Panel Session II - Sea Launch Overview BCSC Perspective

Similar documents
Paper Session I-A - Space Shuttle, Human Space Transportation for the Next Thirty Years

1 Introduction Reasons for Selecting EUROCKOT EUROCKOT Photograph Gallery...1-4

Producibility Of Advanced Launch Transportation System

Paper Session II-A - International Space Station Alpha Integrated Product Team/ Analysis and Integration Team Process

Paper Session I-B - Industrial Reflight of Eureca Platform in 1998

LAUNCHERONE: VIRGIN ORBIT'S DEDICATED LAUNCH VEHICLE FOR SMALL SATELLITES & IMPACT TO THE SPACE ENTERPRISE VISION

Paper Session I-A - Shuttle-C Heavy-Lift Vehicle of the 90's

Shuttle-C: A Shuttle Derived Launch Vehicle

Paper Session III-A - Rack Level Test Facility- The Columbus APM Payload Verification Tool

Surveyor Spacecraft Total Reliability Program

Paper Session II-A - A Process to Help Assure Successful Commercial Space Ventures

EUROCKOT LAUNCH SERVICES - CANADA`S RELIABLE PARTNER IN SPACE

MTFF Operational Design Features

"MARKS" SMALL AVIATION-ROCKET SPACE LAUNCH SYSTEM

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS)

Paper Session II-B - STS-74 SRMS- Assisted Docking of Docking Module Demonstrates ISS Assembly Technique

Panel Session I - To Understand and Protect Our Home Planet

GENERAL PRESENTATION OF YUZHNOYE SDO ACTIVITIES IN ROCKET SPACE DOMAIN

THE WAY UP The European Launch Provider for Small Satellites

AeroVironment, Inc. Unmanned Aircraft Systems Overview. Background

Brandon Commercial Development, LLC.

THE WAY UP The European Launch Provider for Small Satellites

Lessons Learned from NASA s UAV Science Demonstration Program Missions.

AeroVironment, Inc. Unmanned Aircraft Systems Overview. Background

CHAPTER 11 MISSION INTEGRATION AND MANAGEMENT

VT Group Unmanned Systems Capabilities Brief.

ART Move by Water

This page intentionally left blank.

Commercial Crew: Progress Toward Flights

Position Paper: Now is the Time: A Paradigm Shift in Access to Space

DHL INDUSTRIAL PROJECTS SPECIALIZED LOGISTICS SAFELY AND SKILLFULLY EXECUTED

Supercharge Your Assets with Embedded RFID

"Technical and Programmatic Challenges for Dedicated Ride Share Missions"

September 26, 2014 ENSURE QUALITY ASSURANCE FOR COMPANIES AND INSTITUTIONS P R E S E N T E D B Y: D R. B O Y D L. S U M M E R S

CHIEF EXECUTIVE OFFICER S REPORT

Techlift International Limited Capability Statement

MANAGER OF MARINE OPERATIONS

Design Project Spotlight: NASA Vehicle Assembly Building High Bay 3 Platform Modifications The Next Great Steps

Land Launch User s Guide

Agility (Abu Dhabi) PJSC Subject: Modules Transport Agility Value added

OCEANWIDE MARINE SUITE Comprehensive and Collaborative Processing Solution for the Marine Industry

The Ship Acquisition Process Status and Opportunities

System Level Costs WHAT IS SYSTEM LEVEL COST?

Paper Session III-B - Risk Management for Small Satellite Programs

Management Message. Edition: August 2017

Capital Metropolitan Transportation Authority Response to the State-Mandated Performance Audit, January 12, 2017

Risk assessment and management in the implementation of projects in the rocket and space complex on the basis of commercial effectiveness principles

exceptional Deep Sea

Workforce Solutions staff training and development unit is currently operated by Learning Designs, Inc. as the National Workforce Institute.

Commercial Crew Services Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned Cost Estimating

User s Guide. Original Release Date: March 26, 1996 Revision B: July, Prepared and Distributed by:

e-navigation Frequently Asked Questions

Terms of Reference. Purchase of aerial surveillance service for the EU external land borders

S IGNATURE E VENT C O O R D I N A T O R

ARIANE 6 The new Governance in Ariane world

HERMES MARITIME. MGMT SYS. RvA C 071

ALTAIR Millennium s DARPA SeeMe Commercial Satellite Solution Technical (R)evolution. Presentation to: 2014 AIAA/USU Conference on Small Satellites

Paper Session I-B - The International Space Station Partners: Background and Current Status

Offshore. & Heavy Lift EQUIPMENT & SOLUTIONS

Transitioning from Space Shuttle to Space Station On-Orbit Servicing

S IGNATURE E VENT C O O R D I N A T O R

Air Freight Management. Flexible Products and Options in Expert Hands

Associate Vice President of Facilities Management

Execute on Your Mobile Strategy

Paper Session III-C - The Commercial Development of Space and the Federal Regulatory Process

Science Applications International Corporation (SAIC) [NYSE: SAIC]

Our Vision. Our Mission. Our People. Our Customers

COMPANY PROFILE. seypec.com

DoubleClick. plan. execute. analyze. May 2004 Investor Presentation. We Make Marketing Work Better

Company. Port Moresby Electrical Co. Ltd was incorporated in Papua New Guinea in August 1968.

Case No COMP/M BOEING / LOCKHEED MARTIN / UNITED LAUNCH ALLIANCE JV. REGULATION (EC) No 139/2004 MERGER PROCEDURE

Sustaining America s Exploration Program: An Industry Perspective

Company FUNDAMENTALS: Port Moresby Electrical Co. Ltd was incorporated in Papua New Guinea in August 1968.

SEA LAUNCH ENVIRONMENTAL ASSESSMENT

ISO INTERNATIONAL STANDARD. Space systems Launch-vehicle-tospacecraft

SERVICES OVERVIEW. Manage Results Instead of Resources

Building Large Space Bases in Low Earth Orbit

REQUEST FOR PROPOSAL

SSL Payload Orbital Delivery System (PODS) FedEx to GTO/GEO

1.1.3 In order to achieve effective time management there must be:

End to End Services for the OIL & GAS Industries. Offshore and Onshore Projects

Name of Program: The Boeing Company / F-15 AESA Radar APG-63 CLS Program Aviation Week Program Excellence Award: Sub System Sustainment Category

ASSOCIATION OF SINGAPORE MARINE INDUSTRIES (ASMI)

Industrial Case: Blockchain on Aircraft s Parts Supply Chain Management

ENVIRONMENTAL APPLICATIONS FOR WEB-BASED REPORTING AND TRACKING TOOLS. Kristin Wowak and Christopher Cleet TRW, E&EIS

Welcome to Seef Cargo Express Bahrain

Reusable Booster System (RBS)

What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects

INTERNAL AUDIT DIVISION REPORT 2016/131

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3A Product Specification

A Model for CAS Self Assessment

Audit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission

Design Solution Definition Process

ONSHORE WIND PART OF THE ALE WIND SERVICES DIVISION WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

Cap & Contain (Flow) Defining Success!

BIG G 2 0 DEC 1967 MCDONNELL.

Proposal for the Creation of the Alaska Center for Unmanned Aircraft Systems Integration - Research, Development, Test and Evaluation (ACUASI - RDT&E)

Technology of conducting experiments in Space

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

JASON 1 : LESSONS LEARNED FROM THE DEVELOPMENT AND 1 YEAR IN ORBIT

Transcription:

The Space Congress Proceedings 2007 Space Visions Congress - Growing the Next Generation of Scientists and Engineers Apr 28th, 10:00 AM Panel Session II - Sea Launch Overview BCSC Perspective Malcom J. Philips Boeing Commercial Space Company Follow this and additional works at: http://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Malcom J. Philips, "Panel Session II - Sea Launch Overview BCSC Perspective" (April 28, 2007). The Space Congress Proceedings. Paper 2. http://commons.erau.edu/space-congress-proceedings/proceedings-2007/april-28-2007/2 This Event is brought to you for free and open access by the Conferences at ERAU Scholarly Commons. It has been accepted for inclusion in The Space Congress Proceedings by an authorized administrator of ERAU Scholarly Commons. For more information, please contact commons@erau.edu.

Sea Launch Overview BCSC Perspective Malcolm J. Phillips Manager, Mission Requirements & Interfaces Boeing Commercial Space Company Overview Organization Key Sea Launch Elements Launch Campaign Flow Unique Characteristics of Commercial Launch Business and Sea Launch 1

Sea Launch Company Key Locations and Roles Sea Launch Partner Locations Sea Launch Company, LLC Seattle Long Beach Oslo Moscow Dnepropetrovsk Sea Launch Company is a limited liability corporation with headquarters and Home Port in Long Beach, California Formed in April 1995, with first launch in March 1999 Commercial Launch Services Provider Sea Launch Contractor Team Experienced Industry Leaders Home Port Operations Payload Fairing & Adapter Mission Integration Mission & Range Operations Payload Processing Facility Payload Support Services Zenit Rocket Production Zenit Test & Integration Mission Integration & Launch Support Block DM Production Block DM Test & Integration Ground Processing Equipment Mission Integration & Launch Support BarberMoss Launch Support Equipment & Support Launch Support Launch Vehicle Erector Ground Processing Equipment Launch Support 2

Sea Launch Company Our Past and Momentum Forward... Sea Launch has successfully completed 22 missions to-date 20 consecutive mission successes prior to NSS-8 Successfully have flown or are integrating every major spacecraft platform Sea Launch 12th Year Since Inception! Launch tempo Successfully demonstrated six launches from June 03 to June 04 Three in 2003, four in 2004, four in 2005, five in 2006 One of Industry s most proven heavy-lift vehicles 5 Sea Launch System Salient Features for today s s commercial customers Boeing quality oversight & integration Ensures high reliability and mission assurance Quarterly reviews conducted by Sea Launch at major contractors and subcontractors Processed in major metropolitan area Long Beach, CA Conveniently close to airports, immense supplier base, most US sat makers Other launchers process in remote locations Vessels never enter a foreign jurisdiction during a mission Compelling Value Proposition Creative business terms and conditions Low cost base a function of international sourcing, unique & efficient operations and good management 3

Sea Launch Company Facilities & Assets Home Port Segment Marine Segment Rocket Segment Systems integration Rocket segment processing Payload processing and encapsulation Pier Pier and marine provisioning Support engineering Logistics support Rocket segment storage Rocket integration and test Mission control Launch team accommodations Range Range support and helo operations Launch vehicle checkout Launch vehicle fueling YUZHMASH Sea Launch Zenit rocket Sea Launch Block DM upper stage Payload accommodations Launch complex Launch vehicle transit BCSC Payload Accommodations Produced in Seattle, Washington Graphite/epoxy fairing Shipped to Home Port by road Processed and integrated at Home Port Encapsulated Payload Booster Adapter Graphite/epoxy Fairing 4

Typical Launch Campaign Payload Unit (PLU) Spacecraft arrival at Home Port transfer to Assembly (about 45 days before launch) Command Ship (ACS) (24 days before launch) PLU to Block-DM-SL Mate (19 days before launch) Integrated Launch Vehicle (ILV) Transfer to Launch Platform (LP) (18 days before launch) Integrated Systems Test (17 days before launch) LP to Transit Launch Site (Departs 15 days before launch) ACS Transit to Launch Site (Departs 12 days before launch) Launch Operations (Begins 3 days before launch) Launch (day 0) Sea Launch Advantages Mature launch vehicle No Co Mature launch vehicle no new upgrades or major changes planned No Co-passenger impacts Benign launch site weather, Onboard spares, No range conflicts & Robust launch system. Secure/Dedicated state Secure/Dedicated state-of-the art spacecraft processing facility Proven Mission Processes Insures high reliability and mission assurance Quarterly reviews conducted by Sea Launch at major contractors and subcontractors 5

Unique Aspects of Commercial Launch Business Multiple Domestic & International Customers Schedule (Cash Flow) Driven Intense Competition, Cyclical Demand Reliability, Affordability & Flexibility are Key Discriminators Unique Aspects of Sea Launch Compliant with U.S. ITAR Regulations Serial & Sequential, but Adaptable and Flexible International, Virtual Enterprise Small, Entrepreneurial, Dedicated Team Sea Launch Mission Integration Mission Integration is a collaborative effort amongst the partners Sea Launch, BCSC, RSC Energia, SDO Yuzhnoye Team Based, supported by matrixed organizations within each partner organization Mission Team Lead by Sea Launch Mission Manager, Supported directly by Mission n Integrator (BCSC) and Payload Integration Manager (Sea Launch Operations), and indirectly by other Sea Launch, BCSC, and partner personnel Responsible for: Spacecraft requirements integration ICD requirement definition and verification Execution of program specific requirements Program and customer coordination 6

Summary Unique, International Consortium Specifically Developed to Support Commercial Launch Experienced Team Proven Launch System Comprised of Pedigreed Components Virtual,, Team Based Integration Approach Best Value Solution for Commercial Launch Customers. 7

Launch Site 154 0 W, 0 N/S 8

9