SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Similar documents
ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

3, 2018 LACKAWANNA COUNTY SR 8031(WWR)

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50.

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Lehigh Valley Transportation Study

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

IMPROVING I 81 IN MARYLAND

Highway Construction Program

Construction Cost Estimation Preparation Manual (Metric Units)

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive

Information for File # RJH

Bridge Asset Management City of Battle Creek Planning and Projects

District 2 System Preservation Projects for FY 17 and FY 18

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Annual CSAH Needs Update for 2018

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

PUBLIC INFORMATION MEETING June 24, 2015

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

CONSTRUCTION INSPECTION APPLICATION AND QUALIFICATION FORM

Annual CSAH Needs Update for 2017

Maine Turnpike Authority

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

2019 PAPA REGIONAL TECHNICAL MEETINGS. PAPA REGIONAL MEETING TOPICS 6.3 mm Thin Asphalt Overlay Tack Coat Long Life Asphalt Pavements

CHAPTER 11 PAVEMENT TYPE DETERMINATION

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Berkshire Region TIP Project Data Form

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

PAVEMENT DESIGN MEMORANDUM

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

PENNSYLVANIA TURNPIKE COMMISSION

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

NJTPA Transportation Improvement Program Fiscal Years

Rehabilitation of Highway Pavements an Engineering Challenge

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

SECTION ASPHALT PAVING AND SURFACING

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

MICHIGAN DEPARTMENT OF TRANSPORTATION

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

Transcription:

Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is as follows: for the replacement of the concrete decks on 13 municipally owned bridges, minor approach roadway work, guiderail replacement and other miscellaneous construction all within a length of 3,748.37 Linear Feet (0.710 Miles) as indicated on the approved drawings included in the Bid Package for D11 Local Bridge Bundle Phase 1, in BEAVER and LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. DBE 7%, Anticipated Notice to Proceed 8-29- 16, Required Completion 11-17-17. ERIE COUNTY SR 4034(00S) #105859 PROPOSAL:$16.44 PLANS:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows: traffic signal upgrades, signing, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4034, SECTION 00S, in Erie COUNTY, City of Erie in and around the intersection of the Bayfront Parkway and State Street at segment 0060 offset 2167 to approximately segment 0070 offset 0100. DBE 3%, Anticipated Notice to Proceed 8-29-16, Required Completion 12-2-16. Updated June 15, 2016 CHESTER COUNTY SR 82(HBL) #92311 PROPOSAL:$79.20 PLANS:$57.20 12X18:$70.20 24X36:$1,014.00 EXSTRUCT:$12.32 12X18:$15.12 24X36:$218.40 This project is for the replacement of six (6) structures across Chester, Bucks, and Delaware Counties; and the rehabilitation/repair of four (4) bridges across Bucks, Montgomery, Chester and Philadelphia counties. Typical work for replacement structures includes rigid frames and culverts within the approximate existing footprint, guiderail updates along the approaches of each structure, and the milling and paving of roadway along either approach to tie the existing roadway grade into the new structure. Work included for the repair/rehabilitation the four structures includes deck replacement, timber superstructure replacement, joint repairs, concrete/deck repair, heat straightening beam repairs and replacements, painting of structural steel, and updates to approach guiderail. Also included is other miscellaneous construction, as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed 8-29-16, Required Completion 8-3-19. Updated June 14, 2016 MONTGOMERY COUNTY SR 2004(HAT) #74807 PROPOSAL:$53.76 PLANS:$3.30 12X18:$4.05 24X36:$58.50 The description and location of the project is as follows: provide streetscape items such as sidewalk, curbing, landscaping and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Broad Street, State Route 2004, Section HAT, in Montgomery County, Hatfield Township from approximately segment 0030 offset 0700 to approximately Rosenberry Ave. at segment 0030 offset 2220. Design activities limited to ADA compliant curb ramps. DBE 3%, Anticipated Notice to Proceed 10-11-16, Required Completion 4-20-17. WARREN COUNTY SR 3008(PBR) #106770 1

PROPOSAL:$13.68 PLANS:$3.00 For the construction or improvement of a certain section of STATE HIGHWAYS in WARREN COUNTY, ELDRED, SPRING CREEK, DEERFIELD AND PITTSFIELD TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 3008 SECTION PBR. This project being situated as follows: SR. 3008 - From the intersection with SR. 3001 at Segment 0050 Offset 0000 then east to the intersection with SR. 0027 at Segment 0170 Offset 3910. SR. 3011 - From approximately 2.3 miles north of Scotch Pine Rd. (T-360) at Segment 0080 Offset 0000 then north to the intersection with SR. 0027 at Segment 0170 Offset 1391. SR. 3015 - From the intersection with SR. 0027 at Segment 0010 Offset 0000 then north to the intersection with SR. 3008 at Segment 0070 Offset 2951. For the bituminous overlay with Warm Mix Superpave Asphalt Mixture Designs 18' in width; also for bituminous milling across bridge decks, undercut section, paved shoulders, drainage, and guiderail all within a project length of 15.10 miles as indicated on the approved drawings. Anticipated Notice to Proceed 8-29-16, Required Completion 5-1-18. FRANKLIN COUNTY SR 75(012) #99180 PROPOSAL:$23.88 PLANS:$5.50 12X18:$6.75 24X36:$97.50 EXSTRUCT:$0.66 12X18:$0.81 24X36:$11.70 This project includes preservation work on four (4) bridges BMS # 28007507003040; BMS # 28007507500522; BMS # 28007507500835; and BMS # 28007508400290. Traffic during construction will be maintained with short-term single-lane operations. Project also involves approach roadway work, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0075, SECTIONS 012, in FRANKLIN COUNTY, FANNETT TOWNSHIP, from Segment 0700; 0750; 0840, Offset 2902; 0387; 0144 to Segment 0700; 0750; 0840, Offset 3202; 0987; 0444, for an overall project length of 750.00 linear feet (0.142 mile). Anticipated Notice to Proceed 8-29-16, Required Completion 8-3-17. BLAIR COUNTY SR 36(29B) #21952 PROPOSAL:$33.96 PLANS:$26.18 12X18:$32.13 24X36:$464.10 X-SEC;$7.7012X18:$9.45 24X36:$136.50 EXSTRUCT:$0.88 12X18:$1.08 24X36:$15.60 The description and location of the project is as follows: This project is for the replacement of the existing deteriorated two span concrete encased steel I-beam bridge with a single span spread box beam bridge at approximately the same location. The proposed structure will carry State Route (SR) 0036, Section 29B (Logan Boulevard) over Brush Run. This project includes roadway approach work, waterline, guiderail and drainage upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0036, SECTION 29B in BLAIR COUNTY, LOGAN TOWNSHIP at the following location: STATION 1117+40.00 TO STATION 1139+50.00 SEGMENT 0330, OFFSET 0357 TO SEGMENT 0340, OFFSET 0782 (NB) SEGMENT 0331, OFFSET 0344 TO SEGMENT 0341, OFFSET 0821 (SB). DBE 6%, Anticipated Notice to Proceed 8-29-16, Required Completion 11-9-17. SUSQUEHANNA COUNTY SR 858(552) #88613 PROPOSAL:$16.08 PLANS:$20.46 12X18:$25.11 24X36:$362.70 X-SEC:$8.14 12X18:$9.99 24X36:$144.30 For the construction of a section of STATE HIGHWAY in SUSQUEHANNA COUNTY, MIDDLETOWN TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0858 SECTION 552. The project being situated as follows: SR 0858 - from a point approximately 0.98 mile north of intersection with SR 4017 at Segment 0100 Offset 2210 (station 76+50) to a point 1.38 mile south of Middletown Center at Segment 0110 Offset 0245 (station 83+90) For the removal of existing twin 60 inch pipes and bridge abutments and replacing with a one span P/S concrete spread box Beam Bridge; full depth pavement consisting of superpave WMA wearing course 1-1/2 depth, superpave WMA binder course 2-1/2" depth, superpave base course 3 depth and subbase 6 depth. Also rock lined slopes and swales, temporary stream crossing, guiderail, drainage and pavement markings all contained within an overall project length of 748 linear feet as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed 8-29-16, Required Completion 9-29-17. BUCKS COUNTY SR 0000(LSR) #105445 2

PROPOSAL:$24.12 The description and location of the project is as follows: the repair and replacement of Type A, and Type E signs as well as Overhead signs and other miscellaneous construction, as needed, for Various STATE ROUTES in BUCKS, CHESTER, DELAWARE, MONTGOMERY, AND PHILADELPHIA COUNTIES. Anticipated Notice to Proceed 8-29-16, Required Completion 8-28-19. LANCASTER COUNTY SR 7213(BRG) #19799 PROPOSAL:$23.28 PLANS:$14.08 12X18:$17.28 24X36:$249.60 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 This project consists of the construction of a two-span Continuous Composite Prestressed Concrete Spread Box Beam Bridge and approach work as indicated on the approved drawings included in the Bid Package for T-848 (Conestoga Creek Road) in LANCASTER COUNTY, EAST EARL TOWNSHIP, from Sta. 0+15.00 to Sta. 9+14.10, for an overall project length of 899.10 linear feet (0.170 mile). DBE 5%, Anticipated Notice to Proceed 10-11-16, Required Completion 9-15-17. CRAWFORD COUNTY SR 1032(PBR) #107070 PROPOSAL:$14.64 PLANS:$2.76 For the bituminous resurfacing of various state routes throughout CRAWFORD and WARREN COUNTIES, Commonwealth of Pennsylvania, STATE ROUTE 1032 SECTION PBR with Warm Mix Asphalt Mixture (WMA) designs. Also for bituminous milling, drainage, concrete curb, and guiderail update as indicated on the approved drawings. Anticipated Notice to Proceed 8-29-16, Required Completion 5-1-18. Updated June 13, 2016 LANCASTER COUNTY SR 72(054) #96212 PROPOSAL:$16.32 PLANS4.40 12x18:$5.40 24x36:$78.00 This project includes concrete patching, spall repair, minor drainage updates, signs & pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0072, SECTION 054, in LANCASTER COUNTY, MANHEIM TOWNSHIP, from just north of Calder Road at Segment 0130/0131 Offset 0110/0110 to Granite Run Drive at Segment 0140/0141 Offset 2037/2026, for an overall project length of 5229.00 linear feet (0.99 mile). Anticipated Notice to Proceed 8-29-16, Required Completion 6-23-17. BUCKS COUNTY SR 0000(SSR) #105468 PROPOSAL:$30.12 The description and location of the project is as follows: for the furnishing and installation of state approved signs, Type B posts, removal of existing signs and posts and other miscellaneous operations for various STATE ROADS described herein, in various BUCKS, CHESTER, DELAWARE, MONTGOMERY, and PHILADELPHIA COUNTIES and TOWNSHIPS within the Commonwealth of Pennsylvania. Anticipated Notice to Proceed 8-29-16, Required Completion 8-28-19. ADAMS COUNTY SR 116(042) #90866 PROPOSAL:$18.96 PLANS:$4.18 12X18:$5.13 24X36:$74.10 This project consists of minor drainage updates, base repair, ADA ramps, milling, resurfacing, signing & pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0116, SECTION 042, in ADAMS COUNTY, FAIRFIELD BOROUGH and HAMILTONBAN TOWNSHIP, from just east of Iron Springs Road at Segment 0060 Offset 2856 to Carroll's Tract Road at Segment 0090 Offset 0856, a length of 5,261.00 linear feet (1.00 mile). Also included is SR 3016-009 from Segment 0070 Offset 0758 to Segment 0070 Offset 1493, a length of 666.00 linear feet (0.13 mile). Overall project length is 5927.00 linear feet (1.13 mile). Anticipated Notice to Proceed 8-29-16, Required Completion 7-3-17. BERKS COUNTY SR 176(06M) #104259 3

PROPOSAL:$14.28 PLANS:$0.96 The description and location of the project is as follows: Milling, Base Repair, Overlay, RPM's, and Line Painting & Legends as indicated on the approved drawings included in the bid package for State Route 176, Section 06M, in Berks County, Caernarvon, Robeson and Exeter Townships from approximately segment 0018/0019 offset 1938/1926 to approximately segment 0040/0035 offset 0280/1378, approximately 21,246 feet or 4.02 miles and other miscellaneous construction. DBE 4%, Anticipated Notice to Proceed 8-29-16, Required Completion 7-31-17. FRANKLIN COUNTY SR 16(037) #74889 PROPOSAL:$28.20 PLANS:$22.88 12X18:$28.08 24X36:$405.60 X-SEC:$3.96 12X18:$4.86 24X36:$70.20 EXSTRUCT:$0.44 12X18:$0.54 24X326:$7.80 Construction consists of the replacement of the PA-16 Memorial Bridge over the west branch of Antietam Creek. Traffic control is phased construction. Phase 1 will maintain onelane of traffic on the existing structure using a temporary signal. Phase 2 will maintain both lanes of traffic on the over-widened portion of the new bridge. The existing 2-span bridge will be replaced with a two-span composite box beam bridge. Accelerated bridge construction components are part of the as-design bridge and A+Bx bidding is specified. Other work includes: 12 waterline relocation, approach reconstruction; Superpave asphalt; milling; guide rail; drainage; curb; sidewalk; signing; pavement markings; and other miscellaneous items, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0016, SECTION 037, in FRANKLIN COUNTY, WAYNESBORO BOROUGH and WASHINGTON TOWNSHIP, from Segment 0520 Offset 1776 to Segment 0530 Offset 0613, a length of 855.00 linear feet (0.162 mile). Anticipated Notice to Proceed 8-29-16, Required Completion 5-3-18. Updated June 9, 2016 GREENE COUNTY SR 2011(PBE) #106926 PROPOSAL:$13.68 PLANS:$2.42 12X18:$2.97 24X36:$42.90 The description and location of the project is as follows: The scope of work involves resurfacing and updating the guide rail, pavement markings, minor drainage upgrades, and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 2011, SECTION PBE, in GREENE COUNTY, Dunkard Township and Monongahela Township, beginning approximately 500' north of S.R. 2012 (Bobtown Hill Road) and ending approximately at Creek Road (T-411). (Segment 0070 offset 0417 to segment 0150 offset 0100). Anticipated Notice to Proceed 8-29-16, Required Completion 12-2-16. ECMS ADVANCED INFORMATION JULY 14, 2016 Updated June 8, 2016 LYCOMING COUNTY SR 2016(017) #102133 PROPOSAL:$17.28 PLANS:$2.64 12X18:$3.24 24X36:$46.80 The description and location of the project are as follows: This work is for intersection improvements including traffic signal installation, pavement markings, signs, plain cement concrete curb, cement concrete sidewalk, detectable warning surface, excavation, flexible base replacement, Superpave Asphalt Mixture Design WMA scratch and wearing courses, milling, and other miscellaneous construction all within an overall length of 730.00 linear feet (0.138 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 2016, SECTION 017 in LOYALSOCK TOWNSHIP, LYCOMING COUNTY from approximately 0.29 miles east of the intersection with Almond Street at Segment 0140 Offset 0016 to approximately 0.20 miles west of the intersection with State Route 2056 at Segment 0140 Offset 0746. DBE 2%, Anticipated Notice to Proceed 8-29-16, Required Completion 7-18-17. 4

Update June 6, 2016 WASHINGTON COUNTY SR 88(127) #47432 PROPOSAL:$60.60 PLANS:$25.52 12X18:$31.32 24X36:$452.40 X-SEC:$5.50 12X18:$6.75 24X36:$97.50 The description and location of the project is as follows: Improvements at the intersection of SR 0088, SR 0837, and the Fisher Heights Giant Eagle store, including the installation of left turn lanes, a new traffic signal, new drainage and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0088, SECTION 127, in WASHINGTON COUNTY, CARROLL TOWNSHIP, from segment 0560 offset 3005 to segment 0560 offset 1575. Anticipated Notice to Proceed 8-29-16, Required Completion 11-3-17. ECMS ADVANCED INFORMATION JULY 14, 2016 LYCOMING COUNTY SR 2016(017) #102133 PROPOSAL:$17.28 PLANS:$2.64 12X18:$3.24 24X36:$46.80 The description and location of the project are as follows: This work is for intersection improvements including traffic signal installation, pavement markings, signs, plain cement concrete curb, cement concrete sidewalk, detectable warning surface, excavation, flexible base replacement, Superpave Asphalt Mixture Design WMA scratch and wearing courses, milling, and other miscellaneous construction all within an overall length of 730.00 linear feet (0.138 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 2016, SECTION 017 in LOYALSOCK TOWNSHIP, LYCOMING COUNTY from approximately 0.29 miles east of the intersection with Almond Street at Segment 0140 Offset 0016 to approximately 0.20 miles west of the intersection with State Route 2056 at Segment 0140 Offset 0746. DBE 2%, Anticipated Notice to Proceed 8-29-16, Required Completion 7-18-17. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 5