Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Similar documents
Guideline Asset Management

ONRSR Guideline. Asset Management

WORK HEALTH AND SAFETY AUDIT STANDARD

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

WHS Change Management

Health and Safety Management Standards

Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations

Railway Interface Planning Scheme Rules (RIPS Rules)

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme

WORK IN THE VICINITY OF UNDERGROUND ASSETS

Guideline Identifying rail safety work under the RSNL

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

MASS MANAGEMENT ACCREDITATION STANDARDS

Work Health and Safety Management Systems and Auditing Guidelines

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

PS 02 PLANT AND EQUIPMENT

RISQS Audit Protocol. Safe Work planning. Document no.: RISQS-AP-003. Safe Work Planning

Reporting High Risk Defects

Protection Officer Training and Perpetual Accreditation QUEENSLAND RAIL OFFICIAL. Approved for public release

Reporting High Risk Defects

WHS Management Plans

Asset Management Plan. Tool of Trade Fleet Management Plan

Table of Contents. Project Agreement Schedule 14

Verify Category A Audit Content

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY

BAFE SP203-1 Assessment Check List

The National Heavy Vehicle Accreditation Scheme (NHVAS)

Work Health & Safety Procedure

Workplace Safety and Health Guidelines Contractor Management

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

National self-insurer OHS management system audit tool. Version 3

NATIONAL HEAVY VEHICLE ACCREDITATION SCHEME BASIC FATIGUE MANAGEMENT AUDIT MATRIX

ESTABLISHMENT OF A QUALITY SYSTEM

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015

(Non-legislative acts) REGULATIONS

Health and Safety Policy Statement

Implement Traffic Control Plans - RIISS Practical Assessment Tools. Name: Trainer / Assessor Name: Date:

ONRSR Guideline. Road/Rail Vehicle Management & Operations

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Work Based Training Policy and Procedure

Australian Network Rules and Procedures Development

Impact Assessment for Changes to Railway Group Standards

Assessment Strategy. for. NVQ Qualifications. in Rail Services. based on. GoSkills. National Occupational Standards

The National Heavy Vehicle Accreditation Scheme (NHVAS)

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

QSS 0 Products and Services without Bespoke Contracts.

ALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Health and Safety Management System Manual

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

Asset Management Policy

Occupational Health and Safety Management Manual v2.2

Hazardous. Scheme. the power behind your business

PICS Health and Safety Policy and Arrangements

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

ELECTROMAGNETIC ENERGY

SERVICE LEVEL PROCEDURE

NATIONAL HEAVY VEHICLE ACCREDITATION SCHEME ADVANCED FATIGUE MANAGEMENT AUDIT MATRIX

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

CITY OF DARWIN CRUISES Environmental Management System

Electrical Safety Management Plan (ESMP)

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

Measurement Assurance and Certification Scotland

POSITION DESCRIPTION

Centre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock

NSPCC Job Description. To provide high quality facilities management to a designated Division / Region of the NSPCC.

Ensure your own actions reduce risks to health and safety

Health & Safety Policy & Management Systems. Guidance Note 13

OHS Management of Contractors in Capital Works and Maintenance

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

QP.00 Quality Procedure Manual Scope and Purpose

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

POSITION DESCRIPTION 1. POSITION DETAILS. Parking & Fleet Services. Management Level: 2. ORGANISATIONAL RELATIONSHIPS. Position Title of Supervisor:

Procedure 14 Internal Audits

Health, Safety, Security and Environment

WHS Manual Insert Business Name & Logo

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

Plan assessment activities and processes

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd.

Guidance Note: Corporate Governance - Audit Committee. January Ce document est aussi disponible en français.

Quality, Health Safety & Environment Code: 2013

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Industry Minimum Requirements (IMR Condensed - 5 Star Qualified Organisations).

SA Power Networks Work Health and Safety Directive

Procedure: Work health and safety responsibilities

Animal Products Notice

SENIOR PROJECT MANAGER

Supplier Excellence General Requirements

Air Monitoring Directive Chapter 5: Quality System

Australian Safe T Training

CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0

Document 2007 Rev 0 December 2005 Page 1 of 8

Transcription:

1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles 3 April 2012 Reviewed as part of continuous improvement process. Renaming of appointments & Forms 4 February 2013 Reviewed in line with legislative changes and Company responsibilities 5 July 2014 Reviewed by Select July 2014 as part of annual review of documents 6 November 2014 Reviewed to incorporate additional information / processes 7 December 2015 Reviewed against criteria contained in ONRSR Guideline 8 January 2016 Revised form references and processes included

2/16 1. Introduction Asset management is defined as a systematic process of effectively maintaining, upgrading and operating assets; combining engineering principles with sound business practice and economic rationale; and providing the tools to facilitate a more organised and flexible approach to making decisions necessary to achieve the company s expectations. Rolling stock asset management means managing the rolling stock through all phases of its life cycle. This is to satisfy the requirements of Laing O Rourke and other users at the lowest possible cost over a long period of time. The asset lifecycle covers: Design not linked to Laing O Rourke s accreditation criteria. Undertaken by others. Construction and implementation not linked to Laing O Rourke s accreditation criteria. Undertaken by others. E-P-8-1917A Commissioning of Rolling Stock E-P-8-1917B Maintenance and Repair of rolling Stock E-P-8-1917C Modification of Rolling Stock E-P-8-1917I Travelling of Track machines E-P-8-1917D Decommissioning of Rolling Stock

3/16 The main streams in asset management are: The identification of the need for the asset, in light of company requirements The development of an asset management plan The accountability of Select and line managers for all asset safety requirements The provision of the asset, including its ongoing maintenance and repair to suit continuing needs it is necessary to define the serviceability standards The operation of the asset it is necessary to define the operational standards The disposal of the asset when the need no longer exists or it is no longer appropriate for the asset to be retained. Records This Procedure links to the stand alone Procedures i.e. Procurement of Rolling Stock, Commissioning of Rolling Stock etc. relating to the separate asset lifecycle stages which are contained in other Engineering and Operational Systems Procedures. Laing O Rourke, as an accredited rolling stock operator, is required in terms of its accreditation and as part of its rail safety management system, to have an asset management programme in place for the rolling stock operations they undertake. In April 2015 Laing O Rourke conducted a gap analysis of this Procedure against the criteria contained in the ONRSR Guideline and made a number of minor adjustments to align both documents. 2. Purpose The purpose of this Procedure is to advise Laing O Rourke personnel involved in the management of rolling stock of the processes to be applied during the period the rolling stock is owned or leased by Laing O Rourke. 3. Scope This Procedure applies to all items of rolling stock owned or leased by Laing O Rourke for the railway operations they will be engaged in across Australia. While the asset management process will be generic across the country, there may be specific requirements set by the relevant State and Territory Rail and/or Work Health and Safety Regulators. There may also be specific requirements set by the respective Rail Infrastructure Manager that could impact on the generic process developed. Should other legislative criteria or higher standards apply, that requirement will take preference over any generic issue contained in this Procedure and will be contained in the respective Project / Select Rail Safety Management Plan. 4. Definitions Asset management system The approach used by an organisation to ensure that physical assets remain safe, fit-for-purpose, and commercially viable from design and construction, throughout its life-cycle, to decommissioning.

4/16 Rail Infrastructure Manager (RIM) Railway Operations Rolling Stock Rolling Stock Operator The person who has effective management and control of the rail infrastructure of a railway (a) The construction of a railway, railway tracks and associated track structures or rolling stock (d) The operation or movement, or causing the operation or movement by any means, of rolling stock on a railway (including for the purposes of construction or restoration of rail infrastructure) (e) The movement or causing the movement, of rolling stock for the purposes of operating a railway service A vehicle that operates on or uses a railway and includes a locomotive, carriage, rail car, rail motor, light rail vehicle, train, tram, light inspection vehicle, selfpropelled infrastructure maintenance vehicle, trolley, wagon or monorail vehicle, but does not include a vehicle designed to operate both on and off a railway when the vehicle is not operating on a railway. A person who has effective management and control of the operation or movement of rolling stock on rail infrastructure and in the case of Laing O Rourke has an accreditation in terms of the relevant Rail Safety Act as a rolling stock operator. 5. Responsibilities Laing O Rourke will delegate authorities to relevant personnel responsible for the management of rolling stock. These responsibilities and authorities will be contained in the position description of the relevant person. 5.1 Rail Plant Manager The Rail Plant Manager will exercise engineering authority for the rolling stock standards applicable to the respective railway operations and implement configuration management for these standards. (This will be achieved through a third party if the Rail Plant Manager isn t suitably qualified to carry out the engineering authority). The processes developed by the Rail Plant Manager for the management of rolling stock will be aligned to the criteria set out in the relevant standards and in accordance with the Rail Infrastructure Manager s criteria. It will meet the legislative criteria assigned to Laing O Rourke through the respective Notice of Accreditation as well any conditions imposed by any other external party. All line managers who are responsible for rolling stock in the railway operations they undertake will liaise with the supplier, Select personnel or their agents assigned to the respective item of rolling stock. This will ensure SFAIRP that the item of rolling stock is maintained to the defined standards at all times it is provided to the railway operations. The Rail Plant Manager will authorise key personnel at respective rolling stock depot locations to arrange for the retraction of the registration process as required in accordance with the rail infrastructure manager s rolling stock operating conditions manual, where items of rolling stock are to be decommissioned or disposed of. 5.1.1 Designers, Manufacturers, Suppliers Designers, manufacturers, and suppliers must ensure that rolling stock assets are safe for their intended purpose.

5/16 They must also provide adequate information as to their safe use to help Laing O Rourke maintain safety, including: details about the use for which the asset was designed, commissioned, manufactured, or supplied, the results of any testing or examination of the asset; and any conditions necessary to ensure, SFAIRP, that the asset is safe if used as intended. A person who decommissions rail infrastructure or rolling stock must ensure, SFAIRP, that the decommissioning is carried out safely and that appropriate testing and examination has been carried out to comply with the duty Various asset or systems life-cycle models have been published which may provide guidance for this purpose, such as the diagram below, which is in accordance with ISO/IEC 15288.

6/16 6. Flowchart overview Element 19 General Engineering & Operational Systems Asset Management Flowchart Documentation Process Responsibility Need for item of rolling stock identified Analysis by Project Leader and Rail Plant Manager ManagerManager Project Leader RIM Rolling Stock Standards Review standards relevant to the RIM Standards determined Rail Plant Manager Design standards provided to supplier / manufacturer Rail Plant Manager E-P-8-1916A Procurement of rolling stock Rail Plant Manager E-P-8-1917A Commissioning of rolling stock Rail Plant Manager E-P-8-1917B Repair and maintenance of rolling stock Rail Plant Manager E-P-8-1917C Modification of rolling stock Rail Plant Manager E-P-8-1917I Operation of rolling stock Project Leader E-P-8-1917D Decommissioning of rolling stock Rail Plant Manager Disposal of rolling stock Rail Plant Manager

7/16 7. Process The procurement and management of rolling stock must be managed in a formal process from the time an item of rolling stock or plant is identified as being required through to the disposal itself. (Refer to E-P-8-1916A Procurement of Rolling Stock and E-P-8-1917D Decommissioning of Rolling Stock.) There is a requirement throughout the period in which an item of rolling stock is owned or leased by Laing O Rourke, for the item to be monitored, repaired, and maintained so the item meets the safety standards applicable to the item of rolling stock (see E-P-8-1917B Maintenance and Repair of rolling Stock). This includes periods when the item is being operated at worksites. Construction, operation, maintenance and improvement work on Laing O Rourke s rolling stock is to be performed by authorised and competent personnel in accordance with approved design, inspection and testing, repair and renewal procedures. Contained within the Rail Safety Management System are supporting documents that define the criteria to be applied during the: E-P-8-1916A Procurement of Rolling Stock E-P-8-1917A Commissioning of Rolling Stock E-P-8-1917B Maintenance and Repair of rolling Stock E-P-8-1917C Modification of Rolling Stock E-P-8-1917I Travelling of Track machines (operation) E-P-8-1917D Decommissioning of Rolling Stock The following are the systems to be applied to the rolling stock owned or leased by Laing O Rourke to ensure, SFAIRP, that the assets are managed in a coordinated manner. All processes associated with the management of rolling stock must be analysed using the Laing O Rourke risk management process (E-P-8-1914 Risk Management). 7.1 Concept The concept stage is managed through the E-P-8-1916A Procurement of Rolling Stock As a minimum, the following will be considered: Completion of a feasibility study which needs to include: A determination of the requirements for any new and/or modified assets and consult on them with relevant stakeholders manage the risks associated with implementing such changes, in line with the SMS and the change management process manage the risks associated with asset procurement and contract management Approval from the relevant / applicable Project / Operations Manager and where necessary the Laing O Rourke Board Capital/Asset Expenditure (CAPEX) approval by way of E-P-8-0533 Fixed Assets Purchase transfer and disposal (CAPEX) Approval of suitable supplier/suppliers Proposal specification

8/16 7.2 Design Design is managed in accordance with the E-P-8-1917F Design Management and Certification of Rolling Stock 7.3 Commissioning Prior to the use of new or significantly altered plant, commissioning must be completed appropriate to the intended use, standards and alterations made. For new plant this will be defined in the Inspection and Test Plan as defined by the Rail Plant Manager. For existing plant that has been significantly altered, this will be defined by the Rail Plant Manager. The commissioning process is completed by the relevant Select Branch Depot representative under the guidance of the Rail Plant Manager as defined in E-P-8-1917A. 7.4 Maintenance, Servicing and Repairs Maintenance, servicing and repairs of plant can present additional risks to personnel. For example, personnel may be required to: Work on remote-controlled plant i.e. PEM / LEMS Test the operation of guards, remove guards or render guards ineffective Force control device inputs or outputs Perform adjustments or measurements in proximity to hazards (moving parts, pressure, and electricity). All plant is to be maintained, serviced and cleaned in line with the manufacturer s specifications, or, in the absence of such specifications, in accordance with the inspection and testing requirement. The processes developed by Laing O Rourke have incorporated the requirements set out in the RISSB rolling stock standards as well as those of other network owners and operators. Where maintenance is performed in-house, the Select Depot Manager is responsible for ensuring the plant is maintained. They must ensure that in-house maintenance is compliant with the Maintenance Plan as specified for the respective item and any relevant plant registration constraints/instructions. Maintenance must only be performed by competent Select personnel or their authorised agents. Personnel are deemed competent if they have met the criteria under the respective units of competence determined by the Australian Qualification Framework. Plant is to be isolated before maintenance, service or cleaning commences. Where plant is isolated and any total or partial shutdown results, this must be managed to prevent hazardous situations being created. Refer Primary Standard 41 Tagging, Testing & Lockout Where plant cannot be isolated, alternative means of preventing accidental operation are to be implemented and work is to be conducted under controlled procedures such as a permit to work system. This must be clearly defined in the relevant SWMS. Plant-specific controls relate to the risks arising from the plant or the interaction between the plant and the environment in which it is located. They may be integrated with or form part of other risk management tools. The specific controls for maintenance are set out in:

9/16 The manufacturers and designers documents, including handbooks, specifications, manuals and guidance material for operation and maintenance assets are operated and maintained in accordance with the relevant manuals; the condition of the assets is monitored; equipment needed to test or inspect assets is appropriately controlled, calibrated, and maintained; any risks associated with operating and maintaining the assets are being managed in accordance with Laing O Rourke s SMS, Asset Management strategy, risk management processes; and all workplace health and safety (WHS) laws; spare parts are available for maintenance, especially for the safety critical assets. This is achieved by determining spare part needs for the assets based on the asset criticality. Asset maintenance processes applied by Laing O Rourke or their agents must: address competency, capacity, and resource requirements; provide for information management and record keeping needs; deliver detailed plans that have been established through a risk-based process; and ensure calibration of the tools and equipment that will be used for maintenance Planning of the maintenance and operational needs should be documented and controlled in a computer maintenance management system (MEX) and discussed at regular meetings with the operational people. The process Laing O Rourke has adopted ensures that: maintenance is delivered to schedule; work instructions are available for all safety critical activities; all tasks are signed-off for compliance; documentation about maintenance carried out is controlled; and Competent and trained maintenance personnel are utilised for maintenance and repair of all safety critical systems. Where maintenance is completed by an external supplier, they must be approved in line with Selects approval of suppliers. In order for Laing O Rourke to monitor the effectiveness of its asset maintenance program it is necessary for key stakeholders to: understand the performance of their safety critical assets by identifying what needs to be monitored, measured, and reported; establish and record the method and frequency of monitoring, measurement, analysis, and evaluation of the performance of safety critical assets; monitor trending performance against the predicted strategic life of an asset; report on performance issues based on the level of safety risk and escalate high-risk performance issues so that that they are adequately addressed; establish channels to communicate any results (this can use the communications strategies already in place for the SMS); improve the conformance of safety critical assets with nominated standards by: o reviewing operational and maintenance controls, and assessing the risk of assets not meeting the predetermined standards; o identifying the root cause(s) of safety performance issues; and o identifying actions that might be needed for recovery to safe operating conditions;

10/16 improve the SMS continuously by identifying potential risks and taking corrective action; document where opportunities have been taken to reduce or eliminate risk and how this was achieved. The relevant information is contained in E-P-8-1917B Maintenance and Repair of rolling Stock and results of inspections are to be recorded on the E-T-8-1917B (1) Track- Bound Plant Compliance and Annual Inspection Checklist. Road Rail Vehicles will have their annual inspections recorded on E-T-8-1917B (1-1) RRV Compliance and Annual Checklist 7.5 Repair Before any repairs are undertaken on plant, personnel are to make sure the plant is isolated and in a safe condition for the work to commence. Repairs are to be undertaken by competent personnel only, and are to be carried out: In line with the manufacturer s instructions and documented procedures In accordance with relevant RISSB Standards In accordance with the systems developed by Laing O Rourke for the management of the rolling stock. 7.6 Trending performance Against Predicted Strategic Life of Asset. The asset life is initially dictated by the finance policies which are referenced within the CAPEX procedure.. Monthly management reports are produced to monitor and review the commercial and operational performance of the asset against the financial maintenance and revenue budgets that have been set. These reviews are based on annual performance. Before reaching the initial financial life expectancy, the asset is reviewed to determine whether it remains in the fleet. The determination is based on the commercial and operational performance of the asset. 7.7 Modification Modification is managed in accordance with the E-P-8-1917C Modification of Rolling Stock and through the application of PS 20 Change Management. Modifications of plant may result in the modifier assuming the obligations of a designer or manufacturer. In the case of plant that requires design registration any modifications may require a new plant design registration certificate to be issued by the respective WH&S Regulator. Modifications that require a change in design registration include all those that affect the safety of the plant, including changes such as: Alteration of running speed Changes that affect the stability, reach, capacity, working load limit Changes to drive systems Relocation of fixed plant to new premises Where the Select Area Manager is unsure if the modifications affect the registration of an item of plant, they are to contact the Rail Plant Manager. Before undertaking modifications, the modifier is to consult with the designer, manufacturer or relevant design authority to ensure all safety issues have been considered. If the original

11/16 designer and manufacturer cannot be contacted the modifications are to be designed and fitted by a competent person. A person modifying the design of plant fulfils the roles of the designer of plant, under WH&S legislation which requires relative risk assessments to be undertaken. Modification to plant is to be carried out: As recommended by the manufacturer or in other documented procedures In accordance with relevant Standards By an appropriately qualified person Before being returned to service after maintenance, service, cleaning, repair or modification plant must: Have control measures in place to prevent or reduce risks SFAIRP Have all forms of guarding replaced Be inspected and tested having regard to the modified design specifications and relevant RISSB Standards Be resubmitted for design registration (where applicable) Have a pre-mobilisation checklist completed by the person to confirm the item is again fit for use 7.8 Operation When the rolling stock is ready for operation, the following must be adhered to: 7.8.1 Training Operators must complete the necessary training and be deemed competent to operate the plant prior to use. They must hold the relevant unit of competence aligned to the National Qualification Framework for the overall operation of the item of rolling stock. For example 'Operate on Track Self-propelled Equipment'. In addition to the evidence that they hold this unit of competence as well as any other national competency for other specific tasks associated with the operations undertaken, they must also have undertaken and successfully passed any assessment criteria for the specific item of rolling stock. Where this is not linked to a national unit of competence the training and assessment can be undertaken by a suitably qualified trainer and assessor who holds relevant qualifications and has or seeks from an employee, knowledge in relation to the operation of the specific item of rolling stock. In addition to the above, there are registration requirements set by the rail infrastructure manager of the railway on which the rolling stock is to operate that Laing O Rourke will need to attain prior to operating on that network. 7.8.2 Preparation Prior to Use An assigned Select representative is responsible for preparing the rolling stock for operation and for checking that it is in a safe condition and compliant with all rules and procedures for its operation.

12/16 A Pre-Mobilisation checklist specific to the item of rolling stock must be completed by the fitter and sent with the item to the site where it will be received by the site representative / operator and signed off. 7.8.3 Use The operator of the machine must ensure that the plant is only used in accordance with the documented method statement and manufacturers operating instructions and in accordance with the appropriate safe working systems applied to the particular railway network. The operator of rolling stock is to perform a pre-start check of the rolling stock prior to use each shift. Results of inspections are to be recorded in an asset specific Pre-start Book. E-C-8-0536O Hi Rail Vehicle Pre-Start Checklist E-C-8-0536P Hi-Rail Excavator Pre-start Checklist E-C-8-1917B (3-2) Pre Start Ballast Regulator E-C-8-1917B (3-3) Pre Start Checklist Tampers The completed pre-starts are to be handed in to the relevant plant maintenance supervisor at the end of each week. 8. Inspection and audit of plant 8.1 Inspections Line managers are to present the respective item of rolling stock for inspection, repair, maintenance or modification as required, to ensure SFAIRP that plant and equipment is inspected and serviced according to the determined schedule. If a defect is identified the operator is to comply with the Laing O Rourke processes for the management of defective equipment and notify Select / asset owner in accordance with the process. If an item of rolling stock malfunctions, it is to be stopped where appropriate in a safe place or have other safety controls applied and be inspected by a competent person. Any faults that pose a potential safety hazard are to be rectified before the plant is operated again. The rolling stock may only be used or operated if the Select representative responsible for maintenance arranges the repair or replacement, or deems that the safe operation or use of the rolling stock is not effected. Inspection of items of rolling stock is to be recorded and will form part of a general inspection and audit process of the work site. Inspection can identify: Potential problems that were not anticipated during plant design or task analysis Deficiencies in plant associated with its use such as excessive wear and tear, corrosion and damage to plant Damage caused by incorrect operation or incorrect use of plant Adverse effects of changes in processes Inadequacies in control measures Regular monitoring and review is required to maintain rolling stock to applicable standards of operational safety and quality. This is achieved by: Pre-mobilisation checks Pre-start checks

13/16 Scheduled inspections Scheduled calibration Machine history recording and reporting Condition monitoring 8.1 Audits Audits of rolling stock operations including commissioning, maintenance and repair, modification, operation and decommissioning processes are to be undertaken by suitably qualified auditors. They must examine and verify from records kept that the processes developed have been conducted effectively and that all rail safety obligations are being met. Records that are to be available during audits include, but are not limited to: Accident records and investigation reports Past audit reports Past inspection reports Rolling stock checklist for Tampers and Regulators Pre-mobilisation checklists for other items of rolling stock Operators pre-start checklists Maintenance requests Past maintenance and servicing reports Repair records Training records and qualifications for Select and project personnel Hiring and recruitment criteria for plant operators Risk assessments Communication between representatives involved with the use of rolling stock Shutdown/emergency procedures Audits should include discussions with employees regarding the implementation of work processes, risk management and control measures, training, audit and investigation procedures that are required to be implemented. 9. Sale or transfer Where rolling stock is sold or transferred the Rail Plant Manager is to make sure that risks arising from the condition of the rolling stock are eliminated. If this is not reasonably practicable, they must be controlled in accordance with the hierarchy of control SFAIRP. This must be done by means of a plant risk assessment. Where used items of rolling stock (other than for use as scrap or as spare parts for other items) is sold or transferred, Select is to advise the purchaser or intended owner of the item of any faults detected and, if appropriate, that the item is not to be used until the faults are rectified. Where items of rolling stock are sold as scrap the purchaser is to be advised it is only sold to them as scrap. The asset owner must obtain a destruction certificate from the purchaser.

14/16 All available information such as log books, records of tests/inspections, manufacturers' instructions are to be made available to the new owner as well as a risk assessment outlining the risks associated with the item being scrapped. Where items are withdrawn from service in preparation for sale or disposal they shall be secured in such a way that no unauthorised use of the item can be achieved. 10. Documentation Persons involved in the commissioning, installation, use and testing, de-commissioning, dismantling and disposal of rolling stock are to be supplied with all available information concerning the safety of the rolling stock. All relevant information on emergency procedures relating to rolling stock is to be displayed where it can be readily seen by persons who may be exposed to risks arising from the operation of the rolling stock. 11. Training and Instruction Personnel required to implement the requirements of this procedure must be trained in the use of the checklists, forms and associated risk management techniques. Personnel required to follow the systems of work developed by the implementation of this procedure must be instructed in the relevant systems of work. Line Managers, including those from Select, must ensure personnel and subcontractors are competent to use and /or maintain / repair the item of rolling stock, and, where necessary, hold the required competencies. Where rolling stock is to be operated on a particular railway, the operator must hold the relevant competencies for the respective railway. Employees who are likely to be exposed to risks associated with the rolling stock operations, and anyone supervising these employees must be trained and provided with information and instruction on: The nature of the hazards and risks associated with the rolling stock and systems of work The need for, and correct use and maintenance of control measures Operation of rolling stock and the procedures for safe use of the rolling stock The use, fit, testing, maintenance and storage of any personal protective equipment required Emergency procedures in case of a malfunction or other incident The location of information relating to the safe use of the rolling stock 12. Records Persons involved in the commissioning, installation, use and testing, de-commissioning, dismantling and disposal of rolling stock must maintain records of the actions taken in regard to such issues. An electronic database is maintained through MEX which is used to store the information relevant to the maintenance and management of all items of rolling stock. The records for all items of rolling stock will be subject to regular auditing and will be made available to relevant and authorised personnel on request.

15/16 The following Records will be retained / produced in accordance with this Procedure: Manufacturers standards and specifications Plant design registration information Final and approved design drawings and calculations Relevant data from commissioning Compliance statements and/or test certificates Risk analysis carried out on the item of rolling stock Registration documents relating to the RIM s registration criteria The unique plant or equipment identification number Pre-mobilisation checklists RRV Pre-mobilisation checklist Track Bound Pre-Mobilisation Checklist Pre- start checklists Hi-Rail Vehicle Prestart Checklist Hi-Rail Excavator Pre-start checklist Maintenance Requests Maintenance records and service logs The Track-Bound Plant Compliance and Annual Inspection. RRV Commissioning and Annual Checklist Results of inspections Results of tests on safety devices Information on major repairs carried out Information on major modifications or ratings to original design Change management documents where relative to modifications Significant deviations from normal operating or design conditions, including breakdown or other malfunction Competency of operators 13. Related Documents The following are related RSMS documents: E-P-8-1914 Risk Management E-P-8-1916A Procurement of Rolling Stock E-P-8-1917 Engineering and Operational Systems E-P-8-1918 Process Control E-P-8-1922 Rail Safety Worker Competence

16/16 The following are other related documents: Laing O Rourke s Notice of Accreditation covering the respective rolling stock operations Registration by the respective rail infrastructure manager responsible for such registrations Health and Safety Management System Certification and / or registration processes prescribed in WH&S legislation Laing O Rourke Core and Enabling Processes. 14. Reference Material The following reference material should be referenced as part of the asset management process: RISSB Rolling stock standards as well as other standards relevant to rolling stock Network owners Train Operating Conditions Manual or similar (where relevant) Manufacturers standards and operators manual Safety legislation relevant to the State or Territory where the item of rolling stock is to operate.