel Communication Cables on page 5. 2.Remove the conduit plate at the back of the UPS cover and drill holes with center in the small pre-drilled holes. 2 cm (3/4 in) is recommendable for conduits. 13

UPS 2 UPS 1 To next UPS 3. Run the ABus and the PBus cables through the conduit holes into the inside of the top cover on UPS 1. Leave the cables on top of the UPS. 4. Attach conduits with 2 cm (3/4 in) fittings (not supplied). 5. Run conduits with PBus cables to UPS 2. Pull the cables through the top cover conduit plate and leave the cables on top of the UPS as shown. 6. Attach conduits to UPS 2 with 2 cm (3/4 in) fittings (not supplied). 7. Run the ABus cables (in conduits if applicable) to the Maintenance Bypass Panel (see Maintenance Bypass Panel (MBP) CAN I/O Board Installation sheet 990-2873). Note: Proceed the routing of cables into UPS 3 and UPS 4, if applicable. 14

Final Mechanical Assembly Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries Note: The leveling feet and the L-shaped floor anchoring brackets (reuse of transportation brackets) are used in some configurations instead of the optional U-shaped floor anchoring brackets described earlier in this manual. Level the enclosures with the leveling feet Note: Verify that the installation has been electrically wired before setting the leveling feet. Set the leveling feet to ensure that the UPS is completely horizontal when it is in its final operating position. Use the wrench shipped with the UPS to adjust all four leveling feet from the front to the back, and from the left to the right, until the pads make solid contact with the floor. Use a bubble level to check that the enclosure is horizontal. Caution: To avoid equipment damage, do not push or pull the UPS after the leveling feet have been lowered.. 15

Install battery-securing and floor-anchoring brackets Battery securing bracket L-shaped floor-anchoring bracket (reuse of transportation bracket) 1. Install the batteries by pushing them all the way into the enclosure. 2. If required, install the battery securing brackets to hold the batteries firmly in place. Note! Do not install the bracket the same way they were positioned when the enclosure arrived. Rotate the brackets 180º and reinstall. Note: Battery securing brackets are delivered with the UPS or XR Battery Enclosure and installed in front of the batteries. Extra battery securing brackets for additional batteries can be purchased. Refer to kit SUVTOPT003: APC Smart-UPS VT Battery Lock Kit for one Battery Module (two batteries). 3. Install the L-shaped floor-anchoring bracket (reuse of transportation brackets) by adding four M6 screws and nuts (provided) to the enclosure (only if the optional U-shaped floor anchoring brackets described in this manual have not been chosen). Note: If the floor has not been prepared for anchoring, see Prepare for Floor-Anchoring (optional) on page 2. 4. Drill floor holes. 5. Add a minimum of two M8 screws (not provided) to the anchoring bracket and tighten the screws to the floor. Reinstall the top cover and the front panel Note: See Remove the top cover on page 6 and Remove the front panel on page 6 and perform these procedures in reverse order. 16

Power Connections (Overview) 380/400/415 V input Mains input (provided by others) 3x400/320 V, 50 Hz L1, L2, L3, N, PE Maintenance Bypass Panel (MBP) Load UPS System Output 3x400/230 V L1, L2, L3, N, PE UPS A XR 1A UPS B XR 1B UPS C XR 1C 17

Breaker sizes 380/400/415 V Q3 in capacity systems. Rating in kva (380/400/415 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 40 kva 2 35 A 50 A 63 A 100 A 125 A 3 50 A 80 A 100 A 160 A 200 A 4 63 A 100 A 125 A 200 A 250 A Q4 in capacity systems. Rating in kva (380/400/415 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 40 kva 2 35 A 50 A 63 A 100 A 125 A 3 50 A 80 A 100 A 160 A 200 A 4 63 A 100 A 125 A 200 A 250 A Q3 in redundant systems (n+1). Rating in kva (380/400/415 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 40 kva 2 16 A 25 A 35 A 50 A 63 A 3 35 A 50 A 63 A 100 A 125 A 4 50 A 80 A 100 A 160 A 200 A Q4 in redundant systems (n+1). Rating in kva (380/400/415 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 40 kva 2 16 A 25 A 35 A 50 A 63 A 3 35 A 50 A 63 A 100 A 125 A 4 50 A 80 A 100 A 160 A 200 A Q1 and Q5 in capacity and redundant systems. Rating in kva (380/400/415 V) 10 kva 15 kva 20 kva 30 kva 40 kva Bypass overcurrent protection Q1 Bypass overcurrent protection Q5 16 A 25 A 35 A 50 A 63 A 16 A 25 A 35 A 50 A 63 A 18

Q2 in capacity and redundant systems. Rating in kva (380/400/415 V) 10 kva 15 kva 20 kva 30 kva 40 kva Load side breaker Q2 (output) 16 A 25 A 35 A 50 A 63 A Note: Note: If fuses are used, they must have a gl/gg-characteristic. 200/208/220 V input Q3 Q5B Q4 Q1B UPS B Q2B XR Battery Enclosure (optional) Q5A Q1A UPS A Q2A XR Battery Enclosure (optional) Note: Note: Fuses must be Class J, i.e. Bussmann LPJ or equivalent. 19

Breaker sizes 200/208/220 V Q3 in capacity systems. Q4 in capacity systems. Q3 in redundant systems (n+1). Q4 in redundant systems (n+1). Rating in kva (200/208/220 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 2 70 A 125 A 150 A 225 A 3 125 A 175 A 225 A 350 A 4 150 A 225 A 300 A 450 A Rating in kva (200/208/220 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 2 70 A 125 A 150 A 225 A 3 125 A 175 A 225 A 350 A 4 150 A 225 A 300 A 450 A Rating in kva (200/208/220 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 2 35 A 60 A 70 A 125 A 3 70 A 125 A 150 A 225 A 4 125 A 175 A 225 A 350 A Rating in kva (200/208/220 V) Units in parallel 10 kva 15 kva 20 kva 30 kva 2 35 A 60 A 70 A 125 A 3 70 A 125 A 150 A 225 A 4 125 A 175 A 225 A 350 A Q1 and Q5 in capacity and redundant systems. Rating in kva (200/208/220 V) 10 kva 15 kva 20 kva 30 kva Bypass overcurrent protection Q1 35 A 60 A 70 A 125 A Bypass overcurrent protection Q5 35 A 60 A 70 A 125 A Q2 in capacity and redundant systems. Rating in kva (200/208/220 V) 10 kva 15 kva 20 kva 30 kva Load side breaker Q2 (output) 35 A 60 A 70 A 125 A 20

Contact Information For local, country-specific centers: go to www.apc.com/support/contact. 21

APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests. www.apc.com (Corporate Headquarters) Connect to localized APC Web sites for specific countries, each of which provides customer support information. www.apc.com/support/ Global support searching APC Knowledge Base and using e-support. Contact the APC Customer Support Center by telephone or e-mail. Local, country-specific centers: go to www.apc.com/support/contact for contact information. For information on how to obtain local customer support, contact the APC representative or other distributors from whom you purchased your APC product. 2009 APC by Schneider Electric. APC, the APC logo, and TRADEMARK NAMES are owned by Schneider Electric Industries S.A.S., American Power Conversion Corporation, or their affiliated companies. All other trademarks are property of their respective owners. 990-3045E-001 *990-3045E-001* 12/2009