Thin Brick Façade. Façades Installation Guide

Similar documents
FACADES - ACM BASE AT OVERHANG (WITH BASE FLASHING) INDEX SHEET

Flushglaze For Steel Tube Applications and Horizontal Panels. Façades Installation Guide

Installation Guide Wall Panels

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

Panel Clip with (2) ¼ 14 x 2 Fasteners at Each Panel Joint. Base Angle. Fasteners to Concrete 24 O/C Base Z Flashing

Impression Graphic panels

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

KARRIER PANEL - BRICK

Insulated Panels North America. KarrierPanel Universal Barrier Wall Solution

KS SERIES - VERTICAL INSTALLATION

DETAIL INSTRUCTION No. 1

Installation Guidelines

Exterior System installation instructions

Container Installation Guide

Siding and Soffit Installation Guidelines

Installation Guidelines for all Quaker products with nail fins New construction nail fin installation with a drainable weather resistant barrier.

Se incluyen las instrucciones en español

Installing the Sno-free Panel Eave System for New Roofs

Revision Date: April 01, Premier Vinyl Enclosure

YOW 250 T Window System

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

Siding and Soffit Installation Guidelines

Agenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia

Pacific Tile Counter Batten and Batten

Pacific Tile Counter Batten and Batten

Installation Guide Single-Hung, Picture & Shapes Non-Impact & Impact Resistant Florida Flange Windows

Thin Architectural Splitface Block Veneer Specification Guide

DuraLife Capped Composite Decking Installation Instructions

Install & Maintenance Instructions

Classic and NB Tile Counter Batten and Batten

Container Installation Guide

KWiK N EZ Rigid Track Silicone System

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

Technical Data Sheet

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

Resysta Wall Cladding Installation Guidelines

AcroWall-ES System. Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details

ELEVATION FOR DETAIL REFERENCE ONLY

ALLMET CONTINENTAL INSTALLATION GUIDE

INSTALLATION GUIDE.

Pebbletex Wall System Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details

Installation Guidelines for Sealing PTAC Sleeves

Installation Guide. Rain Screen Panel System

STORAGE AND TRANSPORTION

Installation Manual. Foundations. Version 2

BENCHMARK Evolution Axis

Rectangular Area: 15 x 10 = 150 sq ft Triangular Area: 15 x 5 x ½ = 38 sq ft

SUPERIOR ROOF SYSTEMS

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

rout & return INSTALLATION GUIDE

Pittsburgh Corning Glass Block Shower System Mortar Installation Standard Fit Shower Instructions

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

COMPOSITE PANEL SYSTEM SYSTEM OVERVIEW INDEX INSTALLATION SEQUENCE INSTALLATION SEQUENCE INSTALLATION SEQUENCE

BARREL VAULT Tile Counter Batten and Batten Installation Guide

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Assembly Instruction. wedi Fundo Primo Shower System

200 / 300 SERIES PANELS COLD STORAGE

A-ONE Insulated Forms Installation Manual

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS

Window Installation Instructions Hung Window Systems with Receptor Pan

1 PVC or ABS drain with strainer

INSTRUCTIONS AND GUIDELINES

SECTION FLEXIBLE FLASHING SYSTEM FOR MASONRY VENEER

SECTION NON-STRUCTURAL METAL FRAMING

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION MORTAR AND MASONRY GROUT

PART 1-SAWN THIN VENEER GENERAL

Duracast Pressure Plate Installation Instructions

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

Designwall 2000/4000. Façades Installation Guide

Commercial Flashing Details

DRY SEAL INSTALLATION GUIDE

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

OZARK PATIO COVER INSTALLATION INSTRUCTIONS

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Assembly Instruction wedi Fundo Floor element

Assembly Instruction. wedi Fundo Primo Steam Shower System

Proudly Made in the U.S.A. 5-Year Warranty. Wayfinding Products

WEIGHT PER PIECE (LBS.)

FORMWORK 66 x 40 x 24 Lithic Freestanding or Alcove Box Bathtub Installation Guidelines. STYLE No. CAUTION: BATHTUB IS EXTREMELY HEAVY

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

BioPrism Solid Surface

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

Technical Data Sheet

Chapter 13. Ceiling Sheetrock

Chapter 25: Sliding Door Opening Framing

Product and System Specifications DuPont Flashing Systems

Substation #9 Instructions for Assembly of the HO scale kit. v1.1

Shower Pan Extension Installation Guide

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

0331 Brick and block construction

TYPICAL ROOF CONDITION LAYOUT

INSTALLATION MANUAL KOCH

ELEVATION FOR DETAIL REFERENCE ONLY

OmniFlex 300 Plus Installation Instructions

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

SECTION STAINLESS STEEL WALL PANELS

Transcription:

Thin Brick Façade Façades Installation Guide October 2016

BENCHMARK Welcome to Kingspan, global leaders in the design and manufacture of insulated metal panels. Insulated panels serve as energy efficient, state-of-the-art alternative to traditional construction. This document serves as installation guidelines for the BENCHMARK By Kingspan Thin Brick Facade system. Disclaimer This installation guide is only to be used in conjunction with panel installation drawings and Kingspan recommended details. Details shown in project shop drawings prepared by Kingspan take precedence over any similar information in this manual. This guide is intended to provide the panel contractor with recommended methods, procedures and guidelines for the installation of the Thin Brick façade system for architectural applications. Information presented is accurate but may not cover all situations, building conditions and/or details of your specific project. Consult Kingspan Technical Services where this guide does not cover your unique construction requirements. It is the sole responsibility of the project engineer and panel installer to ensure specified air and weather tightness of a building by good design and workmanship in accordance with approved drawings using only the appropriate type of sealants. It is the sole responsibility of the owner s representative and panel installer to maintain quality workmanship in accordance with approved shop drawings to ensure the best performance of the wall system. Kingspan recommends installers read this document fully before receiving the panels on the job site. Installation classes are available through Kingspan s Technical Services Department. Please call 1-888-882-5862 for more information. Follow the approved shop drawings and engineering calculations for your project specific fastening patterns. The engineer of record is responsible for verifying applicable design loads and panel fastening requirements. All safety procedures, including adequate fall protection, are the responsibility of the panel contractor. 2

CONTENTS Introduction 4 Installation At Base and Corner 7 At Sill 10 At Jamb 12 At Head 14 Mortar 16 Construction Details 18 Materials 22 Notes 23 3

1. INTRODUCTION FAÇADES 1 1 BENCHMARK By Kingspan Insulated Metal Panel (Barrier Wall) 2 BENCHMARK By Kingspan KarrierRail 3 Subgirt 4 Thin Brick Holding Tray 5 Thin Brick 6 Thin Brick Mortar 3 2 5 4 6 4

DETERMINING TRAY STARTING POINT One of the advantages of the Thin Brick system is that you can start tray installation at any point on the wall. The steel holding trays may be installed from the bottom working up a wall or from the top working down the wall. The key considerations in finding a starting point are: Finding a low starting point that will allow you to easily keep the trays level. Determining how close to ground level you want to install trays. Analyzing all openings and determining a starting point that will minimize course adjustments. Finding a point that allows for easy chalk line markings. MARKING THE LOCATION OF THE FIRST STEEL HOLDING TRAY Once you have determined a starting point, you need to take measurements to assure that the trays are installed level and that trays will align at each corner. The easiest way to determine that the trays are installed level is to measure the distance from your starting point up to the building s soffit. Repeat this process with each framed opening until all have been measured. Trays that intersect at all corners must align or the thin brick corner units will not fit properly. MARKING VERTICAL COURSING LINES Thin Brick steel holding trays are 3.20 in height and 5 trays will course every 16 when installed snugly against each other. This is the ideal condition to maintain the optimum joint size and spacing. There will be times when you will spread the trays out slightly in order to adjust coursing to meet certain conditions, such as to meet the top of windows and doors with a full tile to avoid cuts and increase speed of installation.. The trays should never be separated more than 1/8 apart from their fully seated (snuggly fit together) normal installed condition. 3.20 3.20 16 3.20 3.20 3.20 FINDING AND MARKING WALL STUDS Prior to installing trays, it is helpful to locate and mark the location of wall studs. Marking the stud locations will speed up installation and prevent fasteners from being incorrectly installed in the exterior sheathing. 5

1. INTRODUCTION FAÇADES BRICK TRAY SIZES Brick trays are available in 12 foot lengths. When installing trays along a wall section that is longer than 12 feet, it is important to stagger the tray joints and maintain a minimum 16 offset in joint placement between adjacent trays (see Figure 1.1). Use the appropriate fastener and install a fastener at every KarrierRail along the length of each tray. Fig. 1.1 Continuous KarrierRail 16 Joints are located between KarrierRail Minimum one KarrierRail offset or 16 IMPORTANT NOTE It is important to check the entire length of every tray to be sure the trays are positioned correctly. If they are not positioned correctly, you may have to remove trays, which can cause hidden damage to the building. TRAY PLACEMENT IMPORTANT NOTE Joints between tray ends must always occur between two studs. Never attempt to join two tray ends at the same stud. Always maintain 1/8 gap between tray ends. 1/8 1/8 6

2. INSTALLATION AT BASE AND CORNER INSTALLING THE FIRST TRAY Align your first tray at the proper starting place. Using a screw gun, insert a fastener through the steel holding tray and into the closest stud. Tighten the screw until the screw head is flush with the tray surface. Before inserting another screw, check the alignment of the tray and make sure that it is aligned with the chalk line. Insert another screw through the steel holding tray and into the closest stud at the opposite end of the tray from the starting point. Check the alignment of the tray and finish inserting screws into every stud along the length of the tray. COMPLETING TRAY INSTALLATION AND JOINT STAGGERING You may install additional trays either moving up or down the wall depending on your starting point. The designed tray spacing is 3.2 which requires the flanges to be firmly seated and the backs of the trays touching each other. However, when you need to spread the trays slightly to meet certain conditions, the trays must never be spaced at more than 1/8 apart per course from their fully seated normal install condition. Make certain that every tray flange is firmly seated into the next tray. Use chalk lines and check for level as you install additional trays. Make certain that trays will meet precisely at all corners with the trays on the adjacent wall or corner tile will not work. STARTING WITH A THIN BRICK CORNER It is recommended to begin brick installation in the two steel holding trays immediately below the lowest window opening. If you are starting on a wall that requires corner units, begin the brick installation by inserting a corner brick (using the long end) at one end of the wall. Move to the other end of the wall and insert another corner. Begin filling the first tray completely with thin bricks, allowing 3/8-1/2 vertical head joints between all bricks, whichever works best for windows, doors and wall length. PROPER INSTALLATION OF THIN BRICK Each thin brick contains grooves on each long edg pered. Always install thin bricks with the tapered edge down. Insert a brick into the tray until the top groove fits into the top tray edge. Using a white rubber mallet, tap the bottom of the brick in an upward motion until the tray bottom edge snaps into the brick s bottom groove. TIP When installing trays, use the minimum amount of fasteners needed to hold the tray in place until all rails in that section have been placed. This will make adjusting the tray easier if necessary. 7

2. INSTALLATION AT BASE AND CORNER BRICK TRAY INSTALLATION You may install additional brick support trays, either moving up or down the wall depending on your starting point. The design tray spacing is 3.2 which requires the flanges to be firmly seated and the backs of the trays touching each other. However, when you need to spread the trays slightly to meet certain conditions, the trays must never be spaced more than 1/8 as shown in figure 2.1. NOTE When adjusting coursing by separating trays, 1/8 or less per course is recommended. 3/16 or more separation per course is not recommended. Use chalk lines and check for level as you install additional trays. Make certain that trays will meet precisely at all corners. Fig. 2.1 1/8 maximum seperation 8

Base at Overhang Continuous KarrierRail (KarrierRail available in 1 3 faces) BENCHMARK thin brick Mortar joint Brick support tray BENCHMARK thin brick (bottom course transition option shown) Base flashing Expansion fastener as required Set KarrierRail in butyl sealant at fastener locations Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Fastener to concrete (not by Kingspan) Continuous butyl sealant Base angle with min. 3 vertical leg for panel attachment set in sealant (not by Kingspan) Outside Corner Hat channel set in butyl sealant at fastener locations 1/4 14 low profile fastener with 11/8 bonded washer Pop rivet Inside corner trim Outside corner trim Continuous butyl sealant F.I.P. insulation as required (not by Kingspan) 3/4 phil pan head BENCHMARK thin brick Pop rivet Brick support tray Hat channel set in butyl sealant at fastener locations Mortar joint Horizontal support (not by Kingspan) 9

2. INSTALLATION AT SILL 10

Framed Opening Sill Exposed sealant (not by Kingspan) Door / window frame (not by Kingspan) Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Miter cut joints where required Top leg of brick tray Sill trim BENCHMARK thin brick sill 1/4 14 through fastener Mortar joint BENCHMARK thin brick Brick support tray Sealant Expansion fastener as required Continuous KarrierRail (KarrierRail available in 1 3 faces) WINDOW SILL TREATMENT Using a BENCHMARK Thin Brick Sill is an easy and attractive method of installing BENCHMARK Thin Brick below windows. First, cut a piece of thin brick steel tray the same length as the width of the J-channel below the window or the bottom of the window frame (if J-channel was not used). Second, snap two Tru-Brix S6 sills into each end of the cut tray. Third, place the tray and sills directly below the bottom of the window frame. Slide the tray up until the top of each S6 sill is snug against the J-channel. If not using J-Channel, trim the top flange of the tray so the tray sits snugly against the bottom of the window frame or sill trim as shown above. Using your screw gun, apply fasteners until the tray is securely fastened. If J-channel was not used, apply a bead of highquality exterior sealant in the gap between the sill and the window frame. Next you must lay out the sills to determine if it is necessary to trim the sill bricks. Each sill measures 7 5/8 in length. After adding 3/8 for the mortar joint, an installed sill will measure 8. Re-measure the length of the tray you installed below the window. Divide this measurement by 8 to determine the quantity of sills required. It is important to trim the sills so that they are equal in length. NOTE The top leg of the tray can be trimmed off to allow a closer fit of sill brick to trim. Finally, remove the two sills and install fasteners at each end of the tray. 11

2. INSTALLATION AT JAMB 12

Framed Opening Jamb Door / window frame (not by Kingspan) Framed opening (not by Kingspan) 1/4 14 through fastener Exposed sealant (not by Kingspan) Sealant Backer rod and sealant (not by Kingspan) Continuous butyl sealant 1/4 14 low profile fastener with 1 1 /8 bonded washer Hat channel set in butyl sealant at fastener locations Tray may or may not be necessary here, depending on measurement. If measurement is greater than 3 3 /4, a steel tray is recommended. For all measurement below 3 3 /4 no steel tray is necessary. 13

2. INSTALLATION AT HEAD 14

Framed Opening Head Continuous KarrierRail (KarrierRail available in 1 3 faces) BENCHMARK thin brick Mortar joint Brick support tray Expansion fastener as required Framed opening (not by Kingspan) Drip flashing Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Exposed sealant (not by Kingspan) Door / window frame (not by Kingspan) 15

3. MORTAR PRE-MORTARING CHECKLIST Inspect all wall areas for any defects prior to starting the grouting process. Remove and replace any off color or broken bricks before grouting. Read and follow instructions. Mortar is available in 50lb bags which will cover approximately 27 square feet for modular bricks and approximately 32 square feet when used in conjunction with modular oversized bricks. CAUTION Useful life of mixed mortar is only 30 to 40 minutes. If you cannot use the entire batch in the alloted time, mix half batches of mortar. MORTAR MIXING INSTRUCTIONS Pour 6 quarts of water into a 5 gallon bucket. Pour 3/4 of a 50 lb bag of mortar into the bucket with 6 quarts of water. Mix thoroughly. Add the remaining dry mortar from the 50 lb bag into the 5 gallon bucket. Mix again until the right consistency is reached. Do not add more water if seems too dry - keep mixing it will get wetter. If water absolutely needs to be added, do so in very small amounts at a time. Re-temper (re-mix) every 10-15 minutes or as necessary until mortar is used up. Be sure to only add a little bit of water when re-tempering. Work in a methodical fashion, 6-10 brick across at the bottom course and move up 1 course at time so when it s time to strike the mortar you begin at the same place you first put the mortar into the wall. Overfill the joint or there won t be enough mortar to strike. Don t strike too early or you will have a messy smeared wall. The mortar needs to setup to the point that it strikes well and the excess falls right off. CAUTION Be careful not to add too much water, which will make the mortar too thin. Soupy mortar may slump during application resulting in walls that will require cleaning after grouting. 16

PREPARING THE MORTAR POINTING GUN Once assembled, lightly spray WD40 or a similar lubricant into the gun s tube. Also lightly coat the rubber gasket attached to the gun s plunger. Using the scooper, fill the pointing gun cartridge completely with mortar. Begin filling the joints by starting with the vertical head joints. Work carefully to prevent excess mortar from dripping on the brick faces. After two rows of vertical head joints, begin filling the adjacent horizontal bed joints. CAUTION Make sure that all head joints are completely filled. If some joints are not completely filled, take mortar from a joint that has been overfilled. Simply scrape the excess off with the striking tool and apply the mortar to the joint that is underfilled. HINT If you spill mortar on to the faces of the bricks, wait until striking is completed before trying to remove the mortar droppings. If you immediately try to remove the droppings, the mortar will smear and cleaning may be required when finished grouting. 17

4. CONSTRUCTION DETAILS Stack Joint Expansion fastener as required Continuous KarrierRail (KarrierRail available in 1 3 faces) BENCHMARK thin brick Horizontal supports (not by Kingspan) Continuous butyl sealant with marriage bead to vertical panel joint Fastener as required (not by Kingspan) Mortar joint Brick support tray Parapet Parapet assembly Wrap membrane over brick (not by Kingspan) Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Parapet blocking (not by Kingspan) F.I.P. insulation as required (not by Kingspan) Fastener to parapet backer (not by Kingspan) Expansion fastener as required BENCHMARK thin brick Membrane roof and parapet backer (not by Kingspan) Brick support tray Mortar joint 18

Rake Refer to 900/1000 Series roof panel details for additional information Rake angle (not by Kingspan) F.I.P. insulation as required (not by Kingspan) Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Expansion fastener as required BENCHMARK thin brick Brick support tray Mortar joint Continuous KarrierRail (KarrierRail available in 1 3 faces) Low Eave Refer to 900/1000 Series roof panel details for additional information F.I.P. insulation as required (not by Kingspan) Brick support tray Expansion fastener as required Continuous butyl sealant both sides of trim with marriage bead to vertical panel joint Mortar joint BENCHMARK thin brick Eave strut (not by Kingspan) NOTE Rake should fasten through the mortar joint. Fastener holes should be pre-drilled. Do not fasten through the brick as bricks will crack. 19

4. CONSTRUCTION DETAILS Panel Termination Structural supports (not by Kingspan) Backer rod and sealant (not by Kingspan) 1/4 14 low profile fastener with 1 1 /8 bonded washer Continuous butyl sealant Hat channel set in butyl sealant at fastener locations BENCHMARK thin brick Brick support tray Cap trim Backer rod and sealant Inside Corner 3/4 phil pan head 1/4 14 low profile fastener with 1 1 /8 bonded washer Continuous butyl sealant Hat channel set in butyl sealant at fastener locations Inside corner trim F.I.P. insulation as required (not by Kingspan) Continuous butyl sealant 1/4 14 low profile fastener with 1 1 /8 bonded washer 3/4 phil pan head Pop rivet Mortar joint Outside corner trim Horizontal support (not by Kingspan) Brick support tray 20

Horizontal Expansion Joint Mortar joint BENCHMARK thin brick 2 1 /4 Vertical KarrierPanel Sealant on both sides Brick support tray with #8 x 3 /4 modified truss head #2 phillips drive self-drilling fasteners at each tray (24 O.C.) Girt (not by Kingspan) Continuous KarrierRail (KarrierRail available in 1 3 faces) Backer rod 3/4 horizontal expansion joint Sealant along horizontal expansion joint 3/4 Field cut KarrierRail Brick adhesive between brick tray and brick Flat trim 2 x #14 HH fasteners with bonded washers Vertical Expansion Joint #14 HH thru fastener with bonded washer at each steel support Vertical wall panel Steel Support (not by Kingspan) Sealant 16GA. hat-bar Brick support tray with #8 x 3 /4 modified truss head #2 phillips drive self-drilling fasteners at hat-bar Backer rod 3/4 Mortar joint BENCHMARK thin brick Flat trim 3/4 horizontal expansion joint Sealant along vertical expansion joint 21

5. MATERIALS TOOLS AND HARDWARE TOOLS AND SEALANTS Electric tin snips Metal cutting circular saw with fine tooth carbide blade Caulking gun Power drill / Screw gun Brick Guillotine (Chopper) Tape measure Chalk line Rubber mallet Pointing Gun Mortar paddle Grout bag Mortar scoop Mason s Soft Bristle Brush 22

NOTES 23

BENCHMARK Support BENCHMARK By Kingspan Columbus, OH, USA 1-888-332-5862 Modesto, CA, USA 1-800-377-5110 Caledon, ON, CA 1-866-442-3594 www.benchmarkbykingspan.us www.benchmarkbykingspan.ca Care has been taken to ensure that the contents of this publication are accurate, but Kingspan Limited and its subsidiary companies do not accept responsibility for errors or for information that is found to be misleading. Suggestions for, or description of, the end use or application of products or methods of working are for information only and Kingspan Limited and its subsidiaries accept no liability in respect thereof.