KENT BREEZE WIND FARMS

Similar documents
BEAVER CREEK SOLAR FARM

K2 WIND POWER PROJECT DECOMMISSIONING PLAN REPORT. Prepared by: K2 Wind Ontario Limited Partnership Suite 105, 100 Simcoe Street Toronto, ON M5H 3G2

Decommissioning Report East Durham Wind Energy Centre

Prepared for: Prepared by:

Grant County Wind: Revised Decommissioning Plan

SOUTH BRANCH WIND FARM DECOMMISSIONING REPORT

File No March Prepared for: Prepared by:

New York Community Solar Facility Decommissioning Plan

Samsung Renewable Energy Inc. and. Pattern Renewable Holdings Canada ULC. 4 Decommissioning Plan Report. For. Armow Wind Project

Canadian Solar Developers Ltd.

Marble River Wind Farm: Contact Information

BOW LAKE WIND FARM DECOMMISSIONING PLAN REPORT. File No January Prepared for:

Big Thunder Wind Park

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

Chapter 750 WIND POWER GENERATION FACILITIES

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

4.11 AGRICULTURAL RESOURCES INTRODUCTION ENVIRONMENTAL SETTING. Regional. Project Site Setting

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

PROJECT DESCRIPTION CHAD EXPORT PROJECT SUPPORTING DOCUMENTS - VOLUME DECOMMISSIONING

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4

5 ENVIRONMENTAL ASSESSMENT AND RESIDUAL EFFECTS

Decommissioning Plan Report: Waterloo WWTP Cogeneration Facility

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

DUFFERIN WIND POWER INC. Dufferin Wind Power Project Decommissioning Report

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Linfairn Wind Farm Addendum Chapter A3: Project Description

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Suncor Energy Adelaide Wind Power Project March 20, 2012 Public Meeting Comment Response Table

Enclosure 23 Revised Invasive Species Plan

Code of Practice for Exploration Operations

H 6062 S T A T E O F R H O D E I S L A N D

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Operating and Reclamation Plan

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

6.5 SMALL WIND ENERGY SYSTEMS

It s All About the Dirt!

STATE OF VERMONT PUBLIC SERVICE BOARD PREFILED TESTIMONY AND EXHIBITS OF IAN A. JEWKES

Reclamation Plan for the Non-metallic Mining Site owned and operated by Birds Eye Foods, LLC.

Willow Ridge Wind Project Frequently Asked Questions. Popular Questions Who is the developer of the proposed project?

Final Construction Plan Report Belle River Wind Project

C. Foundation stabilization for pipe and utility structures.

We are here to:

Environmental Assessment Matrix

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS

Greene County Demolition and Clean-Up Plan for FEMA Flood Buy Out Properties NYCDEP Properties

Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Prepared for: Prepared by:

Substation Developments Environmental Guidelines Checklist for Applicants

CCSD#1 Stormwater Standards

WHO ARE WE? Willow Ridge Wind Project

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

KENT BREEZE WIND FARMS

Construction Specification for General Excavation

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Background Information MANURE STORAGE IMPROVEMENTS, MANURE COMPOSTING and MORTALITY MANAGEMENT

Ch. 291 LAND APPLICATION 25 CHAPTER 291. LAND APPLICATION OF RESIDUAL WASTE

Alberta Transportation The City of Edmonton The City of Calgary

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

RE: Modifications to Suncor Energy Adelaide Wind Project Location

APRIL 2015 CONTINGENCY PLANS

ENVIRONMENTAL SCREENING REPORT

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment

Landfill Closure. SWANA NLC Conference May 2017

Technical Data

UPDATE CONSTRUCTION ASKED AND ANSWERED: RESTORING AGRICULTURAL LAND. COMMUNITY BENEFITS Williams hiring veterans CONTACT ATLANTIC SUNRISE 310 SR 29 N

Construction of Dariali HEPP. Reinstatement Plan

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

Appendix B. Summary of Potential Environmental Effects and the Environmental Effects Monitoring Plan

BEFORE THE OHIO POWER SITING BOARD

CONSTRUCTION SPECIFICATION

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

Water Pollution Control for Work in Sensitive Areas

Meyer, Meyer, LaCroix & Hixson

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

Chapter 9.37 Soil Erosion and Dust Control

Concrete Waste Management

Factor Potential Effects Mitigation Measures

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Prepared for: Prepared by:

AMHERST ISLAND WIND ENERGY PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT. File No April Prepared for:

Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010

Box Elder County Land Use Management & Development Code Article 3: Zoning Districts

Chapter CONSTRUCTION SITE EROSION CONTROL

APPENDIX 1B Construction Mitigation Plans

Perpetual CleanPower Oro 4 Line Solar Farm

Environmental Impact Assessment (EIA)

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

Transcription:

Decommissioning Plan Report MAY 2010

TABLE OF CONTENTS 1. INTRODUCTION... 1 2. DECOMMISSIONING PROCESS DESCRIPTION... 2 3. SITE RESTORATION... 3 4. EXCESS MATERIALS AND WASTE MANAGEMENT... 4 5. MANAGING IMPACTS OF DECOMMISSIONING... 4 6. EMERGENCY RESPONSE AND COMMUNICATIONS PLAN... 5 7. OTHER APPROVALS... 5 May 2010 Page i.

1. INTRODUCTION Decommissioning the Kent Breeze Wind Farms means withdrawing the wind turbines from active service and remediating the lands for agricultural purposes. This plan describes the process and requirements for the removal of project components at the end of their useful function for the production of renewable electrical energy. Alternatively, in worst case scenarios, decommissioning could occur during construction due to unforeseen economic circumstances. The objective is to remove any improvements to the land and restore it to the same agricultural function as existed prior to the construction of the wind farms. The cost of decommissioning will be borne by the owner of the wind farms and may be recovered through the sale and reuse of project components as recycled material. Decommissioning involves the following actions: 1. Removal of the wind turbines and all electrical appurtenances for salvage; 2. Removal of foundations and any access roads not wanted for future farming purposes to a depth suitable for ploughing (approximately 1.0 metres); 3. Replacement of topsoil to a depth of surrounding undisturbed lands and plant with suitable ground cover dependant on time of year and in consultation with farm operator; 4. Ensuring that there are no environmental impacts related to decommissioning activities. It is expected that decommissioning procedures will take approximately 3 months to complete. May 2010

2. DECOMMISSIONING PROCESS DESCRIPTION The following indicates the procedure for the disassembling of the Kent Breeze Wind Farms infrastructure; and is applicable to decommissioning both during construction or after operations have ceased: Physical Works/Activities Blade, Generator and Tower Disassembly Removal of electrical appurtenances Removal of Access Roads Description of Activity The blade, generator and towers would be disassembled using a crane and removed from the site using a flatbed truck. Generators and towers will be sold for their recyclable resource value. Blades will be disposed of at a landfill. Electrical equipment will be removed from the site on flatbed trucks for salvage based on their value as a recyclable resource. All permanent access roads will be maintained for farming purposes if so desired by the owners of the land. The reason for not removing access roads is that it allows the farmer of the land continued, and possibly improved access to fields. This decision will be left to the landowner at the time of decommissioning. All unwanted access roads would be restored as per method used for decommissioning concrete foundations described below. Any aggregate removed from on-site will be disposed of at a recycling facility or, if unavailable or impractical, at a licensed landfill in the Province of Ontario. Removal of Concrete Foundation The foundations will be broken up by heavy machinery and removed by dump truck to a depth of approximately 1.0m and filled with subsoil to rebuild the grade. Clean topsoil would be imported on-site by dump truck and replaced over the area of a soil type (loam, sandy loam) and to an approximate depth of adjacent horizontal topsoil depths. The areas will be left for cultivation or seeded for erosion control, depending on the preference of the landowner and timing during the calendar year. Concrete will be disposed of at a licensed landfill or recycling facility in the Province of Ontario. Removal of Distribution Lines The distribution lines and any underground conduit will be terminated and removed from the ground. Trenches and areas where conduit has been removed (including underground creek and railway crossings) will be backfilled with subsoil and other suitable substrates to rebuild the grade and stabilize the subsurface conditions for continued use for drainage and/or railway purposes. Clean topsoil would be replaced over the area of a soil type (loam, sandy loam) and to an approximate depth of adjacent horizontal topsoil depths. Conduit will be disposed of at a licensed landfill in the Province of Ontario, and distributions lines will be sold as scrap metal to a local May 2010 Page 2

3. SITE RESTORATION 3.1 Existing Conditions recycler. All lands that will be occupied by project infrastructure are currently used for the growing of common field crops, in particular corn and soybeans. The activities outlined in Section 2 of this report will ensure that the project area is returned to its pre-construction state of cropped agricultural fields and field drainage. 3.2 Water Resources There are no expected decommissioning activities required or related to water resources, as there are none present within those portions of the project boundary that require decommissioning activities, with the exception of stabilizing underground conduit areas beneath drains in two locations (see Map 5 Project Description Report). No stormwater surface runoff prevention measures are required due to the distance from any water bodies. No open ditches or swales that would affect surface water movement will be encountered during decommissioning activities. 3.3 Soils Soils on-site are characterized by a mixture of Normandale, St. Williams, Tavistock, and Maplewood soils which are characterized as loam / sandy loam, and are all considered Class 1 and 2 prime agricultural lands. All areas impacted by surface infrastructure will be replaced with similar loam / sandy loam soil types and to an approximate depth of 1.0 metre and all subsurface tile drains damaged during decommissioning will be repaired. The areas will be left for cultivation by the landowner if decommissioning occurs in the spring, or seeded for soil erosion control with cover crops during any other times during the calendar year. All of the subject lands are very flat. As such, reseeding with cover crops quickly is considered the most suitable method for controlling soil erosion. 3.4 Unexpected Spills To address unexpected spills in the project area, the owners of the projects will complete a Phase I and II Environmental Assessment of the wind turbine lease areas, storage areas, switching stations and any removed roads when remediating the lands. This assessment would review all past records of spills that were recorded over the operations phase of the project. All spill locations would be tested to ensure there are no negative effects to surface soils or ground water. May 2010 Page 3

4. EXCESS MATERIALS AND WASTE MANAGEMENT All excess materials and waste will be transported off-site by flatbed trailer or dump truck. These materials and waste include: Generator, Tower, Electrical Appurtenances and Wiring - sold for scrap value to a licensed scrap metal facility within the Province of Ontario; Blades disposed of at an appropriately licensed landfill facility within Ontario in accordance with Ontario Regulation 347 or its succeeding regulation. If financially and technically feasible at a future date, the blades may alternatively be recycled; Concrete and Aggregate - send to recycling facility approved to receive construction building components within the Province of Ontario. Any hazardous wastes that are used and/or stored on site such as used lubricating oils will be removed in accordance with Ontario Regulation 347 and disposed of at a registered facility in Ontario. All wastes will be transported by a registered hauler. 5. MANAGING IMPACTS OF DECOMMISSIONING A key aspect of decommissioning will be on the minimization of environmental effects. The following table shows the environmental effects and mitigation plans of the decommissioning activities: Type of Environmental Effect Residual Impacts Aquatic Environment Agricultural Impacts Terrestrial Vegetation Terrestrial Wildlife (Including Birds) Description Disassembly will result in no residual impacts. There are no environmental effects expected from the decommissioning of the Kent Breeze wind farms because no materials from the site are expected to enter the water, since good construction practices will be adhered to (e.g. proper disposal of waste off-site). Agricultural land use will be restored to existing conditions after equipment disturbances have been rehabilitated. There will be minimal disturbance to plant communities in the area from decommissioning activities as trucks and construction equipment will be able to use existing roads from the operations phase of the development. Sensory disturbance of wildlife and birds for short term due to use of trucks and equipment for removal of the project components. There are minimal environmental effects expected from the decommissioning of the wind farm. May 2010 Page 4

Noise Levels Cultural Resources Social Noise levels associated with decommissioning would be similar or less than those associated with construction. Therefore no significant adverse effects are expected beyond the approximate 3 month period of decommissioning. There are no archeological or heritage effects that would result from the decommissioning of the wind farm. The decommissioning of the wind farm may create a temporary nuisance from a visual perspective. Since the nuisance effects would be very short term, minimal environmental effects would be expected. 6. EMERGENCY RESPONSE AND COMMUNICATIONS PLAN The proposed Emergency Response and Communications Plan for the decommissioning phase of the projects will follow the same procedures outlined in the Design and Operations Report. In addition, the proposed notification procedure for any decommissioning activities outlined in this report will follow the same procedures outlined in the Emergency Response and Communications Plan. 7. OTHER APPROVALS Based on consultation efforts to date, and uncertainty regarding the regulatory timeframe under which the project will be decommissioned, the only known approvals required for decommissioning the project at this current time would include demolition permits from the Municipality, and possible work permits issued by the conservation authorities. However, we are aware that the Province may require a Record of Site Condition under the Environmental Protection Act; may require financial assurance of the decommissioning activities proposed within this report; and may include conditions of approval to ensure that such activities proposed are implemented. J:\20443\10.0 Reports\REA\PTR-5decommissioning_final2010-03-29.doc\2010-08-25\DD May 2010 Page 5