This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form.

Similar documents
Update on FCPS Construction/Renovation Projects. June 2016

PROJECT STATUS TOTAL MAN HOURS FROM 11/20 THRU 12/14 PERCENT COMPLETE 18% OVERALL PROJECT 24% LOWER SCHOOL 31% PLAYGROUND 17% PARKING LOT

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Building Excellence IV Capital Levy Projects Under Construction

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Project Time Management. Course Objectives. Outline

Building Excellence IV Capital Levy Projects Under Construction

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

Update on FCPS Construction/Renovation Projects. December 2015

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Update on FCPS Construction/Renovation Projects. November 2015

Christopher Glinski Construction Management. AE Senior Thesis Columbia Heights Community Center. Appendix B. Project Summary /Detailed Schedule

Port KC RFP NORTHLAND PARK BUILDING V

Dr. David R. Riley October 30, 2006 TABLE OF CONTENTS. Executive Summary.1. Detailed Project Schedule Site Layout Planning 4

Update on FCPS Construction/Renovation Projects. August 2015

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Construction Manager s Clarification

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

4.1.3 Project Manual

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

Seattle Public Schools Building Excellence IV Projects Under Construction

City of Rohnert Park Building Department Inspection Descriptions

NEW MIDDLE SCHOOL PROJECT

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

Schedule of Values Cruise Terminal 2 Expansion

SECTION ADDENDA

PAULDING COLLEGE & CAREER ACADEMY

City of Westerville Guide to Commercial Inspections

GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Inspection of New One- and Two- Family Dwellings

October 17, Albany MS Logistics Plan. Overview:

Residential Construction Minimum Required Inspections

Update on FCPS Construction/Renovation Projects. July 2016

DOCUMENT BID DOCUMENT

Accessory Building/Detached Building Permit

Construction Summary

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

City Of Mendota Construction Procedures

TABLE OF CONTENTS Public Safety Building

LAND DISTURBANCE PERMIT

APPLICATION AND CERTIFICATE FOR PAYMENT

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

Technical Assignment 2

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY

A. Each Contractor shall comply with the requirements outlined in these documents.

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Project Manual Index of Specifications Shenandoah Schools Concession Building

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

New Administration Building

ADDENDUM 2 - JULY 14, 2015

MARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

Proud of its Heritage, Preparing for its Future

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Bryant Denny Stadium Bryant Denny Stadium September 15, 2009

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Student Life Building. Technical Report 2. Northampton Community College Tannersville, Pa

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

Building Better Storm Water Quality

Capital Projects Update

Project Status Update & Progress Report

New Ringgold Middle School. Project Slideshow August 26, 2017

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Technical Assignment #2 Cost and Methods Analysis

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

Fleet Elementary School

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Heritage High School

MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Building Excellence IV Capital Levy Projects Under Construction

SAULT COLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE BUILDING AND CONSTRUCTION ESTIMATING

EROSION CONTROL AND GRADING PERMIT APPLICATION

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

Carpentry/Carpenter CIP Task Grid

Residential Building Inspections

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

NAAHB Workgroup Index General Ledger Account

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

SECTION TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS. ADD the following sections: Commissioning Requirements...

SAULT COLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE. Building and Construction Estimating

SPECIAL ADMINISTRATIVE BOARD OF THE TRANSITIONAL SCHOOL DISTRICT OF THE CITY OF ST. LOUIS

NEW MIDDLE SCHOOL PROJECT

Request for Proposal

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Single Family Residential Construction Erosion/Sediment Control Standards

Inspection Procedure Handout

Transcription:

Project: Ben Steele Middle School Addendum #: 2 Date Issued: January 11, 2016 Description of Addendum & Attachments: 1. A Pre Bid Meeting is scheduled for January 18 th, 2016. Attendance is strongly encouraged, but not mandatory. The meeting will be split into Bid Package scopes for time and location per the following: a. Site & Concrete Bid Packages 2A, 2B, 3A, & 3B i. Date & Time: January 18 th, 2016 at 10:30 am. ii. Location: On site job trailer 5640 Grand Ave. b. Building Structure, Framing, Doors & Exterior Finishes Bid Packages 4A, 5A, 5B, 6A, 7A, 7B, 7C, 7D, 7E, 8A, 8B, & 8C i. Date & Time: January 18 th, 2016 at 1:00 pm. ii. Location: Veeder Office Building, 2255 Overland Ave. c. Interior Finishes & Misc. Bid Packages 1A, 3C, 6B, 6C, 9A, 9B, 9D, 10A, 10B, 11A, 11B, 12A, & 14A. i. Date & Time: January 18 th, 2016 at 2:00 pm. ii. Location: Veeder Office Building, 2255 Overland Ave. d. Mechanical, Electrical, & Plumbing Bid Packages 15A, 15B, 15C, & 16A i. Date & Time: January 18 th, 2016 at 3:00 pm. ii. Location: Veeder Office Building, 2255 Overland Ave. Each meeting will be approximately one hour long. The agenda will include a review of the Bid Documents, bidding requirements, project schedule, project layout & phasing, rules of conduct, and opportunity to discuss the project with the Construction Manager and Design Team. 2. Ben Steele Middle School Staging and Phasing Plan Attached 1 page 3. Ben Steele Middle School CM Schedule Attached 7 pages 4. SWPPP Plan and BMP Descriptions Attached 2 pages 5. Billings School District #2 Code of Conduct Attached 3 pages Bid Date: January 28 th, 2016 at 2:00 pm. This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form. END OF ADDENDUM #2

14063_02_OVERALL_PROD.DWG PM:\14063.02 ATV CONSTRUCTION FENCING THIS AREA COMPLETED JULY 2017 P:\14063_02_West_End_Middle_School_Basic_Serv_PM\CADD_C3D\PRODUCTION_DWG\14063_02_OVERALL_PROD.dwg, OVERALL, 12/17/2015 11:32:35 AM, averhasselt, 1:1 BEN STEELE MIDDLE SCHOOL project a&e proj # ia proj # BILLINGS PUBLIC SCHOOLS OVERALL SITE PLAN CONSTRUCTION ENTRANCE sheet HEAVY-DUTY ASPHALT owner LIGHT-DUTY ASPHALT OFFICE TRAILER 100% CONSTRUCTION DOCUMENTS ALL SITEWORK, 1st LIFT PAVING, & FIELDS IN THIS AREA COMPLETED 2016 CONSTRUCTION ENTRANCE 13048.20 21438.00 revision ALL SITEWORK, 1st LIFT PAVING, & FIELDS IN THIS AREA COMPLETED 2016 date phase 100% CONSTRUCTION DOCUMENTS NORTH 50 25 0 50 100 SCALE: 1"=50' NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEB, 2015. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. issue date 12/18/2015 C2.0

Ben Steele Middle School Bid Schedule ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Task Name Duration Start Finish GC/CM INTERVIEWS 1 day Wed 6/10/15 Wed 6/10/15 PRECONSTRUCTION 74 days Tue 11/17/15 Mon 2/29/16 100% CD's ISSUED 0 days Tue 11/17/15 Tue 11/17/15 PREPARE BID DOCUMENTS 31 days Wed 11/18/15 Wed 12/30/15 BID PROJECT 20 days Thu 12/31/15 Wed 1/27/16 SUBCONTRACT BIDS DUE 1 day Thu 1/28/16 Thu 1/28/16 QUALIFY BIDS 10 days Thu 1/28/16 Wed 2/10/16 ESTABLISH GMP & FINALIZE CONTRACT 5 days Thu 2/11/16 Wed 2/17/16 EARLY SUBMITTALS 8 days Thu 2/18/16 Mon 2/29/16 CONSTRUCTION BEGINS 0 days Mon 2/29/16 Mon 2/29/16 BUILDING 370 days Mon 2/29/16 Fri 7/28/17 BUILDING PAD/EXCAVATION 37 days Mon 2/29/16 Tue 4/19/16 SURVEY BUILDING PAD 1 day Mon 2/29/16 Mon 2/29/16 CONSTRUCT AND CERTIFY BALANCE OF 10 days Tue 3/1/16 Mon 3/14/16 BUILDING PAD LAYOUT BUILDING 2 days Fri 3/11/16 Mon 3/14/16 EXCAVATE FOR PERIMETER FOOTINGS 15 days Mon 3/14/16 Fri 4/1/16 FOUNDATION EXCAVATE FOR INTERIOR GRADE BEAMS 15 days Wed 3/30/16 Tue 4/19/16 FOOTINGS/FOUNDATIONS 40 days Mon 3/21/16 Fri 5/13/16 FOOTINGS STAKED 2 days Mon 3/21/16 Tue 3/22/16 PERIMETER FOOTINGS FORM, REINFORCE, 17 days Mon 3/21/16 Tue 4/12/16 POURED INTERIOR GRADE BEAMS FORM, REINFORCE, POURED 20 days Wed 3/30/16 Tue 4/26/16 FOUNDATION WALLS 28 days Wed 4/6/16 Fri 5/13/16 SLAB ON GRADE 36 days Mon 4/25/16 Mon 6/13/16 AREA #D SLAB ON GRADE [EVERYTHING BUT 23 days Mon 4/25/16 Wed 5/25/16 GYM] FOUNDATION INSULATION 2 days Mon 4/25/16 Tue 4/26/16 FOUNDATION BACK FILLED 3 days Mon 4/25/16 Wed 4/27/16 MEP UNDERGOUND 12 days Wed 4/27/16 Thu 5/12/16 FINE GRADE SLAB 3 days Thu 5/12/16 Mon 5/16/16 SLAB FORM, REINFORCE, POUR EXCEPT GYM 3 days Mon 5/16/16 Wed 5/18/16 SLAB CURE TIME AREA D OUTSIDE GYM 5 days Thu 5/19/16 Wed 5/25/16 AREA #D SLAB ON GRADE [GYM] 30 days Mon 4/25/16 Fri 6/3/16 FOUNDATION INSULATION 2 days Mon 4/25/16 Tue 4/26/16 FOUNDATION BACK FILLED 3 days Mon 4/25/16 Wed 4/27/16 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep 6/10 GC/CM INTERVIEWS Mon 1/11/16 PRECONSTRUCTION 11/17 2/29 11/17 100% CD's ISSUED 11/18 PREPARE BID DOCUMENTS 12/31 BID PROJECT 1/28 SUBCONTRACT BIDS DUE 1/28 QUALIFY BIDS 2/11 ESTABLISH GMP & FINALIZE CONTRACT 2/18 EARLY SUBMITTALS 2/29 CONSTRUCTION BEGINS BUILDING 2/29 7/28 BUILDING PAD/EXCAVATION 2/29 4/19 2/29 SURVEY BUILDING PAD 3/1 CONSTRUCT AND CERTIFY BALANCE OF BUILDING PAD 3/11 LAYOUT BUILDING 3/14 EXCAVATE FOR PERIMETER FOOTINGS FOUNDATION 3/30 EXCAVATE FOR INTERIOR GRADE BEAMS FOOTINGS/FOUNDATIONS 3/21 5/13 3/21 FOOTINGS STAKED 3/21 PERIMETER FOOTINGS FORM, REINFORCE, POURED 3/30 INTERIOR GRADE BEAMS FORM, REINFORCE, POURED 4/6 FOUNDATION WALLS SLAB ON GRADE 4/25 6/13 AREA #D SLAB ON GRADE [EVERYTHING BUT GYM] 4/25 5/25 4/25 FOUNDATION INSULATION 4/25 FOUNDATION BACK FILLED 4/27 MEP UNDERGOUND 5/12 FINE GRADE SLAB 5/16 SLAB FORM, REINFORCE, POUR EXCEPT GYM 5/19 SLAB CURE TIME AREA D OUTSIDE GYM AREA #D SLAB ON GRADE [GYM] 4/25 6/3 4/25 FOUNDATION INSULATION 4/25 FOUNDATION BACK FILLED

Ben Steele Middle School Bid Schedule ID 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 Task Name Duration Start Finish MEP UNDERGOUND 4 days Thu 5/19/16 Tue 5/24/16 FINE GRADE SLAB 3 days Tue 5/24/16 Thu 5/26/16 SLAB FORM, REINFORCE, POUR GYM 2 days Thu 5/26/16 Fri 5/27/16 SLAB CURE TIME GYM 5 days Mon 5/30/16 Fri 6/3/16 AREA #C SLAB ON GRADE ON GRADE 23 days Mon 5/2/16 Wed 6/1/16 FOUNDATION INSULATION 2 days Mon 5/2/16 Tue 5/3/16 FOUNDATION BACK FILLED 3 days Mon 5/2/16 Wed 5/4/16 MEP UNDERGOUND 12 days Wed 5/4/16 Thu 5/19/16 FINE GRADE SLAB 3 days Thu 5/19/16 Mon 5/23/16 SLAB FORM, REINFORCE, POUR 3 days Mon 5/23/16 Wed 5/25/16 SLAB CURE TIME AREA C 5 days Thu 5/26/16 Wed 6/1/16 AREA #B SLAB ON GRADE 21 days Mon 5/9/16 Mon 6/6/16 FOUNDATION INSULATION 2 days Mon 5/9/16 Tue 5/10/16 FOUNDATION BACK FILLED 3 days Mon 5/9/16 Wed 5/11/16 MEP UNDERGOUND 10 days Wed 5/11/16 Tue 5/24/16 FINE GRADE SLAB 3 days Tue 5/24/16 Thu 5/26/16 SLAB FORM, REINFORCE, POUR 3 days Thu 5/26/16 Mon 5/30/16 SLAB CURE TIME AREA B 5 days Tue 5/31/16 Mon 6/6/16 AREA #A SLAB ON GRADE 21 days Mon 5/16/16 Mon 6/13/16 FOUNDATION INSULATION 2 days Mon 5/16/16 Tue 5/17/16 FOUNDATION BACK FILLED 3 days Mon 5/16/16 Wed 5/18/16 MEP UNDERGOUND 10 days Wed 5/18/16 Tue 5/31/16 FINE GRADE SLAB 3 days Tue 5/31/16 Thu 6/2/16 SLAB FORM, REINFORCE, POUR 3 days Thu 6/2/16 Mon 6/6/16 SLAB CURE TIME AREA A 5 days Tue 6/7/16 Mon 6/13/16 STRUCTURAL STEEL & CMU WALLS 61 days Thu 4/28/16 Thu 7/21/16 EXTERIOR CMU GRIDS NN & 29 WALLS AREA D 15 days Thu 4/28/16 Wed 5/18/16 STRUCTURAL STEEL DELIVERED AREAS D & C 2 days Tue 5/17/16 Wed 5/18/16 EXTERIOR CMU GRIDS RR & 30 WALLS AREA D 12 days Thu 5/19/16 Fri 6/3/16 JOISTS & DECKING DELIVERED AREAS D & C 1 day Thu 5/26/16 Thu 5/26/16 STEEL/JOISTS/DECKING ERECT AREA D 10 days Fri 5/27/16 Thu 6/9/16 EVERYTHING OUTSIDE GYM JOISTS/DECKING AREA D GYM INSTALLED 5 days Mon 6/6/16 Fri 6/10/16 STEEL/JOISTS/DECKING ERECT AREA C 10 days Fri 6/10/16 Thu 6/23/16 STRUCTURAL STEEL DELIVERED AREAS B & A 3 days Tue 6/21/16 Thu 6/23/16 STEEL/JOISTS/DECKING ERECT AREA B 10 days Fri 6/24/16 Thu 7/7/16 JOISTS & DECKING DELIVERED AREAS B & A 1 day Fri 7/1/16 Fri 7/1/16 STEEL/JOISTS/DECKING ERECT AREA A 10 days Fri 7/8/16 Thu 7/21/16 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep Mon 1/11/16 5/19 MEP UNDERGOUND 5/24 FINE GRADE SLAB 5/26 SLAB FORM, REINFORCE, POUR GYM 5/30 SLAB CURE TIME GYM AREA #C SLAB ON GRADE ON GRADE 5/2 6/1 5/2 FOUNDATION INSULATION 5/2 FOUNDATION BACK FILLED 5/4 MEP UNDERGOUND 5/19 FINE GRADE SLAB 5/23 SLAB FORM, REINFORCE, POUR 5/26 SLAB CURE TIME AREA C AREA #B SLAB ON GRADE 5/9 6/6 5/9 FOUNDATION INSULATION 5/9 FOUNDATION BACK FILLED 5/11 MEP UNDERGOUND 5/24 FINE GRADE SLAB 5/26 SLAB FORM, REINFORCE, POUR 5/31 SLAB CURE TIME AREA B AREA #A SLAB ON GRADE 5/16 6/13 5/16 FOUNDATION INSULATION 5/16 FOUNDATION BACK FILLED 5/18 MEP UNDERGOUND 5/31 FINE GRADE SLAB 6/2 SLAB FORM, REINFORCE, POUR 6/7 SLAB CURE TIME AREA A STRUCTURAL STEEL & CMU WALLS 4/28 7/21 4/28 EXTERIOR CMU GRIDS NN & 29 WALLS AREA D 5/17 STRUCTURAL STEEL DELIVERED AREAS D & C 5/19 EXTERIOR CMU GRIDS RR & 30 WALLS AREA D 5/26 JOISTS & DECKING DELIVERED AREAS D & C 5/27 STEEL/JOISTS/DECKING ERECT AREA D EVERYTHING OUTSIDE GYM 6/6 JOISTS/DECKING AREA D GYM INSTALLED 6/10 STEEL/JOISTS/DECKING ERECT AREA C 6/21 STRUCTURAL STEEL DELIVERED AREAS B & A 6/24 STEEL/JOISTS/DECKING ERECT AREA B 7/1 JOISTS & DECKING DELIVERED AREAS B & A 7/8 STEEL/JOISTS/DECKING ERECT AREA A

Ben Steele Middle School Bid Schedule ID 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 Task Name Duration Start Finish INTERIOR WALL FRAMING/SOFFITS & DOOR FRAMES 84 days Tue 5/17/16 Fri 9/9/16 DOOR FRAMES DELIVERED 0 days Tue 5/17/16 Tue 5/17/16 AREA D INTERIOR WALL/SOFFIT FRAMING 30 days Tue 6/14/16 Mon 7/25/16 AREA C INTERIOR WALL/SOFFIT FRAMING 30 days Tue 6/28/16 Mon 8/8/16 AREA B INTERIOR WALL/SOFFIT FRAMING 35 days Tue 7/12/16 Mon 8/29/16 AREA A INTERIOR WALL/SOFFIT FRAMING 35 days Mon 7/25/16 Fri 9/9/16 CONCRETE FLOOR POLISHING ROUGH GRIND 35 days Fri 6/10/16 Thu 7/28/16 AREA D CONCRETE POLISHING ROUGH GRIND 10 days Fri 6/10/16 Thu 6/23/16 AREA C CONCRETE POLISHING ROUGH GRIND 10 days Fri 6/24/16 Thu 7/7/16 AREA B CONCRETE POLISHING ROUGH GRIND 10 days Fri 7/8/16 Thu 7/21/16 AREA A CONCRETE POLISHING ROUGH GRIND 5 days Fri 7/22/16 Thu 7/28/16 EXTERIOR FRAMING & SHEATHING 60 days Fri 6/10/16 Thu 9/1/16 AREA D EXTERIOR FRAMING 30 days Fri 6/10/16 Thu 7/21/16 AREA C EXTERIOR FRAMING 30 days Fri 6/24/16 Thu 8/4/16 AREA B EXTERIOR FRAMING 30 days Fri 7/8/16 Thu 8/18/16 AREA A EXTERIOR FRAMING 30 days Fri 7/22/16 Thu 9/1/16 SLAB ON DECK (SOD) 15 days Fri 7/1/16 Thu 7/21/16 SOD AREA B FORM, REINFORCE,POUR 5 days Fri 7/1/16 Thu 7/7/16 SOD AREA A FORM, REINFORCE,POUR 5 days Fri 7/15/16 Thu 7/21/16 EXTERIOR AIR BARRIER, PRIMARY FURRING, 50 days Fri 7/22/16 Thu 9/29/16 INSULATION, & WINDOW FLASHING AREA D EXT. ENVELOPE 20 days Fri 7/22/16 Thu 8/18/16 AREA C EXT. ENVELOPE 20 days Fri 8/5/16 Thu 9/1/16 AREA B EXT. ENVELOPE 20 days Fri 8/19/16 Thu 9/15/16 AREA A EXT. ENVELOPE 20 days Fri 9/2/16 Thu 9/29/16 ROOFING 83 days Fri 7/22/16 Tue 11/15/16 AREA D ROOFING 12 days Fri 7/22/16 Mon 8/8/16 AREA C ROOFING 12 days Fri 8/5/16 Mon 8/22/16 AREA B ROOFING 12 days Fri 8/19/16 Mon 9/5/16 AREA A ROOFING 12 days Fri 9/2/16 Mon 9/19/16 PARAPET CAP D TO A 20 days Wed 10/19/16 Tue 11/15/16 PRE-ROCK INSULATION 44 days Tue 7/26/16 Fri 9/23/16 AREA D INSULATION 10 days Tue 7/26/16 Mon 8/8/16 AREA C INSULATION 10 days Tue 8/9/16 Mon 8/22/16 AREA B INSULATION 10 days Tue 8/30/16 Mon 9/12/16 AREA A INSULATION 10 days Mon 9/12/16 Fri 9/23/16 MEP ROUGH INS 70 days Tue 8/2/16 Mon 11/7/16 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep INTERIOR WALL FRAMING/SOFFITS & DOOR FRAMES 5/17 9/9 Mon 1/11/16 5/17 DOOR FRAMES DELIVERED 6/14 AREA D INTERIOR WALL/SOFFIT FRAMING 6/28 AREA C INTERIOR WALL/SOFFIT FRAMING 7/12 AREA B INTERIOR WALL/SOFFIT FRAMING 7/25 AREA A INTERIOR WALL/SOFFIT FRAMING CONCRETE FLOOR POLISHING ROUGH GRIND 6/10 7/28 6/10 AREA D CONCRETE POLISHING ROUGH GRIND 6/24 AREA C CONCRETE POLISHING ROUGH GRIND 7/8 AREA B CONCRETE POLISHING ROUGH GRIND 7/22 AREA A CONCRETE POLISHING ROUGH GRIND EXTERIOR FRAMING & SHEATHING 6/10 9/1 6/10 AREA D EXTERIOR FRAMING 6/24 AREA C EXTERIOR FRAMING 7/8 AREA B EXTERIOR FRAMING 7/22 AREA A EXTERIOR FRAMING SLAB ON DECK (SOD) 7/1 7/21 7/1 SOD AREA B FORM, REINFORCE,POUR 7/15 SOD AREA A FORM, REINFORCE,POUR EXTERIOR AIR BARRIER, PRIMARY FURRING, INSULATION, & WINDOW FLASHING 7/22 9/29 7/22 AREA D EXT. ENVELOPE 8/5 AREA C EXT. ENVELOPE 8/19 AREA B EXT. ENVELOPE 9/2 AREA A EXT. ENVELOPE ROOFING 7/22 11/15 7/22 AREA D ROOFING 8/5 AREA C ROOFING 8/19 AREA B ROOFING 9/2 AREA A ROOFING PRE-ROCK INSULATION 7/26 9/23 7/26 AREA D INSULATION 8/9 AREA C INSULATION 10/19 PARAPET CAP D TO A 8/30 AREA B INSULATION 9/12 AREA A INSULATION MEP ROUGH INS 8/2 11/7

Ben Steele Middle School Bid Schedule ID 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 Task Name Duration Start Finish AREA D MEP ROUGH INS 35 days Tue 8/2/16 Mon 9/19/16 AREA C MEP ROUGH INS 35 days Tue 8/23/16 Mon 10/10/16 AREA B MEP ROUGH INS 35 days Tue 9/6/16 Mon 10/24/16 AREA A MEP ROUGH INS 35 days Tue 9/20/16 Mon 11/7/16 PRE-ROCKING 42 days Tue 8/9/16 Wed 10/5/16 AREA D PRE-ROCKING 8 days Tue 8/9/16 Thu 8/18/16 AREA C PRE-ROCKING 8 days Tue 8/23/16 Thu 9/1/16 AREA B PRE-ROCKING 8 days Tue 9/13/16 Thu 9/22/16 AREA A PRE-ROCKING 8 days Mon 9/26/16 Wed 10/5/16 EXTERIOR BRICK/CMU VENEER 50 days Fri 8/12/16 Thu 10/20/16 AREA D EXT. BRICK/CMU VENEER 20 days Fri 8/12/16 Thu 9/8/16 AREA C EXT. BRICK/CMU VENEER 20 days Fri 8/26/16 Thu 9/22/16 AREA B EXT. BRICK/CMU VENEER 20 days Fri 9/9/16 Thu 10/6/16 AREA A EXT. BRICK/CMU VENEER 20 days Fri 9/23/16 Thu 10/20/16 EXTERIOR STOREFRONT 53 days Fri 8/12/16 Tue 10/25/16 AREA D EXTERIOR STOREFRONT 18 days Fri 8/12/16 Tue 9/6/16 AREA C EXTERIOR STOREFRONT 18 days Fri 9/2/16 Tue 9/27/16 AREA B EXTERIOR STOREFRONT 18 days Fri 9/16/16 Tue 10/11/16 AREA A EXTERIOR STOREFRONT 18 days Fri 9/30/16 Tue 10/25/16 EXTERIOR METAL PANELS 55 days Wed 8/17/16 Tue 11/1/16 AREA D EXT. METAL PANELS 25 days Wed 8/17/16 Tue 9/20/16 AREA C EXT. METAL PANELS 25 days Wed 8/31/16 Tue 10/4/16 AREA B EXT. METAL PANELS 25 days Wed 9/14/16 Tue 10/18/16 AREA A EXT. METAL PANELS 25 days Wed 9/28/16 Tue 11/1/16 EXTERIOR SWISSPEARL SIDING 50 days Fri 8/19/16 Thu 10/27/16 AREA D EXT. SWISSPEARL SIDING 20 days Fri 8/19/16 Thu 9/15/16 AREA C EXT. SWISSPEARL SIDING 20 days Fri 9/2/16 Thu 9/29/16 AREA B EXT. SWISSPEARL SIDING 20 days Fri 9/16/16 Thu 10/13/16 AREA A EXT. SWISSPEARL SIDING 20 days Fri 9/30/16 Thu 10/27/16 INSULATION 55 days Thu 9/8/16Wed 11/23/16 AREA D INSULATION 20 days Thu 9/8/16 Wed 10/5/16 AREA C INSULATION 20 days Thu 9/29/16 Wed 10/26/16 AREA B INSULATION 20 days Thu 10/13/16 Wed 11/9/16 AREA A INSULATION 20 days Thu 10/27/16 Wed 11/23/16 SHEET ROCK 60 days Mon 9/26/16 Fri 12/16/16 AREA D SHEET ROCK 20 days Mon 9/26/16 Fri 10/21/16 AREA C SHEET ROCK 20 days Mon 10/17/16 Fri 11/11/16 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep 8/2 AREA D MEP ROUGH INS 8/23 AREA C MEP ROUGH INS 9/6 AREA B MEP ROUGH INS 9/20 AREA A MEP ROUGH INS PRE-ROCKING 8/9 10/5 8/9 AREA D PRE-ROCKING 8/23 AREA C PRE-ROCKING 9/13 AREA B PRE-ROCKING 9/26 AREA A PRE-ROCKING EXTERIOR BRICK/CMU VENEER 8/12 10/20 8/12 AREA D EXT. BRICK/CMU VENEER 8/26 AREA C EXT. BRICK/CMU VENEER 9/9 AREA B EXT. BRICK/CMU VENEER 9/23 AREA A EXT. BRICK/CMU VENEER EXTERIOR STOREFRONT 8/12 10/25 8/12 AREA D EXTERIOR STOREFRONT 9/2 AREA C EXTERIOR STOREFRONT 9/16 AREA B EXTERIOR STOREFRONT 9/30 AREA A EXTERIOR STOREFRONT EXTERIOR METAL PANELS 8/17 11/1 8/17 AREA D EXT. METAL PANELS 8/31 AREA C EXT. METAL PANELS 9/14 AREA B EXT. METAL PANELS 9/28 AREA A EXT. METAL PANELS EXTERIOR SWISSPEARL SIDING 8/19 10/27 8/19 AREA D EXT. SWISSPEARL SIDING 9/2 AREA C EXT. SWISSPEARL SIDING 9/16 AREA B EXT. SWISSPEARL SIDING 9/30 AREA A EXT. SWISSPEARL SIDING INSULATION 9/8 11/23 9/8 AREA D INSULATION 9/29 AREA C INSULATION 10/13 AREA B INSULATION 10/27 AREA A INSULATION SHEET ROCK 9/26 12/16 9/26 AREA D SHEET ROCK 10/17 AREA C SHEET ROCK Mon 1/11/16

Ben Steele Middle School Bid Schedule ID 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 Task Name Duration Start Finish AREA B SHEET ROCK 25 days Mon 10/31/16 Fri 12/2/16 AREA A SHEET ROCK 25 days Mon 11/14/16 Fri 12/16/16 TAPE & FINISH 65 days Mon 10/10/16 Fri 1/6/17 AREA D TAPE & FINISH 20 days Mon 10/10/16 Fri 11/4/16 AREA C TAPE & FINISH 20 days Mon 10/31/16 Fri 11/25/16 AREA B TAPE & FINISH 25 days Mon 11/21/16 Fri 12/23/16 AREA A TAPE & FINISH 25 days Mon 12/5/16 Fri 1/6/17 PAINT 70 days Fri 10/28/16 Thu 2/2/17 AREA D PAINT 20 days Fri 10/28/16 Thu 11/24/16 AREA C PAINT 20 days Fri 11/18/16 Thu 12/15/16 AREA B PAINT 25 days Fri 12/16/16 Thu 1/19/17 AREA A PAINT 25 days Fri 12/30/16 Thu 2/2/17 CEILING GRID 65 days Thu 11/17/16 Wed 2/15/17 AREA D CEILING GRID 15 days Thu 11/17/16 Wed 12/7/16 AREA C CEILING GRID 15 days Thu 12/8/16 Wed 12/28/16 AREA B CEILING GRID 15 days Thu 1/12/17 Wed 2/1/17 AREA A CEILING GRID 15 days Thu 1/26/17 Wed 2/15/17 MEP ABOVE CEILING TRIM 70 days Thu 12/1/16 Wed 3/8/17 AREA D MEP ABOVE CEILING TRIM 20 days Thu 12/1/16 Wed 12/28/16 AREA C MEP ABOVE CEILING TRIM 20 days Thu 12/22/16 Wed 1/18/17 AREA B MEP ABOVE CEILING TRIM 20 days Thu 1/26/17 Wed 2/22/17 AREA A MEP ABOVE CEILING TRIM 20 days Thu 2/9/17 Wed 3/8/17 CONCRETE FLOOR POLISHING FINISH 65 days Thu 12/8/16 Wed 3/8/17 AREA D CONCRETE FLOOR POLISHING FINISH 10 days Thu 12/8/16 Wed 12/21/16 AREA C CONCRETE FLOOR POLISHING FINISH 15 days Thu 12/29/16 Wed 1/18/17 AREA B CONCRETE FLOOR POLISHING FINISH 15 days Thu 2/2/17 Wed 2/22/17 AREA A CONCRETE FLOOR POLISHING FINISH 15 days Thu 2/16/17 Wed 3/8/17 PLAM WALL PANELS & WVP 70 days Thu 12/15/16 Wed 3/22/17 AREA D PLAM WALL PANELS & WVP 20 days Thu 12/15/16 Wed 1/11/17 AREA C PLAM WALL PANELS & WVP 20 days Thu 1/5/17 Wed 2/1/17 AREA B PLAM WALL PANELS & WVP 20 days Thu 2/9/17 Wed 3/8/17 AREA A PLAM WALL PANELS & WVP 20 days Thu 2/23/17 Wed 3/22/17 ACOUSTIC WALL PANELS 70 days Thu 12/15/16 Wed 3/22/17 AREA D ACOUSTIC WALL PANELS 20 days Thu 12/15/16 Wed 1/11/17 AREA C ACOUSTIC WALL PANELS 20 days Thu 1/5/17 Wed 2/1/17 AREA B ACOUSTIC WALL PANELS 20 days Thu 2/9/17 Wed 3/8/17 AREA A ACOUSTIC WALL PANELS 20 days Thu 2/23/17 Wed 3/22/17 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep 10/31 AREA B SHEET ROCK 11/14 AREA A SHEET ROCK TAPE & FINISH 10/10 1/6 10/10 AREA D TAPE & FINISH 10/31 AREA C TAPE & FINISH 11/21 AREA B TAPE & FINISH 12/5 AREA A TAPE & FINISH PAINT 10/28 2/2 10/28 AREA D PAINT 11/18 AREA C PAINT 12/16 AREA B PAINT 12/30 AREA A PAINT CEILING GRID 11/17 2/15 11/17 AREA D CEILING GRID 12/8 AREA C CEILING GRID 1/12 AREA B CEILING GRID 1/26 AREA A CEILING GRID MEP ABOVE CEILING TRIM 12/1 3/8 12/1 AREA D MEP ABOVE CEILING TRIM 12/22 AREA C MEP ABOVE CEILING TRIM 1/26 AREA B MEP ABOVE CEILING TRIM CONCRETE FLOOR POLISHING FINISH 12/8 3/8 2/9 AREA A MEP ABOVE CEILING TRIM 12/8 AREA D CONCRETE FLOOR POLISHING FINISH 12/29 AREA C CONCRETE FLOOR POLISHING FINISH 2/2 AREA B CONCRETE FLOOR POLISHING FINISH 2/16 AREA A CONCRETE FLOOR POLISHING FINISH PLAM WALL PANELS & WVP 12/15 3/22 12/15 AREA D PLAM WALL PANELS & WVP 1/5 AREA C PLAM WALL PANELS & WVP 2/9 AREA B PLAM WALL PANELS & WVP ACOUSTIC WALL PANELS 12/15 3/22 2/23 AREA A PLAM WALL PANELS & WVP 12/15 AREA D ACOUSTIC WALL PANELS 1/5 AREA C ACOUSTIC WALL PANELS 2/9 AREA B ACOUSTIC WALL PANELS 2/23 AREA A ACOUSTIC WALL PANELS Mon 1/11/16

Ben Steele Middle School Bid Schedule ID 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 Task Name Duration Start Finish CASEWORK & COUNTERTOPS 75 days Thu 12/15/16 Wed 3/29/17 AREA D CASEWORK & COUNTERTOPS 20 days Thu 12/15/16 Wed 1/11/17 AREA C CASEWORK & COUNTERTOPS 25 days Thu 1/5/17 Wed 2/8/17 AREA B CASEWORK & COUNTERTOPS 25 days Thu 2/9/17 Wed 3/15/17 AREA A CASEWORK & COUNTERTOPS 25 days Thu 2/23/17 Wed 3/29/17 MEP TRIM 80 days Thu 12/29/16 Wed 4/19/17 AREA D MEP TRIM 25 days Thu 12/29/16 Wed 2/1/17 AREA C MEP TRIM 25 days Thu 1/26/17 Wed 3/1/17 AREA B MEP TRIM 25 days Thu 3/2/17 Wed 4/5/17 AREA A MEP TRIM 25 days Thu 3/16/17 Wed 4/19/17 DOORS AND HARDWARE INSTALL 70 days Thu 1/5/17 Wed 4/12/17 AREA D DOORS & HARDWARE 15 days Thu 1/5/17 Wed 1/25/17 AREA C DOORS & HARDWARE 15 days Thu 2/2/17 Wed 2/22/17 AREA B DOORS & HARDWARE 15 days Thu 3/9/17 Wed 3/29/17 AREA A DOORS & HARDWARE 15 days Thu 3/23/17 Wed 4/12/17 HYDRAULIC ELEVATOR 30 days Mon 1/9/17 Fri 2/17/17 CEILING TILES 65 days Tue 1/10/17 Mon 4/10/17 AREA D CEILING TILES 12 days Tue 1/10/17 Wed 1/25/17 AREA C CEILING TILES 12 days Fri 2/3/17 Mon 2/20/17 AREA B CEILING TILES 12 days Fri 3/10/17 Mon 3/27/17 AREA A CEILING TILES 12 days Fri 3/24/17 Mon 4/10/17 TILE WORK 80 days Thu 1/19/17 Wed 5/10/17 AREA D TILE WORK 25 days Thu 1/19/17 Wed 2/22/17 AREA C TILE WORK 25 days Thu 2/16/17 Wed 3/22/17 AREA B TILE WORK 25 days Thu 3/23/17 Wed 4/26/17 AREA A TILE WORK 25 days Thu 4/6/17 Wed 5/10/17 FLOORING 83 days Fri 2/17/17 Tue 6/13/17 AREA D FLOORING 25 days Fri 2/17/17 Thu 3/23/17 AREA C FLOORING 25 days Fri 3/17/17 Thu 4/20/17 AREA B FLOORING 25 days Fri 4/21/17 Thu 5/25/17 AREA A FLOORING 25 days Wed 5/10/17 Tue 6/13/17 DIVISION #10 & LOCKERS 62 days Mon 2/20/17 Tue 5/16/17 AREA D DIVISION #10 7 days Mon 2/20/17 Tue 2/28/17 AREA C DIVISION #10 7 days Mon 3/20/17 Tue 3/28/17 AREA B DIVISION #10 7 days Mon 4/24/17 Tue 5/2/17 AREA A DIVISION #10 7 days Mon 5/8/17 Tue 5/16/17 KITCHEN EQUIPMENT 30 days Fri 3/17/17 Thu 4/27/17 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep CASEWORK & COUNTERTOPS 12/15 3/29 12/15 AREA D CASEWORK & COUNTERTOPS 1/5 AREA C CASEWORK & COUNTERTOPS 2/9 AREA B CASEWORK & COUNTERTOPS 2/23 AREA A CASEWORK & COUNTERTOPS MEP TRIM 12/29 4/19 12/29 AREA D MEP TRIM 1/26 AREA C MEP TRIM 3/2 AREA B MEP TRIM 3/16 AREA A MEP TRIM DOORS AND HARDWARE INSTALL 1/5 4/12 1/5 AREA D DOORS & HARDWARE 2/2 AREA C DOORS & HARDWARE 3/9 AREA B DOORS & HARDWARE 3/23 AREA A DOORS & HARDWARE 1/9 HYDRAULIC ELEVATOR CEILING TILES 1/10 4/10 1/10 AREA D CEILING TILES 2/3 AREA C CEILING TILES 3/10 AREA B CEILING TILES 3/24 AREA A CEILING TILES TILE WORK 1/19 5/10 1/19 AREA D TILE WORK 2/16 AREA C TILE WORK 3/23 AREA B TILE WORK 4/6 AREA A TILE WORK FLOORING 2/17 6/13 2/17 AREA D FLOORING 3/17 AREA C FLOORING 4/21 AREA B FLOORING DIVISION #10& LOCKERS 2/20 5/16 2/20 AREA D DIVISION #10 5/10 AREA A FLOORING 3/20 AREA C DIVISION #10 4/24 AREA B DIVISION #10 KITCHEN EQUIPMENT 3/17 4/27 5/8 AREA A DIVISION #10 Mon 1/11/16

Ben Steele Middle School Bid Schedule ID Task Name Duration Start Finish 218 AREA C KITCHEN EQUIPMENT 30 days Fri 3/17/17 Thu 4/27/17 219 CONSTRUCTION CLEANING 68 days Fri 3/24/17 Tue 6/27/17 220 AREA D CONSTRUCTION CLEANING 10 days Fri 3/24/17 Thu 4/6/17 221 AREA C CONSTRUCTION CLEANING 10 days Fri 4/28/17 Thu 5/11/17 222 AREA B CONSTRUCTION CLEANING 10 days Fri 5/26/17 Thu 6/8/17 223 AREA A CONSTRUCTION CLEANING 10 days Wed 6/14/17 Tue 6/27/17 224 G.C. INCOMPLETE WORK LIST BUILDING 35 days Wed 5/17/17 Tue 7/4/17 225 AREA D INCOMPLETE WORK LIST 10 days Wed 5/17/17 Tue 5/30/17 226 AREA C INCOMPLETE WORK LIST 10 days Wed 5/17/17 Tue 5/30/17 227 AREA B INCOMPLETE WORK LIST 10 days Fri 6/2/17 Thu 6/15/17 228 AREA A INCOMPLETE WORK LIST 10 days Wed 6/21/17 Tue 7/4/17 229 OWNERS PUNCH LIST WALK BUILDING 28 days Wed 5/31/17 Fri 7/7/17 230 AREA D OWNER PUNCH LIST 3 days Wed 5/31/17 Fri 6/2/17 231 AREA C OWNER PUNCH LIST 3 days Wed 5/31/17 Fri 6/2/17 232 AREA B OWNER PUNCH LIST 3 days Fri 6/16/17 Tue 6/20/17 233 AREA A OWNER PUNCH LIST 3 days Wed 7/5/17 Fri 7/7/17 234 OWNER PUNCH LIST BUILDING WORK 30 days Mon 6/5/17 Fri 7/14/17 235 AREA D OWNER PUNCH LIST WORK 5 days Mon 6/5/17 Fri 6/9/17 236 AREA C OWNER PUNCH LIST WORK 5 days Mon 6/5/17 Fri 6/9/17 237 AREA B OWNER PUNCH LIST WORK 5 days Wed 6/21/17 Tue 6/27/17 238 AREA A OWNER PUNCH LIST WORK 5 days Mon 7/10/17 Fri 7/14/17 239 OWNER FF&E 35 days Mon 6/12/17 Fri 7/28/17 240 AREA D OWNER FFE 10 days Mon 6/12/17 Fri 6/23/17 241 AREA C OWNER FFE 10 days Mon 6/12/17 Fri 6/23/17 242 AREA B OWNER FFE 10 days Wed 6/28/17 Tue 7/11/17 243 AREA A OWNER FFE 10 days Mon 7/17/17 Fri 7/28/17 244 TEST AND BALANCE- COMMISSIONING 20 days Wed 6/28/17 Tue 7/25/17 245 AREA'S A - D TEST & BALANCE 20 days Wed 6/28/17 Tue 7/25/17 246 AREA'S A - D COMMISSIONING 20 days Wed 6/28/17 Tue 7/25/17 247 SUBSTANTIAL COMPLETION 0 days Fri 7/28/17 Fri 7/28/17 248 SITE WORK 370 days Mon 2/29/16 Fri 7/28/17 249 ONSITE WORK FIELDS 126 days Mon 2/29/16 Mon 8/22/16 261 ONSITE WORK BUILDING 370 days Mon 2/29/16 Fri 7/28/17 283 PROJECT COMPLETION 0 days Fri 7/28/17 Fri 7/28/17 284 FIRST DAY OF SCHOOL 2017 0 days Thu 8/24/17 Thu 8/24/17 3rd Quarter 2nd Quarter 1st Quarter 4th Quarter May Sep Jan May Sep Jan May Sep 3/17 AREA C KITCHEN EQUIPMENT CONSTRUCTION CLEANING 3/24 6/27 3/24 AREA D CONSTRUCTION CLEANING 4/28 AREA C CONSTRUCTION CLEANING 5/26 AREA B CONSTRUCTION CLEANING 6/14 AREA A CONSTRUCTION CLEANING G.C. INCOMPLETE WORK LIST BUILDING 5/17 7/4 5/17 AREA D INCOMPLETE WORK LIST 5/17 AREA C INCOMPLETE WORK LIST 6/2 AREA B INCOMPLETE WORK LIST 6/21 AREA A INCOMPLETE WORK LIST OWNERS PUNCH LIST WALK BUILDING 5/31 7/7 5/31 AREA D OWNER PUNCH LIST 5/31 AREA C OWNER PUNCH LIST 6/16 AREA B OWNER PUNCH LIST 7/5 AREA A OWNER PUNCH LIST OWNER PUNCH LIST BUILDING WORK 6/5 7/14 6/5 AREA D OWNER PUNCH LIST WORK 6/5 AREA C OWNER PUNCH LIST WORK 6/21 AREA B OWNER PUNCH LIST WORK 7/10 AREA A OWNER PUNCH LIST WORK OWNER FF&E 6/12 7/28 6/12 AREA D OWNER FFE 6/12 AREA C OWNER FFE 6/28 AREA B OWNER FFE 7/17 AREA A OWNER FFE TEST AND BALANCE- COMMISSIONING 6/28 7/25 SITE WORK 2/29 7/28 ONSITE WORK FIELDS 2/29 8/22 ONSITE WORK BUILDING 2/29 7/28 6/28 AREA'S A - D TEST & BALANCE 6/28 AREA'S A - D COMMISSIONING 7/28 SUBSTANTIAL COMPLETION 7/28 PROJECT COMPLETION 8/24 FIRST DAY OF SCHOOL 2017 Mon 1/11/16

Ben Steele Middle School 1/11/16 Langlas & Associates, Inc. Storm Water Pollution Prevention Plan & Best Management Practices The Ben Steele Middle School project will utilize a combination of the Best management Practice s (BMP s) listed below. BMP's will be installed per the installation instructions as noted in the reference material MDEQ Storm Water Management During Construction Field Guided. 1. Vehicle Tracking Pads: Tracking pads will be constructed at south entrance off of 56 th Street in order to keep sediments from tracking off site. Vehicle tracking pad will be constructed 40-0 wide by 50-0 long. The tracking pad will be constructed of non-woven geotextile fabric between aggregate and sub grade. The aggregated will be 6 minus limestone aggregate. On the egress side of the tracking a cattle guard or rumble strips will be added to physically jar vehicles and remove sediment or mud from vehicle prior to leaving the site. Construction of the new tracking pad will also require culvert pipe in the ditch. Routine maintenance will be required for the North and South tracking pad (Refer to Site Map for location of existing and new tracking pads). Routine street sweeping and maintenance will be required to keep 56 th Street and or Grand Avenue clear of any sediments/soils that may have been tracked by vehicles or equipment. 2. Filter socks will be installed along installed along the entire West side of the property as well as on the East side to the South Tracking Pad. Existing filter socks are installed along the entire South side of the property and turns up North 100 on both the West and East side. Routine maintenance will be required for new and existing sediment barrier to ensure sediment is not leaving the site. 3. Stockpiles shall be stabilized or covered at the end of each work day. If necessary, silt fencing or wattles will be placed on the downslope side of the soil stockpiles. Coordinate location of stockpile with site superintendent. 4. Concrete washout pits will be constructed to ensure that the slurry and concrete do not contaminate. The concrete washout pit will be routinely cleaned once it reaches 2/3 of the way full or at the end of the job. Coordinate location of washout pit with site superintendent. 5. To mitigate dust from earth moving activities, a water truck will be utilized as necessary. 6. Equipment must be checked pre and post shift for leaks and damaged to mitigate any potential soil or storm water contamination. Spill kits will be kept in fueling trucks and used in the event of any spills or leaks. 7. Use dandy bags for inlet protection to prevent sediment from entering the storm drain system. 8. Install a rock check dam right way on the South East corner of the property to ensure no contaminates are leaving the site. END OF SWPPP & BMPs

Billings School District #2 RULES OF ON-SITE CONDUCT School District No. 2 takes the protection and safety of its students and staff very seriously. These Rules of On-Site Conduct apply to all persons or firms engaged in providing on-site work for this project. Failure to abide by these rules may result in the immediate, temporary suspension and/or permanent removal of the offending person or firm from the project, at the sole discretion of the Superintendent and/or the Executive Director of Facilities. Registered Sex Offenders No person shall be employed for any on-site portions of this project who is a registered sex offender in any jurisdiction. Sexual Harassment Sexual harassment in any form is prohibited. This includes, but is not limited to lewd comments, leering, offensive clothing and whistling. Firearms No firearms are allowed on District property at any time, including stored in a vehicle. Contact and interaction with students No contact or interaction with students is allowed under any circumstances. If approached by a student you must introduce yourself as a member of the project team and then politely decline to engage in conversation and immediately terminate the contact. Avoid putting yourself in a position where students have direct or unsupervised access to you. Visual Identification While working on school grounds, workers will be identified according to procedures established by the Construction Manager. Tobacco, alcohol and illegal drugs In accordance with district policy and Montana State Law, no tobacco products may be used on school property. All tobacco products must be concealed at all times. No alcohol or illegal drugs are allowed on school property at any time. Language and Music Loud or offensive music or language is not allowed, and must be discontinued immediately upon the offending party being notified. Self-Reporting If you are accused of any of these violations, or if there is any question about a specific circumstance or situation, immediately report the incident or circumstance to the project superintendent and/or District s Construction Manager, Architect or Engineer. Situations reported by others: In the event that an alleged incident is reported to the School District by a student, parent, staff member or any other observer, the named party will be suspended from on-site duties until the issue is fully resolved. Init. Page 1 of 3

Zero-tolerance policy The District reserves the right to refuse access to the site of any person either accused or found guilty of a breach of any of the listed rules of conduct. Accountability Every person engaged in any on-site work of this project must be issued a copy of these rules and acknowledge, in writing, that they have fully read and understand them. Each employer is required to provide the name and signature of every employee expected to perform work or visit the site. The District reserves the right to spot check any person on the site and to have them immediately removed from District property if their name does not appear on the acknowledgement list. Init. Page 2 of 3

On-Site Conduct Rules Acknowledgement Sheet Each sub-contractor is required to provide a current copy of this sheet to the Construction Manager before on-site work begins. Each employee must sign, signifying receipt and understanding of the Rules of On-Site Conduct. The sub-contractor is required to update this list as needed in order to maintain a current list of employees. Employer Name Signature Received Rules Init. Page 3 of 3