HTNA SUPPLIER QUALITY MANUAL

Similar documents
Supplier Quality Manual. QF-SQR001 / Rev. Date: / Rev. Level: D

Supplier Quality Manual. QF-SQR001 / Rev. Date: 10/14/2017 / Rev. Level: E

SECTION II.2.4 PRODUCTION PART APPROVAL PROCESS (PPAP)

Supplier Quality System Survey

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual (QQS )

Supplier Containment

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139

SUPPLIER QUALITY ASSESSMENT

Production Part Approval Process (PPAP)

Metal Powder Products Company

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Supplier Quality Standard

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

Supplier Quality Systems Requirements Manual

Supplier Quality Manual

Integrated Supplier Quality Requirements

SUPPLIER QUALITY MANUAL

Production Part Approval Process (PPAP)

Supplier Quality Manual

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

ABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING

TSV Supplier Quality Manual TABLE OF CONTENTS

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Blue Chip Engineered Products Supplier Quality Manual

Supplier Quality Requirements Manual

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods.

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

Supplier Quality System Requirements Manual

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY PLANNING II. Study supports

JSP Supplier Quality Assurance Manual

GLOBAL PURCHASING. Supplier Technical Assistance. Phased PPAP

Supplier Manual Rev /15

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS

Key Characteristic Designation System Doc. No. QAP -001 Rev. I Date: 05/14/02 Page 1 of 10

Integrated Supplier Quality Requirements

Global Supplier Quality Manual

Advanced Product Quality Planning

Global Supplier Quality Manual. Revision 4

Advanced Product Quality Planning (APQP) and Production Part Approval Process (PPAP)

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract

Supplier Quality Manual

Vendor Qualification Survey

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements

Supplier Quality Requirements FSQ01

Integrated Supplier Quality Requirements

PPAP Process Checklist \ Sign Off Sheet Instructions

SUPPLIER GUIDELINES MANUAL

Supplier Quality Assurance Manual (SQAM)

PPAP Process Checklist \ Sign Off Sheet instructions

List of Documented Information (Document & Records)

Supplier Quality Requirements

SUPPLIER QUALITY REQUIREMENTS MANUAL

Steve Binkowski Director of Purchasing

QUALITY PLANNING FOR SUPPLIERS - PERFECTION IS OUR DRIVE -

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

Trostel, Ltd. Supplier Quality First Manual. Rev: C 6/19/09

Danfoss Supplier Quality Manual

Supplier Quality Manual

Global Supplier Manual Appendix T Ford Customer Specific Requirements for Suppliers. October 26, 2017

Revision no: 01 Date: Global Supplier Quality Assurance Network

Supplier Requirements Manual

Supplier. Quality. Assurance. Manual (SQAM)

Net Shaped Solutions Supplier Assessment

Supply Chain Supplier Quality Manual. Creation Date: 19 th September 2012 Last Updated: February 16, 2016 Revision Number: 03 Document Number: AQM005

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Production Part Approval Process Supplier Information. - Version 1.0

Supplier Day 2011 Quality Expectations

Montaplast of North America, Inc.

Supplier Requirement Manual. Preface

Culture of Excellence: Advanced Product Quality Planning (APQP) for Manufacturers

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

Quality Honeycomb Supplier Quality Requirements

Supplier Quality Manual. Autoneum Group Supplier Quality Manual

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook

Supplier Quality Manual

MERIT Customer Specific Requirements

UNCONTROLLED DOCUMENT

CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

Metric Manufacturing Supplier Manual

Revcor Supplier Quality Manual

Applied PPAP within a Process Approach, Including Fourth Edition Updates. Jim Collins

Western Diversified Plastics, LLC. Supplier Requirements Manual

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

JDI Quality Assurance Guideline

TRICO PRODUCTS PUR-C-P106-A

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

Supplier Quality Assurance Manual. January 2019 Edition

SUPPLIER SURVEY FORM Instructions

Supplier Quality Requirements Manual

SUPPLIER QUALITY MANUAL

Transcription:

SECTION II.9.3 PROCESS CONTROL PLAN PURPOSE: To establish the development and submission requirements of a process control plan for HTNA that defines and controls the method of consistent production processes. SCOPE: This applies to all suppliers of purchased production intent parts to HTNA. EXPLANATION: A process control plan is a chart compiled with processes and the systems that are used to control them. The process control plan is to be developed to aid in the manufacture of quality products according to the requirements of HTNA. This can be accomplished by using a structured approach to the design, selection, and implementation of value added control methods. The process control plan is an important part of the overall quality system, it helps define and shape the quality processes that are required to produce quality products. Like most documents that control or monitor quality, this document is to be treated as living and thus should be used to drive continuous improvement activities. SUPPLIER RESPONSIBILITIES: 1. Process Control: HTNA Supplier Quality System Requirements reflect TS 16949 Section 6.4 Work Environment. HTNA Clarification As a general rule, the supplier at a minimum should have systems in place that control, monitor, and evaluate the following: Cleanliness (5S) see section II.9.7 Contingency Plan Records (i.e. process, tooling, maintenance, etc.) Designation of Special Characteristics and their control Tooling & Machines Maintenance Operator Work Instruction Sheets Operator Training Matrix and Training Schedules 2. Process Control Plan: HTNA Supplier Quality System Requirements match Advanced Product Quality Planning and Control Plan Section 6.0 Control Plan Methodology. A. Supplier shall use Section 6.0, Control Plan Methodology of the AIAG Advanced Product Quality Planning and Control Plan book to develop the Process Control Plan. B. The supplier should use the AIAG APQP, A-4 ProductProcess Quality (pages 5 & 6) and A-8 Control Plan (page 7) Checklists to help ensure all necessary requirements are met. C. The supplier should use the AIAG standard form or a format that closely resembles when submitting the control plan to HTNA. D. A copy of the Process Control Plan (prototype or production) must be included with each submission. Revision No. D Date: 12216 HTNA Page 1 of 7

E. The supplier shall have a prototype control plan for products that are developed for Design Validation (DV) and are not produced using production equipment, tooling, or personnel. F. The supplier shall have a process control plan for products that are intended for Production Validation (PV) using production equipment, tooling, or personnel. This document is a living document that can be changed up to the point of PPAP submission. All changes made to the process after PPAP submission will require a Part Submission Warrant (PSW) with a Process Change Request (PCR) and a formal written response from HTNA. See SQM section II-9.9. G. If the supplier is unclear if the proposed change will require a PSW, they should consult with HTNA QEQC prior to any change. H. The supplier must provide supporting documentation stating that the methods used to control the process are effective at maintaining the quality, reliability, and capacity. I. The supplier must adequately identify all revisions and the capability to explain the reasons for changes. J. If the process for service parts differs from the production process, a separate process control plan must be created and identified. The supplier is not required to submit this document but must be able to produce it upon request. K. The significant characteristics must be identified and controlled using statistical techniques. L. The control plan steps must match those of the PFMEA & Flow Diagram. Revision No. D Date: 12216 HTNA Page 2 of 7

TIMING SUPPLIER HTNA Design Validation (DV) According to date on Supplier Advanced Quality Planning Schedule Draft initial prototype process control plan Submit copy to HTNA QEQC Review Draft of prototype control plan Provide feedback to supplier Prototype production builds Production Validation (PV) According to date on Supplier Advanced Quality Planning Schedule Pilot Production Trials PPAP Submission Run @ Rate Build PPAP Submission Provisional Approval Request (30 Mfg. days after SOP) Final Approval Request Continuous improvements based on feedback and trials Use prototype build experience to develop preliminary Control Plan Further develop preliminary Control Plan Attach Preliminary Process Flow Diagram & PFMEA Submit copy to HTNA QEQC at each build request Finalize Control Plan Submit PPAP package Submit Request for PSW provisional approval Submit long term capability study results Submit Request for PSW final approval Review Draft of preliminary control plan Provide feedback to supplier Review final control plan Provide feedback to supplier Approve request for provisional approval Review final long term capability study results Approve request for final approval (45 Mfg. days after SOP max) Change Requests Revisions after Provisional Approval stage (including current production) If change meets PPAP issuance criteria, issue PSW w marked up copy of control plan to HTNA QEQC Review request and provide response per PPAP procedure If change does not meet PPAP issuance criteria, issue revised copy of control plan to HTNA QEQC Review Process Control Plan Provide feedback Revision No. D Date: 12216 HTNA Page 3 of 7

PROCESS CONTROL PLAN Prototype Pre-Launch Production Control Plan Number Key ContactPhone Date (Orig.) Date (Rev.) Part NumberLatest Change Level Core Team Customer Engineering ApprovalDate (If Req'd.) Part NameDescription SupplierPlant ApprovalDate Customer Quality ApprovalDate (If Req'd.) SupplierPlant Supplier Code Other ApprovalDate (If Req'd.) Other ApprovalDate (If Req'd.) MACHINE, CHARACTERISTICS PART PROCESS NAME DEVICE, SPECIAL METHODS PROCESS OPERATION JIG,TOOLS, CHAR. PRODUCTPROCESS EVALUATION SAMPLE REACTION NUMBER DESCRIPTION FOR MFG. NO. PRODUCT PROCESS CLASS SPECIFICATION MEASUREMENT SIZE FREQ. CONTROL PLAN TOLERANCE TECHNIQUE METHOD Revision No. D Date: 12216 HTNA Page 4 of 7

Customer or Internal Part No. A-4 PRODUCTPROCESS QUALITY CHECKLIST Question Yes No Comment Action Required 1 Is the assistance of the customer's quality assurance or product engineering activity needed to develop or concur to the control plan? 2 Has the supplier identified who will be the quality liaison with the customer? 3 Has the supplier identified who will be the quality liaison with its suppliers? 4 Has the quality assurance system been reviewed using the Chrysler, Ford, and General Motors Quality System Assessment? Are there sufficient personnel identified to cover: 5 Control plan requirements? 6 Layout inspection? 7 Engineering performance testing? 8 Problem resolution analysis? Is there a documented training program that: 9 Includes all employees? 10 Lists whose been trained? 11 Provides a training schedule? Has training been completed for: 12 Statistical process control? 13 Capability studies? 14 Problem solving? 15 Mistake proofing? 16 Other topics as identified? 17 Is each operation provided with process instructions that are keyed to the control plan? 18 Are standard operator instructions available at each operation? 19 Were operatorteam leaders involved in developing standard operator instructions? Do inspection instructions include: 20 Easily understood engineering performance specifications? 21 Test frequencies? 22 Sample sizes? 23 Reaction plans? 24 Documentation? Are visual aids: 25 Easily understood? 26 Available? 27 Accessible? 28 Approved? 29 Dated and current? Person Responsible Due Date A-4 ProductProcess Quality Checklist Continued on next page Revision No. D Date: 12216 HTNA Page 5 of 7

A-4 PRODUCTPROCESS QUALITY CHECKLIST (Continued) Question Yes No Comment Action Required 30 Is there a procedure to implement, maintain, and establish reaction plans for statistical control charts? 31 Is there an effective root cause analysis system in place? 32 Have provisions been made to place the latest drawings and specifications at the point of the inspection? 33 Are formslogs available for appropriate personnel to record inspection results? Have provisions been made to place the following at the monitored operation: 34 Inspection gages? 35 Gage instructions? 36 Reference samples? 37 Inspection logs? 38 Have provisions been made to certify and routinely calibrate gages and test equipment? Have required measurement system capability studies been: 39 Completed? 40 Acceptable? 41 Are layout inspection equipment and facilities adequate to provide initial and ongoing layout of all details and components? Is there a procedure for controlling incoming product that identifies: 42 Characteristics to be inspected? 43 Frequency of inspection? 44 Sample size? 45 Designated location for approved product? 46 Disposition of nonconforming products? 47 Is there a procedure to identify, segregate, and control nonconforming products to prevent shipment? 48 Are reworkrepair procedures available? 49 Is there a procedure to requalify repairedreworked material? 50 Is there an appropriate lot traceability procedure? 51 Are periodic audits of outgoing products planned and implemented? 52 Are periodic surveys of the quality system planned and implemented? 53 Has the customer approved the packaging specification? Revision Date Person Responsible Due Date Prepared By: Revision No. D Date: 12216 HTNA Page 6 of 7

Customer or Internal Part No. A-8 CONTROL PLAN CHECKLIST Question Yes No Comment Action Required 1 Was the control plan methodology referenced in Section 6 used in preparing the control plan? 2 Have all known customer complaints been identified to facilitate the selection of special productprocess characteristics? 3 Are all special productprocess characteristics included in the control plan? 4 Were SFMEA, DFMEA, and PFMEA used to prepare the control plan? 5 Are material specifications requiring inspection identified? 6 Does the control pan address incoming (materialcomponents) through processingassembly including packaging? 7 Are engineering performance testing requirements identified? 8 Are gages and test equipment available as required by the control plan? 9 If required, has the customer approved the control plan? 10 Are gage methods compatible between supplier and customer? Person Responsible Due Date Revision Date Prepared By: Revision No. D Date: 12216 HTNA Page 7 of 7