SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

Similar documents
A GUIDE TO LAYING ARTIFICIAL GRASS BEFORE 0 %INTEREST* MINIMUM SPEND $499 AFTER

InstallatIon. Guidelines. Relax More. A C T G L O B A L. C O M / X T R E M E L A W N E M A I L : X T R M E L A W A C T G L O B A L.

A DIVISION OF INSTALLATION. Guide. Relax More.

Porcelain Paver Installation Guide

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

1850 x 40/50mm Raised Shower Tray Kit

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

CRESTONE STRAIGHT FIRE PIT SKU:

General Brick Installation Instructions

25 m2 (270 sq ft) Extension Kit

SAND INSTALLATION GUIDE

How to build 4 DIY projects with. AB Courtyard

stone oasis collection oasis circle patio (diameter ) instruction guide

TECHNICAL DATA SHEET

INSTALLATION PROCEDURES FOR RUBBER FLOORING

Suggested laying methods for STONE pavers

Texline Ideal loose lay

Hardscaping Installation Manual

PRESCOTT FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

EASY GARDEN WALKWAYS Home Gardeners School March Presented by Robert W. Bellek Owner

Decking Buying Guide for Customers

28 BELGIAN WEDGE FIRE RING

Impact Protection Slabs and Sports Pavement Slabs

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

RAFFINATO FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

One Meter Internal Dome Oven AVERAGE GUIDE

TECHNICAL DATA SHEET

Pre-build: TOOLs & Materials

36" CRESTONE FIRE RING

Installation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage

RUSTIC FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND.

Instructions on how to install a Pre casted Calabrese oven kit September 2017

Capillary Concrete Bunker Edge Installation Instructions

Installation of Ecodure Bamboo or Ecodure Oak over particle board, plywood and existing timber floors

INSTALLATION INSTRUCTIONS - Please read before installation

Substation #9 Instructions for Assembly of the HO scale kit. v1.1

ADPED FIXING GUIDE. Visit to view the PorcelQuick demonstration video

MUTUAL MATERIALS TECH SHEET RomanStack. Coverage* 4.5 pcs / ft² (48.44 pcs / m²) 3,242 lb (1,470 kg) 4 x 8 Cap Unit. 1.6 pcs / ln ft (4.

Garden WallScape Installation Guide

Retaining Wall Ranges Bribie 4 Daintree 6 Heron 8 Moreton 10 How to Build Retaining Walls 12 Pavers Ranges Ecology 14 How to Pave 16 Contact 18

GROUNDtrax GROUNDGRIDZ

Dansand. Joint Filling Sand. Product information on patented joint filling sand for concrete pavements

Installation Manual. Foundations. Version 2

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

INSTALLATION. The no mess, fast and easy, Peel & Stick flooring underlay and installation system... Quick Glance - Features and Benefits

Please Note: PhoneStar was previously branded as Phonewell

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

CAST STONE WALL SQUARE FIRE PIT KIT INSTALLATION GUIDELINE

DRiBOND. Advanced Dry Mudset for Concrete Overlays

HYBRID. Pre-Laying Checks

Pot and Bothered. Tools. Materials: Peat moss Sand Portland cement Water

Tactile Pad Installation Guide. All Surfaces.

Rigid Core Installation & Maintenance Instructions

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

30mm Height Linear Drain Shower Trays

Stretch Your Dollar Theme Designs Fire Pit

ARTEX AND PLASTER. 2 - Choosing the right product

ABOUT CONCRETE. What does it mean to "cure" concrete? Why does concrete crack? What does 28 -day strength mean?

Panel Installation Guide

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION

Installation and Maintenance instructions

how to easy! TILE A BATHROOM DIY made Scan here to watch the video HOW TO TILE A BATHROOM

ASHWELL FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND. Plan Date: June 2016

Retaining Wall Installation Instructions PART 1 RETAINING WALL GENERAL

Cedar Flooring Rounds

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

Agenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia

Tasman Retaining Wall System

Application Instructions for Keystone Kool Deck on Existing Concrete

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

Berkshires Glueless and Full Spread Installation Instructions

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

premium click optimum click

Installation instruction

AQUATITE. Also designed as: Crack/gap filler for masonry and unglazed ceramics Sealants against leaks Repairer for roof cracks and gutters

EZ BASE. Paver Base System ECHNICAL DATA SHEET TECHNICAL DATA SHEET TECHNICAL DATA SHEET TECHNICAL DATA SHEE UPDATE APPLICATIONS PROPERTIES

Which way up? There seems to be some confusion about the way you lay natural stone. Please see the diagram as detailed below

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

Installation Information 2018

COUNTY BLOCK. Construction Guidelines on County Block Steps. Special Considerations When Building Steps. Natural Beauty Absolute Strength

Instructions for laying Parmate Engineered Flooring

PAVE SCHOOL printer version. Complete Installation Guide for Concrete and Clay Paver Walkways By, Bob Cramer

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

T65 Impact Panels Floor System

PPC Cement TUTORIAL. how to screed a floor

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Impact protection Slabs for Outdoor Games

Installation Guidelines: Magnolia

at home installation guide Manufactured by:

Unit 9 Reinstatement of modular surfaces and concrete footways

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

Installation Instructions - Dry Method

Installing Large Format Outdoor Tiles Using Adjustable Support Pedestals

For detailed product information, visit our DeckOver, Textured DeckOver or Extra Textured Deckover product pages.

RESURFACES PROPERLY PREPARED WEATHERED WOOD AND CONCRETE

Tasman Retaining Wall System

Transcription:

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

HARD SURFACE INSTALLATION You will need: Tape measure Rope or spray paint Weed spray Sharp utility knife and spare blades Synthetic grass adhesive V-notch trowel You may also need: Stiff bristled broom Dried silica sand Gloves Eye protection 1. PREPARATION a. Mark out the area you wish to cover with Coolaroo Synthetic Grass. 2. CLEARING a. Ensure that the surface is level and there are no large gaps between paving slabs, patio tiles or decking planks. Anything larger than 20mm can cause sagging as the Coolaroo Synthetic Grass is laid. If you do have gaps in your surface, you ll need to fill them prior to laying your Coolaroo Synthetic Grass. b. Sweep the concrete surface thoroughly and pull any weeds out that are present. Examine the concrete to ensure no dirt or other organic matter is present before treating the cracks with a commercial herbicide. b. Measure the total area you have marked out and calculate the amount of Coolaroo Synthetic Grass required. NOTE: When calculating the area and preparing your layout, remember the pile needs to run in the same direction.

3. LAYING THE GRASS 4. SECURING AND JOINING a. Starting just in from the edge, roll the Coolaroo Synthetic Grass out across the entire area, taking note of the pile direction. For best results let the Coolaroo Synthetic Grass rest for a couple of hours to settle. b. Using a sharp, heavy duty utility knife, cut the grass to the desired size and shape. Take your time to ensure a flawless finish. c. Once laid, stand back and review the entire area. Any changes will need to be made before moving on to the next step. NOTE: Ensure that all grass is laid with the pile running in the same direction. Leave a gap around all edges of no less than 5mm to allow for water run-off. a. Starting at any edge, lift up the artificial turf. Using a v-notch trowel, apply a thin layer of synthetic grass adhesive on the concrete and press the grass down. b. Continue around the entire edge of the turf and then use the glue to secure the joins in the same manner. When joining lengths of grass, ensure joins are pulled together as closely as possible without overlapping and that there are no tufts of grass crushed under the join. There should never be more than a 1mm gap between joins. c. Walk along the join several times to ensure it sticks down securely. You may need to ruffle the pile along the join, as some fibers may be lying flat. d. Allow the adhesive to dry according to manufacturer s instructions. NOTE: Do not apply the adhesive too thickly as it can block the drainage holes.

5. SAND FILLING Adding sand fills in the gaps between each blade, giving support to the pile and helping it remain upright. This provides a more natural and lush finish. Infill is not required for all Coolaroo Synthetic Grass applications. a. Spread dried silica sand across the entire surface, moving up and back in straight lines to achieve an even cover. Distribute the sand evenly over the Coolaroo Synthetic Grass using a stiff bristled broom, ensuring this is done against the direction of the pile. 10-15kg of sand per square metre is recommended for most pile lengths.

SOFT SURFACE INSTALLATION You will need: Tape measure Rope or spray paint Rake/screed Coolaroo Synthetic Grass Underlay Crushed rock Hose or watering can and access to water Sharp utility knife and spare blades Synthetic grass joining tape Synthetic grass pegs Hammer Compactor/whacker You may also need: Stiff bristled broom Dried silica sand Gloves Eye protection 1. PREPARATION a. Mark out the area you wish to cover with Coolaroo Synthetic Grass. b. Measure the total area you have marked out and calculate the amount of Coolaroo Synthetic Grass required. Note: When calculating the area and preparing your layout, remember the pile needs to run in the same direction. 2. CLEARING a. Excavate the area to a depth of 70-80mm to create a level base. b. Remove all loose vegetation and debris in the area. c. Roughly rake or screed the area to ensure the soil is level and to remove any rocks or lumps of soil. If there are any existing sprinklers, ensure that they are either capped or removed.

3. CREATING THE BASE a. In order to prevent weeds from growing up through the surface, lay a sheet of Coolaroo Synthetic Grass Underlay on top of the soil. Weeds can cause the layer of Coolaroo Synthetic Grass to buckle and disfigure. b. Spread a 70-80mm layer of crushed rock/roadbase over the Coolaroo Synthetic Grass Underlay and screed it off to create a level surface. Make sure to allow a slight fall on the base to encourage water drainage away from any buildings. c. Dampen the surface slightly with water then using a compactor/ whacker, compact the crushed rock and create a solid base. Compact the area at least twice, with a focus on the edges for extra strength and support. d. When compacted, the base should be 10-15mm below finished height. NOTE: For a finer finish the base can be created using 60mm of crushed rock (compacted) and then a further 20mm of fine crushed rock (compacted).

4. LAYING THE GRASS 5. CONCEALED JOINS a. Starting from an edge, roll the Coolaroo Synthetic Grass out across the entire area, taking note of the pile direction and allowing for a small amount of overhang at the edges. For best results let the Coolaroo Synthetic Grass rest for a couple of hours to settle. When joining the lengths of grass, ensure joins are pulled together as closely as possible without overlapping. There should never be more than a 1mm gap. a. Once in place, create a mark on the crushed rock at both ends of the grass where the two pieces join together. Fold back both pieces of grass to allow room for the tape. b. Roll out the joining tape and cut to length, positioning it centrally between the two markers and covering both sides of the grass equally. b. Using a sharp, heavy-duty utility knife, cut the grass to the desired size and shape, trimming around trees and flower beds to fit the area. Take your time to ensure a flawless finish. c. Once laid, stand back and review the entire area. Any changes will need to be made before moving onto the next step. NOTE: Ensure that all grass is laid with the pile running in the same direction. c. Starting at one end, gently peel off the backing and carefully push the grass down onto the tape. Slowly work your way along the length of the join, making sure the joined gap is the same all the way along and there are no tufts of grass under the join. d. Walk along the join several times to ensure it sticks down securely. You may need to ruffle the pile along the join using your hands or a stiff bristled broom, as some fibres may be lying flat.

7. SAND FILLING e. Allow about 30 minutes for the joining tape to form a strong adhesion. f. Carefully trim the Coolaroo Synthetic Grass around the surrounding edges, if required. 6. SECURING YOUR GRASS each blade, giving support to the pile and helping it remain upright. This provides not required for all Coolaroo Synthetic Grass applications. a. the Coolaroo Synthetic Grass to raise the pile, making it easier to distribute the b. Spread dried silica sand across the entire surface, moving up and back in straight lines to achieve an even cover. a. Secure the grass down around the edges using synthetic grass pegs. Hammer the pegs into the rock base, as close to the edge as possible, spacing them 250mm apart. Continue around the entire area. b. with the surface. At the completion of this step, the pegs should be hidden. c. Using the broom, brush the sand into the pile, ensuring this is done against the direction of the pile. 10-15kg of sand per square metre is recommended for most pile lengths. WARNING During periods of extreme heat synthetic grass can become hot to touch. Avoid skin contact and wear footwear during hot conditions.

THA N K Y O U FOR PURCHASING A COOLAROO PRODUCT The best under the sun Coolaroo is the leader in exterior fabric technology. Our extensive range of attractive shade and landscape solutions are carefully manufactured to beautify your home and provide protection for your family and garden from the harsh sun. coolaroo.com.au WARNING WHEN INSTALLING AND USING THIS PRODUCT, SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED TO REDUCE THE RISK OF PERSONAL INJURY AND DAMAGE TO EQUIPMENT. DURING PERIODS OF EXTREME HEAT SYNTHETIC GRASS CAN BECOME HOT TO TOUCH. AVOID SKIN CONTACT AND WEAR FOOTWEAR DURING HOT CONDITIONS. PLEASE READ ALL INSTRUCTIONS CAREFULLY AND KEEP CHILDREN AND PETS AWAY FROM INSTALLATION AREA. To register your product go to www.coolaroo.com.au. Product codes can be found printed above the barcodes on product For help with product information or for any other questions you may have, contact our Customer Service Department. Australia Toll Free: 1800 331 521 New Zealand Toll Free: 0800 555 171 United States: +1 407 772 7900 Middle East: +971 4 881 7114 China: +86 574 5626 8888 430726 145 Woodlands Drive, Braeside, Victoria, 3195 Australia Coolaroo is a registered trademark 1508