CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

Similar documents
4.4 AIR QUALITY Approach to Analysis

CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA

What is the CNMI Divert Activities EIS? Who Prepared the Draft EIS? What Is Proposed? What Are the Decisions?

CHAPTER 17. HAZARDOUS MATERIALS AND WASTE

Port of Long Beach Port Master Plan Overview December 22, 2008

5.7 Traffic 5.7 TRAFFIC Affected Environment

OPTIONAL STATIONAVIATION/MANCHESTER

Transportation Facility Inventory

Merrill Field Airport Anchorage: Performance. Value. Results.

Mendocino Forest Products Grading For Industrial Land Improvements

Chapter 5 - Needs Assessment and Freight Forecast

Transportation Advisory Board May 21, 2014

5. Cumulative and Other Effects

SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT NORTH BELT FREEWAY SUMMARY INTRODUCTION

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

12 Evaluation of Alternatives

TRAFFIC STUDY GUIDELINES

ARROWS RANSPORTATION LAN

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

Oakland International Airport-Materials Management Program (MMP) Updated November 2007

Draft ENVIRONMENTAL IMPACT STATEMENT FOR DIVERT ACTIVITIES AND EXERCISES, GUAM AND COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Port Authority of Guam

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Hawthorne, Mineral County Nevada And the Intermountain West Corridor I-11

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

Update on the Draft EIR on the Proposed Airport Master Plan

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

State of the Practice - How Public Transportation is addressed in Traffic Impact Studies ITE Transit and Traffic Impact Studies Committee

GUAM PORTS OF ENTRY. Presented By: CMTF Ports & Customs Subcommittee. Carlos H. Salas Deputy Executive Manager. Kenneth Tagawa General Manager

Fore River Bridge Replacement Project. Spanning the Weymouth Fore River between Quincy and Weymouth, Massachusetts. Highway

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

Guam and CNMI Military Relocation EIS Volume 7: Proposed Mitigation, Preferred Alternatives Impacts, and Cumulative Impacts

Final Air Quality Report

CHAPTER 3.0 CIRCULATION ELEMENT

Merrill Field Airport Anchorage: Performance. Value. Results.

WREI FORMER NEANY BUILDING. Real Estate Investments, LLC WAREHOUSE/ INDUSTRIAL. W H E E L E R Real Estate Investments, LLC

CHAPTER 5: TRANSPORTATION

SOUTHWEST LOUISIANA PORT NETWORK THE ENERGY CORRIDOR S PATH TO GROWTH & SUCCESS

CHAPTER 17. HAZARDOUS MATERIALS AND WASTE

Kevin Abt Chief Engineer Virginia Port Authority

Benefit Cost Analysis Narrative

3.14 UTILITIES Definition Regulatory Framework

Chapter 4. Recommendations

3.12 NOISE Regulatory Setting Environmental Setting EXISTING NOISE SOURCES AND SENSITIVE LAND USES

TRANSPORTATION AND ADAPTATION A Canadian Perspective. Elizabeth Smalley Manager, Adaptation Policy Transport Canada June 7-8, 2018

P4.0 Highway Quantitative Scoring Workgroup Recommendations

Supply Chain Management Summit August 23, 2012

Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015

Attachment No. 1 Council Report Attachment

Examples of Eligible Projects. Project Category Description Examples

Presented to: Tampa Bay Applications Group. Presented by: Louis E. Miller Executive Director Tampa International Airport

AL-AMEEN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

Section 3.11 Land Use

Airports in the Region Case Study

NEW YORK TRANSPORTATION FACTS ECONOMIC IMPACTS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

CHAPTER 2. PROPOSED ACTION AND ALTERNATIVES

NOTICE OF PREPARATION AND NOTICE OF A PUBLIC SCOPING WORKSHOP FOR AN ENVIRONMENTAL IMPACT REPORT

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Transportation Sustainability Program

CHAPTER 6 FREIGHT MOVEMENT

LOCATION HYDRAULIC REPORT

(Image of a moving Muni light rail vehicle in the Geneva Yard at night)

1000 Jefferson Avenue, Elizabeth, NJ ± 28, ,000 SF Available For Lease

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor April 9, :30 a.m.

Pavement Design. TTP Orientation Seminar 2013

Draft Commonwealth of the Northern Mariana Islands Joint Military Training Environmental Impact Statement/ Overseas Environmental Impact Statement

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Eastern Shore Corridor

Overview of the Draft Highway Primary Freight Network. November 20, :00 2:30 pm ET Coral Torres Ed Strocko

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

LANDSIDE FACILITIES AIRLINE TERMINAL FACILITIES INVENTORY 5.0 INTRODUCTION C H A P T E R 1 CHAPTER 5

WELCOME. Central Coast Terminal Development Plans. Top 5 Things to Know about the Plan

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. December 5, 2017

Port NOLA Forward: Strategic Master Plan FAQs

Proposed Amherst Island Turbine Project APAI Comments on Marine Logistics and Safety in the draft Operations Plan

Supplemental Environmental Impact Statement

Guam and CNMI Military Relocation (2012 Roadmap Adjustments) SEIS Final July 2015 EXECUTIVE SUMMARY

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

Appendix F 2008 Travel Demand Modeling

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

WELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING CE RAILWAYS AIRPORT AND HARBOUR ENGINEERING QUESTION BANK

Investments in Transport Infrastructure Projects

Chapter IV - Alternatives

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

INLAND WATERWAY OPERATIONS

Owensboro Riverport General Information

APPENDIX E. Project Description Detailed Elements

Pavement Design. TTP Orientation Seminar 2013

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014

How HRTPO Helps Freight Move. Presented by Robert B. Case, PE, PhD Transportation Technical Advisory Committee Agenda Item #13 April 1, 2015

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015

Moving Forward with Local Support Port of Oakland Case Studies: Middle Harbor Shoreline Park and Maritime Air Quality Improvement Plan (MAQIP)

DRAFT MITIGATION MONITORING AND REPORTING PROGRAM Document considered draft until Board considers document

Transcription:

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource This section describes the existing transportation facilities, specifically roads, the Tinian International, and the Tinian Harbor, in Tinian and the activities that occur there. The possible effects to these transportation facilities as a result of the proposed action are presented and these effects are compared to the conditions under the no-action alternative. 14.1.2 Tinian 14.1.2.1 Tinian has approximately 68.4 miles (mi) (110 kilometers [km]) of roads, most of which were constructed prior to and during World War II. Most roads were developed, graded, and paved for heavy truck traffic when the island s United States (U.S.) military population was about 150,000. throughout Tinian are now in good to poor condition and traffic is extremely light. Roadways in the Military Lease Area (MLA) include former runways, taxiways, and parking aprons constructed to support B-24 and B-29 bombers (Belt Collins 1999). Two primary roadways (Broadway and 8 th Avenue) connect the San Jose Village to the MLA. Broadway is a two-lane divided highway with approximately 20-foot (ft) (6.10-meters [m]) wide lanes and a 32-ft (9.75-m) wide median. 8 th Avenue has three distinct roadway sections: a 24-ft (7-m) unpaved roadway adjacent to the Tinian, an 18-ft (5-m) to 22-ft (7-m) two-lane undivided highway immediately north and south of the Tinian, and an 18-ft (5-m) two-lane undivided highway just south of 86 th Street. This third section was previously a divided roadway with approximately 18-ft (5-m) wide lanes and a 36-ft (11-m) wide median. Lack of maintenance on Broadway and 8 th Avenue within the MLA has resulted in the southbound lanes of these roads being unusable. Other roadways on Tinian are typically two lanes, undivided, with no striped median and have a capacity of approximately 5,000 vehicles per day. The majority of the roadways on Tinian carry between 25 to 400 vehicles per day. Broadway and 8 th Avenue carry up to 1,470 and 180 vehicles per day in certain segments, respectively. Route 201 and 202, two major routes that provide access in and out of the San Jose Village area, carry the highest traffic with approximately 1,520 and 2,240 vehicles per day, respectively. Based on the operational analysis conducted in the Draft Commonwealth of the Northern Mariana Islands (CNMI) Comprehensive Highway Master Plan, all roadways on Tinian are operating at excellent levels of service in their existing condition, as evidenced by free flowing traffic and no traffic delays. 14.1.2.2 The Tinian International is a Federal Aviation Administration (FAA) certified facility that currently accommodates single engine aircraft and Shorts 360 aircraft with capacity of up to 36 passengers. In 2002, the runway was extended to 8,600 ft (2,621.28 m) from 6,000 ft (1,828.80 m) in length capable of handling 767s. The apron is capable of handling two 767 in addition to one 767 at the gate. There is additional capacity for one C130 in the hard packed area at the west end of the taxiway. VOLUME 3: MARINE CORPS TINIAN 14-1 Roadways and Marine Transportation

14.1.2.3 Harbors The affected environment discussed in this section is in the South region of Tinian. Tinian Harbor includes both the Inner Harbor near the town of Tinian and the Outer Harbor lying about 1.7 mi (2.8 km) off shore between Garguan Point and Carolinas Point. The Inner Harbor is entered via a channel that has a navigable width of 500 ft (152 m) and a minimum depth of 25 ft (7.6 m). The Inner Harbor was constructed in 1944 to accommodate up to eight Liberty Ship cargo vessels (Belt Collins 1999). The main quay has a usable length of 2,200 ft (670 m) with depths varying between 25 and 29 ft (7.6 and 8.8 m) (Figure 14.2-1). There are two piers (pier 1 and pier 2) lying to the southwest of the main quay (Global Security 2008). Piers 1 and 2 are in a state of disrepair (Tinian Chamber of Commerce 2010). The Municipality of Tinian declared a state of emergency in October 2009 in order to repair these piers. The Navy estimates that the main quay, or wharf, could handle up to 4,500 tons (4,082 metric tons) of cargo daily. The main quay is used to moor commercial barges operating between Tinian and Saipan and for hydrofoil ferry service for visitors from Saipan. Two stevedore companies service commercial shipping traffic. Gasoline and diesel fuel can be obtained at the Mobile Oil tank compound at the harbor. No tugboats operate in Tinian Harbor (Belt Collins 1999). 14.2 ENVIRONMENTAL CONSEQUENCES 14.2.1 Approach to Analysis 14.2.1.1 Methodology The need for the actions proposed on Tinian is to provide facilities to allow Marine Corps forces relocating to Guam to sustain their combat readiness that could not be accommodated on Guam. and operation activities under the proposed action have been compared to the no-action alternative. There is no construction or modification of existing facilities at Tinian Harbor, Tinian International, North Field or the roadways for training under the proposed action. Existing facilities would be used by existing modes of transportation. 14.2.1.2 Determination of Significance A determination of significant adverse effect is made where the projected increase in transportation would exceed the infrastructure for that mode of transportation, such that the infrastructure would not be able to service additional demands while maintaining the same level of service for existing users. 14.2.1.3 Issues Identified during Public Scoping Process As part of the analysis, concerns related to marine transportation that were mentioned by the public, including regulatory stakeholders, during the public scoping meetings were addressed. This included concern for the impact of the proposed military relocation on harbor and navigable waters. Respondents expressed a desire for the military to invest in improving the present harbor infrastructure and for undertaking necessary repairs to the harbor facility. The public expressed a desire to be informed of how the military control would affect local small craft operators who presently use the harbor facility. Concerns were also expressed regarding restriction of public access and movement through the harbor and airport due to military control. Specific comments regarding road transportation were not raised. VOLUME 3: MARINE CORPS TINIAN 14-2 Roadways and Marine Transportation

TINIAN Area Enlarged Printing Date: Oct 27, 2009; M:\projects\GIS\8806_Guam_Buildup_EIS\figures\Current_Deliverable\Vol_3\14.2-1.mxd Aerial Source: QuickBird II 2004 Figure 14.2-1 Tinian Inner Harbor Feet 0 350 700 0 100 200 Meters 14-3

However, access to tourist and historical locations within military zone was identified as a concern by the public. 14.2.2 Alternative 1 (Preferred Alternative) 14.2.2.1 Tinian No new transportation infrastructure would be required for implementation of Alternative 1 at Tinian. There is no construction or modification of existing facilities at Tinian Harbor, Tinian International, North Field or on the roadways for the training related to the relocation. There would be no impact to marine transportation. Under the proposed training, 200 to 400 personnel would be transported between Andersen Air Force Base (AFB) North Field on Guam to Tinian International (West Field) on Tinian, depending on the type of aircraft. Frequency of the training would be approximately one week per month. The various routes proposed to transport the personnel from the airport would be on foot or by contracted bus service with the exception of up to four humvees for ammunition and equipment. The range area would not be accessible by non-participating personnel during training, including sufficient lead-time before training to ensure range area clearance. To facilitate range safety, ground access would be controlled by traffic control points on existing roads. This would maintain access to areas where training is not being conducted. Broadway would be closed during training. However, the public would be able to travel on 8 th Avenue, check in with personnel manning the first traffic control point. Once cleared by range control, they would proceed on 8 th Avenue, checking in with each successive traffic control point until clear of the training area. The additional traffic proposed by transporting personnel, equipment, and ammunition from the airport to the ranges would not exceed the existing capacity of the roadways; impacts to roadways would be less than significant. There is no construction or modification proposed at the airport for training. As indicated above, air transport would be between Andersen AFB North Field on Guam to Tinian International (West Field) on Tinian, depending on the type of aircraft. Only the C-17s need the use of the Tinian West Field due to the runway requirements for these aircraft and there would be 2 airlifts to transport 200 Marines and 4 airlifts to transport 400 Marines per training event. No impacts to the Tinian International are anticipated. In addition, public access to the Tinian International would not be impacted. Harbors If equipment is moved by barge, one single barge would be able to carry the equipment necessary to support the estimated 200 to 400 Marine training evolution. The harbor currently accommodates this type of marine vessel activity on a regular basis. Therefore, the addition of one barge per month would result in no impact to marine VOLUME 3: MARINE CORPS TINIAN 14-4 Roadways and Marine Transportation

14.2.2.2 Summary of Alternative 1 Impacts Table 14.2-1 summarizes Alternative 1 impacts. Area Tinian Project Activities Table 14.2-1. Summary of Alternative 1 Impacts 14.2.2.3 Alternative 1 Proposed Mitigation Measures No mitigation measures are suggested for Alternative 1. 14.2.3 Alternative 2 14.2.3.1 Tinian The impacts for Alternative 2 are the same as Alternative 1. Project Specific Impacts Under the proposed training, 200 to 400 personnel would be transported between Andersen AFB North Field on Guam to either the bivouac area, Tinian North Field, or Tinian International (West Field) on Tinian, depending on the type of aircraft. Frequency of the training would be approximately one week per month. The various routes proposed to transport the personnel from the airport would be on foot or by contracted bus service with the exception of up to four humvees for ammunition and equipment. The range area would not be accessible by non-participating personnel during training, including sufficient lead-time before training to ensure range area clearance. To facilitate range safety, ground access would be controlled by traffic control points on existing roads. This would maintain access to areas where training is not being conducted. Broadway would be closed during training. However, the public would be able to travel on 8 th Avenue, check in with personnel manning the first traffic control point. Once cleared by range control, they would proceed on 8 th Avenue, checking in with each successive traffic control point until clear of the training area. The additional traffic proposed by transporting personnel, equipment, and ammunition from the airport to the ranges would not exceed the existing capacity of the roadways; impacts to roadways would be less than significant. The impacts for Alternative 2 are the same as Alternative 1. Harbors The impacts for Alternative 2 are the same as Alternative 1. 14.2.3.2 Summary of Alternative 2 Impacts Table 14.2-2 summarizes Alternative 2 impacts. VOLUME 3: MARINE CORPS TINIAN 14-5 Roadways and Marine Transportation

Area Tinian Project Activities Table 14.2-2. Summary of Alternative 2 Impacts 14.2.3.3 Alternative 2 Proposed Mitigation Measures No mitigation measures are suggested for Alternative 2. 14.2.4 Alternative 3 14.2.4.1 Tinian The impacts for Alternative 3 are the same as Alternative 1. Project Specific Impacts Under the proposed training, 200 to 400 personnel would be transported between Andersen AFB North Field on Guam to either the bivouac area, Tinian North Field, or Tinian International (West Field) on Tinian, depending on the type of aircraft. Frequency of the training would be approximately one week per month. The various routes proposed to transport the personnel from the airport would be on foot or by contracted bus service with the exception of up to four humvees for ammunition and equipment. The range area would not be accessible by non-participating personnel during training, including sufficient lead-time before training to ensure range area clearance. To facilitate range safety, ground access would be controlled by traffic control points on existing roads. This would maintain access to areas where training is not being conducted. Broadway and 86 th Street would be closed during training. However, the public would be able to travel on 8 th Avenue through the unpaved section west of the Tinian, check in with personnel manning the first traffic control point. Once cleared by range control, they would proceed on 8 th Avenue, checking in with each successive traffic control point until clear of the training area. The additional traffic proposed by transporting personnel, equipment, and ammunition from the airport to the ranges would not exceed the existing capacity of the roadways; impacts to roadways would be less than significant. The impacts for Alternative 3 are the same as Alternative 1. Harbors The impacts for Alternative 3 are would be the same as Alternative 1. 14.2.4.2 Summary of Alternative 3 Impacts Table 14.2-3 summarizes Alternative 3 impacts. VOLUME 3: MARINE CORPS TINIAN 14-6 Roadways and Marine Transportation

Area Tinian Project Activities Table 14.2-3. Summary of Alternative 3 Impacts 14.2.4.3 Alternative 3 Proposed Mitigation Measures No mitigation measures are suggested for Alternative 3. 14.2.5 No-Action Alternative Project Specific Impacts Under the no-action, no new construction or new training activities associated with the Marine Corps relocation to Guam would occur in Tinian, and the Marine Corps would not meet training needs and requirements in support of the proposed action. The purpose and need for training in Tinian as described in Chapter 1 would not be met. Existing operations on Tinian would continue. Therefore, the no-action alternative would result in no impacts to roadways. Since there is no proposed construction or transportation of Marines or supplies by ship or barge, there would be no impact to marine transportation in Tinian Harbor. 14.2.6 Summary of Impacts Table 14.2-4 summarizes the potential impacts of each action alternative and the no-action alternative. A text summary is provided below. Table 14.2-4. Summary of Impacts Alternative 1 Alternative 2 Alternative 3 No-Action Alternative LSI LSI LSI NI NI NI NI NI Tinian Harbor NI NI NI NI Legend: LSI = Less than significant impact, NI = No impact. 14.2.7 Summary of Proposed Mitigation Measures Table 14.2-5 summarizes the proposed mitigation measures. Table 14.2-5. Summary of Proposed Mitigation Measures Alternative 1 Alternative 2 Alternative 3 None None None None None None Tinian Harbor None None None VOLUME 3: MARINE CORPS TINIAN 14-7 Roadways and Marine Transportation

This Page Intentionally Left Blank. VOLUME 3: MARINE CORPS TINIAN 14-8 Roadways and Marine Transportation