RE: Initiating Near Term Transmission Components of the Central Toronto Integrated Regional Resource Plan

Similar documents
ONTARIO ^ POWER AUTHORITY \Jr

TORONTO REGION SCOPING ASSESSMENT OUTCOME REPORT FEBRUARY 9, 2018

1 The Needs Screening Report for the GTA East Region can be found at:

NEEDS ASSESSMENT REPORT

Burlington to Nanticoke Region. Scoping Assessment Outcome Report ONTARIO ^ POWER AUTHORITY. September 25, 2014

LOCAL PLANNING REPORT

Region: GTA East Sub-Region: Oshawa-Clarington. Revision: Final Date: May 15, 2015

Subject: Regional Planning Status Hydro One Distribution

Subject: Regional Planning Status Hydro One Distribution

NEEDS SCREENING REPORT

LOCAL PLANNING REPORT

GREATER LONDON SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN. Part of the London Area Planning Region January 20, 2017

GTA East REGIONAL INFRASTRUCTURE PLAN

LOCAL PLANNING REPORT

NEEDS SCREENING REPORT

BRONTE SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN - APPENDICES. Part of the Burlington-Nanticoke Planning Region June 30, 2016

TRANSMISSION GREEN ENERGY PLAN

NEEDS ASSESSMENT REPORT

Thunder Bay Sub-Region Local Advisory Committee Introductory Meeting. November 26, 2015

CENTRAL TORONTO AREA INTEGRATED REGIONAL RESOURCE PLAN. Part of the Metro Toronto Planning Region April 28, 2015

REGIONAL PLANNING PROCESS

NORTHWEST GREATER TORONTO AREA INTEGRATED REGIONAL RESOURCE PLAN. Part of the GTA West Planning Region April 28, 2015

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved.

Central Toronto Integrated Regional Resource Plan

KITCHENER-WATERLOO- CAMBRIDGE-GUELPH REGION INTEGRATED REGIONAL RESOURCE PLAN. April 28, 2015

Standard MH-TPL Transmission System Planning Performance Requirements

483 Bay Street Toronto, Ontario M5G 2P5. Date: April 30 th Prepared by: Niagara Region Study Team

NEEDS ASSESSMENT REPORT

POTOMAC ELECTRIC POWER COMPANY

March 3, Submitted to: CAISO

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria

Interconnection Feasibility Study

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: Service Requested

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: IFHS MH MW, firm :00:00 CS

FERC Directives in Order 693 Addressed in IROL Implementation Plan

NERC Reliability Functional Model

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

Greater Ottawa Region Local Advisory Committee Meeting #3 Item # 3. January 12, 2016

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)

Re: Release of 20-year Electricity Plan for Greater Toronto Area North

Interconnection Feasibility Study

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

SE-109: Outage Management Process Redesign Interim Process Training. Mark Gojmerac, IESO December 11, 2013

DRAFT STUDY PLAN FOR 2018

CONSERVATION AND DEMAND MANAGEMENT ( CDM ) PLAN

Mapping Document for FAC-010-3

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

Transmission Expansion Advisory Committee

Feasibility Study Report

18-Month Outlook. An Assessment of the Reliability and Operability of the Ontario Electricity System FROM OCTOBER 2017 TO MARCH 2019

April 26, PJM Mr. Mark J. Kuras Senior Lead Engineer NERC and Regional Coordination 2750 Monroe Blvd. Audubon, PA 19403

Greater Bruce-Huron - Regional Infrastructure Plan August 18, [This page is intentionally left blank]

Context - Current State

REGIONAL PLANNING PROCESS ANNUAL STATUS REPORT 2015

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Standard Development Timeline

Overview of IPSP for Web Teleconference Amir Shalaby, VP, Power System Planning

YORK REGION INTEGRATED REGIONAL RESOURCE PLAN. Part of the GTA North Planning Region April 28, 2015

Standard Development Timeline

Implementation Plan for IRO Reliability Coordination Facilities Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2

SSR STUDY REPORT FINAL

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

Standard Development Timeline

GTA East Regional Infrastructure Plan 09 January South Georgian Bay/Muskoka REGIONAL INFRASTRUCTURE PLAN

KITCHENER-WATERLOO- CAMBRIDGE-GUELPH REGION INTEGRATED REGIONAL RESOURCE PLAN - APPENDICES. April 28, 2015

Interconnection Feasibility Study

NORTHWEST GREATER TORONTO AREA INTEGRATED REGIONAL RESOURCE PLAN - APPENDICES. Part of the GTA West Planning Region April 28, 2015

GREENSTONE-MARATHON AREA INTEGRATED REGIONAL RESOURCE PLAN Interim Report for the Near-Term ( )

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Standard TPL Transmission System Planning Performance Requirements

Ontario Energy Board. Preliminary Filing Requirements For a Notice of Proposal under Sections 80 and 81 Of the Ontario Energy Board Act, 1998

Meeting Summary. Key Topics

WEST OF THUNDER BAY SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN. Part of the Northwest Ontario Planning Region July 27, 2016

July 15 July 31. August First ballot September 1 10, Drafting Team considers comments and makes any revisions indicated

Transmission System Security and Planning Standards

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

SPP RTO Compliance Forum TPL Jason Terhune

EAST-WEST TIE TRANSMISSION PROJECT

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Update on Northeast Seams Issues. February 20, 2008 NYISO Business Issues Committee Meeting

Standard Development Timeline

SUMMARY OF TRANSMISSION BUSINESS

Standard FAC System Operating Limits Methodology for the Planning Horizon

NERC PLANNING STANDARDS

Connection Study Requirements

5.4 Post Contingency Local Load Relief Warning

IESO Northwest Regional Electricity Forum

Implementation Plan IRO Reliability Coordination Current Day Operations

Platte River Power Authority. Ten-Year Transmission Plan ( )

OUTAGE COORDINATION PROCESS

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Interconnection System Feasibility Study

Meeting Information. Key Topics

OUTAGE COORDINATION PROCESS

THUNDER BAY SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN - APPENDICES. Part of the Northwest Ontario Planning Region December 16, 2016

18 Month Outlook. An Assessment of the Reliability and Operability of the Ontario Electricity System FROM OCTOBER 2016 TO MARCH 2018

Reliability Analysis Update

A separate notification will be provided to NPCC Members announcing the start of the formal 10 day ballot period.

PJM Report on TLR Level 5A Activity For April 1 7, 2003

1.3 Planning Assumptions and Model Development

Transcription:

ONTARIO 120 Adelaide Street West Suite 1600 Toronto, Ontario M5H 1T1 POWER AUTHORITY\Jr T 416-967-7474 F 416-967-1947 www.powerauthority.on.ca December 27, 2013 Mr. Bing Young Director, Transmission System Development Hydro One Networks Inc. 483 Bay Street Toronto, Ontario M5G 2P5 RE: Initiating Near Term Transmission Components of the Central Toronto Integrated Regional Resource Plan Dear Bing: The purpose of this letter is to: Hand off from the Ontario Power Authority (OPA) the lead responsibility for the planning process associated with specific near term transmission components of the Central Toronto Integrated Regional Resource Planning (IRRP) process to Hydro One. Request that Hydro One initiate the implementation of wire(s) solutions to develop and implement specific near term transmission components of the integrated plan to meet near and medium term reliability needs of the central and downtown Toronto area, for which conservation and local generation are not technically viable alternatives. This is consistent with the regional planning process endorsed by the Ontario Energy Board (OEB) as part of its Renewed Regulatory Framework for Electricity. The Central Toronto IRRP Working Group (Working Group), consisting of staff from the OP A, the Independent Electricity System Operator (IESO), Hydro One and Toronto Hydro, has been conducting an IRRP process for the central Toronto area including downtown. The IRRP process investigates conservation, local generation, as well as wire(s) options (transmission and distribution) to meet the needs of an area. The Working Group has established that certain near term reliability needs, based on the Independent Electricity System Operator's "Ontario Resource and Transmission Assessment Criteria" (ORTAC), cannot be met through the application of conservation and local generation solutions. 1

More detailed study and development work is required before recommended solutions can be proposed and implemented for these near term needs. Development of transmission components of the plan is best accomplished by the lead transmitter, Hydro One, leading these efforts as part fo the Working Group, and guided by the information and requirements provided below and in Attachment 1, from the IRRP process. Supporting Information for Central Toronto Near-Term Projects: The objectives and scope of the near term transmission components of the plan are provided in Attachment 1. To facilitate the transition to the development of wire(s) solutions, the OPA will provide Hydro One with the following information: Summary of the needs that have been established Relevant system base cases Demand forecasts Conservation and distributed generation forecasts Preliminary assessments of some options Other relevant information upon request from Hydro One We look forward to information, results and deliverables as part of the Working Group activities, and to continuing to work with and supporting Hydro One on the further development and implementation of these projects. Best Regards, Joe Toneguzzo Director, Transmission Integration Power System Planning Division Ontario Power Authority Copied: Central Toronto IRRP Working Group 2

Attachment 1 It should be noted that the following needs and observations have been established with the understanding that the supply for Horner TS would be changed from circuits R2K and R15K to circuits R2K and RI3K, by the second quarter of 2014, as advised by Hydro One. l.a Needs Requiring Immediate Implementation of Solutions The near term need described in this section is based on the Independent Electricity System Operator's ORTAC, and it has been determined for this specific need, that CDM, local generation, or other electricity system initiatives are not technically feasible solutions. The outage of any two of the three 230/115 kv autotransformers at either the east or west yard of Manby TS can result in the overload of the remaining autotransformer. This outage can be caused by the failure of any of the following Manby TS breakers: A1H4, H1H4, or H2H3. Solutions are required as soon as possible to address the resulting overload to fulfill the requirements specified in ORTAC. Some options that have been investigated on a preliminary basis by the Working Group include the following: 1. A Special Protection Scheme that can be armed if prevailing system conditions (normal and emergency) would result in loadings exceeding equipment ratings following the contingencies. 2. Re-termination of existing facilities at Manby TS to reduce the impact of breaker failure contingencies at Manby TS. l.b Discretionary Near Term Observations to Enhance Supply to Downtown Double circuit contingencies involving the lines C2L/C3L or C16L/C17L from Cherrywood TS to Leaside TS can result in the loss of two of the three 230/115 kv autotransformers on the same half of Leaside TS. At present, if the steam-turbine generator at the Portlands Energy Centre is unavailable, and consequently is derated to the output of a single combustion unit, coincident with either of these double circuit contingencies, then curtailment of load would be required to respect the Long Term Rating of the remaining autotransformer. In addition, the voltage stability limit, based on 95% of the critical load of Leaside supplied facilities, is determined to be 1420 MW for this particular condition. This limit is forecast to be exceeded as early as 2021 (under a load forecast scenario which considers no new CDM beyond 2014), if limitations at Manby prevent load transfers to relieve Leaside autotransformer loading. 3

Some options that have been investigated on a preliminary basis by the Working Group include the following: 1. Re-termination of the incoming 230 kv Cherrywood to Leaside circuits to ensure that a C2L/C3L or a C16L/C17L double contingency does not result in the removal of two autotransformers from the same half of the Leaside 115 kv yard. 2. Modification of operating instructions to include closing the Leaside 115 kv bus-tie breakers following the loss of any two Cherrywood to Leaside circuits and/or two Leaside autotransformers if the Portlands Energy Centre steam turbine generator is unavailable. It should also be noted that by addressing breaker failure contingencies at Manby TS, additional load transfer from Leaside to Manby would be available and could substantially reduce load curtailment requirements in the Leaside sector for C2L/C3L and C16L/C17L contingencies. Therefore, considerations for load transfer should be quantified and included in the assessments. The outage of two of the three Leaside to Bridgman circuits may result in overloading of the remaining circuit, and unacceptable voltages at Bridgman TS. This outage can be caused by the failure of breaker L14L15 at Leaside TS. The following options have been investigated on a preliminary basis by the Working Group and include the following, which are not necessarily mutually exclusive: 1. Special Protection Scheme that can be armed if prevailing system conditions would result in loading exceeding equipment ratings following the outage of two Leaside to Bridgman circuits. 2. Re-termination of L14W or L15W to ensure that no two circuits supplying Bridgman share a common breaker. LC Other Observations and Assessments from the IRRP Review for Consideration In addition to the above near term needs, a number of other observations are identified for consideration to enhance the level of service and should be considered in developing the solutions to address the needs identified in 1.A. It should be noted that these observations do not represent criteria violations; however, consistent with ORTAC Section 7.4, the customer and transmitter can agree to a higher level of reliability "for technical, economic, safety, and environmental reasons." These observations are: 1. Supply to Duplex TS, Glengrove TS, and Leaside DESNs in the event of the loss of Leaside TS, including considering feasible load transfers, operating measures, and/or the use of temporary facilities. 4

2. Supply to Manby DESNs for the loss of Manby TS, including considering feasible load transfers, operating measures, and/or the use of temporary facilities. 3. Enhance the transfer capability from the Leaside sector to Manby sector, including considering the uprating of the limiting sections of 115 kv circuit H2JK and/or providing additional 115 kv circuits between John TS and Hearn station. 4. Enhance the load-meeting capability to respect the loss of two adjacent 115 kv circuits on the multi-circuit 115 kv tower lines in the Manby East and West sectors, which are not anticipated to be defined as Bulk Electric System (BES) facilities by the NERC Transmission Planning Standards, to provide an equivalent standard of reliability as compared to those applied to the Leaside sector (largely anticipated to be BES). 5. Enhance load restoration capability, to mitigate the impact of extreme contingency events, such as the complete loss of Manby TS or Leaside TS. END of LETTER 5