JCM Project Design Document Form

Similar documents
JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form. A. Project description A.1. Title of the JCM project 1.6MW Solar PV Power Plant Project in Jakabaring Sport City

JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

JCM_MN_F_PDD_ver03.0. Joint Crediting Mechanism Project Design Document Form

JCM Project Design Document Form

JCM Project Design Document Form

A.2. General description of project and applied technologies and/or measures

A.2. General description of project and applied technologies and/or measures

JCM_MN_PDD_MR_ver01.0

Joint Committee of the Joint Crediting Mechanism between Indonesia and Japan Eighth Meeting. Meeting Report

The Joint Crediting Mechanism (JCM) Current

Promoting Market Mechanism: Development of the JCM in Indonesia

The Joint Crediting Mechanism (JCM) Experiences in the Energy Efficiency Financing

Updates on JCM projects, financing programme, and JCM Matchmaking Platform

Updates on JCM projects, financing programme, and JCM Matchmaking Platform

JCM Validation Report Form. Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban Reference number

Joint Crediting Mechanism (JCM) Indonesia Japan

JCM Validation Report Form

The Joint Crediting Mechanism MRV and

Terms of reference INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Current State of Joint Crediting Mechanism and Relevant JICA Cooperation in Indonesia

Republic of Indonesia. Electrification Promotion by Small Scale Biomass Power Generation System in Non-electrified Regions.

Ex-Ante Evaluation (for Japanese ODA Loan)

CASE STUDY: Wind power project in Mongolia. 22 January 2014 Kenta Usui Climate and Energy Area, IGES

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

Summary Report Feasibility Study of the Landfill Methane Gas Utilization Project in Semarang, Indonesia

JCM Model Project Financing Programme. Project development process and tips

Bulgarian JI Guidelines. 2006, September

Indonesia JCM Methodology Development

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

(1) Current State and Issues of the Electricity Sector in Indonesia

Hybrid Power Generation Project Using Biogas and Solar Power

GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

EMR for People s Welfare

Additional Information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Joint Crediting Mechanism Approved Methodology ID_AM001 Power Generation by Waste Heat Recovery in Cement Industry

Draft JCM Guidelines for Developing Proposed Methodology for REDD-plus

Joint Crediting Mechanism (JCM) and Market Based Mechanism in Indonesia. Dr. Rizal Edwin Manansang Coordinating Ministry for Economic Affairs

INDONESIA. Energy and Sustainable Development in Indonesia. A report

Promoting Geothermal Energy Utilization in Indonesia Challenges and Opportunities

3. Project Description a. Project Location: Hang Nadim International Airport Batam-Indonesia

Article 6 of the Paris Agreement and the Joint Crediting Mechanism (JCM) Kentaro Takahashi Programme Manager Climate and Energy Area

Market Based Mechanism in Indonesia, a JCM case study Dicky Edwin Hindarto

The Implementation Joint Crediting Mechanism Scheme in Indonesia Facts and Review

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Regenerative burners for aluminum melting furnaces

MRV development for market based mechanism implementation. a Joint Crediting Mechanism case. Dicky Edwin Hindarto Head of Indonesia JCM Secretariat

JCM Project Development by JFE

Introduction to JCM MRV and methodologies

DNA of REDD+? Dicky E. Hindarto and Doddy S. Sukadri

JCM City-to-City Collaboration with Yangon-city and DKI-Jakarta

PROJECT DESIGN DOCUMENT (PDD)

Indonesia s GHG Inventories at Regional Level

JCM Validation Report Form. Introduction of Solar PV System at shopping mall in Ho Chi Minh Reference number

CONTENTS Profile of MYANMAR Profile of Organization National Energy Policy Future Plan

Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios

Chapter 7. Indonesia Country Report. September 2016

Description of the Bundle and the subbundles:

Energy Saving by High-efficiency Centrifugal Chiller

Monitoring report form (Version 05.1)

Indonesian DNA and Lessons Learned

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

POLICY ON SOLAR AND BIOENERGY DEVELOPMENT IN INDONESIA

Economy Report Indonesia

CDM Financing for Geothermal Project in Indonesia: Current Status and Post 2012 Prospect

Possibility of Co-generation and Energy conservation in Energy Sector

Dissemination of high-efficiency inverter air conditioners

Ministry of Environment and Forestry ITTO - ISWA ITTO PD 737/14 Rev. 14 (I)

Joint Crediting Mechanism Approved Methodology ID_AM009. Replacement of conventional burners with regenerative burners for aluminum holding furnaces,

THE REPUBLIC OF INDONESIA GREEN BOND AND GREEN SUKUK FRAMEWORK

INDONESIAN COAL - A BRIGHT FUTURE

Developing Potential JCM Model Projects

Hybrid Power Generation Project Using Biogas and Solar Power Implementing Entity: Next Energy & Resources Co., Ltd.

DISCUSSION PURPOSE ONLY. JCM Project Development by JFE

COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA REGULATION STRATEGY TO IMPROVE DEVELOPMENT OF RENEWABLE ENERGY IN INDONESIA

Introduction of High Efficiency Once-through Boiler In Golf Ball Factory of PT. Sumi Rubber Indonesia

(20-MW Geothermal Power Generation)

JCM Proposed Methodology Form

The Current Status of the JCM in Thailand

Progress of The Joint Crediting Mechanism (JCM) In Indonesia

CER Monitoring Report

National Council on Climate Change Indonesia. Registered CDM Projects Average Annual. Review N. of. Total ERs by Amount of Issued

Implementation of the JCM in Thailand

Introduction to the JCM, Current development and Support programme

Executive summary of the third synthesis report on technology needs identified by Parties not included in Annex I to the Convention

Main CDM Activities in Viet Nam

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.

Feasibility Study on JCM Project by City-to-City Collaboration in Ulaanbaatar, Mongolia

OPPORTUNITIES AND CHALLENGES IN BIOGAS DEVELOPMENT IN INDONESIA. Paul Butarbutar South Pole Carbon Asset Management Ltd

Linkages of JCM with NAMAs, MRV and Registry: An Update

Transcription:

JCM Project Design Document Form A. Project description A.1. Title of the JCM project GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia A.2. General description of project and applied technologies and/or measures The proposed project is implementation of operation optimization of steam boilers, through introduction of an utility facility operation optimization technology. The project involves introduction of a utility facility operation optimization technology to the utility facility at one of the existing refineries of PERTAMINA 1, Refinery Unit IV (hereafter referred to as RU IV), located in Cilacap, Central Java. The target utility facility at RU IV consists of 10 boilers, which supply high pressure steam to the steam turbine generators. "RENKEI Control", or the utility facility operation optimization technology by Azbil Corporation (hereafter referred to as Azbil) to be introduced by the project optimizes the operation of existing utility facilities at RU IV through application of software algorithm using linear programming method and advanced process control. A remote monitoring system to monitor the performance of the system is also installed. As a result, a great saving in fuel consumption for the utility facility is achieved. The expected annual emission reduction that would be achieved by the proposed project is 20,000 ton CO 2. The actual emission reduction may vary depending on the actual operation of the target utility facility. A.3. Location of project, including coordinates Country The Republic of Indonesia Region/State/Province etc.: City/Town/Community etc: Latitude, longitude S 7.703388 E 109.005269 Central Java Jl. Letjen Haryono MT. 77 Lomanis, Cilacap A.4. Name of project participants The Republic of Indonesia PT. PERTAMINA (PERSERO) 1 A state-owned energy company in Indonesia 1

Japan Azbil Corporation A.5. Duration Starting date of project operation 01/12/2017 Expected operational lifetime of project 5 years A.6. Contribution from Japan The proposed project receives support from the government of Japan. The project has been selected as one of the JCM demonstration projects by the New Energy and Industrial Technology Development Organization (hereafter referred to as NEDO), one of the largest national public research and development management organizations in Japan. The purpose of NEDO's JCM demonstration projects is to demonstrate the effectiveness of advanced clean energy and low-carbon technologies which leads to GHG emission reductions through the introduction of such technologies in the partner country, i.e. Indonesia. As a result of the financial support provided by NEDO's program, implementation cost of the proposed JCM project has been financed by Japanese government. Further, implementation of the demonstration project promotes dissemination of low-carbon technologies in Indonesia. In addition, as a part of NEDO program, know-how transfer to the operators in Indonesia for operation and maintenance of the utility facility operation optimization technology has been planned. B. Application of an approved methodology(ies) B.1. Selection of methodology(ies) Selected approved methodology No. Version number ID_AM007 Ver01.0 B.2. Explanation of how the project meets eligibility criteria of the approved methodology Eligibility criteria Criterion 1 Criterion 2 Descriptions specified in the methodology The project is implementation of operation optimization of boilers to generate steam, through introduction of Utility Facility Operation Optimization Technology. The site of introduction is an existing industrial facility which Project information One of the utility facility operation optimization technologies, "RENKEI- Control of Azbil is implemented in this project. The target utility facility consists of 10 boilers, which supply high pressure steam 2

includes two or more boilers to generate steam. Criterion 3 Historical data for fuel consumption, fuel characteristics (type of fuel, net calorific value) and generation of steam is identifiable for individual boiler for at least one year, as specified in the methodology. Criterion 4 All steam demand is met internally and not sourced from outside the industrial facility. to the steam turbine generators. Distributed Control System of the target utility facility has a capability of historical data collection at least one year for each utility boiler. The demand of high pressure steam generated by boilers is mainly for the steam turbine generators and some is for process unit consumption. All steam demand is met internally and not sourced from outside the industrial facility. C. Calculation of emission reductions C.1. All emission sources and their associated greenhouse gases relevant to the JCM project Reference emissions Emission sources GHG type Consumption of fuel oil and fuel gas of each boiler CO 2 Emission sources Project emissions GHG type Consumption of fuel oil and fuel gas of each boiler CO 2 C.2. Figure of all emission sources and monitoring points relevant to the JCM project 3

C.3. Estimated emissions reductions in each year Year Estimated Reference Estimated Project Estimated Emission emissions (tco 2e ) Emissions (tco 2e ) Reductions (tco 2e ) 2013 - - - 2014 - - - 2015 - - - 2016 - - - 2017 84,852 83,185 1,667 2018 1,018,227 998,227 20,000 2019 1,018,227 998,227 20,000 2020 1,018,227 998,227 20,000 Total (tco 2e ) 3,139,533 3,077,866 61,667 D. Environmental impact assessment Legal requirement of environmental impact assessment for the proposed project No 4

E. Local stakeholder consultation E.1. Solicitation of comments from local stakeholders To solicit comments from local stakeholders, a consultation meeting was planned by the project participants, and the project participants invited various stakeholders. Details of the local stakeholders consultation meeting is summarized as follows: Date and Time: 18 July 2017, 9:00-12:00 Venue: Hotel Ciputra Semarang Address: Jl. Simpang Lima, Semarang, Central Java, Indonesia Following organization from Indonesia side were invited to the consultation meeting: - Indonesia JCM Secretariat - Coordinating Ministry of Economic Affairs (CMEA) - Department of Industry and Trade (Dinperindag), Central Java Province - Department of Energy and Mineral Resources (DESDM), Central Java Province - Department of Environment and Forestry (DLHK), Central Java Province - Regional Environment Management Board of Central Java Province - Bureau of Regional Autonomy and Cooperation, PPI Secretariat of Central Java Regional Secretariat - Department of Manpower and Industry (Disnakerin), Cilacap Regency - Department of Environment, Cilacap Regency - Directorate of Technical and Environment, Directorate General of Oil and Gas, Ministry of Energy and Mineral Resources (MEMR) - Indonesia Petroleum Association (IPA) - Society of Indonesia Petroleum Engineer - Society of Indonesia Oil and Gas Production Facility Expert The total of twenty six stakeholders from the invited agencies and the project developers attended the meeting. At the meeting, JCM implementation status in Indonesia was first presented by Indonesian JCM Secretariat. Then the details of the proposed JCM project and the technology to be introduced were explained by representative of Azbil who is in charge of the technical design of the project. Any queries in relation to JCM application in Indonesia was answered by Indonesian JCM Secretariat. There were no negative comments toward the proposed project expressed during the stakeholders meeting by the attendees. The comments received during the local stakeholders meeting, along with the responses/action to the 5

comments, are summarized in the following section. For those who were invited and were unable to attend the meeting, the project participants sent presentation materials used during the meeting, requesting them to send their comments, if any. The project did not receive any comments from those who were invited and were not able to attend the local stakeholders' consultation meeting. E.2. Summary of comments received and their consideration Stakeholders Comments received Consideration of comments received Department of Can JCM be used to finance / There are 3 renewable energy JCM Energy and assist for the development of projects under development in Mineral Resources, Central Java Province new renewable energy power plants, such as a geothermal Power Plant? There are a few Indonesia: 1.6MW solar power project at Jakabaring stadium at South Sumatera for Asian Games in 2018, 600 kw potential places for rooftop solar panel project at an industry Geothermal to be developed in Central Java, but investment towards geothermal is not attractive for investors and private sectors. in Cileungsi, West Java; 10 MW hydropower plant in North Sumatera. As such, JCM can be used to assist for development of new renewable energy project. JCM support may not be sufficient to overcome the risks associated with geothermal projects, however. Investors may be interested at the later stage after successful exploration, especially for locations in Eastern part of Indonesia, where electricity selling price is much higher. (answered by Indonesia JCM Secretariat) Department of DLHK has been assigned to do PERTAMINA will certainly cooperate to Environment and GHG inventory for Central submit the required data once it receives Forestry (DLHK), Java Province. PERTAMINA the official request from Local Central Java RU-IV is requested to Government of Central Java. Province cooperate by submitting relevant data to the local 6

Directorate of Technical and Environment, Directorate General of Oil and Gas, Ministry of Energy and Mineral Resources Pertamina RU-IV government. How does JICA involve in JCM project? In the presentation by the secretariat, there have been a total of 30 projects under JCM with total investment of about USD 150 million. What are the total reductions of CO 2 from these 30 projects? Pertamina RU-IV would like to have assistance from Indonesia government during the process of validation and verification, to maintain objectivity and to avoid any potential dispute in the future Does the Implementation of Azbil technology affect the scoring under the performance rate assessment program in environmental management (PROPER) for the company? JICA in the case of JCM in Indonesia is having cooperation with Coordinating Ministry of Economic Affairs to give assistance / funding to operate the Indonesia secretariat. (answered by Indonesia JCM Secretariat) The emission reductions from each project vary. There are projects reducing only 29 tco 2 / year or 549 tco 2 / year. Some projects on the other hand can reduce more than 10,000 tco 2 / year, with much higher investment costs. Following the JCM standard procedures, both validation and verification is conducted in a transparent manner. So it is unlikely there will be any dispute happening. Should there is any trouble; it is free to seek advice from JCM secretariat or Coordinating Ministry of Economic Affairs. (answered by Indonesia JCM Secretariat) The expected effect of installation of Azbil technology towards PROPER evaluation would be positive albeit minimal. (answered by Indonesia JCM Secretariat) F. References N/A 7

Reference lists to support descriptions in the PDD, if any. Annex N/A Revision history of PDD Version Date Contents revised 01.0 09/09/2017 First Edition 8