Integrated Action Plan (IAP) Successful Works

Similar documents
Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi

SOCIO ECONOMIC PROFILE OF THE SAMPLE HOUSEHOLDS

INITIATIVES OF THE MINISTRY UNDER MGNREGA FOR ADDRESSING THE DESERTIFICATION, LAND DEGRADATION & DROUGHT(DLDD) CHALLENGE

SOLAR WATER PUMPING IN

Tumkur Head Office & other branch offices Name with complete address

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

URAVU Indigenous Science & Technology Study Centre

Name of PIA Project Title

USAID Environmental Compliance and Environmental Procedures Workshop. Virtual Field Visit Instructions

Water conservation project

Infographic : Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh

Socio Economic Impact of Rural Livelihood Programme Implemented in Three Districts of Madhya Pradesh

Tata Trusts. Impacting quality of life of poor communities

Decision-Making Support System for Irrigation Water management of Jingtai Chuan Pumping Irrigation Scheme at the Upper Reaches of Yellow River

Assured irrigation for Increasing Cropping Intensity in Assam

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Solar Based. Drinking Water Supply System

COST OF CULTIVATION AND DISPOSAL PATTERN OF TOMATO IN RAIPUR DISTRICT OF CHHATTISGARH, INDIA

Overview of ITC s sustainability commitment. Water management approach. Water stewardship performance

SECTION 3 CROSS CONNECTION CONTROL

Context: Public works programs in India

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

UNLOCKING TRANSFORMING SECURING

Convergence of NREGS with Water Resource Department in the State of M.P. Date

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

Integrated Domestic Water Management. Workshop Date: 5 th June Venue: TARA Gram Orcha

Innovations for Sustainable Infrastructure Experience from Azerbaijan Rural Investment Project (AZRIP)

Order to Talk. Water Measurement Techniques, Water Price and Water Fee collection. 1 Water Measurement Techniques

HINDALCO INDUSTRIES LIMITED WEST COAST BAUXITE MINES DIST. KOLHAPUR

Responding to climate change impacts: Constraints and potential adaptations options in the Koshi basin

CHAPTER 7. Summary of District Reports and District Profiles

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Agriculture and Farmers Welfare COCSSO JANUARY 2017 DES UTTARAKHAND

Adilabad District Profile:

SECTOR ASSESSMENT (SUMMARY): IRRIGATION. 1. Sector Performance, Problems, and Opportunities

GROUNDWATER BASED RICE FARMING IN GANGA BASIN- A SUSTAINABILITY STUDY

Distribution Tradesperson (Jobsplus Permit No. 706/2017)

SECTORAL M&E TO MEASURE PROGRESS TOWARDS NATIONAL CLIMATE CHANGE POLICY (CRGE) OBJECTIVES EXPERIENCES FROM APPLYING TAMD IN ETHIOPIA

Fertilizer Sector Subsidy in India. Vijay Laxmi Pandey Suresh Babu

THE SPARC PROGRAM. Supporting Parliamentarians on Analysis and Research in the Constituency

Project impact. Challenges

NREGA / Watershed Development; Implications for Green Jobs and Climate Change. Prof. Ravindranath Indian Institute of Science Bangalore

Sinnar Taluka Overview and preparation for field trip. Pooja Prasad (Ph D scholar) 22/8/2017

Executive Summary of Bistan Lift IrrigationProject

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

BANGLADESH FLOODS 2004

Interlinking of Markets in Tribal Areas and their Implications on Livelihoods of the Tribal Population: A Case of Chattisgarh*

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Solar Pumping Experience in Nepal

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION WATER BODIES WITH EXTERNAL ASSISTANCE

SRI LANKA. Drought Impact Assessment and Monitoring using Computer Assisted Telephone Interviewing (CATI) Services. August 2017

TOTAL LANDCARE, MALAWI INTEGRATED CHILD LABOUR ELIMINATION PROJECT (ICLEP) FOOD SECURITY AND NATURAL RESOURCE MANAGEMENT

Demand & Supply of Fish Seed in State

-

Impact of Andhra Pradesh Micro Irrigation Project (APMIP) on the Beneficiaries

2013 OU Water Conference Norman, Oklahoma September 2013

Ensuring accessibility of safe drinking water coupled with improved sanitation and hygiene for deprived communities of Thar Desert Sindh.

ISPRS Archives XXXVIII-8/W3 Workshop Proceedings: Impact of Climate Change on Agriculture

PROJECT PROPOSAL. Drinking Water Supply Project for village Ganderi Ditt Charsadda KP. Submitted to: Association for Development of Pakistan

RAIN WATER HARVESTING STATE LEVEL NODAL AGENCY TAMIL NADU WATERSHED DEVELOPMENT AGENCY

PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY

BRIEF NOTE ON WATER CONSERVATION MISSION (NEERU-MEERU)

Focusing Philanthropy Diligence Trip Report charity:water Page 1

About Farmer Producer organization (FPO) and Present Status. About SFAC:- About Farmer Producer Organization:-

Localized installation & service support teams in over 8 key states

Moot Points STATE PRESSURES

Legal Reforms and Multi-functional Water Users Associations (WUAs) to manage water and agriculture support services Chhattisgarh (India) experience

Drought Impact Assessment and Monitoring using Computer Assisted Telephone Interviewing (CATI) Services

INVITATION FOR EXPRESSION OF INTEREST FOR. Evaluation Study in Madhya Pradesh. Small Farmers Agribusiness Consortium. August Kranti Marg, Hauz Khas,

RURAL INDIA. An Opportunity

Khammam District Profile

Sacrifice for humanity

CORPORATE SOCIAL RESPONSIBILITY POLICY

No.19020/35/93-SCD-VI Dated the 29 th July 1993

Mainstreaming Climate actions at the Sectoral level in Chhattisgarh

waste management both in rural and urban Karnataka.

Annual Outcome Survey Report. Tejaswini Rural Women Development Programme, Madhya Pradesh 3/21/16

The impacts of aquaculture on Myanmar s rural economy

Participatory rural planning processes

PEO Study No.116 EVALUATION REPORT ON OILSEEDS DEVELOPMENT PROGRAMME The Study

For more information contact

INNOVATIONS IN DEVELOPMENT

Innovative Model for Safe Drinking water

Socio-economic Challenges Caused by Fresh Water Crisis in Mandir Bazar Block of South 24 Parganas District, West Bengal

Proceedings of Farmer s Fair and Farm Field School organized at Navala village of district Muzaffarnagar (U.P.) on

Integrated Action Plan Irrigation and Flood Control

CHAPTER I 1.1 Introduction

COCOA LIFE COTE D IVOIRE NEEDS ASSESSMENT. Executive summary

Linking Mara Fruits and Vegetable Growers to Serengeti National Park Tourist Hotels Market

COMMUNITY DEVELOPMENT

India - Cost Effectiveness of Rural Water Schemes. Smita Misra Sr. Economist, SASSD

Enhancement of fish production at an annual growth rate of 6%. Increasing the per capita consumption of fish to kg/annum.

Climate Change The International Journal

VIABILITY OF AGRICULTURAL INPUT VOUCHERS

CHAPTER VII. Tamil Nadu Watershed Development Agency

Jala Samvardhane Yojana Sangah Water Resource Department (Minor Irrigation) Department Information

Lesotho Post Disaster Needs Assessment

The present study has certain specific research objectives: 1. ' To study the distribution and growth of landless labourers in the study area.

CONCLUDING REPORT. Roadmap toward Effective flood Hazard Mapping in. Lao PDR. By: Mr. Anousone SISA-AD. Lao PDR

Transcription:

Kanker (Chhattisgarh) 1/13 Kanker (Chhattisgarh) Integrated Action Plan (IAP) Successful Works District: North Bastar Kanker, Chhattisgarh 1

Kanker (Chhattisgarh) 2/13 1- Canal Lining/ Renovation Work, Rarwahi, Bhanupratappur Increased water use efficiency due to repair and lining in canal (Faults in major and minor canals) Increased Irrigation area (229.58 hect.) Increase in Rabi crop area to the extent of 8 hectare Benefitted 145 farmers in form of improved agricultural incomes 2

Kanker (Chhattisgarh) 3/13 2- Renovation of Lift Irrigation System, Kokanpur, Bhanupratappur Increased water use efficiency due to repair and lining in canal (faulty canal/ repair requirements) Increased Irrigation area (40.89 hect.) Increase in Rabi crop area to the extent of 2 hectare Benefitted 38 farmers in form of improved agricultural incomes 3

Kanker (Chhattisgarh) 4/13 3- Canal Lining/ Renovation Work, Diyagaon, Durgkondal, Increased water use efficiency due to repair and lining in canal (Faults in major and minor canals) Increased hect.) Irrigation area (28 Increase in Rabi crop area to the extent of 60 hectare Benefitted 89 farmers in form of improved agricultural incomes 4

Kanker (Chhattisgarh) 5/13 4- Canal Lining/ Renovation Work, Palachur, Durgkondal, Increased water use efficiency due to repair and lining in canal (Faults in major and minor canals) Increased Irrigation area (200 hect.) Increase in Rabi crop area to the extent of 60 hectare Benefitted 200 farmers in form of improved agricultural incomes 5

Kanker (Chhattisgarh) 6/13 5 - Canal Lining/ Renovation Work, Nelchang, Durgkondal, Increased water use efficiency due to repair and lining in canal (Faults in major and minor canals) Increased hect.) Irrigation area (45 Increase in Rabi crop area to the extent of 6 hectare Benefitted 30 farmers in form of improved agricultural incomes 6

Kanker (Chhattisgarh) 7/13 6 Erection of separate 33 KV line for Bhanupratappur, Antagarh & Pakhanjur Poor voltage of electricity supply to 4 most affected blocks due to distance from 132 KV station Poor voltage affecting life of local people (affecting communication, irrigation etc- strong community need ) Ensured better & adequate voltage in 4 most backward blocks (benefitting 2.10 lakh people) Ensured better utilization of tube wells etc resulting in increased irrigation potential of area Improved quality of life through proper voltage power supply 7

Kanker (Chhattisgarh) 8/13 7 Culvert Construction, Tadoki (Antagarh), Kanker Rajanadgaon- Vailadila route is main route connecting state and districts (this bridge was damaged by naxal in July, 2012) The culvert construction on SH-5 facilitating connectivity between district Kanker to district Narayanpur Satisfied local population due immediate relief of connectivity Convenience to local people in approaching- block and district head quarter 8

Kanker (Chhattisgarh) 9/13 8 Emergency Ambulance with all basis facility, Kanker, CG Lack of well equipped mobile van for minor treatment during the naxal activates To facilitate timely services/ treatment, at the field site - to the affected person during naxal incidences The vehicle well equipped with the all basic facility - more effective to safe the life of the person during the transportation Vehicle services are now being used regularly 9

Kanker (Chhattisgarh) 10/13 9 Augmentation and extension of the piped water supply system, Kanker, CG Earlier 20 year old damagedvillage internal water supply system (Non functional) Piped Water Supply Scheme, Dumali, Kanker Meeting immediate quality drinking water - demands of the villagers through augmenting and extension of the village internal water supply line Satisfied household (>2000/ village), due to meeting their basic needs. Piped Water Supply Scheme, Icchapur, Kanker 10

Kanker (Chhattisgarh) 11/13 10 Safe Potable water in Aaganwadi, Schools, Kanker, CG Aaganwadi and school with non availability of safe potable water nearby the institutions Children at the Aaganwadi and schools with potable drinking water facility nearby Primary School - Kurrubhat Improved hygiene behavior among the children 11

Kanker (Chhattisgarh) 12/13 11 Bamboo craft training centre, Pakhanjur, Kanker Bamboo available in local area but limited value addition lack of training 50 local person (from naxal affected households) to be trained in bamboo based handcraft. The centre has been inaugurated. Use of specialized machines and equipments- likely to improve the income of the affected families through training, production, marketing, placement support 12

Kanker (Chhattisgarh) 13/13 12 Hatkargha Training Centre, Babu-Kohka, Kanker Limited infrastructure and support system for value addition of the local kosa (earlier up the reeling stage) Provision of support equipment for effective value addition of local kosa Separate training cum production centre- to facilitate improved livelihood for local 40 beneficiaries 13