BOEING QUALITY / CONTRACT CLAUSES

Similar documents
Customer Specific Requirements. Last Update 23July2015

Supplier Quality Requirements

Supplier Quality Requirements

LIGHTING SYSTEMS. REVISION DATE DESCRIPTION PAGE(S) AFFECTED July 2017 Initial Release All

Boeing Contractual Supplements

Meggitt Oregon Purchase Order Quality Notes

Supplier/Subcontractor Requirements Instruction. Approved by: Jeanette Sicklovan, Quality Manager (Management Representative)

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

Supplier Quality Assurance Requirements Manual

Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES

Supplier Quality Requirements

SHELTON INDUSTRIAL PATTERN INC.

Supplier Quality RUSSTECH Purchase Order Clauses (RPOC s)

Terms and Conditions Form OL-668 Rev l

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

Clauses applicable only when specified by Q-number on the purchase order.

Boeing Spares PO Notes

Purchase Order Notes. Note A17

PROCUREMENT QUALITY REQUIREMENTS

TASK REQUIREMENTS. Supplier Quality Requirements

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Arnprior Aerospace Inc.

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

SUPPLIER QUALITY REQUIREMENTS (SQR S)

These requirements apply to all suppliers:

SP SECTION QUALITY ASSURANCE

PURCHASING QUALITY CLAUSES

Aero-Tech Engineering (ATEI) Quality Clauses

SUPPLIER QUALITY REQUIREMENTS (SQR S)

General Purchase Order Requirements

Requirements for Suppliers

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

SUPPLIER QUALITY REQUIREMENTS

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Procurement Quality Assurance Requirements

FLYSHEET 100 Rev. 14 QUALITY SYSTEM REQUIREMENTS

QUALITY CLAUSE CODES

Quality Management System

Absolute Manufacturing. Supplier Quality Requirements

TERMS AND CONDITIONS. No charges are allowed for boxing, packing, crating, and insurance unless specifically provided for in the Purchase Order.

LIST OF CHANGES Rev Date Page Description

Supplier Quality Requirements (ASQR)

HM Dunn AeroSystems Purchase Order Quality Clauses

Rosen Aviation Supplier Quality Assurance Requirements

Purchasing PURPOSE SCOPE

Supplier PO Quality Requirements

1025 E. King Street Revision: C Winona, MN PURCHASE ORDER TERMS AND CONDITIONS

SL - MONTEVIDEO TECHNOLOGY, INC.

Purchase Order Quality Notes, Terms & Conditions PFM Revision K (9/9/2014)

GKN Aerospace Advanced Composite Structure

PROCUREMENT QUALITY CLAUSES

Absolute Manufacturing. Supplier Quality Requirements

DOW-KEY MICROWAVE CORPORATION PURCHASE ORDER QUALITY REQUIREMENTS

SUPPLIER QUALITY REQUIREMENTS

PURCHASE ORDER QUALITY CLAUSES

SL - MONTEVIDEO TECHNOLOGY, INC.

Type : Quality Procedure: Q - 023CLR Titre / Title: Flow Down of Additional Requirements Revised Date: May

PP Quality Assurance Procurement Clauses for Suppliers

Supplier Quality Requirements (SQR)

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Requirements Master List

Supplier Quality Codes

DOW-KEY MICROWAVE CORPORATION PURCHASE ORDER QUALITY REQUIREMENTS

Procedure Documentation

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

SUPPLIER QUALITY CLAUSES

GRMA-032-PRO-00 Page 1 of 8

Supplier Quality Manual

MAGNETIC COMPONENT ENGINEERING, INC.

Apex Industries Inc. 100 Millennium Blvd. Moncton, New Brunswick, Canada E1E 2G8 Purchase Order Quality Assurance Clauses

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

QUALITY AGREEMENT. This Quality Agreement is made between. (Customer Legal Entity Name Hereinafter called CUSTOMER ) And

Purchase Order Quality Terms and Conditions

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

Purchase Order Quality Clauses

AEROFAB PURCHASE ORDER QUALITY CLAUSES

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

ALVA MANUFACTURING PURCHASE ORDER QUALITY CLAUSES

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Plasma Ruggedized Solutions

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

TT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order

Dear Valued Customer,

LM Logistic Services Quality Notes Conversion Chart

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

2. GENERAL REQUIREMENTS

Purchase Order and Quality Clauses

Helical Products Company

Supply Chain Quality Assurance (SCQA) Page 1 of 6

Vendor / Sub-Contractor General Terms & Conditions

Manufacturing supplier s quality systems must comply with one of the following:

1.1 Wesco Aircraft Supplier Quality Flow Down Requirements to Subtier Sources.

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

Manufacturing supplier s quality systems must comply with one of the following:

Operating Procedure 6-02 Supplier Quality Requirements

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Procurement Quality Requirements

Transcription:

BOEING QUALITY / CONTRACT CLAUSES The following Quality / Contract Clauses will be identified on GKN Aerospace- Orangeburg Purchase Orders or Purchase Schedules as applicable. QA-BOE: BOEING List of applicable programs: 737 Max Winglet 787 Section 47 Floor Grids Control of Digital Data: Boeing document D6-51991 Quality Assurance Standard for Digital Product Definition at Boeing Suppliers is applicable as defined below: Digital Product Definition (DPD), Model Based Definition (MBD). If the Supplier receives, downloads and or uses Boeing DPD / MBD geometry in any format then Supplier shall conform to Boeing document D6-51991 and obtain Company approval as DPD / MBD Capable. If the Supplier provides Boeing DPD/MBD geometry to sub-tiers, the Supplier shall impose Boeing document D6-51991 as a requirement and is responsible for the subtier s conformance. ITAR/ EAR Controls: Specific ITAR or EAR restrictions and controls are flowed down via Manufacturing License Agreements (or similar) or notices attached to the applicable Data Transfers Records (DTR). Materials & Processes: The Supplier is to maintain compliance with D1-4426 Boeing Approved Process Sources. D1-4426 defines the approved sources for special processing, composite raw materials, composite products, aircraft bearings, designated fasteners, and metallic raw materials. D1-4426 shall be reviewed regularly for changes in the approval status of process sources. If a processing source, used in support of this contract, loses its Boeing D1-4426 approval, then the Company must be informed immediately.

The Suppliers Certificate of Conformity shall include Process specification number with revision status, processing date(s) and name and address of processor(s) performing each of the D1-4426 process(es). Tooling: Any Boeing or Government owned accountable tooling is to be controlled per Boeing Specification D33200-1 Boeing Suppliers Tooling. Any issues relating to the accountable tooling and or the requirements of D33200-1 are to be directed to GKN- Orangeburg Quality Manager. Inspection: Sampling plans based on statistical analysis if used in lieu of 100% inspection for onreceipt, in-process or final inspections shall conform to the requirements of Boeing Document D1-8007. Sampling plans for engineering defined Safety or Critical characteristics are not permitted unless prior written acceptance of the plan is obtained (via the Company) from the Boeing design authority, that is unless the design documentation specifically defines a method of acceptance. Validation of Raw Material Test Reports Test reports shall be checked 100%. Concessions Applications Concessions will be submitted to GKN Orangeburg. Do not deliver the affected product until any required further work identified by the Engineering disposition has been complete, and or you are in receipt of a completed concession, or have otherwise been authorized by the Company Permission to Ship (PTS) process to deliver the product with an open concession application. When delivering a product that is subject to a concession or an assembly that contains a concessed part, it shall be delivered under cover of a separate Certificate of Conformity (i.e. not included on the same C of C as other conforming products being delivered at the same time). The Company or Boeing concession number must be referenced on the Supplier s Certificate of Conformity. A red warning label must be attached to the deliverable product; this warning label must reference the concessed product part number and the applicable Company or Boeing concession number, and shall have a statement saying that the label is not to be removed until the product is assembled by GKN on the Winglet. Notice of Escape: The Supplier shall notify the Company in writing when a non-conformity or potential non-conformity is discovered for product that has already been delivered to the Company; this notification must be within 3 days of the Supplier becoming aware of the escape. If there is the potential for the escape to affect flight safety, then the Company must be notified immediately.

Delegation of Product Verification: If the Supplier delegates product verification to a sub-tier, then Supplier shall conform to the requirements of AS9015 Supplier Self Verification Process Delegation Requirements. The Company (and Boeing) reserves the right to conduct surveillance at Supplier s facility to determine conformance to the requirements of AS9015. The delegation of product verification does not relieve the supplier of its obligation under this contract. US Federal Clean Air Act Definition. "Ozone-depleting substance," as used in this clause, means any substance the US Environmental Protection Agency designates in 40 CFR Part 82 as-- (1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or (2) Class II, including, but not limited to hydrochlorofluorocarbons. Supplier shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as applicable: Warning Contains *, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere. Warning Manufactured with *, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere. * Supplier shall insert the name of the substance(s). Excess Inventory The Supplier shall control all inventory of Company or Boeing proprietary product that is in excess of contract quantity in order to prevent product being sold or provided to any third party without prior written authorization from the Company. Certification Statement The supplier s statement of conformity shall include the following statement: Seller [it is acceptable to replace Seller with the Company name or We ] hereby acknowledges that the parts and or materials being shipped under this order are intended for use under Boeing s Federal Aviation Administration (FAA) issued Production Certificate 700. The statement may be printed, stamped or attached as a label or sticker). FOD Prevention Program Effective from 1 st January 2016 Suppliers shall establish and maintain a Foreign Object Debris/ Damage (FOD) prevention programme in accordance with Boeing document D6-852622 Foreign Object Debris / Foreign Object Damage (FOD) Prevention Requirements for Boeing Suppliers.

Operator Self Verification Program Effective from 1 st April 2016 if Supplier uses an Operator Self-Verification (OSV) programme, Supplier shall comply with the requirements of Boeing document D6-85748 Aerospace Operator Self-Verification Programs. Note upon release of the SAE industry standard AS9162 Aerospace Operator Self-Verification Programs, the Boeing document D6-85748 is to be cancelled and Suppliers shall comply with the requirements of AS9162. Flow-down of Requirements All provisions of the requirements set forth in the Contract, Purchase Order and related Clauses are to be flowed down to the Supplier s sub-tier supply chain. Change in Manufacturing Facility Location/ Work Transfer: Work planned to be transferred (per AS9100C 7.1.4.. from one organization facility to another, from the organization to a supplier, from one supplier to another) and or any change to the manufacturing facility location of contracted part or assembly requires to be notified to the Company. The Supplier shall notify the Company within 5 days of knowing: Details of work being transferred To-be supplier s name & address To-be supplier s Quality contact details First production target date The Company may require Supplier to complete Boeing Form X36219 Supplier Initiated Work Transfer Questionnaire to support the Company s application to Boeing (the Company would supply a copy of the questionnaire if required). Written approval from the Company/Boeing is required prior to the commencement of manufacture by the To-be supplier. Records: Manufacturing quality records to be maintained per PUR 1.1.2. FAI records are to be retained for a minimum of 10 years after date of last shipment. No quality records are to be disposed of unless authorized by the Company. Regulatory Approval For aircraft regulated by the Civil Aircraft Authorities, regulatory approval may be required for Seller to make direct sales of modification or replacement parts to owners/operators. Seller agrees not to engage in such direct sales of products or services without prior GKN, Boeing or regulatory approval. Unless explicit contract direction is given to the contrary, no articles (or constitute parts thereof) ordered by Boeing Commercial Aircraft (via GKN) shall contain any Federal Aviation Administration- Parts Manufacturer Approval (FAA-PMA) markings and the accompanying paperwork (eg shippers etc) shall not contain any FAA-PMA markings.

First Article Inspection Boeing reserves the right to conduct surveillance of the Seller s FAI, referred to as Boeing FAI (BFAI). BFAI may include in-process inspections. Suppliers will be notified via GKN, and Supply will coordinate with GKN the schedule for such BFAI activity. Suppler shall make available for review all related FAI supportive information. All FAI reports, completed per AS9102, shall be uploaded into Net-Inspect.