SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Similar documents
Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

State Road (S.R.) 12 (Florida Arts Trail PD&E)

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations

MEETING SUMMARY FOR APRIL 13, 2017

AIR QUALITY TECHNICAL MEMORANDUM

Statewide Acceleration Transformation (SWAT)

INTERCHANGE MODIFICATION REPORT

1.4 Analysis of Alignment Alternatives

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

SR 50 PD&E Study

FDOT PROJECT INFORMATION APPLICATION FORM

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

Wednesday May 22, 2013 Managed Lanes Modeling Workshop

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

Working with Transportation Concurrency Exception Areas

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract

2040 Long Range Transportation Plan

Alternatives Evaluation Methodology

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Arterial Traffic Control: Advancing Mobility. 1980s, Now, and Beyond

Palm Beach MPO Board Meeting December 7, 2015

Project Study Area. Presentation. July 8, 2008

NC General Statutes - Chapter 136 Article 3A 1

Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County

FDOT District 5 TSM&O. Program Development

Broward County Urban Freight/Intermodal Mobility Study Executive Summary

Highway Construction Program

Air Quality Analysis Technical Memorandum

Final Recommendations Identification of Improvements, Strategies, and Solutions

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Land Use Vision and Transportation Strategy

South Florida East Coast Corridor (SFECC) Study

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

CORE MPO Freight Transportation Plan. Project Advisory Committee December 3, 2014

a. Reevaluation Phase: Design Change (FM & ) b. Document Type and Date of Approval: Type 2 Categorical Exclusion approved 7/21/2010

Chapter 2 Transportation Element Goals, Objectives and Policies

Tampa Bay has a traffic problem. We re working on a comprehensive set of solutions.

Northwest State Route 138 Corridor Improvement Project

North I-75 Master Plan Summary

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

FASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting

FTP/SIS Steering Committee Work Plan and PPI Update

APPENDIX H NEPA TRANSITION REPORT

Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO. TMA Federal Certification Review Closeout Presentation

Draft Preliminary Engineering Report

EXHIBIT "A" SCOPE OF SERVICES (STAGE 1) SYSTEMS PLANNING TRAVEL FORECASTING MODELING F.P.I.D. NO

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

Space Coast TPO. ITS Master Plan and Project Overview in Brevard County. FSITE/District 10 & ITS FL 2017 Joint Annual Meeting

RE Request for FY 2018 UPWP Budget Adjustments

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

Attachment E. Logistics. Ridge Road Extension Alternatives Analysis

Design-Build and Design-Bid-Build

2035 LRTP Transportation Options Introduction

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

I-95 Corridor Study Phase II Highway Element

How Should MPO s Engage in Setting Freight Priorities?

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

DECEMBER P R O G R E S S R E P O R T

August 30, Public Meeting #1

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Air Quality Analysis Technical Memorandum

University Corridor Draft Environmental Impact Statement (DEIS)

ASSIGNMENT OF ACCESS MANAGEMENT CLASSIFICATIONS TO THE STATE HIGHWAY SYSTEM

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas

DRAFT PRELIMINARY ENGINEERING REPORT

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Neal Campbell (WSDOT) Mike Dahlem (City of Sumner) Kirk Wilcox (Parametrix)

DRAFT Subject to Modifications

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO)

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018

Autonomous/Connected Vehicle Guidance. Dan Beaty, AICP HNTB

Air Quality Analysis Technical Memorandum

I-295/I-76/RT. 42 INTERCHANGE

Florida Department of Transportation. Lane Elimination

Intelligent Transportation Systems Master Plan

II. Approval of June 23, 2015 Meeting Notes. IV. Recap of the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

Stakeholder Interview Information Packet December 14-17, 2015

Transcription:

Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217

Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to Congress Avenue MUNICIPALITIES: City of West Palm Beach Town of Mangonia Park City of Riviera Beach 7

Purpose and Need Project Purpose: o Identify short-term and long-term needs within the study area, o Develop design concepts to address traffic spillback onto I-95, o Improve interchange operations, reduce congestion, and increase safety at the study interchange. Project Need: o Alleviate existing and future traffic congestion thereby improving safety of I-95 and the interchange 8

Alternatives Analysis No-Build Transportation System Management & Operations (TSM&O) Alternatives Evaluation Process No Build NB TSM&O A Build Alternatives 1 2 3 ALTERNATIVES SCREENING o Add additional right and left turn lane at the ramp intersections o Add directional signage on NB off-ramp to Port of Palm Beach o Add one EB and one NB left turn lane at Congress Avenue Traffic Operations Safety Freight Access Management Utilities Canal Impacts Constructability MOT Historic & Archeological Wetlands Noise Impacts Permitting R/W Impacts Aesthetic Features Community Services EVALUATION MATRIX Build Alternatives o Alternative 1: Widening of 45th Street o Alternative 2: Diverging Diamond Interchange o Alternative 3: SR 71 Ramps Alternatives Public Workshop Recommended Alternative 9

Alternatives Analysis Alternative 1 Widening of 45th Street 1

Alternatives Analysis Alternative 2 Diverging Diamond Interchange 11

Alternatives Analysis Alternative 3 SR 71 Ramps NOTE: Alternative 3 was developed but eliminated from further consideration as part of this study N AUSTRALIA AVE N MILITARY TR CONGRESS AVE 71 45 STREET 12

Environmental Analysis Wetlands/Benthic Resources No jurisdictional wetlands Sparse tape grass in C-17 Canal south of 45th Street Special Designations No special designation or Outstanding Florida Waters Wildlife and Habitat Project area does not generally provide wildlife habitat Contractor should verify absence of nests prior to construction along canal banks In-water construction should include special protection measures Contamination 2 High Risk Sites 13

Preliminary Right-of-Way Impacts COMPONENT TSM&O ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 Residential Properties Business Properties 17 7 4 Vacant Land 7 4 24 7 8 TOTAL PROPERTIES IMPACTED Preliminary Cost Estimate COMPONENT Roadway Construction TSM&O ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 $3,88, $13,67, $11,57, $54,27, Engineering/Design (15% Construction) $582, $1,96, $1,726, $8,131, CEI (15% Construction) $582, $1,96, $1,726, $8,131, $ $1,583, $467, $4,581, $5,44, $18,57, $15,426, $75,5, Right-of-Way Acquisition TOTAL COST 14

Public Involvement Public Kick-Off Meeting o September 13, 217 Elected Officials/Agencies Briefings o Palm Beach County o Town of Mangonia o City of Riviera Beach Alternatives Public Workshop o March 28, 217 Public Hearing o Fall 217 15

Summary Schedule ACTIVITY 216 217 218 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J Notice to Proceed Fact Sheet/Newsletter Elected Officials/Agency Kick-Off Meeting Public Kick-Off Meeting Engineering Data Collection Engineering Analysis Environmental Data Collection Environmental Analysis Develop and Evaluate Alternatives Alternatives Public Workshop Engineering Reports Environmental Reports Public Hearing Federal Highway Administration (FHWA) Review Location and Design Concept Acceptance (LDCA) Continuous Public Involvement TODAY 16

Long Range Transportation Plan (LRTP) Amendment I-95 at 45th Street Interchange Project FM #436519-1 FDOT District Four requested and received approval for statewide SIS funds for all phases Draft Tentative Work Program FY 218 FY 222 and SIS 2nd Five Requesting an amendment to Palm Beach MPO s adopted 24 LRTP to incorporate the I-95 at 45th Street Interchange project as a fully funded project in the Cost Feasible Plan (CFP) 17

THANK YOU For more information, please call, email or write to: Robert Lopes, PE Project Manager Florida Department of Transportation District Four 34 West Commercial Boulevard Fort Lauderdale, FL 3339 Phone: (954) 777-4425 Toll free: (866) 336-8435, ext. 4425 E-mail: Robert.Lopes@dot.state.fl.us www.95at45street.com 18