PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

Similar documents
SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

MagnumStone Specifications Gravity

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

SECTION MECHANICALLY STABILIZED EARTHEN SLOPES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION 303 CULVERTS

CHAPTER 11: WALLS.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SECTION TRENCHING

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

T-WALL Retaining Wall System

ARMOR-BLOCK. Installation guide. Installation Manual: ARMOR-BLOCK Retaining Wall System. Cap Block. Exposed void for planting.

SECTION EARTHWORK

SECTION ASPHALT CONCRETE


BIN-WALL BRIDGE ABUTMENTS PRODUCT GUIDE

INS T A LLA T I O N G U I D E

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS

LANDSCAPE RETAINING WALLS

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

2.1 Backfill - General

Ministry of Forests, Lands and Natural Resource Operations

SECTION MECHANICALLY STABILIZED EARTH 1.01 SUMMARY

GEOGRID CONNECTION DETAIL OLYMPIA RADIUS UNIT

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

CONSTRUCTION MANUAL 2.5 x 5 UNITS

Rethinking Water Management Systems

CONCRETE SEGMENTAL RETAINING WALLS

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

C. Foundation stabilization for pipe and utility structures.

Installation Guidelines

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

NCMA SRW Design & Construction Best Practices Guide. Scott Vollmer, PE SRW Market Manager Oldcastle Architectural

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

PROGRESS REPORT. CONSTRUCTION PROGRESS REPORT 2017 Minor Construction Works

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

SECTION PAVING SLABS ON AN AGGREGATE BASE

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Building. Anchorplex. Retaining Wall Systems

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

SPECIFICATION FOR REINFORCED SOIL WALL

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

SECTION Segmental Concrete Unit Masonry Retaining Wall Height Over 5-0 High

R-TANK SPECIFICATIONS

Redi Rock Specification and Installation Manual

StormTech Construction Guide

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

SEPA Environmental Checklist Mercer Island Center for the Arts. Attachment F Geotechnical Supplemental Memo

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Anchorplex retaining wall construction guide

Special Provision No. 405F03 March 2005

SECTION SPECIFICATION FOR MECHANICALLY STABILIZED EARTH TWO STAGE WALL SYSTEM

StormTech Construction Guide

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

Foundations, Excavation & Shoring Specialists

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION 18 - EARTHWORK TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CHAPTER 3. Grading Standards

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Construction Specification for Utility Adjustments

DIVISION: EXTERIOR IMPROVEMENTS SECTION: SEGMENTAL RETAINING WALLS REPORT HOLDER: ANCHOR WALL SYSTEMS EVALUATION SUBJECT:

STANDARD DESIGN NOTES 1 / 2

SECTION FILL AND BACKFILL

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

StormTech Construction Guide An company

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

ICPI TECH SPEC NUMBER 2 Construction of Interlocking Concrete Pavements

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

Lantz-Boggio Architects, P.C LBA Project No

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Construction Procedures

Transcription:

SITE NOT TO SCALE 635-8-STOCKPILEPHGA- 00 SHEET: OF DRAWING INDEX: SHEET 2 OF 0 - NOTES SHEET 3 OF 0 - PLAN VIEW :000 SHEET 4 OF 0 - PLAN VIEW :000 WITH REFERENCE SHEET 5 OF 0 - PLAN VIEW :500 SHEET 6 OF 0 - FUEL STORAGE PAD PLAN VIEW SHEET 7 OF 0 - S G AND H SHEET 8 OF 0 - S/W FILL RETAINING WALL VIEWS, S A AND B SHEET 9 OF 0 - S C, D, AND E SHEET 0 OF 0 - F AND DETAILS, 2, 3 AND 4 SHEET OF - CONCRETE BLOCK (INTERLOCKING) WALL LAYDOWN PATTERN

NOTES:. REFERENCED CODES.. BC BUILDING CODE 202.2. HEALTH SAFETY AND RECLAMATION CODE FOR MINES IN BRITISH COLUMBIA, 207.3. BRITISH COLUMBIA MINES ACT, 996 2. STRUCTURE: 2.. CONCRETE BLOCKS TO BE NO. GRADE STANDARD SIZED BLOCKS AS INDICATED IN DRAWING DETAILS. 2.2. ALL STEEL TO BE CSA G40.2 350A STEEL UNLESS OTHERWISE NOTED. 2.3. ALL GALVANIZED COMPONENTS TO ADHERE TO ASTM A23. 3. GEOTECHNICAL: 3.. FOUNDATION DESIGN REFERENCES THE CANADIAN FOUNDATION ENGINEERING MANUAL. SUBSURFACE INFORMATION HAS BEEN GATHERED FROM SITE OBSERVATIONS OF SOIL EXPOSURES IN EXPOSED CUTS AND MACHINE DUG TEST PITS. FIELD CONDITIONS MAY VARY FROM THOSE ENCOUNTERED. IF, UPON EXCAVATION, FIELD CONDITIONS VARY FROM THOSE ENCOUNTERED, THEN CHANGES TO THE FOUNDATION DESIGN OR INSTALLATION MAY BE REQUIRED. 3.2. SEE THE GEOTECHNICAL REPORT PREPARED BY ONSITE ENGINEERING LTD (OEL) FOR, COMPLETED OCTOBER 207. THE REPORT PREPARED BY OEL DETAILS COMPACTION REQUIREMENTS FOR TYPICAL EQUIPMENT SIZES AND MATERIAL TYPES, MAXIMUM SUBGRADE ELEVATION TOLERANCES, AND ACCEPTABLE MATERIAL GRADATIONS. 4. FIELD REVIEWS: 4.. A PROFESSIONAL ENGINEER OR THEIR DESIGNATE IS REQUIRED TO INSPECT THE FOLLOWING ACTIVITIES AND/OR CONSTRUCTION ELEMENTS PRIOR TO PROVIDING RECORD DRAWINGS: FOUNDATION SUBGRADE SOILS FOLLOWING EXCAVATION PREPARED SUBGRADE IMMEDIATELY PRIOR TO PLACING THE HDPE LINER AND ASSOCIATED GEOTEXTILE LAYOUT AND PLACEMENT OF GEOGRID PRIOR TO BACK FILL OTHER SITE INSPECTIONS AT THE DISCRETION OF THE PROFESSIONAL 5. INSTALLATION NOTES: 5.. NOTE THAT WHERE EXCAVATION SPECIFICATIONS ON THESE DRAWINGS CONFLICT WITH WORKSAFEBC REGULATIONS, WORKSAFEBC REGULATIONS ARE TO GOVERN. 5.2. CONTRACTOR MUST NOT DISTURB THE LYNX CONVEYOR FOOTINGS OR BEARING SOILS. 5.3. CONTRACTOR MUST NOT DISTURB FUEL TANK FOUNDATION SOILS TO PREVENT DIFFERENTIAL SETTLEMENT OF THE FUEL TANKS. 5.4. CONTRACTOR TO FIELD FIT CULVERT AROUND LIME SILOS TO PREVENT SILO FOUNDATION DISTURBANCE WHILE MAINTAINING MINIMUM SPECIFIED GRADE. DO NOT EXCEED MANUFACTURES BEND RADIUS SPECIFICATIONS DURING FIELD FIT ACTIVITIES. CULVERT MUST DISCHARGE INTO PRE-EXISTING CONTACT WATER DITCH. 5.5. RAIN GUN INSTALLATION TO BE FIELD FIT ONCE THE CONTRACTOR CONFIRMS THE LOCATION OF A SUITABLE TIE IN LOCATION AFTER INITIAL EXCAVATION HAS TAKEN PLACE. 5.6. THE CONSTRUCTION SITE IS AN HISTORIC MILL SITE AND DOCUMENTATION OF PRE-EXISITNG UTILITIES AND STRUCTURES IS LIMITED. CONTRACTOR TO EXPECT UNIDENTIFIED UTILITIES DURING EXCAVATION. 6. DATA COLLECTION METHODOLOGY THE DESIGN IS BASED ON FIELD INSPECTIONS AND A REVIEW BY AN OEL AND NYRSTAR REPRESENTATIVE COMBINED WITH LIDAR AND ORTHOGRAPHIC DATA PROVIDED BY NYRSTAR IN JUNE 207. NO INDEPENDENT SURVEY BY OEL WAS COMPLETED FOR THIS WORK SITE. 635-8-STOCKPILEPHGA- 002 SHEET: 2 OF

LIME SILOS LYNX CONVEYOR FUEL STORAGE FUEL BAY MILL SHOP CONVEYOR FOOTING (TYP.) MILL COARSE ORE BIN PLAN VIEW SCALE :000-0 0 0 20 30 40 50 635-8-STOCKPILEPHGA- 003 SHEET: 3 OF

PROPOSED 600mm HDPE CULVERT. FIELD FIT TO AVOID INTERFERENCE WITH SILOS. F 0 ELRUS 36"-42" PORTABLE BELT FEEDER OR EQUIVALENT LIME SILOS TIE TO EXISTING LYNX CRUSHER DISCHARGE HOPPER D 09 APPROXIMATE EXTENT OF CUT / FILL SLOPE A 08 LYNX CONVEYOR E 09 ELRUS 2442 JAW CRUSHER OR EQUIVALENT B 08 H 07 09 C FUEL STORAGE 07 G FUEL BAY MILL SHOP APPROXIMATE LOCATION OF EXISTING POWER LINES EXISTING CONTACT WATER DITCH TO SUPER POND EXISTING ROAD EDGES FUTURE CLOSURE SPILL WAY BY OTHERS MILL COARSE ORE BIN PLAN VIEW SCALE :000-0 0 0 20 30 40 50 635-8-STOCKPILEPHGA- 0 SHEET: 4 OF EXISTING ROAD EDGES EXISTING DITCH APPROXIMATE EXTENT OF CUT/FILL SLOPE

WP0 FRENCH DRAIN WP3 TORO TG0 RAIN GUN MOUNTED ON 8m UTILITY POLE WP2 2.8m WP4 SLOPE -9% 4m 600mm HDPE CULVERT APPROXIMATE CONVEYOR FOOTING LOCATION 42.0m WP6 53.0m WP2 WP5 23.m WP9 WP ELEVATIONS SHOWN HAVE AN ARBITRARY DATUM AND SHOULD ONLY BE USED TO ESTABLISH RELATIVE ELEVATION FOR CONSTRUCTION PURPOSES. ELEVATIONS ARE AT FINISHED GRADE. PROPOSED CONCRETE BLOCK (INTERLOCKING) WALL WP 33.6m FUEL STORAGE PAD. SEE SHEET 6 FOR DETAILS. *WORKPOINTS AT CULVERT ARE LOCATED AT THE CULVERT INVERTS. WP N E ELEV WP 2933.96 2030.05.52 WP2 2967.58 20.92 3397.35 WP3 2978.47 202.95.93 WP4 2969.0 24.07.27 WP5 2953.38 2058.7 3395.83 *WP6 2959.25 2080.64.0 WP9 2955.78 200.58 339.8 WP0 2982.7 2023.22 3399.0 WP 2943.58 24.09.66 WP2 2952.53 2056.06.66 DUST CONTROL RADIUS (R=40 TYP.) WORK POINT AND DRAINAGE PLAN VIEW SCALE :500-5 0 5 0 5 20 25 635-8-STOCKPILEPHGA- 005 SHEET: 5 OF EXISTING DITCH

.20m MINIMUM CLEARANCE WP2 (INTERLOCKING) TIE-BACK 9.20m PROPOSED CONCRETE BLOCK (INTERLOCKING) WALL 3m 3m HIGH ROCK FENCE, DESIGN BY OTHERS (GEOBRUGG RIGID POST 00KJ OR APPROVED EQUIVALENT) WP EXISTING FUEL STORAGE TANKS 6.75m 5m FUEL STORAGE PAD PLAN VIEW SCALE :200-2 0 2 4 6 8 0 635-8-STOCKPILEPHGA- 006 SHEET: 6 OF

3m HIGH ROCK FENCE, DESIGN BY OTHERS HDPE LINER. SEE DETAIL ON SHEET 0. HDPE LINER ANCHOR. SEE DETAIL 3 ON SHEET 0. FRENCH DRAIN (INTERLOCKING) TIE-BACK (NOT IN PLANE) EXISTING FUEL STORAGE TANK (INTERLOCKING) WALL (INTERLOCKING) WING WALL (NOT IN PLANE) G FUEL TANK WALL 3m HIGH ROCK FENCE.5 (INTERLOCKING) WALL EXISTING FUEL STORAGE TANKS H FUEL TANK WALL PROFILE 635-8-STOCKPILEPHGA- 007 SHEET: 7 OF DESIGNED FINISHED SURFACE HDPE LINER OF EXCAVATION ARMTEC 7XT GEOGRID (OR APPROVED EQUIVALENT)

3402 ARMTEC 7XT GEOGRID. GEOGRID TO EXTEND 3m BEHIND WALL. BACKFILL WITH COMPACTED COMMON FILL TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. (INTERLOCKING) WALL ACCESS ROAD 0.50m HDPE LINER. SEE DETAIL ON SHEET 0. HDPE LINER ANCHOR. SEE DETAIL 3 ON SHEET 0. 0.50m FRENCH DRAIN. SEE DETAIL 2 ON SHEET 0. (BY OTHERS) A NORTH WEST WALL (INTERLOCKING) WALL.5 HDPE LINER. SEE DETAIL ON SHEET 0. HDPE LINER ANCHOR. SEE DETAIL 3 ON SHEET 0. FRENCH DRAIN. SEE DETAIL 2 ON SHEET 0. ACCESS ROAD (BY OTHERS) B FRENCH DRAIN 3402 (INTERLOCKING) WALL (NOT IN PLANE) BACKFILL AND COMPACT EVENLY AROUND POST IN MAXIMUM 0.5m DEEP LIFTS COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. MATERIAL WITHIN 0.5m OF THE POST MUST BE SAND. COAT ALL STEEL WITH BITUMINOUS PAINT PRIOR TO BACKFILLING. **COMPACTED COMMON FILL LYNX CONVEYOR STRUT FILL DETAIL ELEVATION VIEW SCALE :200-2 0 2 4 6 8 0 0.50m.5 EXISTING GROUND LYNX CONVEYOR FOOTING (NOT IN PLANE), ELEVATION APPROXIMATE BACKFILL AND COMPACT EVENLY AROUND POST IN MAXIMUM 0.5m DEEP LIFTS COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. MATERIAL WITHIN 0.5m OF THE POST MUST BE SAND. COAT ALL STEEL WITH BITUMINOUS PAINT PRIOR TO BACKFILLING. HIGH ROW OF BLOCKS MAY BE REQUIRED ALONG TOE OF FILL TO MAINTAIN MAINTENANCE ROAD ACCESS LYNX CONVEYOR FOOTING APPROXIMATE LOCATION 3402.5 3.00m (INTERLOCKING) WALL (NOT IN PLANE) LYNX CONVEYOR STRUT FILL DETAIL PROFILE VIEW SCALE :200-2 0 2 4 6 8 0 **COMPACTED COMMON FILL 635-8-STOCKPILEPHGA- 008 SHEET: 8 OF DESIGNED FINISHED SURFACE HDPE LINER OF EXCAVATION ARMTEC 7XT GEOGRID (OR APPROVED EQUIVALENT)

34 3402 **COMPACTED COMMON FILL ARMTEC 7XT GEOGRID. GEOGRID TO EXTEND 3m BEHIND WALL. BACKFILL WITH COMPACTED COMMON FILL TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. (INTERLOCKING) WALL HDPE LINER ANCHOR. SEE DETAIL 3 ON SHEET 0. HDPE LINER. SEE DETAIL ON SHEET 0..5 FRENCH DRAIN. SEE DETAIL 2 ON SHEET 0. C SOUTH WEST WALL FRENCH DRAIN. SEE DETAIL 2 ON SHEET 0. CULVERT INLET. SEE DETAIL 4 ON SHEET 0. PROPOSED ROAD RUNNING SURFACE.5 SLOPE MIN. -2% 600mm HDPE CULVERT, ADS N-2 WT OR APPROVED EQUIVALENT 3388 COMPACTED LEVELLING COURSE (MIN. 0.5m DEEP) (BY OTHERS) OUTLET TO BE FIELD FIT TO ACHIEVE MINIMUM 2% SLOPE AND NOT TO INTERFERE WITH LIME SILOS. 3386 D CULVERT PROFILE FINISHED ROAD SURFACE SLOPE -9% **COMPACTED COMMON FILL GRANULAR FILL TO BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. E ROAD PROFILE 635-8-STOCKPILEPHGA- 009 SHEET: 9 OF DESIGNED FINISHED SURFACE HDPE LINER OF EXCAVATION ARMTEC 7XT GEOGRID (OR APPROVED EQUIVALENT)

3397 FRENCH DRAIN. SEE DETAIL 2 ON THIS SHEET. 4m 0.65m 3395 HDPE LINER. SEE DETAIL ON THIS SHEET. MIN. 0.5m 0.77m HDPE LINER ANCHOR. SEE DETAIL 2 ON THIS SHEET. NILEX 60mil HDPE LINER OR APPROVED EQUIVALENT STOCK PILE RUNNING SURFACE 0.3m ARMTEC 40 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT COMPACTED ROAD FILL 0.3m COMPACTED ROAD FILL F ROAD SCALE :00-0 2 3 4 5 FILL WITH " TO 6" ROCK 2m m NILEX 60mil HDPE LINER OR APPROVED EQUIVALENT. SEE DETAIL ON THIS SHEET FOR INSTALLATION DETAILS. ROAD OR COMMON FILL 90% PARENT MATERIAL COMPACTION (TYP.). **COMPACTED COMMON FILL GRANULAR FILL TO BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. WELL **COMPACTED SAND ARMTEC 40 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT 0.5m WELL **COMPACTED SAND ARMTEC 40 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT NILEX 60mil HDPE LINER OR APPROVED EQUIVALENT. SEE DETAIL ON THIS SHEET FOR INSTALLATION DETAILS. DETAIL 08 HDPE LINER INSTALLATION SCALE :50-0.5 0 0.5.5 2 2.5 m m COMMON FILL BERM STOCK PILE RUNNING SURFACE FRENCH DRAIN DETAIL 2 8/9 FRENCH DRAIN SCALE :50-0.5 0 0.5.5 2 2.5 NILEX HDPE LINER ANCHOR OR APPROVED EQUIVALENT MINIMUM COVER 0.3m ROAD RUNNING SURFACE MIN. 0.5m DEEP **COMPACTED COMMON FILL 0.46m NILEX 60mil HDPE LINER OR APPROVED EQUIVALENT. SEE DETAIL ON THIS SHEET FOR INSTALLATION DETAILS. 600mm HDPE CULVERT NILEX HDPE LINER ANCHOR OR APPROVED EQUIVALENT **COMPACTED COMMON FILL DETAIL 3 08 BERM ANCHOR SCALE :50-0.5 0 0.5.5 2 2.5 WELL **COMPACTED SAND ARMTEC 40 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT WELL **COMPACTED SAND DETAIL ARMTEC 40 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT 4 09 CULVERT INLET SCALE :50-0.5 0 0.5.5 2 2.5 COMPACTED LEVELLING COURSE MIN. 0.5m DEEP 635-8-STOCKPILEPHGA- 00 SHEET: 0 OF DESIGNED FINISHED SURFACE HDPE LINER ARMTEC 40 GEOTEXTILE (OR APPROVED EQUIVALENT) OF EXCAVATION

2.75m 2.75m NOTE: FINISH OFF ENDS OF WALL USING HALF SIZE CONCRETE BLOCKS (INTERLOCKING). QTY. 2 REQUIRED FOR THIS LAYER. 42m 42m CONCRETE BLOCK (INTERLOCKING) WALL LAYER (BASE LAYER) PLAN VIEW SCALE :00-0 2 4 CONCRETE BLOCK (INTERLOCKING) WALL LAYER 2 PLAN VIEW SCALE :00 3 5-0 2 3 4 5 2.75m 2.75m NOTE: FINISH OFF ENDS OF WALL USING HALF SIZE CONCRETE BLOCKS (INTERLOCKING). QTY. 2 REQUIRED FOR THIS LAYER. 42m 42m CONCRETE BLOCK (INTERLOCKING) WALL LAYER 3 PLAN VIEW SCALE :00 CONCRETE BLOCK (INTERLOCKING) WALL LAYER 4 (TOP LAYER) PLAN VIEW SCALE :00-0 2 3 4 5-0 2 3 4 5 635-8-STOCKPILEPHGA- 0 SHEET: OF