Transportation Workshop. FORA Staff 9/8/17

Similar documents
MONTEREY COUNTY REGIONAL TRANSPORTATION PLAN

MONTEREY COUNTY REGIONAL TRANSPORTATION PLAN

The Level of Service Metric and. Alternatives for Multi-Modal Transportation. in Oakland

CHAPTER 3.0 CIRCULATION ELEMENT

Chapter 5 Transportation Draft

FORT ORD REUSE PLAN. Volume 4: Final Environmental Impact Report F O R T O R D R E U S E A U T H O R I T Y. SCH No Certified June 13, 1997

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

Chapter 5. Congestion Management Program. Chapter 5

TRANSPORTATION IMP ACT MITIGATION FEE (TIMF) NEXUS S TUDY

(Image of a moving Muni light rail vehicle in the Geneva Yard at night)

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

2035 LRTP Transportation Options Introduction

RTP-SCS Preferred Scenario. October 18,

I-70 East PACT DRAFT EVALUATION DATA

12 Evaluation of Alternatives

Request for Proposals

Why a Regional Plan?

Northwest State Route 138 Corridor Improvement Project

Purpose Today: Review information to assist with Prioritization

Mobility 2025 Update: The Metropolitan Transportation Plan

Chapter 5 - Transportation

University of Virginia Master Planning Committee November 17 th Charlottesville Albemarle Metropolitan Planning Organization

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

Planning Commission Study Session. Presentation

Mendocino Forest Products Grading For Industrial Land Improvements

3.0 COMMENTS AND RESPONSES

Transportation and Utilities

Transportation 2040 Toward a Sustainable Transportation System. Toward a Sustainable Transportation System. Sultan Planning Board.

Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION

Transportation Sustainability Program

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

TRANSPORTATION IMPACT ANALYSISGUIDELINES

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Dear Mr. Huerta, A hard copy will follow via US Mail. Best Regards,

Marina Coast Water District: A California Special District STATE OF THE DISTRICT

Please see attached. Thank you. Molly Erickson. STAMP ERICKSON 479 Pacific Street, Suite One Monterey, CA tel: , x14

NOTICE OF PREPARATION

City of Berkeley. Guidelines for Development of Traffic Impact Reports

Senate Bill 375, The Sustainable Communities Strategy and The Monterey Bay Area

Progress Report Regional Express & Bus Rapid Transit Program

Chapter 2 Transportation Element Goals, Objectives and Policies

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

4.9 TRANSPORTATION AND CIRCULATION

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

STATUS REPORT ON THE UPDATE TO THE NORTH SAN JOSE AREA DEVELOPMENT POLICY

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

TRANSFORM66: OUTSIDE THE BELTWAY

KAW CONNECTS EXECUTIVE SUMMARY

GMA Periodic Update Policy/Text Requirements

Planning Group. Alternative Screening Presentations October/November Bow-Concord Interstate 93 Transportation Planning Study

ELEMENT M GROWTH MANAGEMENT

History and Background

Section 4.8 Climate Change

General Plan EIR Scoping Meeting

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

TRANSPORTATION ADVISORY COMMISSION S WORK - PAST AND FUTURE:

Congestion Management Process 2013 Update

2012 Regional Transportation Plan for Butte County Public Outreach Workshops

Joint House and Senate Transportation Committee Update to the Ten Year Plan

3.6 GROUND TRANSPORTATION

CITY OF CLOVIS Traffic Impact Study Guidelines

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

Integrated Land Use, Transportation & Air Quality Planning in the Sacramento Region

Database and Travel Demand Model

Transportation Problems and Issues Excerpts from WWW Links

Update and Status Report for the Comprehensive Transportation Plan. December 2, 2011

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Restoration of Historic Streetcar Service in Downtown Los Angeles

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

CROWS LANDING CORRIDOR PLAN

New Transportation Performance Measures for Transportation Analysis and Thresholds for CEQA

Appendix F 2008 Travel Demand Modeling

2016 Regional Transportation Plan / Sustainable Communities Strategy for Butte County

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

Central Phoenix Transportation Framework Study

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

Marina Coast Water District. Marina City Counsel and Planning Commission Special Joint Meeting and Study Session April 29, 2014

Restoration of Historic Streetcar Service in Downtown Los Angeles. Executive Summary -- Alternatives Analysis (AA) FINAL

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MOBILITY AND ALTERNATIVES ANALYSIS

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

Sunrise Project South I-205 Corridor Improvement Project

MOBILITY PARTNERSHIP. Wednesday, September 14, 2016 MINUTES

RD:VMT:JMD 09/09/2016 RESOLUTION NO.

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

FACT SHEETS SAN BERNARDINO COUNTY

Kathleen Marie Lacey, Chief Comprehensive Planner Boise City Planning and Development Services Department. State Street Memorandum of Understanding

Regional Transit Framework Study

RTC Mobility Plan Workshop. North Central Texas Council of Governments July 9, 2015

TRANSFORM66: OUTSIDE THE BELTWAY

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

Transcription:

Transportation Workshop FORA Staff 9/8/17

Overview History/Background Policy Context CEQA Mitigations Projects Status 2018 TAMC Regional Impact Fee Study Future Considerations 2

Fort Ord Transportation Pre-closure network Orthogonal grid Internally focused routes to serve training Built to military needs (non-civilian use) External access barriers limiting connectivity 3

Regional Roads (~1991) No Public Access Traffic flowed around Fort Ord Hwy 1 Reservation Rd Blanco Rd Hwy 68 4

Reuse Objectives Meet BRP mitigation requirements Support regional economic recovery Establish network to municipal standards Increase connectivity Provide regional transportation benefits Acceptable Levels of Service (LOS) 2 nd Ave GJM Blvd 5

Major Policy Timeline 1994-96: Fort Ord planning process incorporates Peninsula-Salinas traffic 1997: Base Reuse Plan (BRP) & EIR (included mitigations) 1997: Fort Ord Transportation Study 2005: TAMC FORA Fee Reallocation Study 2012: BRP Reassessment 2017: TAMC FORA Fee Reallocation Study 6

Build-out Transportation Network 70K population East-west connections Imjin Parkway Reservation Rd Blanco Rd Intergarrison Rd Hwy 68 Bypass North-south connections Hwy 1 2 nd Ave GJM Blvd Eastside Road Fort Ord Expressway 7

1997 Fort Ord Transportation Study 37K population Key changes: South Boundary Rd Gigling Intergarrison Connector Monterey Rd Coe Ave Hwy 1 Modifications Fort Ord Expressway 8

2005 FORA Fee Reallocation Study Integrated system refinements FORA-TAMC coordination Key changes: S Boundary Rd Hwy 68 bypass Eastside Rd conceptual alignment 9

2017 FORA Fee Reallocation Study Key changes: Del Monte Blvd Ext Hwy 1 definition 10

Environmental Review Process California Environmental Quality Act (CEQA) A high-quality environment now and in the future CEQA Functions: Facilitate interagency coordination Increase public participation Inform decision makers about significant environmental effects Identify ways environmental damage may be avoided or reduced (mitigated) Mitigate environmental damage Disclose to the public why a project is approved even if it leads to environmental damage 11

1997 BRP CEQA Mitigations 1997 Base Reuse Plan 1997 Fort Ord Transportation Study obligations adopted as development mitigations FORA will coordinate with TAMC to monitor current and projected traffic service levels Resource-constrained plan 1997 Fort Ord Transportation Study TAMC refined BRP transportation network Assigned trips to On- Site, Off-Site, & Regional roads Projected percentage share and assigned dollar amount 12

Mello-Roos CFD Mello-Roos Community Facilities District (CFD) California State Law (Govt 53311, et seq) Established geographic area where a special property tax (parcel tax) is imposed on taxable real property by counties, cities, special districts, JPA s, and school districts Means of obtaining additional public funding Pays for public works and public services 13

Transportation Funding EDA Grants $72 million in roadway improvements State Grants Defense Adjustment Matching Grants FORA Financing FORA Community Facilities District Special Tax $22 million collected for transportation/transit Land Sales Funds transportation and other CIP programs after building removal 14

Fund Movement Capital Improvement Projects - Habitat Conservation - Water Augmentation - Transportation/Transit $ $ Community Facility District Special Tax Land Sales + Property Tax Building Removal 15

Project Prioritization 1. Administrative Committee: Confirms development forecasts Applies ranking criteria to transportation mitigations Recommends transportation funding priorities 2. FORA Board: Sets transportation funding priorities through annual CIP approval 16

Project Oversight Board Approves: Design contracts NEPA/CEQA documents Construction contracts Project change orders 17

Completed On-site Projects Project Imjin Parkway 2nd Ave California Ave University and Research Drives Reservation Road bicycle lanes Blanco Road GJMB phases I through VI Rancho Saucito Rd GJMB and Hwy 218 intersection Jurisdiction Marina Marina Marina Marina Marina County Seaside Monterey Del Rey Oaks 18

On-Site Project Status Roadway Info Priority Proj# Description/Location BRP LEAD AGENCY Program Status CEQA NEPA BID 1 FO13B Eastside Parkway/ County On-Site FORA 0% 0% 0% 2 FO14 South Boundary Road Upgrade/ DRO On-Site FORA 100% 100% 0% 5 FO12 Eucalyptus Road/ County On-Site FORA 0% 0% 0% 7 FO7 Gigling/ Seaside-County On-Site FORA 100% 100% 0% 8 FO6 Intergarrison/ County On-Site FORA 0% 0% 0% 14 FO9C GJM Blvd/ DRO On-Site FORA 100% 100% 0% 11 FO5 8th Street/ Marina On-Site Marina 35% NA 0% 19 FO11 Salinas Ave/ Marina On-Site Marina 0% 0% 0% 20 FO2 Abrams/ Marina On-Site Marina 10% 0% 0% 19

Off-Site Project Status Roadway Info Priority Proj# Description/Location BRP LEAD AGENCY Program Status CEQA NEPA BID 6 8 Crescent Ave extend to Abrams/ Marina Off-Site Marina 100% NA 100% 9 10 Del Monte Blvd Extension/ Marina Off-Site Marina 10% 0% 0% 3 2B Davis Rd south of Blanco/ County Off-Site MoCo 100% 100% 0% 15 4E Widen Reservation, WG to Davis/ County Off-Site MoCo 0% 0% 0% 16 4D Widen Reservation-4 lanes to WG/ County Off-Site MoCo 0% 0% 0% 17 1 Davis Rd north of Blanco/ County Off-Site MoCo 0% 0% 0% 20

Regional Project Status Roadway Info Priority Proj# Description/Location BRP LEAD AGENCY Program Status CEQA NEPA BID Hwy 1-Del Monte-Fremont-MBL/ Monterey- 10 R3a Regional TAMC 0% 0% 0% Seaside-Sand City Cal Trans 12 R11 Hwy 156-Freeway Upgrade/ County Regional TAMC 75% 75% 0% 18 R10 Hwy 1-Monterey Rd. Interchange/ Seaside Regional TAMC 0% 0% 0% 21

22 FORA TRANSITION PLANNING TRANSPORTATION AGENCY ROLE & PROJECT FUNDING Transportation Agency for Monterey County

Who is TAMC? 23 Regional Transportation Planning Agency Board of Directors: 12 City elected officials 5 County Supervisors 5 ex-officios

24 Regional Travel Travel Patterns: Farm to Market Visitors Commuters Students and Faculty All Modes: Highways, roads Bus and rail transit Bicycle/Pedestrian

25 Coordination with FORA TAMC oversees: Regional corridor planning FORA Fee Study & mitigations Comprehensive transportation funding

How Projects are Funded 26 FORA (Share) FORA (Paid) TAMC Regional Fee TAMC State Funding TAMC Local (RSTP) TAMC Measure X Highway 1 $17.2 M $0 $2.7 M - - $15.0 M Highway 156 $16.9 M $0 $7.8 M $21.4 M - $30.0 M Highway 68 $0.3 M $0.3 M $4.2 M $1.7 M $1.23 M $50.0 M Marina Salinas $27.8 M $1.0 M $20.3 M $1.65 M $0.7 M $20.0 M Totals $62.2 M $1.3 M $34.8 M $24.8 M $1.93 M $91 M

27 Highway 156 Example State Transportation Improvement Program $22.4 M Measure X $30.0 M State Matching Funds $81.2 M Toll Revenues $214.4 M FORA Fees $17.0 M

28 Regional Development Impact Fee Mitigates CEQA Cumulative Impacts Applies to Development Based on New Vehicle Trips Coordinates with Local Impact Fees

29 Regional Development Impact Fee Nexus Study: Road Network Deficiencies Zone Structure FORA Exempt

30 Regional Development Impact Fee Differences from the FORA Fee? Nexus vs. Mello Roos Local & Regional No Capped Obligations

31 Integration of FORA Impacts & Funding 2018 Regional Fee Update Potential FORA Sunset and Transition Incorporate FORA Zone

Timeline 32 FORA Transition Task Force Direction August 2017 2018 Regional Fee - Kick Off August 23, 2017 FORA Board Recommendation December 8, 2017 2018 Regional Fee Completed August 22, 2018 FORA Staff Transition Plan October 2018 FORA Board Adopts Transition Plan December 2018

Future Considerations Post 2020 Considerations Leveraging Transportation Investments Transportation Workplan 33

Post 2020 Considerations Successful completion of FORA Program Regional, Off-site, and On-Site projects Single-Entity (JPA) or Multi-Agency Transition Taskforce Board Recommendation Nexus-based or Special Tax-based fee structure Funding Flexibility: Nexus share or special tax 100% funding for on-site projects Economic Development incentives: job generation weighting and traffic model weighting Fair and equitable: Entitled projects vs. future projects 34

Leveraging Investments Del Monte Blvd. Extension Transportation project Building Removal Funding opportunities Explore financing options Tax/Revenue Bonds Enhanced Infrastructure Financing District (EIFD) Community Revitalization and Investment Authority (CRIA) Davis Road South of Blanco CalTrans Grant FORA reimbursements = Local Match 35

Transportation Workplan Eastside Parkway CEQA Set Goals and Objectives to guide process Notice of Preparation (NOP) and Scoping Meetings Public Review Draft EIR Public participation Gigling & South Boundary Design, Planning, and Engineering Services contract Annual CIP prioritization and approval 36

Questions? 37