Transforming Resources into Mines

Similar documents
Community Presentation

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Seizing Opportunity and Building Value

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

Quality, Diverse Group of Mining Assets. February 2018

Alan D. Hatfield PE Braemar Wavespec USA Houston, Texas. Yukon Energy Corporation LNG Workshop

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

Corporate Presentation London December, 2011

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Azure Minerals Ltd ASX Code:

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

Morrison Copper/Gold/Moly (Silver) Project

Creating Value Through Operational Excellence

Low-cost, rich, DRC copper

Confidence in Carrapateena project grows

NGEX ANNOUNCES POSITIVE PFS RESULTS FOR JOSEMARÍA WITH A US$2.0 BILLION AFTER TAX NPV AND 19% IRR

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 1 May 2018

AVINO SILVER & GOLD MINES LTD.

Our Strategy for Climate Action

Sierra Metals Exploration Update Call

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

MCEWEN MINING FILES FENIX PRELIMINARY ECONOMIC ASSESSMENT EXTENDS EL GALLO MINE LIFE BY 12 YEARS

Patrick Soares President & CEO Canada s Next Base Metal Mining Camp

TEPAL PROJECT MEXICO Corporate update

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS

Minerals to Market. September 26 th 2011

EXCO S PROJECT PIPELINE

Energy : Expanding Clean Energy and Energy Efficiency Manitoba Helping the World

For personal use only

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick

Independent Power Production Policy

5 th Asian Bauxite & Alumina Conference

Infrastructure. Services

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017

Galore Creek Project Update Minerals North Conference April 2006

PEGMONT PEA HIGHLIGHTS

HELLENIC COPPER MINES LTD. History of the Company

A Preliminary Economic Assessment of the Hackett River Project features the following highlights:

Infrastructure to Sustain Canada s North

Progress Update on the Lower Footwall Zone

Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade

Frieda River Copper-Gold Project feasibility study completed

Evaluating Renewable Energy Options for Global Mining Sites. Competence Center for Mining & Mineral Resources. Scott Fraser Director Power Projects

Financial results for the 6 months to 30 June 2008

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1

Appendix 4.4 Industrial Energy and Peak Demand Forecast

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. June 1, May 2013

DEVELOPING CANADA S PREMIER COPPER-GOLD MINE

Presentation to the FPT Working Group on Adaptation and Climate Resilience

FOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR

Q PRODUCTION REPORT

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine

SILVERCORP REPORTS Q2 RESULTS: NET INCOME OF $11.1 MILLION, $0.07 PER SHARE

Niblack Project Poised For Development

DENISON ANNOUNCES DECISION TO ADVANCE WHEELER RIVER PROJECT FOLLOWING POSITIVE PFS RESULTS

and future events could differ materially from those anticipated in such statements. Such information contained

Hard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX

December Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Sierra Metals Updates Mineral Resource Estimate for Cusi Mine, Mexico

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico

Renewables and Mining Summit DUNCAN STEVENS AND MARTIN SPROTT Evaluating Renewables for Gold Fields Global Operations 23 June 2014

INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

Cu-eq references throughout this press release.

Mineral Development Agreement. Canada-British Columbia

Australia s leading explorer in Mexico

NEWS RELEASE. Highlights of the Copperwood Project Feasibility Study

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

Hydrogen Energy Supply Chain based on Victorian brown coal linked with CCS

NEWS RELEASE Trading Symbol: TSX: SVM

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

Q PRODUCTION REPORT

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

ENERGY AND CARBON CHALLENGES FOR REMOTE CANADIAN MINES

Renewable Energy Feasibility Study for Ione Band of Miwok Indians

SILVERCORP NET INCOME $43.7 MILLION, $0.26 PER SHARE, FOR FISCAL 2017

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

Freegold Ventures Announces Positive Results from Independent Preliminary Economic Assessment for the Golden Summit Project

Photo Courtesy of Jason Pineau Photography MINING SERVICES

Highlights of the Feasibility Study (all amounts are stated in Canadian dollars):

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT

For personal use only

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

For personal use only

African Gas Infrastructure: Project Development and Financing

OZ MINERALS SECOND QUARTER REPORT Andrew Michelmore Managing Director & CEO. 22 July 2008

ASX Announcement FURTHER DRILLING WARRANTED AT SIMUKU TO PROGRESS TO FEASIBILITY COMPLETION OF CONCEPTUAL MINING STUDY

We are building NEW AITIK. New Aitik. 36 million tonnes

THE SISSON PARTNERSHIP

Optimisation Study Yanfolila Gold Project Mali

Modernization of the Power System

Transcription:

Transforming Resources into Mines YEC LNG Workshop January 18th, 2012 JANUARY 2012

CASINO PROJECT TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 2

CASINO OVERVIEW SIZE LOCATION Reserves: 1.1 billion tonnes Additional inferred resource: 1.7 billion tonnes 120,000 mtpd milling rate Politically stable Yukon, Canada Approximately 380 km NW of Whitehorse Settled Land Claims with First Nations ECONOMICS $1.0 billion NPV at long term prices Very low cash costs TEAM Experienced management Excellent track record TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 3

CASINO LOCATION 380 km northwest of Whitehorse, Yukon 560 km from year-round port at Skagway, Alaska Low political risk First Nations settled claims Semi-arid environment, favourable topography One-window environmental assessment process 3 4 IN THE PAST MINES YEARS OPENED TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 4

CASINO PRODUCTION LONG MINE LIFE 23+ Years EXPECTED INITAL PRODUCTION 435 k ozs GOLD 234 M lbs COPPER 13 M lbs MOLYBDENUM 1.6 M ozs SILVER TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 5

After-Tax Pre- Tax PRE-FEASIBILITY STUDY - APRIL 2011 Note: See note 3 in appendix CAPITAL COSTS ECONOMICS MINE CAPITAL (C$ M) 1,750 POWER PLANT (C$ M) 260 ROAD, PORT, ETC. (C$ M) 120 TOTAL CAPEX (C$ M) 2,130 SEPT 2011 LONG TERM SPOT COPPER (US$/lb) 3.85 2.50 GOLD (US$/oz) 1,761 1,100 MOLYBDENUM (US$/lb) 14.60 14.00 SILVER (US$/oz) 37.60 17.00 FOREIGN EXCHANGE (US$:C$) 1.00 0.90 NPV @ 5% (C$ M) 5,800 2,570 NPV @ 8% (C$ M) 3,910 1,570 IRR (100% equity) (%) 33.0 19.6 NPV @ 5% (C$ M) 3,964 1,700 NPV @ 8% (C$ M) 2,610 963 IRR (100% equity) (%) 27.4 16.2 CASH FLOW (Y1-Y4) (C$ M/y) 835 567 CASH FLOW ( LOM ) (C$ M/y) 422 250 PAYBACK (y) 2.1 3.3 Cu CASH COST (net of credits) (US$/lb) 0.86 0.06 TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 6

CASINO TAX AND ROYALTY LOM Contribution Avg. Annual Contribution Royalty ($M) 320.2 13.9 Property Tax ($M) 2.6 0.1 Taxes on Income ($M) 1,820.0 79.1 Total Taxes & Royalty ($M) 2,142.8 93.1 Note above values exclude personnel income taxes paid by employees TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 7

ELECTRICAL POWER GENERATION & FUEL SUPPLY CASINO POWER PLANT The 150 MW Casino power island consists of: Two gas turbine driven generators with heat recovery boilers supplying steam to a steam driven generator for a combined output of 130 MW. This combined cycle configuration results in efficient, low emissions power generation. Internal combustion engine driven generators operating in simple cycle to produce up to 18.6 MW of black start and standby power. These units have dual fuel capability and operate on natural gas or diesel fuel. LNG storage facility, LNG gasification equipment to convert LNG liquid fuel to essentially natural gas to fuel the power generators. Low grade heat recovery (separate from heat recovery for power generation) for use in LNG gasification, process and space heating TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 8

Casino Project Power Needs & Characteristics: Typical running load 120 MW Comparatively steady load, ideal for base load generation system Plant operates 24/7, 365 days per year Largest drives are: 1 @ 28 MW, 2 @ 22MW Project is remote, off-grid Nature and size of loads requires harmonic filters and PF compensation installation Electrical Power represents about 30 % of cost to process ore. Reliable, cost effective power & fuel supply is key to project success TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 9

FUEL SUPPLY FOR POWER GENERATION The 2011 Pre-Feasibility Study assumes that LNG from the, soon to be constructed, LNG export facility(s) in Kitimat, BC would be transported by a marine carrier to Skagway, Alaska and transferred to tanker trucks for delivery to the Casino Project LNG supply chain continues to be evaluated for the project, alternative supply chains being investigated, include: Direct trucking of LNG from Kitimat to the project site thereby eliminating the marine carrier portion of the supply chain and transshipment across the US-Canadian border. Natural gas or LNG from Eagle Plains, Yukon. Construction of a natural gas pre-treatment facility and LNG liquefaction plant in Fort Nelson, BC and trucking the LNG to Casino. Construction of a 130 Km, eight inch diameter natural gas pipeline to connect to the proposed Alaska-Canada Pipeline TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 10

Base Load, Power Generation Technologies Evaluated by WC&G: Coal fired power plant (CFB) Natural Gas & LNG fuelled power plant Diesel fuelled internal combustion engine & gas turbine driven generators Simple cycle & combined cycle configurations Alternative technologies evaluated but deemed unacceptable for base load purposes: Solar Wind Power Biomass Geothermal TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 11

Conceptual 150 MW CCGT Power Island TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 12

LNG STORAGE FACILITY IN MOSJØEN, NORWAY TSX: WRN / NYSE Amex: WRN Appendix 13

LNG Opportunities Work cooperatively with YEC and others to develop a reliable, cost effective energy for Casino and the Region. Utilize LNG fuelled tractors to haul concentrates and supplies to Casino. Potential to fuel mine haul trucks with LNG in lieu of diesel. LNG has high potential to displace diesel for transportation purposes in the region and as substitute for heating oil resulting in substantial cost savings for Yukon residents. TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 14

PLAN TIMELINE PFS UP-DATED 4/2011 INITIATE FEASIBILITY STUDY Completed COMPLETE FEASIBILITY STUDY Q1 2013 SUBMIT ENVIRONMENTAL ASSESSMENT Q1 2013 RECEIVE INITIAL PERMITS 2015 SECURE FINANCING 2015 INITIATE CONSTRUCTION 2015 PRODUCTION GOLD HEAP LEACH 2017 PRODUCTION MILLING OPERATION 2019 TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 15

CASINO DESIGH PHILOSOPHY WESTERN COPPER AND GOLD DESIGN PHILOSOPHY Fully committed to using best practices in the design for closure & reclamation, beginning in pre-feasibility stage and carried throughout the detail design, construction and operating phases of the project. Best practice design solutions applied to each facility design. Project embraces sound environmental design and construction principles and strict adherence to environmental standards and regulations. Combined cycle gas turbine technology with additional waste heat recovery for space and process heating represents the most attractive energy solution for the Casino Project. Project financial performance includes a provision of $100 million fund against future reclamation costs. TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 16

web www.westerncopperandgold.com e-mail info@westerncopperandgold.com phone 604.684.9497