FAA Conformity Inspection Checklist Form N/C 10JAN16

Similar documents
PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13.

Instructions for Supplier Survey

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Vendor Qualification Survey

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

FAR CASR COMMENTS. Class I, Class II and Class III products have not existed anywhere in the world since Adopt FAR

Supplier Quality Requirements (ASQR)

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

NQA-1 Graded Approach, 55-Gallon Drum Summary

Nonconforming Material System Procedure

Page 1 / 11. Version 0 June 2014

General Quality Assurance Procedure (QAP) QAP: 13.0 Subject: Control of Nonconforming Product Date: 11/21/13 Created By: Approved By: Rev: C

Self-Audit Checklist

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

Quality Assurance Procurement Clauses and Flow Down Requirements

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

INS QA Programme Requirements

TURBO MACH A DIVISION OF VT SAA

Supplier Quality Requirements Revision B Dated November 21, 2017

TASK REQUIREMENTS. Supplier Quality Requirements

Manufacturing Supplier Requirements Manual

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Ahlers Aerospace Quality Procedures Manual

Executive Instruments Inc.

Standard Operating Practice S.O.P. No

Quality Assurance Manual

Vendor Qualification Quality Audit Checklist

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

VACCO. Supplier Training. Updated 12/13/18

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

VACCO. Supplier Training. Updated 8/21/18

GE - Aviation, Services Supplier Quality Specification

NON-CONFORMING MATERIAL

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Assurance Manual

1. CERTIFICATION YES NO N/A 2. ANTI-DRUG TESTING PLAN YES NO N/A

OUTLINE OF IQCS-440 F-16 CO-PRODUCER FIRST ARTICLE INSPECTION REQUIREMENTS

Certificated Repair Station Checklist for Quality System Audit

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

Quality Management System

HACCP audit checklist

SHELTON INDUSTRIAL PATTERN INC.

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

2018 Gogo BA Supplier Quality Management Survey A High Level Response to Customer Query

NON-CONFORMING MATERIAL

Voluntary Industry Distributor Accreditation Program (AC 00-56)

Self-Audit Checklist. Thank you. General:

Quality Assurance Manual

COMPLETED QUALITY SYSTEMS QUESTIONNAIRE

Price Electronics,LLC Quality Assurance Manual

Clauses applicable only when specified by Q-number on the purchase order.

Quality Assurance Manual

NUCLEAR QUALITY ASSURANCE MANUAL

Supplier / Vendor / Repair Agency Self-Evaluation Questionnaire

AIRCRAFT SYSTEMS & MANUFACTURING, INC. Quality System Manual

MONOGRAM SYSTEMS CABIN INTERIORS Supplier Quality Requirements

QUALITY SYSTEM QUESTIONNAIRE RESPONSE GA Telesis Composite Repair Group -Certified FAA/EASA Part 145 Repair Station

4-OF AS9102 FAIR Forms and Instructions (SC)

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Supplier Quality Requirements

Out latest Certification is available from our Web Site to download,

Florida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

QUALITY SYSTEM QUESTIONNAIRE RESPONSE

Trident Precision Manufacturing

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax

2.1 This work instruction will apply to all Suppliers, Engineering, Planning, Maintenance, Manufacturing, Supply Chain and Purchasing.

VENDOR SELF-AUDIT CHECKLIST Page 1 of 6 Date: January 26, 2017

Supplier Quality System Requirements

SECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING

Mechanical & Electrical Product Workmanship Standards Procedure

FIRST ARTICLE INSPECTIONS

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

External Provider Quality Requirements

GENERAL SUMMARY. Company History: Company General Information: Key Management:

Quality Supplier Requirements for Beckwith Electric Co., Inc.

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

Vendor Quality Control Audit Form Quality Assurance Survey

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

Purchasing- requirements Attachment A ALLEN AIRCRAFT PRODUCTS MINIMUM REQUIREMENTS FOR SUPPLIERS AGREEMENT

of Maintenance and/or Alteration Specifications Initiated by Change:

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS

TASK REQUIREMENTS. Supplier Quality Requirements

PROCUREMENT QUALITY REQUIREMENTS

Rosen Aviation Supplier Quality Assurance Requirements

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS

Quality Manual ISO 9001:2000

Supplier Quality Codes

Transcription:

Purpose The purpose of this checklist is to provide a system to assist with the FAA design and installation conformity inspection process. This form is primarily intended to serve applicants for FAA design approvals under 14 CFR Part 21. This form may also serve companies or individuals engaged in research and development or homebuilding who want to track the detailed conformity status of aircraft parts and assemblies. For individuals or companies engaged in FAA design approval activities under 14 CFR part 21, this checklist provides a mechanism to ensure that all necessary design and production data is provided to complete FAA forms 8130-9 (Statement of Conformity), 8120-10 (Request for Conformity) and 8100-1 (Conformity Inspection Record). This checklist is a guideline, and does not constitute any particular FAA compliance or conformity record. Instructions To complete this checklist, use the table provided on subsequent pages to provide objective evidence and information for each line item. The checklist is broken down into the following general sections 1. Identifies the applicant for the approval, and the design or process data that will be used for the inspection 2. Identifies the if inspection is associated with a part, assembly, and/or process 3. Identifies data for forms 8130-9 and 8120-10. 4. Identifies information to provide objective evidence in support of completion of the conformity inspection record, FAA form 8110-1. 5. Identifies how to document and communicate data for a deviation or nonconformance For each line of the checklist: 1. Add any requested information 2. Indicate if that line item is acceptable in the yes/no box as applicable 3. Provide any available document identifications or numbers, dates, names, or other references to objective evidence to support and associated with the specified information. 4. In locations where requested, provide an appropriate attachment with this checklist. Note: Some items on this checklist may not be applicable to your conformity inspection, mark these items N/A in the verify column. Additional Resources Momentum Aeronautics provides a range of engineering and airworthiness inspection services to support applicants involved in design and production activities for aircraft and rotorcraft. Our resources include a full FAA DER and staff who can provide immediate and effective support on your particular project. Please visit our website for more information.

Unique checklist reference number Record this number on each page of the checklist FAA Project Number FAA NACIP conformity inspection reference number Record the number at the top of electronic FAA form 8120-10 FAA DMS tracking number Managing FAA MIDO office (address, e mail, phone and contact name) Managing FAA ACO office (address, e mail, phone and contact name) Identify if this is a part or installation conformity inspection. Enter a description of one or both Applicant project manager s contact info Applicant company name and address FAA project engineer contact info MIDO inspector contact info MIDO certification specialist contact info DER contact info DER certificate letter of authorization date contact info certificate letter of authorization date Verify FAA form 8120-10 has been issued by engineering and processed by MIDO Verify that a responsible agent for the applicant has issued FAA form 8130-9, record the form date, and the signatory s name and title, note if any deviations are present Verify conformity delegation In this case, part also means assembly, referred to as the article herein. Name, e mail, phone no. required for all contact info

request has been processed by MIDO in DMS with inspection(s) delegated to the above Time and date available for inspection Location of the inspection, if different from the applicant s physical address Article or installation type Make and model of type Document requesting conformity inspection Is there a Conformity Inspection Plan (CIP)? If so, record the document number and revision Special instructions ensure these are completed as required by 8120-10 during the inspection Remarks for the 8120-10: ensure that non-conformity disposition and inspection delegation request is made for the designees on the checklist Record the Master Drawing List (MDL) number, date and revision, if applicable Part or assembly number(s) (The article(s)) to be inspected, qty of each and S/Ns if applicable Total quantity of articles Is/are the article(s) critical parts as defined by 14 CFR Sec. 45.15(c)? If so, are they marked appropriately? Record drawing number(s) with dates and revisions specified on the approved Choose one: aircraft, rotorcraft, engine or propeller Company and model number PO, application date, letter, memo, other requesting document Request for conformity and vendor inspections, request DER for non-conformity disposition

design and process data Verify that design data has been approved by the FAA or by a DER For an installation conformity on an aircraft, record the airframe, engine and propeller, incl. makes, models and serial numbers Review FAA form 8130-9 statement of conformity. Are deviations present in any article or installation? If so, ensure they are treated appropriately. Purchase orders for all materials and outside services attach POs to checklist Receiving verify all received material/services conform to specs on the PO and design data attach received PO Work order numbers attach WOs Material specification(s) on design data Material specification(s) used for production of article Attach all material(s) certificates of conformance to this checklist Process specifications(s) on design data Process specifications used for production of article Attach all process(es) certificates of conformance to this checklist, if applicable What vendors were used for the procurement of material or services to complete the article(s)? Are any vendors located outside the US? If so, ensure the approved supplier list Record form 8110-3 date; if FAA approved record the approval letter date

includes vendor contact info Does the vendor currently produce FAA PMA parts using an FAA approved quality system? Is the vendor(s) currently serving any manufacturer with an FAA or EASA approved quality system? If so, which manufacturer? Are vendor(s) providing a critical material and/or process requiring an on-site audit by the FAA or their designee in accordance with conformity inspection plan? If so record who performed this audit and attach objective evidence of on-site audit. Are any commercial off the shelf (COTS) parts used on the article? If so, have they been received, inspected and documented with purchase orders using FAA approved procedures? Does the article(s) deviate from the approved design data in any way? If deviations are present, have they been documented? Has a resolution been documented Attach forms if applicable If a nonconformity is/are present on the article, has a DER been authorized to disposition the nonconformities? If so, who? In the event of a nonconformity disposition, list design data or reports (with dates and revisions) to be used for re-inspection to support disposition. Ensure Verify the COTS components are on an approved commercial parts list (CPL). Verify COTS parts are not marked per 14 CFR Part 45.

DER and have made the appropriate entry on form 8100-1 for each disposition What measuring equipment or process was used? What calibration was/were performed for the measuring equipment? When were they performed? Was evidence of current calibration provided at the time of inspection. First article inspection form: verify complete and attach to this checklist, verify that any discrepancies are noted. Ensure the first article form includes a record of dimensions, materials and/or processes as specified, used, and/or measured. Has an engineering change notice or order (ECN or ECO) been applied to the design data? Has a certificate of conformance been issued by the applicant? Have materials been handled and stored in a manner to ensure security from the time of construction to the time of inspection? Attach ACCEPTED tags been issued for all conforming articles, or for articles that have a dispositioned nonconformity? If an article contains a nonconformity that has been treated using the applicant s quality system, then add the text MRB Form ID No to the ACCEPTED tag This form shall be reviewed by the applicant s accountable manager in order to complete form 8130-9. Measurement of all dimensions must be recorded and compared, except for reference dimensions Form 8130-9 is acceptable If applicable, reference a quality manual or other approved plan for storage procedures. All conformed parts will be segregated in a secure area with access restrictions after the ACCEPTED tag has been issued Items may be tagged ACCEPTED with a nonconformity(ies), providing the non-conform is traceable, noted on form 8130-9, and dispositioned on form 8100-1

Applicant to issue 8130-9 after the ACCEPTANCE tags have been issued, verify forms are attached. Attach tag with text R&D only to the subject articles If a vendor was used as part of an FAA approved quality system, did the vendor complete the survey and are they acceptable for use? If a vendor was used, are they listed on the applicant s FAA approved supplier list? as authorized Execute the inspection and complete FAA form 8100-1 as prescribed by FAA form 8120-10, record the end of inspection date Form 8100-1 block 5, record verification for the following lines Material: Were raw materials used in the fabrication process in conformity with the design data? Material: Is evidence available to ensure the chemical and physical properties were identified and checked as appropriate? Material: Is there documented evidence to show traceability from the raw material to the prototype part? Material: Are there any part or process deviations recorded against the submitted design data (including material review Be sure to note any deviations on this checklist This tag will be removed after the conformity inspection, and/or if form 8130-3 is issued Ensure 8100-1 line items include the following: 1. 8120-10 ID and date 2. Letter of designation 3. FAA project number, DMS and NACIP ref numbers 4. 8130-9 ID and date 5. Lines for each inspection item

dispositions)? Processes and Processing (Process): Is there a process specification for each special process? Process: Has the applicant submitted the process specification for FAA engineering review? Process: Does a check of the processed articles show the process produces consistent parts that meet the type design? Is there statistical or other evidence to show this? Process: Is the process being operated following the process specification? Are any deviations recorded? Critical and Major Characteristics (CMC): Has the applicant identified and inspected all critical and major characteristics? CMC: Does the applicant have a record of these inspections? CMC: Does witnessing the reinspection and surveillance show the above inspections were accurate and adequate? CMC: Are there any deviations recorded against the submitted design data (including material review disposition)? Workmanship: Does the workmanship add to the quality of the product? Could it be duplicated, and has the applicant set criteria to identify workmanship practices? Adequacy of Drawings and Related Change Records

(Drawings): Can the part be produced and inspected using the information on the drawing? Drawings: Are drawing tolerances practicable and attainable during production? What evidence supports this? Drawings: Has the applicant included all changes in the drawing submitted for FAA approval (including one-time only deviations in the prototype article submitted for FAA testing)? Drawings: What procedure does the applicant use to ensure an engineering change is included in the production part and on the drawing? Drawings: Did the drawing include all information needed to inspect the part, the material to be used, the treatment of the material (such as hardness, finish, and any special process specifications)? Inspection records: Do the inspection records show all inspections conducted? Records: Do they show who conducted the inspection? Records: Do they indicate the results of the inspection and disposition of unsatisfactory conditions? Records: Are procedures adequate to ensure reinspection of parts that are reworked or replaced? Material review action: Is the This includes inspection of installation of new parts and inspection of the parts

material review procedure documented and adequate to ensure disposition for nonconformities? Material review: Is there adequate corrective action for observed nonconformities to prevent reoccurrence? Have use as is or repair dispositions for nonconformances been submitted to FAA engineering for review, and have they been incorporated in the type design? Previously produced parts: if parts were taken from approved stock, verify there is a system to associate any MRB actions with the parts Previously produced parts: Have the previously accepted deviations been made a part of the current design data submitted? Software does the conformity include software? If so, ensure checklist 00-903- 56-02 is completed. DER as authorized complete any non-conformity dispositions on FAA form 8100-1 if required as authorized and if required complete and document any additional inspections for 8100-1 items that have been dispositioned by the DER If executing the conformity as specified by FAA Form 8110-1 (TIA) One-time only engineering orders Nonconforming parts should not be used unless it can be shown that they will have no adverse effects or they are re-inspected to record all deviations for FAA engineering evaluations. Are deviations listed on form 8130-9? Record the data used for disposition and reinspection on FAA form 8100-1 DER

ensure all of the items requested in block 18A are completed. as authorized, and if requested on form 8120-10 issue FAA form 8130-3 tags for each article(s) specified Make a copy of each 8130-3 form for s 10 year records storage. Provide original 8130-3 to applicant. as authorized, and if requested (or required) on form 8120-10 complete the type inspection report (8110-5) or supplemental type inspection report forms (8110-26) Provide a copy of this checklist with attached FAA forms 8130-3, 8100-1, 8130-9 and inspection results to Chicago ACO project engineer to provide a record of the following to MIDO: 1. Cover letter with reference number 2. Copy of this checklist without attachments 3. Copy of 8100-1 4. Copy of 8130-9 5. Copy of 8120-10 6. Copy of DMS auth. 7. A list of the forms 8130-3 that were issued Verify that parts have been marked in accordance with 14 CFR Part 45 and/or IAW the FAA approved design data using procedures in the FAA approved quality manual. If the article is identified as critical ensure the serial numbers are All 8130-3 tags will be for new prototype parts Only if 8130-3 tags are required by 8120-10 This checklist and all attachments will be maintained on hardcopy file by the applicant as part of the conformity record for parts and assemblies. Checklist content may be updated in the process of execution, leading to the final checklist completion at the time of conformity inspection completion. Parts too small to mark should be marked per the applicable design data, or per an FAA approved quality manual

marked on the part When checklist is complete, the applicant s quality manager shall sign and date below When checklist is complete, the applicant s document administrator shall make a hardcopy file with the following data: 1. Copy of this checklist with all attachments specified herein Verify that conformed parts and assemblies are placed in the applicants secure storage area with their acceptance tag and forms 8130-3 attached (if applicable) Date should be when checklist was completed. The hardcopy file should be backed up with a PDF scanned copy and placed on controlled and secure digital storage. The original hardcopy file should be placed in the applicant s controlled and secure file storage