103785-MEC-CW-E-2003 Site Team Leader Holds a B. Sc. in Mechanical Power Engineering and has over 10 years hands-on experience working in construction and piping. PERSONAL DATA Nationality : Egyptian Birth Date : 06/04/1978 Gender : Male Marital Status : Married Residence : Currently Algeria EDUCATION : B. Sc. in Mechanical Power Engineering, Helwan University, 2003 LANGUAGES Arabic : Native Language English : Very Good COMPUTER SKILLS : Windows, MS Office, Internet : MS Project TRAINING COURSES AND CERTIFICATIONS : Training course in the field of hydraulics at Yasser Filmy Hydraulic. : Training course in the field of mechanical maintenance at Egypt Air. : Training course in the field of mechanical maintenance at Ceramic Industrial Co. : Safety trainings: INASP (international association of safety professional). HSE Leadership. CONFINED SPACE ENTRY. FIRE FIGHTING. FIRST AID. PERMIT TO WORK. www.egyptrol.com Page 1 of 5 Updated: Feb. 2016
CHRONOLOGICAL EXPERIENCE RECORD Dates : From Sep. 2015 till now Employer : Orascom Construction Industries Algeria (OCIA) Project : Ain Elkbira Cement Project, Algeria (Setif - Ain Elkbira) Job title : Site Team Leader Job Description : Devise plans for each phase of the project. Identify and procures the resources needed. Recruit engineering staff. Perform quality control checks, ensuring the safety and effectiveness or reliability of the system. Evaluate the costs within a specific time frame. Supervise the installation of the equipment or the manufacturing process of a product. Negotiate with team members to generate ideas and clarify specifications. Determine the goals of the company. Delegate tasks as necessary to engineering team. Resolve disputes between team members. Dates : From Oct. 2013 till Jul. 2015 Employer : Orascom Construction Industries Algeria (OCIA) Project : ALGIERS REFINERY (REHABITATION & ADABTATION PROJECT), Algeria (Alger) Job title : Site Team Leader Job Description : Responsible of all Installation underground Piping at the Brown field area of Algiers Refinery Project (Manufacturing, Erecting, Testing, Commissioning of Piping lines for all systems). Controlling that any activities before performance has an approved shop drawing, method of statement, quality control procedure, quantity survey and planning. Using International standards and Regulations for Piping work (API, ASME, DIN). Preparation of daily reports. Participate in reviewing the relevant As-Built drawings. Dates : From Jan. 2013 till Oct. 2013 Employer : Energya (KSA) Project : Haramain High speed Railway, KAEC STATION, SAABER, KSA Job title : Construction Manager Job Description : Responsible of all activities for steel structure installation at Haramain High speed Railway Project. Control that all Contractors personnel are using the latest revision for approved shop drawings, method statement, quality control procedure, quantity survey and planning. Participate in final inspection of work and preparation of Punch List. Closely monitor site activities to ensure quality of work is in compliance with contract requirements, good practice, approved shop drawings and only approved materials are used. www.egyptrol.com Page 2 of 5 Updated: Feb. 2016
Dates : From Oct. 2009 till Jan. 2013 Employer : Orascom Construction Industries (OCI) Project : Sorfert Fertilizer Complex, Arzew Industrial Zone, Oran, Algeria: Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day Train 2 for Ammonia 2200 Ton/Day Job Description : Manufacturing, Erecting,Testing, Commissioning of Piping lines for services and process systems (natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor, Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment Systems, Hydraulic systems, F.etc.). Installation of Pipe Supports ({pipe shoe, U bolts and other special supports). Installation and connecting of Mechanical Equipments and components (valves, pumps, heat exchangers, filters, gages...etc.). Applied the below Pipes Welding methods (SMAW, GMAW, GTAW). Using International standards and Regulations for Mechanical and Piping work (API, ASME, DIN). Dates : From Mar. 2009 till Oct. 2009 Project : ISCC EL-KUREIMAT Power Plant, Egypt Job Description : Ensuring Construction activities are carried out in accordance with the specification codes, site procedures and specification for client. Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping lines (Carbon steel, st st., High temp., low temp) using P&ID S, Isometrics and plans). Installation for Steel structures (Fabrication and Erection) (Pipe Racks - Access platforms - Shelters - Pipe supports). Review construction progress with the approved work schedule. Manage and fallow up with client solutions of the technical problems. Working as a Building Engineer (HVAC, Plumbing & Fire Fighting works and Electrical Equipment s). Dates : From Dec. 2008 till Mar. 2009 Project : Construction of main branch factory, 10th from Ramadan Industrial Zone, Cairo, Egypt Job Description : Leading construction and service team (Installation, connecting, testing, commissioning and operating). Installation of the Steel structures (Fabrication and Erection) (pipe shoes, U bolts and other special supports). Using international standards and regulations for mechanical activities. Review finial documentation. www.egyptrol.com Page 3 of 5 Updated: Feb. 2016
Dates : From Jun. 2008 till Dec. 2008 Project : Construction of Cables Factory, Rabigh Industrial Zone, Jeddah (KSA) Job title : Senior Mechanical Site Manager Job Description : Monitoring and control the industrial building construction activities. Preparation and monitoring of the electromechanical works. Prepare of the working procedures in the sites. Working as a Building Engineer (HVAC, Plumbing & Fire Fighting works and Electrical Equipment s). Dates : From Sep. 2007 till Jun. 2008 Project : Construction of Energya Factory, Rabigh Industrial Zone, Jeddah (KSA) Job title : Senior Mechanical Site Engineer Job Description : Erection of the Piping lines (above/under) ground. Installation of the Steel structures (Fabrication and Erection) (Pipe Racks - Access platforms - Shelters - Pipe supports). Erection of All Site Equipment s. Follow of the reinstatement activities performed after testing and commissioning. Worked as Electro- Mechanical Engineer with MEP groups at site (HVAC (Chilled Water & Other A/c applications), Plumbing & Fire Fighting works). Dates : From Apr. 2007 till Sep. 2007 Employer : SEA GULL for General Contracting & Supply Project : Tama Thermal Power Plant (GE Frame 9E GT 125MW Island and Balance of plant), Tama Industrial Zone (GHANA) Job Description : Installation for all Site Equipment s (Vessel - towers - Air coolers - stack - Oil heater - Pumps). Installation, connecting, testing, commissioning and operating for mechanical Equipment s and components (pumps, purifiers, boilers, gen. sets, heat exchangers, fuel modules, sewage treatment planets, filters, valves,...etc.). Optimize operation in accordance with the production systems and work. The ability to deal and convince the client. Dates : From May 2006 till Apr. 2007 Employer : SEA GULL for General Contracting & Supply Project : Cairo North II Power Plant (Two Boilers 250MW) Job Description : Coordinate Boilers erections (two heat recovery steam boiler) (Combined cycle). Managing constructions activities in field erection (Steel structure, Stacks, Air filter, Piping, Mechanical alignment, Pumps, Eectromechanically, Boiler panels, and Equipment s). Preparation of weekly progress report to record usage of material, www.egyptrol.com Page 4 of 5 Updated: Feb. 2016
equipment s, construction activities, carried out manpower, etc. Dates : From Dec. 2005 till Apr. 2006 Employer : Vibrex for Tunnel and foundation Project : Construction of waste water tunnels Job Description : Able to handle the operations of mechanical engineering. Leading workshops fabrication works. Installing and maintaining variable kinds of machines and equipments. Leading construction and service teams. Review finial documentation. Field of experience : Generally responsible for implementations and monitoring of all mechanical and Electro-Mechanical related works at site as per approved drawings, method statements and safety rules. Estimate, prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all Mechanical and related works prior to execution. Plan and analyse all possible construction methodologies and recommends the best options of performance to the Site Manager for approval prior to execution at site. Interpret construction drawings and study the contract documents and applicable standards or specifications prior to execution of any jobs. Manage directly and provide engineering and technical supports to all the Mechanical and Electro- Mechanical work groups at site. Plan the execution of all Mechanical related works and co-ordinates the works with Electrical and civil groups. Assign targets for accomplishments and ensure targets are met on daily basis for all Mechanical groups at site. Submit site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required. Support the MEP Manager in accomplishing the Millstone and Targets for the Mechanical and electrical groups. Managerial staff to ensure project completion in an efficient manner. Ensure that all the works done are in accordance with the approved construction drawings,contract documents, project specifications, and all applicable standards wherever local, national or international standards. Ensure that all site works are done according to all applicable quality standards. Directly responsible for the safety of all Mechanical groups personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards. Prepare cost estimates and budgeting for projects. Experience of Industry codes and standards. www.egyptrol.com Page 5 of 5 Updated: Feb. 2016