SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE

Similar documents
ADDENDUM NO. 2. Please find answers to bidding questions received by the architect below.

1. ASTM F : Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment.

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

SECTION RESILIENT SHEET FLOORING

UPHOLSTERED WALL SYSTEM UPHOLSTERED WALL SYSTEM

CARPET CARPET

Section SYNTHETIC GRASS SURFACING. ADDENDUM 2 January 17, 2019

Sun City Lincoln Hill ARC Application Checklist

and tools necessary for the complete installation of the synthetic grass turf field as indicated on the plans and as

STATE UNIVERSITY CONSTRUCTION FUND

ROLLED EROSION CONTROL PRODUCTS (RECP)

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

TILE TILE

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

02800 SHADE STRUCTURES

End of Addendum No. 3

SYNTHETIC TURF SYSTEMS Artificial Turf Perfect Putt

For. Project #: Lee Jackson Practice Field Turf Replacement

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Specification Guide and Installation Overview

SECTION 07530CP EPDM MEMBRANE ROOFING

REVISION OF SECTION 623 IRRIGATION SYSTEM GENERAL

C. Foundation stabilization for pipe and utility structures.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems

E. Popcorn or other spray applied textures on ceiling or walls are not acceptable.

Pup Turf Dog Park Pup Turf (921)

BENTONITE WATERPROOFING

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

Section HIGH-TENSION Stretched-Fabric Wall Systems SoftWalls, Inc.

Student Services & Classroom Addition

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SECTION TILE CARPETING

SYNTHETIC PLAYGROUND TURF Artificial Turf Playtime

Artificial Turf Robertson 921 Pup Turf

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS

SECTION FLUID-APPLIED WATERPROOFING

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SECTION POLYPROPYLENE FABRIC WALL COVERING

Corium Brick Rainscreen System Specifications

SECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

SECTION WOOD GYMNASIUM FLOORING

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

CONCRETE TILE PAVERS

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

TRUEGRID Permeable Paver Technical Specifications

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

SECTION DETECTABLE GUIDE TACTILES

Section Pre-Applied Sheet Membrane Waterproofing

SECTION ASPHALT PAVING

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

SECTION GYPSUM BOARD ASSEMBLIES

Architectural Roof and Wall Products Guide Specifications

HUITEX GEOCELL INSTALLATION MANUAL

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STAINLESS STEEL WALL PANELS

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

University of New Hampshire Scholars' Repository

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

Mandatory Wood Frame Soft-story Retrofit Program PERMITTING AND INSPECTION PROCESS GUIDELINES

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

SECTION CARPET Summary A. This Section includes carpet, carpet adhesive, and carpet accessories.

Northpointe Renovation EPN #1701 F/A Prroject #17027 September 8, 2017

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

SECTION FLEXIBLE PAVING

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

Michigan State University Construction Standards SEGMENTAL CONCRETE RETAINING WALLS PAGE SECTION SEGMENTAL CONCRETE RETAINING WALLS

EAST SIDE UNION HIGH SCHOOL DISTRICT TRACK & FIELD RESURFACING PROJECTS BID DOCUMENTS

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

Guide Specifications ADP Series SECTION SHEET METAL ROOFING

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

Construction Specification for Utility Adjustments

Section X - Miscellaneous

Wood Floor Bonding Systems

SECTION DECORATIVE STAINLESS STEEL DRAINS AND GRATES

Customer Owned and Constructed Transformer Alcove

Section 32 - Miscellaneous

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION RESILIENT TILE FLOORING

Triton DCI Decoupling Mat

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

Student Services & Classroom Addition

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

City of Westerville Guide to Commercial Inspections

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

EPOXY TERRAZZO 1 REV. 8/02

SECTION ASPHALT INTERLAYER REINFORCEMENT SYSTEM. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

Transcription:

SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE 1.01! DESCRIPTION OF WORK: The contractor shall provide all labor, materials, equipment and tools necessary for the complete installation of a knitted no in-fill synthetic grass dog surface with a stable draining base. The complete synthetic grass system shall consist of, but not necessarily be limited to, the following: A.! Area of construction with the extent of artificial turf work as shown on the drawings. B.! Subgrade, base, and drainage construction as specified in Section 2 and Section 3 of this document. C.! Quality synthetic grass product manufactured in the USA according to specifications in Section 2 of this document. Product shall be a knitted synthetic grass product (not tufted) and contain an antimicrobial agent while meeting or exceeding all guidelines as established herein. For characteristics not specifically stated, shall meet or exceed all guidelines published by the Synthetic Turf Council. D.! The synthetic grass surface shall be specifically designed, manufactured and installed for the intended use as a commercial / high use dog surfacing solution. E.! Plastic perimeter boards (typically 1 x 2 laid flat) are to surround the entire area for anchoring of the turf. The top edge of this surface is to be a minimum of below any adjacent solid surfaces where there could be foot traffic. F.! Stainless steel screws, a minimum of 1 in length, aluminum tack strips, and aluminum cover strips are recommended to anchor the synthetic turf to the perimeter boards. 1.02! SYSTEM PERFORMANCE: Contractor shall ensure that products for pet/dog system meet the following performance requirements: A.! The components, as well as the installation methods utilized, shall be designed and executed in a manner to hold up to the unique challenges dogs present. The materials as hereinafter specified shall hold up to recommended maintenance procedures (which includes running a vacuum over it), be resistant to insect infestation, and allow the free flow of water vertically through the surface and into the drainage system below. B.! The seams of all system components shall provide a permanent, tight, secure, and hazard free surface. C.! The installed synthetic grass and drainage system shall allow for drainage and water flow through the system at a rate of not less than 2000 per hour. 1.03! SERVICE AND QUALITY ASSURANCE: Synthetic grass vendor shall provide ongoing service quality assurance and warranty consisting of, but not necessarily be limited to, the following:

A.! The synthetic grass vendor must provide competent workmen skilled in this type of dog surface installation. The synthetic grass vendor shall provide a qualified installation foreman to coordinate and review the component parts of the synthetic grass system. B.! The synthetic grass vendor and installer must be experienced with no less than six completed commercial dog installations (1500sf or greater and not less than three successful indoor installations including flushing system) where a knitted synthetic grass surface was installed. Installer must be competent in the installation of this material, including attachment of seams and proper trimming and attaching techniques prior to the start of turf installation. C.! The synthetic grass vendor shall submit its manufacturer s warranty, which warrants the synthetic grass product: I.! Provide coverage of synthetic grass for a minimum of ten (10) years from the date of substantial completion. II.! Warrant that the materials installed meet or exceed the product specifications. III.! Be from a single source (certified by manufacturer) covering workmanship and all materials. IV.! Assure the availability of exact or substantially the same replacement materials for the synthetic grass system for the full warranty period. V.! Include general wear and damage. The warranty may specifically exclude vandalism and Acts of God beyond the control of the manufacturer or installer. 1.04! SUBMITTALS: A.! Synthetic grass vendor must submit the following to owner or owner s representative with the official bid package: I.! One (1) copy of the most recent installation reference list for projects of similar scope to this project completed in last five years. II.! One (1) 12 x12 loose sample of proposed synthetic grass product. III.! One (1) copy of the product warranty for proposed synthetic grass product. IV.! One (1) copy of their maintenance instructions. These instructions will include all necessary instructions for the proper care and maintenance of the newly installed synthetic turf system. V.! One (1) copy of edge details (if requested) of proposed installation and terminations of synthetic grass system. VI.! One (1) copy (if requested) of a signed letter from synthetic grass vendor certifying that the proposed synthetic grass product is manufactured in the USA. VII.! One (1) copy (if requested) of independent laboratory test reports on system or components. VIII.! Recommend drain requirements are reviewed and approved by plumber and local municipality where appropriate.

2 PRODUCTS 2.01 SYNTHETIC GRASS SYSTEM: A. Synthetic Grass ForeverLawn K9Grass Lite Pile Weight: 56 oz/sy Face Yarn Type: Primary: Polyethylene; Secondary: Heat set textured nylon monofilament containing antimicrobial agent. Yarn Count: Primary 5,000/4; Secondary 4,200/8 Pile Height (knitted): 1 Color: Primary: Summer Green; Secondary: Turf Green Construction: Knitted Antimicrobial Protection: AlphaSan (manufactured into yarn) Tufting Gauge: N/A knitted product Backing: Flow-through knitted backing with light acrylic coating Seaming: Turf Adhesive Total Product Weight: 71 oz /sy (+/- 2 oz) Finished Roll Width: 15 (4.6 m) Finished Roll Length: Up to 150 (45.72 m) The synthetic grass shall be delivered in 15-foot-wide rolls. The rolls will be laid out and installed as specified in the site layout and equipment placement drawings. All seams shall be installed and secured with approved turf adhesive. Seams secured with stitching alone shall not be acceptable. No Infill material is to be used. B. Base and Attaching Components: I.! Base is to be prepared using plastic 1 x 2 plastic board that is typically secured to floor using 1 or greater stainless steel screws, aluminum tack strips, and aluminum cover strips. II.! Base is to be sloped and sealed impermeable surface that directs liquid waste to an exit point (drain). III.! Trench drain is recommended but center drain may be acceptable if approved by manufacturer s representative. IV.! Base is to be covered with grid elevation system that raises floor surface a minimum of 1 and reduces contact with the floor to allow liquids to drain vertically as well as flow to drain. V.! Base of grass area is typically 2 below the surrounding area (1 3/8 for grid, 5/8 for grass allowing top of blades to go beyond surrounding surface).

VI.! Floor and wall connection is to be impermeable and it is advisable that walls are impermeable up to a minimum of 36. VII.! Under Grass Flushing System is to be incorporated that rinses the floor diluting urine and moving it to the drain without wetting the grass. VIII.! Any deviation from these methodologies must be approved my manufacturer. Turf is to be secured around all edges. C. HVAC: Indoor use of synthetic grass requires industrial strength dehumidification and potential use of equipment to dry and maintain the grass. An HVAC or dehumidification expert with specific expertise with synthetic grass use for indoor installations should be consulted. D. Alternative Base and Attaching Components: Indoor areas without a consistent sealed sloped surface may still be candidates for a synthetic grass solution but require specific manufacturer design involvement. 3 EXECUTION 3.01 BASE AND DRAINAGE CONSTRUCTION: The synthetic grass base contractor shall strictly adhere to the installation procedures outlined under this section and by the engineer s drawings. Any variance from these requirements must be accepted in writing, by the synthetic grass vendor, and submitted to the owner or owner s representative, verifying that the changes do not adversely affect the performance or warranty. A.! Base Preparation: Floor should be a smooth consistent surface that is sealed and impermeable to liquids. Liquids must easily flow to drainage point. B.! Plastic Nailer Board: The synthetic turf perimeter fastening structure shall be installed before the grid system. I.! Install a plastic board around perimeter and all penetrating objects. Nailer board shall be below grade when adjacent to hard surface (i.e. concrete or tile). This shall be the responsibility of the synthetic turf base contractor. See synthetic turf edge attachment detail. C.! For an alternate aggregate Base Drainage System (must be approved for indoor use by manufacturer representative): Base Drainage Aggregate: Installation of the free draining base aggregate of 3/8 to 5/8 clean compactable angular stone (any mix with fines in excess of 20% must be approved by manufacturer), shall follow procedures provided. If the sub-base does not permit liquids to freely percolate, auxiliary drainage is required. Base material must be installed to a minimum depth of 4. I.! The stone shall be left firm and compacted while allowing the porosity and drainage capabilities of the aggregate profile.

II.! The free draining base will likely require additional drainage components to evacuate liquids. Base must be installed to a minimum depth of 4 with an overall compaction rate of at least 90%. D.! A Flushing System is recommended for installations over grid covering a sealed sloped surface. This system provides mechanisms required to move water and/or cleaning solution under the grass, diluting urine and moving it to the drain (trench drain preferred). I.! Flushing system is typically broken down into 15 to 20 zones of piping with a center feed and emitter holes. Three basic flushing system options typically exist:! Manual System zone is fed by a stubbed pipe coming up through the grass with a male/female quick connect. Zones are fed by a hose connected to water source, manually connected, then turned on.! Semi-Automated zone is fed by a charged water line with a hard connection to each flushing system port. An easy to turn on and off valve is to be provided for each zone for ease of turning on and off.! Automated zone is fed by a hard line and controlled by a central control panel (similar to sprinkler system). Panel provides programming options. II.! Option for integrating cleaning solutions can be set up in water line coming in. It is advisable to provide easy switching between clean water and water infused with cleaning solution.! A backflow protection is typically required by certified plumber to prevent contamination of water source.! An infusion pump needs to be provided into the line providing the cleaning solution.! A tank containing cleaning concentration needs to be connected to the infusion pump vial line. 3:02 SYNTHETIC GRASS SYSTEM INSTALLATION: After a final inspection of the base (stone or grid) by the synthetic grass contractor and the owner s representative, the synthetic turf installation shall begin. The synthetic grass product shall be delivered in 15-foot-wide rolls. A.! Synthetic grass rolls shall be joined via adhesive bond seaming and reinforced with specialty turf adhesive where necessary. I.! Seams shall be flat, tight and permanent with no separation or fraying. II.! Grass rolls must be installed with pile leaning the same direction. III.! Knitted grass product is not to be stretched (lengthwise) during installation.

B.! Synthetic Turf Perimeter Attachment: I.! After final layout and seaming of the synthetic grass product, the synthetic turf material shall at a minimum be secured to the plastic perimeter board. Plastic board is to be firmly anchored to floor, curb, or wall surrounding the synthetic turf area. II.! The turf shall be attached to plastic nailer board by stainless steel staples (staple process must be approved by manufacturer and is important to note restricts future access under the grass), screws, and/or aluminum tack and cover strips. III.! Concrete and solid surfaces should be higher than the top of the perimeter board. C.! Infill Application: It is imperative that no in-fill is utilized with synthetic turf used with dogs. 3.03 CLOSEOUT A.! The synthetic grass vendor must verify that a qualified representative has inspected the installation and that the finished surface conforms to the manufacturer's requirements. B.! Extra materials: Owner shall be given option to retain and store excess materials such as excess turf for project, but not installed. 3.04 CLEAN UP A.! Contractor shall provide the labor, supplies and equipment as necessary for final cleaning of surfaces and installed items. B.! During the contract and at intervals as directed by the owner or owner s representative and as synthetic grass system installation is completed, clear the site of all extraneous materials, rubbish, or debris and leave the site in a clean, safe, well draining, neat condition. C.! Surfaces, recesses, enclosures, etc. shall be cleaned as necessary to leave the work area clean and ready for immediate occupancy and use by the owner.