For personal use only

Similar documents
For personal use only

For personal use only

For personal use only

POPLAR GROVE MINE CONSTRUCTION UPDATE

ABN ILLINOIS BASIN MARKET UPDATE

ABN COMPANY PRESENTATION

ABN Construction Underway at Poplar Grove Mine

BANKABLE FEASIBILITY STUDY CONFIRMS LOW CAPEX PROJECT WITH HIGH FINANCIAL RETURNS

For personal use only

For personal use only

EXPANDED BFS CONFIRMS LOW CAPEX AND LOW RISK DEVELOPMENT PATHWAY TO A$850 MILLION NPV

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

SEPTEMBER 2016 QUARTERLY REPORT

For personal use only

PARINGA DELIVERS EXCEPTIONAL PRE-FEASIBILITY STUDY AT THE BUCK CREEK NO.1 MINE

FIRST GOLD ORE DISPATCHED FROM ULYSSES

Maiden Ore Reserve for Camel Creek JV

For personal use only

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

For personal use only

Thalanga Operations Ore Reserve and Mineral Resource Statement

5 th Asian Bauxite & Alumina Conference

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes

For personal use only

For personal use only

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia

Initial Coal Quality Testing Indicates Metallurgical Coal Potential

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

For personal use only

Bald Hill Delivers Excellent Metallurgical Test Work Results

For personal use only

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

Focused on delivery of high-value metals critical to energy revolution. Peter Williams, CEO Noosa Mining & Exploration Conference July 2018

Second drill rig to accelerate major drilling program at Productora

Gruyere Project - Updated Mine Plan

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

QUARTERLY REPORT March 2011

Company Overview. August 2011

For personal use only

Carbon Energy Low cost, low emission energy has arrived

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces.

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

For personal use only

KOGI REPORTS BARGING STUDY COMPLETED

MOU signed with steel and alloy product company

Excellent Results from Conceptual Mine Study Ondjou Prospect, Namibia

QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

For personal use only

Nullagine Gold Project Pictorial Update October 2011

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

For personal use only

Grange Resources Australia s leading magnetite producer

Investor Presentation

For personal use only

Quarterly Report 30 June 2011

For personal use only

WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER

For personal use only

SUCCESSFUL INFILL DRILLING CAMPAIGN COMPLETED

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

For personal use only

For personal use only. Company Overview. 30 May 2011

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

The Right Project at The Right Time Giulio Casello, Managing Director & CEO Sundance Resources Ltd.

Element 25 Limited Investor Update

Bryah Secures Option over Historic Manganese Mine

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

Australia s leading magnetite producer. Southdown Magnetite Project

Pre-Feasibility Study on Titiribi coal project completed - highlights relatively low capital and operating cost profile to support fasttracking

Panda Hill Niobium Project. January 2014

For personal use only

Haoma Mining NL A.B.N

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD

Investor Presentation. Carbon Energy. May 2009

For personal use only

For personal use only

Completion of Open Cut Pre-Feasibility Study for Dartbrook Project

CEO Presentation Annual General Meeting. November 2016

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

CARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer

MAYOKO-MOUSSONDJI TRANSPORT INFRASTRUCTURE UPDATE

For personal use only

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

Caula graphite and vanadium project on track for first production in mid-2019

Nullagine Gold Project

Transcription:

19 October 2015 PARINGA CONTRACTS FUTURE COAL SALES TOTALING US$220 MILLION WITH A MAJOR UTILITY HIGHLIGHTS: Paringa has executed its cornerstone coal sales agreement with LG&E and KU, two of the largest fuel buyers within the Company s initial target Ohio River Market The coal sales agreement is for the Buck Creek No.1 Mine s 11,200 Btu/lb coal specification and will be sold at the proposed Green River barge load-out facility on an F.O.B. Barge basis Key fixed coal sales and fixed pricing terms of the coal sales agreement are summarised as follows: Table 1: Summary of Key Terms (with 11,800 btu/lb Equivalent Calculation and Buck Creek No.1 Operating Costs) Year Contracted Production Fixed Contract Price 11,800 btu/lb Equivalent Calculation 1 (FOB Barge) 2018 750,000 tons US$44.50 per ton US$46.88 per ton 2019 1,000,000 tons US$45.50 US$47.94 2020 1,000,000 tons US$46.30 US$48.78 2021 1,000,000 tons US$47.25 US$49.78 2022 1,000,000 tons US$48.20 US$50.78 Buck Creek No.1 Mine All-in Operating Costs per ton 2 US$30.19 per ton (1): Calculation of the 11,800 btu/lb equivalent price is = ((11,800 / 11,200) x price) (2): Represents the average all-in operating costs per ton during the steady-state production as per the Pre-Feasibility Study released March 2015 The coal sales agreement is a 7-year contract covering an initial 2-year construction period (2016 to 2017) and a 5-year production period (2018 to 2022) The coal sales agreement requires Paringa to meet certain construction milestones in developing the Buck Creek No.1 Mine LG&E and KU are subsidiaries of PPL Corporation, a diversified US energy company that has a market capitalisation of approximately US$22.2 billion (NYSE: PPL) Execution of the cornerstone coal sales agreement will enable Paringa to facilitate final negotiations with financiers to develop the low-capex Buck Creek No.1 Mine Paringa s President and Chief Executive Officer, Mr. David Gay, said: I am very excited that Paringa has executed its cornerstone coal sales agreement with LG&E and KU. The contract is the culmination of over a year of due diligence, negotiations, documentation and approvals on both sides. We are very proud to be contracting with LG&E and KU and we will look forward to contracting additional coal sales as we move towards production. For further information contact: David Gay President & CEO Nathan Ainsworth Vice-President of Business Development Head Office: 6724 E Morgan Avenue, Suite B Evansville Indiana 47715 New York Office: 6 E 46 th Street, 3 rd Floor New York NY 10017 Registered Office: Level 9, BGC Centre, 28 The Esplanade Perth WA 6000 Email: info@paringaresources.com Website: www.paringaresources.com ABN: 44 155 922 010

Paringa Resources Limited ( Paringa or Company ) (ASX: PNL; OTCQX: PNGZF) is pleased to advise that it has executed its cornerstone coal sales agreement with Louisville Gas and Electric Company and Kentucky Utilities Company ( LG&E and KU ) for future coal sales from the proposed Buck Creek No.1 Mine, totaling US$220 million of contracted sales. Based on feedback from Paringa s potential tier-1 customers within the Ohio River Market, the Buck Creek No.1 Mine s Coal Handling and Preparation Plant was redesigned as part of the Pre-Feasibility Study ( PFS ) released to the ASX in March 2015, to produce both a fully-washed and a blended product. It is estimated that 30% of total sales from the Buck Creek No.1 Mine will be a fully washed 11,800 btu/lb product and 70% of total sales will be a 11,200 btu/lb product. Paringa is expected to begin production at the Buck Creek No.1 Mine in 2018, reaching full production of 3.8mtpa by approximately 2020. Under the coal sales agreement, Paringa is contracted to deliver a total of 4.75 million tons over a 5-year period of its 11,200 btu/lb product, with 750,000 tons to be delivered in 2018 and 1,000,000 tons to be delivered in each year from 2019 to 2022. The Buck Creek No.1 Mine s direct barge access to the Green and Ohio River systems provides a significant transportation advantage. The LG&E and KU coal sales agreement calls for fixed sales prices based on a Free-on-Board ( F.O.B. ) Buck Creek No.1 Green River Barge Price, which is equivalent to a price for selling coal at the end of the Buck Creek No.1 Mine s conveyor belt at the Green River barge load-out facility. The contracted fixed coal sales prices for Paringa s 11,200 btu/lb coal spec begins at US$44.50 per ton in 2018, escalating to US$48.20 per ton in 2022. By adjusting for heating content, the equivalent 11,800 btu/lb coal price implied under this coal sales agreement is US$46.88 for 2018, increasing to US$50.78 by 2022. Provided below is a comparison of the five year (2018 to 2022) weighted average 11,200 btu/lb LG&E and KU contract prices to the PFS sales price assumptions which were adjusted for Paringa s blended 11,200 btu/lb coal product in the PFS: Table 2: Comparison of LG&E and KU, and PFS Model Weighted Average Contract Prices Year LG&E and KU Weighted Average Contract Price PFS Model Weighted Average Price Difference 2018-2022 US$46.45 per ton US$47.40 per ton (2%) The LG&E and KU agreement specifies coal specifications for deliveries of Buck Creek No.1 Mine s coal on an as received basis: Table 3: Summary of LG&E and KU Contract Coal Specifications Specifications Heating Content (Btu/lb) Moisture Ash Chlorine Guaranteed Monthly Weighted Average min. 11,200 Btu/lb max. 10.00 lbs/mmbtu max. 11.00 lbs/mmbtu max. 0.18 lbs/mmbtu The LG&E and KU agreement includes standard project development milestones that are in line with the proposed Buck Creek No.1 Mine construction program. During this construction period, LG&E and KU will progressively monitor Paringa s performance in meeting these milestones. If the Company fails to Page 2

achieve the relevant milestones, then LG&E and KU may terminate the agreement and the Company shall have no further obligations. About LG&E and KU LG&E and KU are subsidiaries of the PPL Corporation (NYSE: PPL) family of companies and are regulated utilities that serve a total of 1.2 million customers. LG&E and KU have consistently ranked among the best companies for customer service in the United States. LG&E and KU own three power plants within Paringa s initial target Ohio River Market (Trimble County, Ghent and Mill Creek) that are almost exclusively supplied by the Illinois Basin. PPL Corporation is one of the largest investor-owned companies in the US utility sector. PPL Corporation has a Moody s/s&p investment grade credit rating, market capitalization of US$22.2 billion, US$11.5 billion in 2014 annual revenue and 10.5 million utility customers in the US and UK. Figure 1: Buck Creek Mine Complex and LG&E and KU s Power Plants within the Ohio River Market Figure 2: LG&E and KU s Trimble County Power Plant on the Ohio River (Note: Cooling tower is releasing water vapor) Page 3

BUCK CREEK MINING COMPLEX The Buck Creek Mining Complex is located in the Western Kentucky region of the Illinois Coal Basin ( ILB ) which is one of the most prolific coal producing regions in the United States. Paringa controls over 34,556 gross acres (~13,988 ha) of coal leases within an area of interest of approximately 72,000 acres (~28,000 ha). The Buck Creek Mining Complex is one of the few remaining contiguous high quality thermal coal projects within the Western Kentucky No. 9 ( WK No. 9 ) seam that is not controlled by one of the major United States coal companies. It offers one of the highest quality, highest heating value products in the ILB. The WK No. 9 is now the second largest producer of coal in the United States by coal seam. The Buck Creek Mining Complex has a JORC Measured and Indicated Coal Resource Estimate of 211 million tons (~192 million tonnes) of high quality thermal coal. The Project s Marketable Ore Reserve is classified as a Proven and Probable Ore Reserve Estimate, of which 16.4 million tons (or 26 percent) is considered proven and 46.3 million tons (or 74 percent) is considered probable. Buck Creek Mining Complex Coal Resource Estimate Measured Indicated CRE Tonnage (Mt) Total Measured & Indicated 57.7 153.5 211.2 5.3 216.5 Coal Quality (+4% Eq. Moisture) Inferred Total Calorific Value Ash Yield 11,855 Btu/lb (6,583 Kcal/kg) 8.35% 92.9% Buck Creek No.1 Mine Maiden Ore Reserve Estimate Recoverable Coal Reserve (Mt) Product Yield Marketable Coal Reserve (Mt) Proven Probable Total % Proven Probable Total 22.25 62.91 85.16 73.54% 16.36 46.27 62.63 The Buck Creek Mining Complex is located adjacent to the Green River which provides year-round linkage to the Ohio and Mississippi rivers systems. These systems feed domestic coal-fired power plants and coastal export coal terminals in the Gulf of Mexico. Location of the Buck Creek Mining Complex Page 4

Forward Looking Statements This announcement may include forward-looking statements. These forward-looking statements are based on Paringa s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Paringa, which could cause actual results to differ materially from such statements. Paringa makes no undertaking to subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or events after the date of that announcement. Competent Persons Statements The information in this announcement that relates to Exploration Results, Coal Resources, Coal Reserves, Mining, Coal Preparation, Infrastructure, Production Targets and Cost Estimation was extracted from Paringa s ASX announcements dated 17 March 2015 entitled Paringa Delivers Exceptional Pre-Feasibility Study at the Buck Creek No.1 Mine and 25 February 2015 entitled Substantial 54% Increase in Measured and Indicated Coal Resources to 211 Million Tons which are available to view on the Company s website at www.paringaresources.com.au. The information in the original ASX announcements that related to Exploration Results and Coal Resources is based on, and fairly represents, information compiled or reviewed by Mr. Kirt W. Suehs, a Competent Person who is a Member of The American Institute of Professional Geologists. Mr. Suehs is employed by Cardno. Mr. Suehs has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and to qualify as a Qualified Person as defined in the 2011 Edition of the National Instrument 43-101 and Canadian Institute of Mining s Definition Standards on Mineral Reserves and Mineral Resources. The information in the original ASX announcements that related to Coal Reserves, Mining, Coal Preparation, Infrastructure, Production Targets and Cost Estimation is based on, and fairly represents, information compiled or reviewed by Messrs. Justin S. Douthat and Gerard J. Enigk, both of whom are Competent Persons and are Registered Members of the Society for Mining, Metallurgy & Exploration. Messrs. Douthat and Enigk are employed by Cardno. Messrs. Douthat, and Enigk have sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and to qualify as Qualified Persons as defined in the 2011 Edition of the National Instrument 43-101 and Canadian Institute of Mining s Definition Standards on Mineral Reserves and Mineral Resources. Paringa confirms that: a) it is not aware of any new information or data that materially affects the information included in the original ASX announcements; b) all material assumptions and technical parameters underpinning the Coal Resource, Coal Reserve, Production Target, and related forecast financial information derived from the Production Target included in the original ASX announcements continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons findings are presented in this presentation have not been materially modified from the original ASX announcements. Page 5